Att J-1 Pricing Worksheet.xlsx
XLSX spreadsheet 118 KB Posted
- Attached to
- J998 - USS SHIP ROH
- Solicitation number
- N6817125R0005
About this file
This document is a detailed Pricing Worksheet (Attachment J-1) for the USS MT WHITNEY (LCC 20) 2025 Regular Overhaul (ROH) contract. The comprehensive spreadsheet provides a line-item breakdown of numerous maintenance, inspection, and repair tasks across multiple categories including electrical systems, machinery, ventilation, fire protection, navigation equipment, and vessel infrastructure. The total estimated contract value is $1,678,500, with a base contract value of $1,600,000 and additional optional work items totaling $25,000 for military personnel hospitality.
The pricing worksheet contains over 100 specific work items (CLINs/ELINs) ranging from annual equipment services to comprehensive system inspections and replacements. Key work categories include deck preservation, machinery space turn-over, sea trials, fire protection system inspections, ventilation cleaning, electronic equipment servicing, and drydocking procedures. The document is structured to allow contractors to input their fully burdened labor rates, subcontractor costs, and material expenses for each line item, with the solicitation number N6817125R0005 issued by the Department of the Navy Naval Supply Systems Command for a ship regular overhaul service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6817125R0005_AMEND0001.pdf | ||
| Att J-7 VL CIVMARS Hospitality Checklist.docx | DOCX document | |
| Att J-4 MSC SHIP REPAIR FACILITY.pdf | ||
| Att J-3 GFM REPORT.xlsx | XLSX spreadsheet | |
| Att J-2 Work Item Specifications.pdf | ||
| N6817125R0005_RFP.pdf | ||
| Att J-5 _PP Information.docx | DOCX document | |
| Att J-6 PP Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-1 ROH Evaluated Price
| USS MT WHITNEY (LCC 20), 2025 ROH | |
| INSTRUCTIONS: |
Please Leave the Red Cells untouched.
Enter the price into the Green Cells. Make sure to review the other tabs.
Enter your fully burdened labor rate into the Cell J2 and authomatically it will be reported in the RED CELL unit price.
| If you are quoting subcontracting costs or "Other" Costs, imput values and further explanation under the "Subcontracting & Other Cost" or "Subcontracting Material" tab. The "Subcontracting Material" tab will automatically populate in the "Subcontracting & Other Cost" tab in column E | Enter in your Fully Burdened Labor Rate | ||||||||||
| It will autopopulate to the red cells Unit Price boxes: | $ - 0 | ||||||||||
| CLIN/ELIN | Description | Unit | Quantity | Unit Price | Extended | Subcontract | Material | Other Direct Costs | Extended Price | ||
| CLIN 0001 TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 53,500.00 | ||||||
| 1 | A001 | 0001 - INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | |||||||||
| 2 | A002 | 0002 - TECHNICAL AND MANUFACTURERS REPRESENTATIVES | |||||||||
| 3 | A003 | 0003 - APPROACH, BERTH, AND MOORING REQUIREMENTS | |||||||||
| 4 | A004 | 0004 - TESTING AND QUALITY ASSURANCE | |||||||||
| 5 | A005 | 0005 - ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | |||||||||
| 6 | A006 | 0006 - HEAVY WEATHER PLAN | |||||||||
| 7 | A007 | 0007 - COLD WEATHER PLAN | |||||||||
| 8 | A008 | 0010 - OVERHAUL MANAGEMENT TEAM (OMT) OFFICES | Day | 126 | $ - 0 | $ - 0 | $ - 0 | ||||
| 9 | A009 | 0011 - FURNISH GENERAL SERVICES (T-LCC CLASS) | TOTAL FROM TAB WI 0011 | $ - 0 | $ - 0 | ||||||
| 10 | A010 | 0012 - TELEPHONE SERVICES | TOTAL FROM TAB WI 0012 | $ - 0 | $ - 0 | ||||||
| 11 | A011 | 0013 - PROJECT PLANNING AND PRODUCTION STATUS MONITORING | Day | 120 | $ - 0 | $ - 0 | $ - 0 | ||||
| 12 | A012 | 0014 - WEIGHT AND MOMENT REPORT | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 13 | A013 | 0015 - INTEGRATED LOGISTICS SUPPORT (ILS) | TOTAL FROM TAB WI 0015 | $ - 0 | $ - 0 | ||||||
| 14 | A014 | 0016 - FIRE PROTECTION AND SHIPS SAFETY PROGRAM REV SEP17 | Day | 120 | $ - 0 | $ - 0 | $ - 0 | ||||
| A015 | 0017 - HANDLING SHIPS STORES | Day | 120 | $ - 0 | $ - 0 | $ - 0 | |||||
| 15 | A016 | 0018 - DELIVERY AND REDELIVERY | Lot | 2 | $ - 0 | $ - 0 | $ - 0 | ||||
| 16 | A017 | 0019 - SHIPBOARD ACCESS AND SECURITY | Day | 120 | $ - 0 | $ - 0 | $ - 0 | ||||
| 17 | A018 | 0020 - GAS FREE CERTIFICATES | Day | 120 | $ - 0 | $ - 0 | $ - 0 | ||||
| 18 | A019 | 0021 - CLEAN AND GAS-FREE TANKS VOIDS AND COFFERDAMS | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 19 | A020 | 0022 - MACHINERY SPACE TURN-OVER, DOCK TRIALS,AND SEA TRIALS | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 20 | A021 | 0023 - HAZARDOUS WASTE DISPOSAL REV MAY16 | TOTAL FROM TAB WI 0023: | $ 50,000.00 | |||||||
| 21 | A022 | 0040 - FORCE PROTECTION OCONUS (BRAVO) | Day | 120 | $ - 0 | $ - 0 | $ - 0 | ||||
| 22 | A023 | 0101 - TALT 18-013 LIFE RAFT DEBARKATION PLATFORM INSTALLATION | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 23 | A024 | 0102 - SAFE REMOVALS | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 24 | A025 | 0104 - SPONSON DECK PRESERVATION (LLR CA) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 25 | A026 | 0105 - AFT VOID 4-147-0 PRESERVATION (LLR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 29 | A027 | 0110 - MAIN DECK PRESERVATION(LLA CA) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 32 | A028 | 0113 - STEAM SAFETY EXHAUST REPAIRS (CA24-139 & 154) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| A029 | 0116 - FLAM LIQ SR 6-12-0-K & 7-12-0-K DECK PRESERVATION (CA24-118,170)) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A030 | 0117 - DECK PRESERVATION 6-30-0-E & 7-38-1-E(CA24-119,120) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A031 | 0118 - AC MACHINERY ROOM 7-40-0-A DECK PRESERVATION (CA24-123) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A032 | 0119 - SD STORE ROOM 6-40-0-A DECK PRESERVATION (CA24-171) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A033 | 0120 - PASSAGEWAY 6-60-1-T DECK PRESERVATION (CA24-174) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A034 | 0121 - AC MACHINERY ROOM 7-64-2-E DECK PRESERVATION(CA24-128) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A035 | 0122 - PASSAGEWAY 7-58-0-E DECK PRESERVATION (CA24-127) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A036 | 0123 - FANROOM 6-68-0-Q DECK PRESERVATION (CA24-169) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A037 | 0124 - SODA STOREROOM 7-68-1-L DECK PRESERVATION (CA24-130) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A038 | 0125 - AC&R STOREROOM 6-118-1-Q DECK PRESERVATION(CA24-175) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A039 | 0128 - 7-64-0-Q DECK PRESERVATION (CA 24-129) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A040 | 0129 - FLUSH WATERTIGHT HATCH REPAIRS (LLR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A041 | 0130 - AFT TROOP ACOM LADDER STATION REPAIR (CA24-017, 025, 146)) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A042 | 0131 - FWD TROOP ACOM LADDER STATION REPAIR (CA24-017, 025, 146) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A043 | 0132 - FAN ROOM 2-19-0-Q REPAIRS (CA 24-059) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A044 | 0133 - FAN ROOM 6-109-2-Q DECK PRESERVATION (CA 24-177) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A045 | 0134 - 01 LVL & MN DK CONNEX BOXES REPLACE (CA24-054, 055, 056, 116) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A046 | 0135 - 01 LEVEL WEATHER DECK PRESERVATION (CA 24-054,055,056,116) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A047 | 0136 - SHAFT ALLEY PRESERVATION | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A048 | 0137 - CONREP Padeye Pull Test (VR23-0045) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A049 | 0138 - CARGO DECK TIE DOWNS REPLACEMENT | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A050 | 0151 - ULTRASONIC HULL THICKNESS GAUGING (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A051 | 0153 - ABS INTERMEDIATE SURVEY - TANK INSPECTION (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A052 | 0155 - Tank Vent Inspection | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A053 | 0186 - CABLE PENETRATION INSPECTION (1 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A054 | 0197 - Handrail Renewal | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 34 | A055 | 0199 - Misc Steel Renewals | TOTAL FROM TAB WI 0199: | $ - 0 | $ - 0 | ||||||
