This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Howard (DDG-83) dated 30-May-2025. The specific task involves a Tightness & Operational Test for the AN/USG-2(V) PAO Cooling System, with the job number CE03-L023. The instruction is associated with Project JC2 and System 48402, prepared by Tanaka Yoshitada and approved by Kevin Peng. The document is marked FOUO (For Official Use Only) and includes a reference to Technical Procedure TP 48402-3-303KTR, with a file number of 12701. The task is focused on testing and verifying the operational status of repaired or reinstalled components for the ship's cooling system, with the zone manager identified as Kawana Takumi.

View the file

Other files

File Type Posted
Att IV GFP_List_V3 for KTR.xlsx XLSX spreadsheet
Att III RFI 25RA057.docx DOCX document
Att I 38JC217101A02_TGI.pdf PDF
N6264925RA057.pdf PDF
Att II Price Proposal Form N6264925RA057.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

30-MAY-2025 1012

20.14.15.2.9020 (September 2024) ICN: 38JC217101 KeyOp: T03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 48402-3-303KTR TT T 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC2 48402

CU PHASE TITLE: AN/USG-2(V) PAO COOLING SYSTEM (T & OP) - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 2

CE03L023

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

TANAKA, YOSHITADA 246.4 3152431984 04-APR-2025

APPROVED BY: CODE: PHONE: DATE:

PENG, KEVIN 246.4 3152434393 11-APR-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

CE03-L023

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

KAWANA, TAKUMI U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

171A1101

Tightness & Operational Test for All Repaired/Reinstalled Components – KTR

TGI Short Form

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

30-MAY-2025 1012

20.14.15.2.9020 (September 2024) (Continued) ICN: 38JC217101 KeyOp: T03

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 48402-3-303KTR TT T 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-83 USS HOWARD JC2 48402

CU PHASE TITLE: AN/USG-2(V) PAO COOLING SYSTEM (T & OP) - KTR

FOUO Pg 2 of 2

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TP 48402-3-303KTR AN/USG-2(V) PAO COOLING

SYSTEM (T & OP) - KTR

OR Y FILE NO.

12701

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38JC217101 KEY OP: T03