Att II Price Proposal Form N6264925RA066.xlsx

XLSX spreadsheet 44 KB Posted

Attached to
Shuttle Boat (Azuma Suttle-1) Overhaul
Solicitation number
N6264925RA066
Issued by

About this file

This file is a Price Proposal Form for a naval shuttle boat overhaul solicitation issued by the Department of the Navy Naval Supply Systems Command. The solicitation (N6264925RA066) covers maintenance and repair work for the Azuma Shuttle-1 boat, with a performance period from 22 August 2025 through 21 February 2026. The work will be conducted at Yokosuka Naval Base and the contractor's facility, with proposal submissions due by 14 July 2025 at 10:00 AM Japan Standard Time. Potential offerors must request access to the detailed work specification package through DoD SAFE by emailing kazuo.takamura.ln@us.navy.mil by 7 July 2025. The pricing spreadsheet indicates no current pricing has been entered, with placeholders for labor, material, and other direct costs across two contract line items (CLIN 0001 and CLIN 0002), including a base contract and a growth CLIN option.

View the file

Other files

File Type Posted
N6264925RA066-0002.pdf PDF
Att IV GFP_GFM listings.xlsx XLSX spreadsheet
Attachment V Warranty Tracking Information.pdf PDF
N6264925RA066-0001.pdf PDF
N6264925RA066.pdf PDF
N6264925RA066-0003.pdf PDF
N6105425RCPR114-0-SOW rev4 shuttle boat.docx DOCX document
Attachment VI Source of Repair Instruction.pdf PDF
Att III Request for Information Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:

TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:N6264925RA066CLIN 0001(1 SOW)0¥0¥0¥0¥0
SHIP NAME:SHUTTLE BOAT (AZUMA SHUTTLE-1)CLIN 0002 (Growth CLIN)0¥0¥0¥0¥0
AVAILABILITY:SOW (POP 22AUG2025-21FEB2026)Total for All CLIN0¥0¥0¥0¥0
Total TGIs (Specify Total)1Total Evaluated Price¥0
Growth CLIN %
Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.SOW No.DESCRIPTIONProposed LaborMaterial/ODCsProposed Price (JPY)
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)
1N6105425RCPR114-0SOW rev4 shuttle boat Updated (003)000¥0¥0¥0¥0
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200

1_N6105425RCPR114-0

SHIP NAME/AVAILABILITY:SHUTTLE BOAT (AZUMA SHUTTLE-1) - SOW (POP 22AUG2025-21FEB2026)TGI 1_N6105425RCPR114-0 SUMMARY
SOLICITATION #:N6264925RA066
SRF-JRMC TGI #:1_N6105425RCPR114-0In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:SOW rev4 shuttle boat Updated (003)00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

File details come from the government source that posted it. Updated .