| 36 | A056 | 0201 - TALT 18-014 MAIN LUBE OIL PRIMING LINE INSTALLATION | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| A057 | 0202 - HP-LP AND RED GEAR ALIGNMENT CHECK | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A058 | 0203 - TALT 18-020 AUXILIARY EXHAUST STEAM RELIEF VALVE | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A059 | 0204 - BOILER SUPERHEATER TUBE REPLACEMENT | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A060 | 0205 - Boiler Mounts (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A061 | 0206 - VR 22-022 MRG LO PUMP 1 STEAM PIPE REMOVAL | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A062 | 0207 - BOILER SAFETY SHUT DOWN DEVICE REPLACE(VR 21-138, 21-139) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A063 | 0251 - WOODWARD GOVERNORS (20K HRS) (SCSI) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A064 | 0252 - REDUCTION GEAR INSPECTION (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A065 | 0254 - THRUST AND LINESHAFT BEARING INSPECTION (5 YR) (SCSI) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A066 | 0280 - OUTBOARD BEARING INSPECTIONS (1 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A067 | 0281 - BOILER INSPECTION AND HYDRO (2.5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A068 | 0282 - BOILER MOUNTS - OPEN, INSPECT AND TEST (2.5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A069 | 0283 - BOILER SAFETY VALVES - OPEN, INSPECT AND TEST (2.5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A070 | 0303 - VR 22-018 WASTE OIL TANK TLI CALIBRATION | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A071 | 0351 - SWITCHBOARD CLEANING (2.5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A072 | 0352 - LOAD CENTER CLEANING (2.5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A073 | 0353 - THERMOGRAPHIC SURVEY (1 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A074 | 0354 - GENERATOR INSPECTION (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 37 | A075 | 0381 - CIRCUT BREAKER INSPECTION AND SERVICING (10 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 39 | A076 | 0382 - BATTERY REPLACEMENT (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 40 | A077 | 0383 - ASSURED POWER UPS SERVICING (1 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 42 | A078 | 0451 - ANNUAL RADAR SERVICE | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 43 | A079 | 0452 - ANNUAL ECDIS SERVICE (SCSI) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 44 | A080 | 0453 - GYRO SYSTEM SERVICE (2.5YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 45 | A081 | 0455 - ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| A082 | 0458 - ANTENNA MAINTENANCE (2.5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 46 | A083 | 0459 - ECHO SOUNDER SERVICE (2.5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 47 | A084 | 0460 - ANNUAL INSPECTION OF MANUALLY OPERATED ALARMS | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 48 | A085 | 0492 - CALIBRATE ELECTRONIC TEST EQUIPMENT (GPETE) (1 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 49 | A086 | 0493 - VESSEL CONTROL SYSTEM ANNUAL SERVICE | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 50 | A087 | 0501 - VR 24-024 DECK AIR COMPRESSOR REPLACEMENT | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 51 | A088 | 0502 - TALT 21-023 NO. 2 AC SW COOLING PUMP | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 52 | A089 | 0503 - VR 24-005 OILY WASTE TANK GENRAL TANK INSP AND SOUNDING TUBE REPAIR | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 53 | A090 | 0504 - VR 23-023&073 CHT PIPING REPLACEMENTS | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 54 | A091 | 0505 - TALT 21-022 NO. 6 AC SW COOLING PUMP | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 55 | A092 | 0506 - TALT 17-010 ESLP SSTG SEA CHEST | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 56 | A093 | 0507 - TALT 21-007 AC CHILL WATER PUMP AND MOTOR REPLACEMENT | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 57 | A094 | 0508 - TALT 21-005 AC CHILLWATER EXPANSION TANK VENT ADDITION | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 58 | A095 | 0509 - TALT 17-011 AC MACHINERY ROOMS 1, 2, & 3 PURGE PUMP MODS | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 59 | A096 | 0510 - TALT 19-023 LPAC UNIT REPLACEMENTS | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 60 | A097 | 0511 - TALT 17-008 BROMINATOR REPLACEMENT | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 62 | A098 | 0515 - Fire Main Piping Repairs | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 63 | A099 | 0550 - CARGO ELEVATOR AND DUMBWAITER SERVICE (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 64 | A100 | 0554 - INSPECT, TEST AND CERTIFY MACHINERY SPACE CRANES AND HOISTS (1 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 65 | A101 | 0561C - GAUGE CALIBRATION (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 66 | A102 | 0562 - SCBA ANNUAL INSPECTION (SCOTT) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 67 | A103 | 0563B - SCBA COMPRESSOR AND FILLING STATION INSPECTION AND MAINTENANCE (2 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 68 | A104 | 0565A - FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 69 | A105 | 0567C - FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (5 YR) (SCSI) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 70 | A106 | 0568B - WATER MIST-SPRAY-SPRINKLER INSPECTION AND TEST (5 YR) (SCSI) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| A107 | 0569 - FIRE AND SMOKE DETECTION AND ALARM SYSTEM (1 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A108 | 0570 - PORTABLE FIRE EXTINGUISHER SERVICE (1 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A109 | 0571 - FIRE AND SMOKE DAMPER SERVICE (1 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A110 | 0572 - DEEP FAT FRYER AND RANGE HOOD FIRE EXTINGUISHING SYSTEM (1 YR)(SCSI) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 71 | A111 | 0573 - FIRE HOSES (1 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 72 | A112 | 0574 - FIRE DOORS AND SHUTTERS (1 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 73 | A113 | 0582 - STEERING SYSTEM SERVICE (5 YR)(SCSI) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 74 | A114 | 0586 - SSTG TURBINE SERVICING (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 75 | A115 | 0598 - OVERHAUL MAIN ENGINE LUBE OIL PURIFIER (VRR 21-045) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 76 | A116 | 0599 - Misc Piping Renewal | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 78 | A117 | 0601 - VR 24-020 CEILING TILE RENEWALS | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| A118 | 0604 - VR 19-069 & 70 DECK HEAD REFURBISHMENT | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A119 | 0606 - CARPET RENEWAL | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A120 | 0653 - ANNUAL RESCUE BOAT AND DAVIT INSPECTION | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A121 | 0655 - IMMERSION SUIT SERVICE (3 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A122 | 0657 - ACCOMODATION LADDER INSPECTION (1 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 79 | A123 | 0659 - PILOT BOARDING EQPT AND EMBARKATION LADDERS (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 80 | A124 | 0662 - DEEP FAT FRYER INSPECTION (1 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 81 | A125 | 0668 - INSPECT, TEST AND CERTIFY MATERIAL HANDLING EQUIPMENT - FORKLIFTS (1YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 82 | A126 | 0683 - USN LIFERAFT AND CRADLE INSPECTION AND PRESERVATION (4YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 83 | A127 | 0688 - RESCUE BOAT ENGINE AND DRIVE SERVICING (2.5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| 84 | A128 | 0697 - PORTABLE DAVIT SERVICING AND CERTIFICATION (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| A129 | 0701 - LMMT (tech refresh) | TOTAL FROM TAB 700 SERIES | $ 500.00 | ||||||||
