This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Howard (DDG-83) dated 30-May-2025. The specific task involves a Tightness & Operational Test for the AN/USG-2(V) PAO Cooling System, with the job number CE03-L023. The instruction is associated with Project JC2 and System 48402, prepared by Tanaka Yoshitada and approved by Kevin Peng. The document is marked FOUO (For Official Use Only) and includes a reference to Technical Procedure TP 48402-3-303KTR, with a file number of 12701. The task is focused on testing and verifying the operational status of repaired or reinstalled components for the ship's cooling system, with the zone manager identified as Kawana Takumi.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att IV GFP_List_V3 for KTR.xlsx | XLSX spreadsheet | |
| Att III RFI 25RA057.docx | DOCX document | |
| Att I 38JC217101A02_TGI.pdf | ||
| N6264925RA057.pdf | ||
| Att II Price Proposal Form N6264925RA057.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
30-MAY-2025 1012
20.14.15.2.9020 (September 2024) ICN: 38JC217101 KeyOp: T03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 48402-3-303KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-83 USS HOWARD JC2 48402
CU PHASE TITLE: AN/USG-2(V) PAO COOLING SYSTEM (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
CE03L023
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
TANAKA, YOSHITADA 246.4 3152431984 04-APR-2025
APPROVED BY: CODE: PHONE: DATE:
PENG, KEVIN 246.4 3152434393 11-APR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
CE03-L023
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
KAWANA, TAKUMI U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
171A1101
Tightness & Operational Test for All Repaired/Reinstalled Components – KTR
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
30-MAY-2025 1012
20.14.15.2.9020 (September 2024) (Continued) ICN: 38JC217101 KeyOp: T03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 48402-3-303KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-83 USS HOWARD JC2 48402
CU PHASE TITLE: AN/USG-2(V) PAO COOLING SYSTEM (T & OP) - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 48402-3-303KTR AN/USG-2(V) PAO COOLING
SYSTEM (T & OP) - KTR
OR Y FILE NO.
12701
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38JC217101 KEY OP: T03
File details come from the government source that posted it. Updated .