| A130 | 0702 - SLQ-32 INSTALLATION | TOTAL FROM TAB 700 SERIES | $ 1,000.00 | ||||||||
| A131 | 0703 - Ready Service Locker Repair | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A132 | 0704 - WI 704 TMPC Installation (tech refresh) | TOTAL FROM TAB 700 SERIES | $ - 0 | $ - 0 | $ 2,000.00 | ||||||
| A133 | 0801 - Ventilation Survey (VR23-033) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A134 | 0802 - VR 21-094 MAIN SPACE EXHAUST FAN VENTILATION | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A135 | 0851 - GALLEY VENTILATION SYSTEM AND GAYLORD HOOD CLEANING (2.5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A136 | 0852 - LAUNDRY VENT CLEANING (2.5) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A137 | 0853 - ACCOMODATION VENT CLEANING SYSTEM (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 93 | A138 | 0901 - DRYDOCKING AND UNDOCKING THE VESSEL (2.5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| A139 | 0953 - ANCHOR CHAINS AND LOCKERS (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A140 | 0954 - Rudder and Stern Frame Examination (2.5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A141 | 0956 - Overhauling Sea Valves | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A142 | 0957 - PROPELLER CLEAN AND POLISH - ON DOCK (2.5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A143 | 0960 - UNDERWATER HULL CLEANING AND PAINTING - SPOT BLAST (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A144 | 0961 - FREEBOARD PRESERVATION (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A145 | 0962 - CATHODIC PROTECTION (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A146 | 0966 - SHAFT ALIGNMENT AND BEARING REACTION CHECKS (2.5 YR) (SCSI) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A147 | 0986 - STERN TUBE SEAL MINOR OVERHAUL (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| A148 | 0988 - HUCK BOLT INSPECTION (5 YR) | Hour | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
CLIN 0002 OPTION $ - 0
0002 0951 - DRYDOCKING AND UNDOCKING THE VESSEL (2.5 YR) (CAT B) Up 30 days Day 30 $ - 0 $ - 0 $ - 0
CLIN 0003 OPTION $ - 0
0003 0030 - CONTINUATION OF SERVICES TOTAL FROM TAB WI 0030 $ - 0
| CLIN 0004 TOTAL ADDITIONAL GOVERNMENT REQUIREMENT | $ 1,600,000.00 | ||
| AGR LABOR COST | Hours | AGR Rate | TOTAL |
| To be calculated on an estimate of 20,000 hours. | 20,000 | $ - 0 | $ - 0 |
| Estimated Value | Percentage: | ||
| Subcontractor/Material Burden percentage -To be calculated on an estimate of $1,600,000 combined | $1,600,000 | 0% | $ 1,600,000.00 |
| CLIN 0005 Category B - Optional Work Items which may or may not be invoked during POP | $ 25,000.00 | ||
| 0005 | MILPERS Hospitality | TOTAL FROM TAB 0005 MILPERS | $ 25,000.00 |
| CLIN 0006 Category B - Optional Work Items which may or may not be invoked during POP | $ - 0 | ||
| 0006 | CIVMAR Hospitality | TOTAL FROM TAB 0006 CIVMARS | $ - 0 |
CLIN TOTALS $ 1,678,500.00
Price Analysis Toolkit.xlsx
WI 0011 GEN SERVICES_
| J-1: WORK ITEM 0011 GENERAL SERVICES | ||||
| A. Unit Price based on Estimate Quantity | Qty | Unit | Unit Price | Total |
| Shore Power | 2,400,000 | KwH | $ - 0 | $ - 0 |
| Potable Water | 900,000 | Gallons | $ - 0 | $ - 0 |
| De-ionized Water | 80,000 | Gallons | $ - 0 | $ - 0 |
| Sewage Disposal | 7,200,000 | Gallons | $ - 0 | $ - 0 |
| Bilge Water Removal | 375,000 | Gallons | $ - 0 | $ - 0 |
| Crane, Forklift and Transportation Services | 750 | Lifts | $ - 0 | $ - 0 |
| Total | $ - 0 |
| B. One Daily price inclusive of the following services listed below: | 120 | Day | $ - 0 | $ - 0 |
| Temporary Space Cooling | ||||
| Debris and Garbage Removal | ||||
| Toilet and Sanitary Facilities | ||||
| MPDE & SSDG Engine Coverings | ||||
| Heat Exchanger Salt Water Cooling | ||||
| Compressed Air | ||||
| Temporary Lighting and Ventilation | ||||
| Heat Lamps | ||||
| Interior Bulkhead and Deck Protection | ||||
| Oil Containment Boom | ||||
| Gangways | ||||
| Helicopter Deck Protection | ||||
| Compartment Access and Security | ||||
| Cold Weather Protection | ||||
| External Vessel Contamination Protection | ||||
| Boilers Hot Air Lay Up: | ||||
| Care of the Ship |
C. Final Vessel Cleaning 1 Lot $ - 0 $ - 0
Total Price for WI 0011 $ - 0
INSTRUCTIONS:
Please Leave the Red Cells untouched.
Enter the price into the Green Cells. Make sure to review the other tabs.
Enter your fully burdened labor rate into the Cell J2 and authomatically it will be reported in the RED CELL unit price.
If you are quoting subcontracting costs or "Other" Costs, imput values and further explanation under the "Subcontracting & Other Cost" or "Subcontracting Material" tab. The "Subcontracting Material" tab will automatically populate in the "Subcontracting & Other Cost" tab in column E
WI 0012 IT SERVICES_
| J-1: WORK ITEM 0012 INFORMATION TECHNOLOGY SERVICES | ||||
| Description | Unit | Qty | Unit Price | Extended Price |
| Internet | Days | 126 | $ - 0 | |
| Computer Work Stations (10 Each) | Days | 126 | $ - 0 | |
| N.2 Telephone services inclusive of a monthly contract for unlimited local/Europe calls. Phones must have the capability to make international calls to United States capability. Price per day per telephone | Days | 126 | $ - 0 | |
| Long Distance Calls (Not to Exceed amount) made using only the 2 telephones authorized. | NTE* | 1 | $ - 0 | |
| Total Price for WI 0012 | $ - 0 |
INSTRUCTIONS:
Please Leave the Red Cells untouched.
Enter the price into the Green Cells. Make sure to review the other tabs.
Enter your fully burdened labor rate into the Cell J2 and authomatically it will be reported in the RED CELL unit price.
If you are quoting subcontracting costs or "Other" Costs, imput values and further explanation under the "Subcontracting & Other Cost" or "Subcontracting Material" tab. The "Subcontracting Material" tab will automatically populate in the "Subcontracting & Other Cost" tab in column E
WI 0015 INT LOGISTICS_
| J-1: WORK ITEM 0015 INTEGRATED LOGISTICS, LOGISTICS COORDINATOR, AND GFM SUPPORT | ||||
| Description | Unit | QTY | Unit Price | Total Price |
| A. Logistics Support Requirement and drawings (para 7.1 and 7.2) | Lot | 1 | $ - 0 | |
| B. Contractor's support for receiving, storing, handling and reporting GFM. Unit price must include all contractor's costs and any fees, customs, tariff, light dues and transportation which are not covered under any other Work Item. | ||||
| Parcels up to 10 kg, | Each | 65 | $ - 0 | |
| Parcels 10 - 100 kg | Each | 20 | $ - 0 | |
| Parcels 101 - 350 kg, | Each | 50 | $ - 0 | |
| Parcels 351 - 500 kg | Each | 50 | $ - 0 | |
| Parcels 501 -1000 kg | Each | 50 | $ - 0 | |
| Parcels over 1000 kg | Each | 10 | $ - 0 | |
| Total Price for WI 0015 | $ - 0 | |||
| INSTRUCTIONS: |
Please Leave the Red Cells untouched.
Enter the price into the Green Cells. Make sure to review the other tabs.
Enter your fully burdened labor rate into the Cell J2 and authomatically it will be reported in the RED CELL unit price.
If you are quoting subcontracting costs or "Other" Costs, imput values and further explanation under the "Subcontracting & Other Cost" or "Subcontracting Material" tab. The "Subcontracting Material" tab will automatically populate in the "Subcontracting & Other Cost" tab in column E
WI 0023 HAZ WASTE_
| J-1: WORK ITEM 0023 HAZARDOUS WASTE DISPOSAL | |||
| Description | Unit | Unit Price | Total |
| Estimated cost of the hazardous waste disposal (NOT TO EXCEED) | 1 | $ 50,000.00 | |
| Description | Unit | Percentage Proposed | Total |
| Percent fee | 1 | $ - 0 | |
| Total Price for WI 0023 | $ 50,000.00 | ||
| INSTRUCTIONS: |
Please Leave the Red Cells untouched.
Enter the price into the Green Cells. Make sure to review the other tabs.
Enter your fully burdened labor rate into the Cell J2 and authomatically it will be reported in the RED CELL unit price.
If you are quoting subcontracting costs or "Other" Costs, imput values and further explanation under the "Subcontracting & Other Cost" or "Subcontracting Material" tab. The "Subcontracting Material" tab will automatically populate in the "Subcontracting & Other Cost" tab in column E
WI 0030 CONT OF SVCS_
| J-1: WORK ITEM 0030 CONTINUATION OF SERVICES | ||||
| Description | Qty | Unit | Unit Price | Extended Price |
| 010 - OVERHAUL MANAGEMENT TEAM (OMT) OFFICES | 15 | DAY | $ - 0 | |
| 011 A. Unit Price based on Estimated Quantity (AVERAGE) | ||||
| Shore Power | 290,759 | KwH | $ - 0 | |
| Potable Water | 112,500 | Gallons | $ - 0 | |
| Distilled Water | 5,000 | Gallons | $ - 0 | |
| Sewage and Grey Water Disposal | 900,000 | Gallons | $ - 0 | |
| Bilge Water Removal | 46,875 | Gallons | $ - 0 | |
| Crane, Forklift and Transportation Services | 94 | Lifts | $ - 0 | |
| 011 B. DAILY PRICE INCLUSIVE OF LIST OF SERVICES | 15 | DAY | $ - 0 | |
| 012 - IT SERVICES | 15 | DAY | $ - 0 | |
| 013 - PROJECT PLANNING AND PRODUCTION STATUS MONITORING | 15 | DAY | $ - 0 | |
| 016 - FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | 15 | DAY | $ - 0 | |
| 019 - SHIPBOARD ACCESS AND SECURITY | 15 | DAY | $ - 0 | |
| 020 - GAS FREE CERTIFICATES | 15 | DAY | $ - 0 | |
| 040 - FORCE PROTECTION CONDITION BRAVO (OCONUS) | 15 | DAY | $ - 0 | |
| Total Price for WI 0030 | 5 | $ - 0 | ||
| INSTRUCTIONS: |
Please Leave the Red Cells untouched.
Enter the price into the Green Cells. Make sure to review the other tabs.
Enter your fully burdened labor rate into the Cell J2 and authomatically it will be reported in the RED CELL unit price.
If you are quoting subcontracting costs or "Other" Costs, imput values and further explanation under the "Subcontracting & Other Cost" or "Subcontracting Material" tab. The "Subcontracting Material" tab will automatically populate in the "Subcontracting & Other Cost" tab in column E
WI 0199 MISC STEEL RENEWAL
| J-1: WORK ITEM 0199 MISC STEEL REWEWALS | ||||
| Description | Unit | QTY | Unit Price | Total Price |
| 7.2.3.1 Miscellaneous plate, bulkheads and decks | lbs | 1000 | $ - 0 | |
| 7.2.3.2 Shell or Rudder Plating | lbs | 1000 | $ - 0 | |
| 7.2.3.3 Shell or Plating Shapped | lbs | 1000 | $ - 0 | |
| 7.2.3.4 Tank Bulkheads | lbs | 500 | $ - 0 | |
| 7.2.3.5 Tank Internals | lbs. | 500 | $ - 0 | |
| 7.2.3.6 Shell Plate Framing | lbs | 800 | $ - 0 | |
| 7.2.3.7 Tank Top in Machinery Spaces | lbs | 800 | $ - 0 | |
| 7.2.3.8 Machinery Foundation in Engine Room | lbs | 500 | $ - 0 | |
| 7.2.3.9 Floor and Intercostals in DoubleBottom Tank | lbs | 500 | $ - 0 | |
| 7.2.3.10 Double Bottom Stiffeners and Bulkheads | lbs | 500 | $ - 0 | |
| 7.2.3.11 Machinery Foundations on Deck | lbs | 600 | $ - 0 | |
| Total Price for WI 0199 | $ - 0 | |||
| INSTRUCTIONS: |
Please Leave the Red Cells untouched.
Enter the price into the Green Cells. Make sure to review the other tabs.
Enter your fully burdened labor rate into the Cell J2 and authomatically it will be reported in the RED CELL unit price.
If you are quoting subcontracting costs or "Other" Costs, imput values and further explanation under the "Subcontracting & Other Cost" or "Subcontracting Material" tab. The "Subcontracting Material" tab will automatically populate in the "Subcontracting & Other Cost" tab in column E
700 series
| WI 701 LMMT (tech refresh) | |||
| DESCRIPTION | HRS | Unit Price | Total Price |
| 7.1.F RIGGING | 100 | $ - 0 | $ - 0 |
| 7.2.A WELDING | 120 | $ - 0 | $ - 0 |
| 7.2.B FIRE WATCH | 80 | $ - 0 | $ - 0 |
| 7.2.E LAGGING | 40 | $ - 0 | $ - 0 |
| MATERIALS (CONSUMABLES) | $ 500.00 | ||
| OTHER COSTS | $ - 0 | ||
| TOTAL WI 701 | $ 500.00 |
| WI 702 SLQ-32 INSTALLATION | |||
| DESCRIPTION | HRS | Unit Price | Total Price |
| 7.2.2 WELDING | 100 | $ - 0 | $ - 0 |
| 7.2.3 FIRE WATCH | 200 | $ - 0 | $ - 0 |
| MATERIALS (CONSUMABLES) | $ 1,000.00 | ||
| OTHER COSTS | |||
| TOTAL WI 702 | $ 1,000.00 |
| WI 704 TPMC Installation (tech refresh) | |||
| DESCRIPTION | HRS | Unit Price | Total Price |
| 7.1.1 RIGGING | 32 | $ - 0 | $ - 0 |
| MATERIALS (CONSUMABLES) | $ 2,000.00 | ||
| OTHER COSTS | |||
| TOTAL WI 704 | $ 2,000.00 |
| Note* Material (Consumables) |
| If more material is required, contractor shall provide proof to the port engineer that the established amount in the WI has been fully expended. |
INSTRUCTIONS:
Please Leave the Red Cells untouched.
Enter the price into the Green Cells. Make sure to review the other tabs.
Enter your fully burdened labor rate into the Cell J2 and authomatically it will be reported in the RED CELL unit price.
If you are quoting subcontracting costs or "Other" Costs, imput values and further explanation under the "Subcontracting & Other Cost" or "Subcontracting Material" tab. The "Subcontracting Material" tab will automatically populate in the "Subcontracting & Other Cost" tab in column E
0005 MILPERs
| MISSION CONTROL CENTER/HOSPITALITY FOR MILPERS | |||||
| CLIN 0003 | DESCRIPTION | UNIT | QTY | UNIT PRICE | TOTAL PRICE |
| A | Berthing Barge/Vessel/Floating Accommodation | ||||
| All inclusive price per day | DAY | 120 | $ - 0 | ||
| Below utilities shall not be included in the price. They are included in the WI 011 | |||||
| Shore Power | |||||
| Potable Water | |||||
| Distilled Water | |||||
| Sewage and Gray Water Disposal | |||||
| Bilge Water Removal | |||||
| Crane and Forklift Services | |||||
| B | Mission Control Center | ||||
| Daily Price all inclusive | DAY | 120 | $ - 0 | ||
| The daily price shall include the following estimated consumables. | |||||
| □ 15,000ft of CAT5 Cable | |||||
| □ 500 CAT5 Male crimp type connectors | |||||
| □ 10,000 Black Zip Ties (10 in long) | |||||
| □ Toner and Ink to support 10,000 Printed Pages | |||||
| □ 10,000 Sheets of Paper | |||||
| C | Internet and Telephone Usage | ||||
| This CLIN is NTE amount of $25,000 | $ 25,000.00 | ||||
| D | Technical Support for installed Internet and Telephonic services | ||||
| Daily price all inclusive | DAY | 120 | $ - 0 | ||
| E | Food Services for MILPERs | ||||
| Food Service (3 meals a day) for 170 persons for the 120 day POP. The unit price should be for one meal. | EACH | 61,200 | $ - 0 | ||
| TOTAL WI 0003 Military Personal (MILPER) Hospitality and Mission Control | $ 25,000.00 | ||||
| INSTRUCTIONS: |
Please Leave the Red Cells untouched.
Enter the price into the Green Cells. Make sure to review the other tabs.
Enter your fully burdened labor rate into the Cell J2 and authomatically it will be reported in the RED CELL unit price.
If you are quoting subcontracting costs or "Other" Costs, imput values and further explanation under the "Subcontracting & Other Cost" or "Subcontracting Material" tab. The "Subcontracting Material" tab will automatically populate in the "Subcontracting & Other Cost" tab in column E
0006 CIVMARs
| CIVMARs Hospitality | |||||
| CLIN 0004 | DESCRIPTION | UNIT | QTY | UNIT PRICE | TOTAL PRICE |
| SIXTY (60) rooms from 16 October 2025 – 11 February 2026, with check out 12 February 2025 (119 nights) | room/night | 7,140 | $ - 0 | ||
| SIX (6) rooms from 16 October 2025 – 20 October 2025, with check out 21 October 2025 (5 nights) | room/night | 30 | $ - 0 | ||
| SIX (6) hotel rooms, 7 February 2026 - 11 February 2026, with check out 12 February 2026 (5 nights) | room/night | 30 | $ - 0 | ||
| TOTAL CLIN 0004 | $ - 0 |
INSTRUCTIONS:
Please Leave the Red Cells untouched.
Enter the price into the Green Cells. Make sure to review the other tabs.
Enter your fully burdened labor rate into the Cell J2 and authomatically it will be reported in the RED CELL unit price.
If you are quoting subcontracting costs or "Other" Costs, imput values and further explanation under the "Subcontracting & Other Cost" or "Subcontracting Material" tab. The "Subcontracting Material" tab will automatically populate in the "Subcontracting & Other Cost" tab in column E
Subcontracting & Other Costs
| USS MT WHITNEY (LCC 20), 2025 ROH-DD | |
| SUBCONTRACTOR AND OTHER COSTS | |
| INSTRUCTIONS: |
Please Leave the Red Cells untouched.
Enter the price into the Green Cells. Make sure to review the other tabs.
Enter your fully burdened labor rate into the Cell J2 and authomatically it will be reported in the RED CELL unit price.
If you are quoting subcontracting costs or "Other" Costs, imput values and further explanation under the "Subcontracting & Other Cost" or "Subcontracting Material" tab. The "Subcontracting Material" tab will automatically populate in the "Subcontracting & Other Cost" tab in column E
| ELIN | Description | Subcontractor's Name - OEM Yes/No | Subcontractor Labor Hours | Hourly Labor Rate | Subcontractor Labor Cost | Subcontractor Material | Subcontractor Total Cost | Other Direct Costs : Comments | Other Direct Costs Value |
| CLIN 0001 TOTAL | |||||||||
| A012 | 0014 - WEIGHT AND MOMENT REPORT | $ - 0 | $ - 0 | $ - 0 | |||||
| A019 | 0021 - CLEAN AND GAS-FREE TANKS VOIDS AND COFFERDAMS | $ - 0 | $ - 0 | $ - 0 | |||||
| A020 | 0022 - MACHINERY SPACE TURN-OVER, DOCK TRIALS,AND SEA TRIALS | $ - 0 | $ - 0 | $ - 0 | |||||
| A023 | 0101 - TALT 18-013 LIFE RAFT DEBARKATION PLATFORM INSTALLATION | $ - 0 | $ - 0 | $ - 0 | |||||
| A024 | 0102 - SAFE REMOVALS | $ - 0 | $ - 0 | $ - 0 | |||||
| A025 | 0104 - SPONSON DECK PRESERVATION (LLR CA) | $ - 0 | $ - 0 | $ - 0 | |||||
| A026 | 0105 - AFT VOID 4-147-0 PRESERVATION (LLR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A027 | 0110 - MAIN DECK PRESERVATION(LLA CA) | $ - 0 | $ - 0 | $ - 0 | |||||
| A028 | 0113 - STEAM SAFETY EXHAUST REPAIRS (CA24-139 & 154) | $ - 0 | $ - 0 | $ - 0 | |||||
| A029 | 0116 - FLAM LIQ SR 6-12-0-K & 7-12-0-K DECK PRESERVATION (CA24-118,170)) | $ - 0 | $ - 0 | $ - 0 | |||||
| A030 | 0117 - DECK PRESERVATION 6-30-0-E & 7-38-1-E(CA24-119,120) | $ - 0 | $ - 0 | $ - 0 | |||||
| A031 | 0118 - AC MACHINERY ROOM 7-40-0-A DECK PRESERVATION (CA24-123) | $ - 0 | $ - 0 | $ - 0 | |||||
| A032 | 0119 - SD STORE ROOM 6-40-0-A DECK PRESERVATION (CA24-171) | $ - 0 | $ - 0 | $ - 0 | |||||
| A033 | 0120 - PASSAGEWAY 6-60-1-T DECK PRESERVATION (CA24-174) | $ - 0 | $ - 0 | $ - 0 | |||||
| A034 | 0121 - AC MACHINERY ROOM 7-64-2-E DECK PRESERVATION(CA24-128) | $ - 0 | $ - 0 | $ - 0 | |||||
| A035 | 0122 - PASSAGEWAY 7-58-0-E DECK PRESERVATION (CA24-127) | $ - 0 | $ - 0 | $ - 0 | |||||
| A036 | 0123 - FANROOM 6-68-0-Q DECK PRESERVATION (CA24-169) | $ - 0 | $ - 0 | $ - 0 | |||||
| A037 | 0124 - SODA STOREROOM 7-68-1-L DECK PRESERVATION (CA24-130) | $ - 0 | $ - 0 | $ - 0 | |||||
| A038 | 0125 - AC&R STOREROOM 6-118-1-Q DECK PRESERVATION(CA24-175) | $ - 0 | $ - 0 | $ - 0 | |||||
| A039 | 0128 - 7-64-0-Q DECK PRESERVATION (CA 24-129) | $ - 0 | $ - 0 | $ - 0 | |||||
| A040 | 0129 - FLUSH WATERTIGHT HATCH REPAIRS (LLR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A041 | 0130 - AFT TROOP ACOM LADDER STATION REPAIR (CA24-017, 025, 146)) | $ - 0 | $ - 0 | $ - 0 | |||||
| A042 | 0131 - FWD TROOP ACOM LADDER STATION REPAIR (CA24-017, 025, 146) | $ - 0 | $ - 0 | $ - 0 | |||||
| A043 | 0132 - FAN ROOM 2-19-0-Q REPAIRS (CA 24-059) | $ - 0 | $ - 0 | $ - 0 | |||||
| A044 | 0133 - FAN ROOM 6-109-2-Q DECK PRESERVATION (CA 24-177) | $ - 0 | $ - 0 | $ - 0 | |||||
| A045 | 0134 - 01 LVL & MN DK CONNEX BOXES REPLACE (CA24-054, 055, 056, 116) | $ - 0 | $ - 0 | $ - 0 | |||||
| A046 | 0135 - 01 LEVEL WEATHER DECK PRESERVATION (CA 24-054,055,056,116) | $ - 0 | $ - 0 | $ - 0 | |||||
| A047 | 0136 - SHAFT ALLEY PRESERVATION | $ - 0 | $ - 0 | $ - 0 | |||||
| A048 | 0137 - CONREP Padeye Pull Test (VR23-0045) | $ - 0 | $ - 0 | $ - 0 | |||||
| A049 | 0138 - CARGO DECK TIE DOWNS REPLACEMENT | $ - 0 | $ - 0 | $ - 0 | |||||
| A050 | 0151 - ULTRASONIC HULL THICKNESS GAUGING (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A051 | 0153 - ABS INTERMEDIATE SURVEY - TANK INSPECTION (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A052 | 0155 - Tank Vent Inspection | $ - 0 | $ - 0 | $ - 0 | |||||
| A053 | 0186 - CABLE PENETRATION INSPECTION (1 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A054 | 0197 - Handrail Renewal | $ - 0 | $ - 0 | $ - 0 | |||||
| A056 | 0201 - TALT 18-014 MAIN LUBE OIL PRIMING LINE INSTALLATION | $ - 0 | $ - 0 | $ - 0 | |||||
| A057 | 0202 - HP-LP AND RED GEAR ALIGNMENT CHECK | $ - 0 | $ - 0 | $ - 0 | |||||
| A058 | 0203 - TALT 18-020 AUXILIARY EXHAUST STEAM RELIEF VALVE | $ - 0 | $ - 0 | $ - 0 | |||||
| A059 | 0204 - BOILER SUPERHEATER TUBE REPLACEMENT | $ - 0 | $ - 0 | $ - 0 | |||||
| A060 | 0205 - Boiler Mounts (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A061 | 0206 - VR 22-022 MRG LO PUMP 1 STEAM PIPE REMOVAL | $ - 0 | $ - 0 | $ - 0 | |||||
| A062 | 0207 - BOILER SAFETY SHUT DOWN DEVICE REPLACE(VR 21-138, 21-139) | $ - 0 | $ - 0 | $ - 0 | |||||
| A063 | 0251 - WOODWARD GOVERNORS (20K HRS) (SCSI) | $ - 0 | $ - 0 | $ - 0 | |||||
| A064 | 0252 - REDUCTION GEAR INSPECTION (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A065 | 0254 - THRUST AND LINESHAFT BEARING INSPECTION (5 YR) (SCSI) | $ - 0 | $ - 0 | $ - 0 | |||||
| A066 | 0280 - OUTBOARD BEARING INSPECTIONS (1 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A067 | 0281 - BOILER INSPECTION AND HYDRO (2.5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A068 | 0282 - BOILER MOUNTS - OPEN, INSPECT AND TEST (2.5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A069 | 0283 - BOILER SAFETY VALVES - OPEN, INSPECT AND TEST (2.5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A070 | 0303 - VR 22-018 WASTE OIL TANK TLI CALIBRATION | $ - 0 | $ - 0 | $ - 0 | |||||
| A071 | 0351 - SWITCHBOARD CLEANING (2.5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A072 | 0352 - LOAD CENTER CLEANING (2.5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A073 | 0353 - THERMOGRAPHIC SURVEY (1 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A074 | 0354 - GENERATOR INSPECTION (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A075 | 0381 - CIRCUT BREAKER INSPECTION AND SERVICING (10 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A076 | 0382 - BATTERY REPLACEMENT (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A077 | 0383 - ASSURED POWER UPS SERVICING (1 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A078 | 0451 - ANNUAL RADAR SERVICE | $ - 0 | $ - 0 | $ - 0 | |||||
| A079 | 0452 - ANNUAL ECDIS SERVICE (SCSI) | $ - 0 | $ - 0 | $ - 0 | |||||
| A080 | 0453 - GYRO SYSTEM SERVICE (2.5YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A081 | 0455 - ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION | $ - 0 | $ - 0 | $ - 0 | |||||
| A082 | 0458 - ANTENNA MAINTENANCE (2.5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A083 | 0459 - ECHO SOUNDER SERVICE (2.5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A084 | 0460 - ANNUAL INSPECTION OF MANUALLY OPERATED ALARMS | $ - 0 | $ - 0 | $ - 0 | |||||
| A085 | 0492 - CALIBRATE ELECTRONIC TEST EQUIPMENT (GPETE) (1 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A086 | 0493 - VESSEL CONTROL SYSTEM ANNUAL SERVICE | $ - 0 | $ - 0 | $ - 0 | |||||
| A087 | 0501 - VR 24-024 DECK AIR COMPRESSOR REPLACEMENT | $ - 0 | $ - 0 | $ - 0 | |||||
| A088 | 0502 - TALT 21-023 NO. 2 AC SW COOLING PUMP | $ - 0 | $ - 0 | $ - 0 | |||||
| A089 | 0503 - VR 24-005 OILY WASTE TANK GENRAL TANK INSP AND SOUNDING TUBE REPAIR | $ - 0 | $ - 0 | $ - 0 | |||||
| A090 | 0504 - VR 23-023&073 CHT PIPING REPLACEMENTS | $ - 0 | $ - 0 | $ - 0 | |||||
| A091 | 0505 - TALT 21-022 NO. 6 AC SW COOLING PUMP | $ - 0 | $ - 0 | $ - 0 | |||||
| A092 | 0506 - TALT 17-010 ESLP SSTG SEA CHEST | $ - 0 | $ - 0 | $ - 0 | |||||
| A093 | 0507 - TALT 21-007 AC CHILL WATER PUMP AND MOTOR REPLACEMENT | $ - 0 | $ - 0 | $ - 0 | |||||
| A094 | 0508 - TALT 21-005 AC CHILLWATER EXPANSION TANK VENT ADDITION | $ - 0 | $ - 0 | $ - 0 | |||||
| A095 | 0509 - TALT 17-011 AC MACHINERY ROOMS 1, 2, & 3 PURGE PUMP MODS | $ - 0 | $ - 0 | $ - 0 | |||||
| A096 | 0510 - TALT 19-023 LPAC UNIT REPLACEMENTS | $ - 0 | $ - 0 | $ - 0 | |||||
| A097 | 0511 - TALT 17-008 BROMINATOR REPLACEMENT | $ - 0 | $ - 0 | $ - 0 | |||||
| A098 | 0515 - Fire Main Piping Repairs | $ - 0 | $ - 0 | $ - 0 | |||||
| A099 | 0550 - CARGO ELEVATOR AND DUMBWAITER SERVICE (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A100 | 0554 - INSPECT, TEST AND CERTIFY MACHINERY SPACE CRANES AND HOISTS (1 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A101 | 0561C - GAUGE CALIBRATION (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A102 | 0562 - SCBA ANNUAL INSPECTION (SCOTT) | $ - 0 | $ - 0 | $ - 0 | |||||
| A103 | 0563B - SCBA COMPRESSOR AND FILLING STATION INSPECTION AND MAINTENANCE (2 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A104 | 0565A - FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) | $ - 0 | $ - 0 | $ - 0 | |||||
| A105 | 0567C - FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (5 YR) (SCSI) | $ - 0 | $ - 0 | $ - 0 | |||||
| A106 | 0568B - WATER MIST-SPRAY-SPRINKLER INSPECTION AND TEST (5 YR) (SCSI) | $ - 0 | $ - 0 | $ - 0 | |||||
| A107 | 0569 - FIRE AND SMOKE DETECTION AND ALARM SYSTEM (1 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A108 | 0570 - PORTABLE FIRE EXTINGUISHER SERVICE (1 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A109 | 0571 - FIRE AND SMOKE DAMPER SERVICE (1 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A110 | 0572 - DEEP FAT FRYER AND RANGE HOOD FIRE EXTINGUISHING SYSTEM (1 YR)(SCSI) | $ - 0 | $ - 0 | $ - 0 | |||||
| A111 | 0573 - FIRE HOSES (1 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A112 | 0574 - FIRE DOORS AND SHUTTERS (1 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A113 | 0582 - STEERING SYSTEM SERVICE (5 YR)(SCSI) | $ - 0 | $ - 0 | $ - 0 | |||||
| A114 | 0586 - SSTG TURBINE SERVICING (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A115 | 0598 - OVERHAUL MAIN ENGINE LUBE OIL PURIFIER (VRR 21-045) | $ - 0 | $ - 0 | $ - 0 | |||||
| A116 | 0599 - Misc Piping Renewal | $ - 0 | $ - 0 | $ - 0 | |||||
| A117 | 0601 - VR 24-020 CEILING TILE RENEWALS | $ - 0 | $ - 0 | $ - 0 | |||||
| A118 | 0604 - VR 19-069 & 70 DECK HEAD REFURBISHMENT | $ - 0 | $ - 0 | $ - 0 | |||||
| A119 | 0606 - CARPET RENEWAL | $ - 0 | $ - 0 | $ - 0 | |||||
| A120 | 0653 - ANNUAL RESCUE BOAT AND DAVIT INSPECTION | $ - 0 | $ - 0 | $ - 0 | |||||
| A121 | 0655 - IMMERSION SUIT SERVICE (3 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A122 | 0657 - ACCOMODATION LADDER INSPECTION (1 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A123 | 0659 - PILOT BOARDING EQPT AND EMBARKATION LADDERS (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A124 | 0662 - DEEP FAT FRYER INSPECTION (1 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A125 | 0668 - INSPECT, TEST AND CERTIFY MATERIAL HANDLING EQUIPMENT - FORKLIFTS (1YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A126 | 0683 - USN LIFERAFT AND CRADLE INSPECTION AND PRESERVATION (4YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A127 | 0688 - RESCUE BOAT ENGINE AND DRIVE SERVICING (2.5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A128 | 0697 - PORTABLE DAVIT SERVICING AND CERTIFICATION (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A131 | 0703 - Ready Service Locker Repair | $ - 0 | $ - 0 | $ - 0 | |||||
| A133 | 0801 - Ventilation Survey (VR23-033) | $ - 0 | $ - 0 | $ - 0 | |||||
| A134 | 0802 - VR 21-094 MAIN SPACE EXHAUST FAN VENTILATION | $ - 0 | $ - 0 | $ - 0 | |||||
| A135 | 0851 - GALLEY VENTILATION SYSTEM AND GAYLORD HOOD CLEANING (2.5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A136 | 0852 - LAUNDRY VENT CLEANING (2.5) | $ - 0 | $ - 0 | $ - 0 | |||||
| A137 | 0853 - ACCOMODATION VENT CLEANING SYSTEM (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A138 | 0901 - DRYDOCKING AND UNDOCKING THE VESSEL (2.5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A139 | 0953 - ANCHOR CHAINS AND LOCKERS (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A140 | 0954 - Rudder and Stern Frame Examination (2.5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A141 | 0956 - Overhauling Sea Valves | $ - 0 | $ - 0 | $ - 0 | |||||
| A142 | 0957 - PROPELLER CLEAN AND POLISH - ON DOCK (2.5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A143 | 0960 - UNDERWATER HULL CLEANING AND PAINTING - SPOT BLAST (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A144 | 0961 - FREEBOARD PRESERVATION (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A145 | 0962 - CATHODIC PROTECTION (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A146 | 0966 - SHAFT ALIGNMENT AND BEARING REACTION CHECKS (2.5 YR) (SCSI) | $ - 0 | $ - 0 | $ - 0 | |||||
| A147 | 0986 - STERN TUBE SEAL MINOR OVERHAUL (5 YR) | $ - 0 | $ - 0 | $ - 0 | |||||
| A148 | 0988 - HUCK BOLT INSPECTION (5 YR) | $ - 0 | $ - 0 | $ - 0 |
Subcontracting Material
| USS MT WHITNEY (LCC 20), 2025 ROH-DD | |
| SUBCONTRACTOR MATERIAL COSTS | |
| INSTRUCTIONS: |
Please Leave the Red Cells untouched.
Enter the price into the Green Cells. Make sure to review the other tabs.
Enter your fully burdened labor rate into the Cell J2 and authomatically it will be reported in the RED CELL unit price.
If you are quoting subcontracting costs or "Other" Costs, imput values and further explanation under the "Subcontracting & Other Cost" or "Subcontracting Material" tab. The "Subcontracting Material" tab will automatically populate in the "Subcontracting & Other Cost" tab in column E
| ELIN | Description | Subcontractor Name | Material Explanation | Material Cost |
| CLIN 0001 TOTAL | ||||
| A012 | 0014 - WEIGHT AND MOMENT REPORT | |||
| A019 | 0021 - CLEAN AND GAS-FREE TANKS VOIDS AND COFFERDAMS | |||
| A020 | 0022 - MACHINERY SPACE TURN-OVER, DOCK TRIALS,AND SEA TRIALS | |||
| A023 | 0101 - TALT 18-013 LIFE RAFT DEBARKATION PLATFORM INSTALLATION | |||
| A024 | 0102 - SAFE REMOVALS | |||
| A025 | 0104 - SPONSON DECK PRESERVATION (LLR CA) | |||
| A026 | 0105 - AFT VOID 4-147-0 PRESERVATION (LLR) | |||
| A027 | 0110 - MAIN DECK PRESERVATION(LLA CA) | |||
| A028 | 0113 - STEAM SAFETY EXHAUST REPAIRS (CA24-139 & 154) | |||
| A029 | 0116 - FLAM LIQ SR 6-12-0-K & 7-12-0-K DECK PRESERVATION (CA24-118,170)) | |||
| A030 | 0117 - DECK PRESERVATION 6-30-0-E & 7-38-1-E(CA24-119,120) | |||
| A031 | 0118 - AC MACHINERY ROOM 7-40-0-A DECK PRESERVATION (CA24-123) | |||
| A032 | 0119 - SD STORE ROOM 6-40-0-A DECK PRESERVATION (CA24-171) | |||
| A033 | 0120 - PASSAGEWAY 6-60-1-T DECK PRESERVATION (CA24-174) | |||
| A034 | 0121 - AC MACHINERY ROOM 7-64-2-E DECK PRESERVATION(CA24-128) | |||
| A035 | 0122 - PASSAGEWAY 7-58-0-E DECK PRESERVATION (CA24-127) | |||
| A036 | 0123 - FANROOM 6-68-0-Q DECK PRESERVATION (CA24-169) | |||
| A037 | 0124 - SODA STOREROOM 7-68-1-L DECK PRESERVATION (CA24-130) | |||
| A038 | 0125 - AC&R STOREROOM 6-118-1-Q DECK PRESERVATION(CA24-175) | |||
| A039 | 0128 - 7-64-0-Q DECK PRESERVATION (CA 24-129) | |||
| A040 | 0129 - FLUSH WATERTIGHT HATCH REPAIRS (LLR) | |||
| A041 | 0130 - AFT TROOP ACOM LADDER STATION REPAIR (CA24-017, 025, 146)) | |||
| A042 | 0131 - FWD TROOP ACOM LADDER STATION REPAIR (CA24-017, 025, 146) | |||
| A043 | 0132 - FAN ROOM 2-19-0-Q REPAIRS (CA 24-059) | |||
| A044 | 0133 - FAN ROOM 6-109-2-Q DECK PRESERVATION (CA 24-177) | |||
| A045 | 0134 - 01 LVL & MN DK CONNEX BOXES REPLACE (CA24-054, 055, 056, 116) | |||
| A046 | 0135 - 01 LEVEL WEATHER DECK PRESERVATION (CA 24-054,055,056,116) | |||
| A047 | 0136 - SHAFT ALLEY PRESERVATION | |||
| A048 | 0137 - CONREP Padeye Pull Test (VR23-0045) | |||
| A049 | 0138 - CARGO DECK TIE DOWNS REPLACEMENT | |||
| A050 | 0151 - ULTRASONIC HULL THICKNESS GAUGING (5 YR) | |||
| A051 | 0153 - ABS INTERMEDIATE SURVEY - TANK INSPECTION (5 YR) | |||
| A052 | 0155 - Tank Vent Inspection | |||
| A053 | 0186 - CABLE PENETRATION INSPECTION (1 YR) | |||
| A054 | 0197 - Handrail Renewal | |||
| A056 | 0201 - TALT 18-014 MAIN LUBE OIL PRIMING LINE INSTALLATION | |||
| A057 | 0202 - HP-LP AND RED GEAR ALIGNMENT CHECK | |||
| A058 | 0203 - TALT 18-020 AUXILIARY EXHAUST STEAM RELIEF VALVE | |||
| A059 | 0204 - BOILER SUPERHEATER TUBE REPLACEMENT | |||
| A060 | 0205 - Boiler Mounts (5 YR) | |||
| A061 | 0206 - VR 22-022 MRG LO PUMP 1 STEAM PIPE REMOVAL | |||
| A062 | 0207 - BOILER SAFETY SHUT DOWN DEVICE REPLACE(VR 21-138, 21-139) | |||
| A063 | 0251 - WOODWARD GOVERNORS (20K HRS) (SCSI) | |||
| A064 | 0252 - REDUCTION GEAR INSPECTION (5 YR) | |||
| A065 | 0254 - THRUST AND LINESHAFT BEARING INSPECTION (5 YR) (SCSI) | |||
| A066 | 0280 - OUTBOARD BEARING INSPECTIONS (1 YR) | |||
| A067 | 0281 - BOILER INSPECTION AND HYDRO (2.5 YR) | |||
| A068 | 0282 - BOILER MOUNTS - OPEN, INSPECT AND TEST (2.5 YR) | |||
| A069 | 0283 - BOILER SAFETY VALVES - OPEN, INSPECT AND TEST (2.5 YR) | |||
| A070 | 0303 - VR 22-018 WASTE OIL TANK TLI CALIBRATION | |||
| A071 | 0351 - SWITCHBOARD CLEANING (2.5 YR) | |||
| A072 | 0352 - LOAD CENTER CLEANING (2.5 YR) | |||
| A073 | 0353 - THERMOGRAPHIC SURVEY (1 YR) | |||
| A074 | 0354 - GENERATOR INSPECTION (5 YR) | |||
| A075 | 0381 - CIRCUT BREAKER INSPECTION AND SERVICING (10 YR) | |||
| A076 | 0382 - BATTERY REPLACEMENT (5 YR) | |||
| A077 | 0383 - ASSURED POWER UPS SERVICING (1 YR) | |||
| A078 | 0451 - ANNUAL RADAR SERVICE | |||
| A079 | 0452 - ANNUAL ECDIS SERVICE (SCSI) | |||
| A080 | 0453 - GYRO SYSTEM SERVICE (2.5YR) | |||
| A081 | 0455 - ANNUAL RADIO COMMUNICATION EQUIPMENT RECERTIFICATION | |||
| A082 | 0458 - ANTENNA MAINTENANCE (2.5 YR) | |||
| A083 | 0459 - ECHO SOUNDER SERVICE (2.5 YR) | |||
| A084 | 0460 - ANNUAL INSPECTION OF MANUALLY OPERATED ALARMS | |||
| A085 | 0492 - CALIBRATE ELECTRONIC TEST EQUIPMENT (GPETE) (1 YR) | |||
| A086 | 0493 - VESSEL CONTROL SYSTEM ANNUAL SERVICE | |||
| A087 | 0501 - VR 24-024 DECK AIR COMPRESSOR REPLACEMENT | |||
| A088 | 0502 - TALT 21-023 NO. 2 AC SW COOLING PUMP | |||
| A089 | 0503 - VR 24-005 OILY WASTE TANK GENRAL TANK INSP AND SOUNDING TUBE REPAIR | |||
| A090 | 0504 - VR 23-023&073 CHT PIPING REPLACEMENTS | |||
| A091 | 0505 - TALT 21-022 NO. 6 AC SW COOLING PUMP | |||
| A092 | 0506 - TALT 17-010 ESLP SSTG SEA CHEST | |||
| A093 | 0507 - TALT 21-007 AC CHILL WATER PUMP AND MOTOR REPLACEMENT | |||
| A094 | 0508 - TALT 21-005 AC CHILLWATER EXPANSION TANK VENT ADDITION | |||
| A095 | 0509 - TALT 17-011 AC MACHINERY ROOMS 1, 2, & 3 PURGE PUMP MODS | |||
| A096 | 0510 - TALT 19-023 LPAC UNIT REPLACEMENTS | |||
| A097 | 0511 - TALT 17-008 BROMINATOR REPLACEMENT | |||
| A098 | 0515 - Fire Main Piping Repairs | |||
| A099 | 0550 - CARGO ELEVATOR AND DUMBWAITER SERVICE (5 YR) | |||
| A100 | 0554 - INSPECT, TEST AND CERTIFY MACHINERY SPACE CRANES AND HOISTS (1 YR) | |||
| A101 | 0561C - GAUGE CALIBRATION (5 YR) | |||
| A102 | 0562 - SCBA ANNUAL INSPECTION (SCOTT) | |||
| A103 | 0563B - SCBA COMPRESSOR AND FILLING STATION INSPECTION AND MAINTENANCE (2 YR) | |||
| A104 | 0565A - FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR) (SCSI) | |||
| A105 | 0567C - FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (5 YR) (SCSI) | |||
| A106 | 0568B - WATER MIST-SPRAY-SPRINKLER INSPECTION AND TEST (5 YR) (SCSI) | |||
| A107 | 0569 - FIRE AND SMOKE DETECTION AND ALARM SYSTEM (1 YR) | |||
| A108 | 0570 - PORTABLE FIRE EXTINGUISHER SERVICE (1 YR) | |||
| A109 | 0571 - FIRE AND SMOKE DAMPER SERVICE (1 YR) | |||
| A110 | 0572 - DEEP FAT FRYER AND RANGE HOOD FIRE EXTINGUISHING SYSTEM (1 YR)(SCSI) | |||
| A111 | 0573 - FIRE HOSES (1 YR) | |||
| A112 | 0574 - FIRE DOORS AND SHUTTERS (1 YR) | |||
| A113 | 0582 - STEERING SYSTEM SERVICE (5 YR)(SCSI) | |||
| A114 | 0586 - SSTG TURBINE SERVICING (5 YR) | |||
| A115 | 0598 - OVERHAUL MAIN ENGINE LUBE OIL PURIFIER (VRR 21-045) | |||
| A116 | 0599 - Misc Piping Renewal | |||
| A117 | 0601 - VR 24-020 CEILING TILE RENEWALS | |||
| A118 | 0604 - VR 19-069 & 70 DECK HEAD REFURBISHMENT | |||
| A119 | 0606 - CARPET RENEWAL | |||
| A120 | 0653 - ANNUAL RESCUE BOAT AND DAVIT INSPECTION | |||
| A121 | 0655 - IMMERSION SUIT SERVICE (3 YR) | |||
| A122 | 0657 - ACCOMODATION LADDER INSPECTION (1 YR) | |||
| A123 | 0659 - PILOT BOARDING EQPT AND EMBARKATION LADDERS (5 YR) | |||
| A124 | 0662 - DEEP FAT FRYER INSPECTION (1 YR) | |||
| A125 | 0668 - INSPECT, TEST AND CERTIFY MATERIAL HANDLING EQUIPMENT - FORKLIFTS (1YR) | |||
| A126 | 0683 - USN LIFERAFT AND CRADLE INSPECTION AND PRESERVATION (4YR) | |||
| A127 | 0688 - RESCUE BOAT ENGINE AND DRIVE SERVICING (2.5 YR) | |||
| A128 | 0697 - PORTABLE DAVIT SERVICING AND CERTIFICATION (5 YR) | |||
| A131 | 0703 - Ready Service Locker Repair | |||
| A133 | 0801 - Ventilation Survey (VR23-033) | |||
| A134 | 0802 - VR 21-094 MAIN SPACE EXHAUST FAN VENTILATION | |||
| A135 | 0851 - GALLEY VENTILATION SYSTEM AND GAYLORD HOOD CLEANING (2.5 YR) | |||
| A136 | 0852 - LAUNDRY VENT CLEANING (2.5) | |||
| A137 | 0853 - ACCOMODATION VENT CLEANING SYSTEM (5 YR) | |||
| A138 | 0901 - DRYDOCKING AND UNDOCKING THE VESSEL (2.5 YR) | |||
| A139 | 0953 - ANCHOR CHAINS AND LOCKERS (5 YR) | |||
| A140 | 0954 - Rudder and Stern Frame Examination (2.5 YR) | |||
| A141 | 0956 - Overhauling Sea Valves | |||
| A142 | 0957 - PROPELLER CLEAN AND POLISH - ON DOCK (2.5 YR) | |||
| A143 | 0960 - UNDERWATER HULL CLEANING AND PAINTING - SPOT BLAST (5 YR) | |||
| A144 | 0961 - FREEBOARD PRESERVATION (5 YR) | |||
| A145 | 0962 - CATHODIC PROTECTION (5 YR) | |||
| A146 | 0966 - SHAFT ALIGNMENT AND BEARING REACTION CHECKS (2.5 YR) (SCSI) | |||
| A147 | 0986 - STERN TUBE SEAL MINOR OVERHAUL (5 YR) | |||
| A148 | 0988 - HUCK BOLT INSPECTION (5 YR) |
File details come from the government source that posted it. Updated .