This file contains Oregon Standard Drawings for road construction and infrastructure projects, issued by the Oregon Department of Transportation (ODOT) with an effective date of June 1, 2025 through November 30, 2025. The drawings provide detailed technical specifications and installation guidelines for various infrastructure components including pipe installations, trench backfill and bedding systems, street cut repairs, concrete inlets and drainage structures, culvert installations with embankment protection, pavement markings, traffic control devices, curb and gutter systems, sediment barriers, and temporary traffic control measures. The specifications cover pipe diameters ranging from 4 inches to 144 inches, various concrete inlet types (G-1, G-2, G-2M, G-2MA), multiple pavement marking configurations, and comprehensive traffic delineation systems including temporary barricades and sign supports.
The drawings specify that all materials must comply with current Oregon Standard Specifications and require professional engineer consultation before implementation. The documents include detailed dimensional requirements, material specifications, installation procedures, and safety requirements for construction activities. Key technical elements include specific pipe bedding classes, concrete mix requirements, retroreflective sheeting specifications for traffic devices, and standardized spacing requirements for various infrastructure components. The drawings emphasize compliance with Americans with Disabilities Act (ADA) requirements, Manual on Uniform Traffic Control Devices (MUTCD) standards, and include provisions for temporary pedestrian accessible routes during construction activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract of Bids Responsiveness - ITB 250040C001 Final Results.pdf | ||
| 00014426 Bid Results.xlsx | XLSX spreadsheet | |
| ATT A Special Provisions and Specifications~34.pdf | ||
| 00014426 Invitation to Bid.docx | DOCX document | |
| ATT E FHWA Form 1273~2.pdf | ||
| 00014426 Addendum 1.docx | DOCX document | |
| ATT B Plans~27.pdf | ||
| ATT C Bid Pricing Form~13.xlsx | XLSX spreadsheet | |
| ATT C Bid Pricing Form_REVISED.xlsx | XLSX spreadsheet | |
| ATT D Project Wage Rates~5.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RD300
INSTALLATIONS
PIPE ZONE AND MULTIPLE
TRENCH BACKFILL, BEDDING,
R D
.d g n
14-JUL-2014N/A
J U
L
C
"A" note 4)
(See general
Tracer wire
MULTIPLE INSTALLATIONS
DIAMETER MIN. SPACE BETWEEN PIPES
(in)
"A"
(in)
"B"
(in)
"C"
(in)
"D"
TABLE A
Finish grade stabilization, as required
Trench foundation see Table A
"C" Pipe bedding, Top of subgrade as directed
Topsoil or existing material
Surfacing-match
Base material m a te r ia l
E x c a v a te d n a ti v e
C la s s A c r u s h e d r o c k
C la s s B o r m a x c le a n s a n d
C la s s C
A s d ir e c te d m a te r ia l m a x
C la s s D p it o r b a r r u n
C L
S M
C la s s E
T re n c h b a c k fi ll a re a P ip e z o n eS e e T a b le
A
D
Nom."B" "B"
Pipe diameter
24" min.
m in
D ia
Up to 48"
48" to 72"
24"
) dia. of pipe2
One half (
4. See Std. Dwg. RD336 for tracer wire details (When required).
3. Pipes over 72" diameter are structures, and are not applicable to this drawing.
diameter.
used and the pipe is ≥ 36" diameter, increase dimension "B" to nominal pipe
2. For pipe installation in embankment areas where the trench method will not be
1. Surfacing of paved areas shall comply with street cut Std. Dwg. RD302.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
see general note 3.
For pipes over 72" diameter, the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
RD302
STREET CUT
R D
.d g n
20-JUL-2020N/A
J U
L
(Actual)
Trench width whichever is greater. Compact as specified.
4. Place AC mix minimum thkn. of 6" or the thkn. of the removed pavement, details.
3. For joining new concrete to existing concrete, see contract plans for sepecific or to the thickness of removed pavement, whichever is greater.
2. Concrete pavement shall be replaced with concrete to a minimum thickness of 8"
1. All existing AC or PCC pavement shall be sawcut prior to repaving.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
(AC patch only) with tack material and sand
Seal surface over joint concrete as specified
CLSM or full depth asphalt
Compacted aggregate base, backfill as specified
Compacted trench
(Extg.)
Undisturbed base
Extg. pvmt.
see general notes
Pvmt. replacement, min.
6" min.
6"
Min. width=Roller width plus 2" m in
Tack coat cut edges (AC only) the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD316
FOR METAL PIPE
SLOPED ENDS
R D
.d g n
15-JAN-2016N/A
J U
L or
B1
END VIEW
X dimensions are to top edge of corner plates on structural plate pipe.
plans or directed when shown on
Slope protection
RD317
Std. Dwg.
See Table A, Sl op e as d ire ct ed
See general note 4
ROADWAY EMBANKMENT
See general note 4
RD317
Std. Dwg.
See Table A, sections on Std. Dwg. RD317
Configuration varies, see
See general note 8
Slopes as directed.
paved end slope.
0 when used with
Slopes as directed.
Adjacent pipe section
H in f e e t)
D ia
H
I n f e e t)
(Corr. structural plate) Plan and pay length joint
First
Axis of pipe
D ia m e te r
Be ve lY = 0)
Bevel (When min.
12" corrugated metal pipe
6 times dia. min. for
(Corr.) Plan and pay length
X
B1
1H metal pipe.
for corrugated
6 times dia. min.
First joint
Y min.
12"
Bottom � length Plan and pay length
Be ve l
Span
R is e
X
H
H 15 15
1H
H 15 15
1H 6. and only applicable for non-hydraulic applications.
11. See Std. Dwg. RD317 for culvert embankment protection and riprap pads (When reqd.).
(For skew diagram, see Std. Dwg. RD319).
10. For pipes with skew no.'s 50, 70, 110 or 130, omit the top step (Y).
9. Full bevel cuts are not recommended for multiple radius shaped pipes.
8. Cross-sectional dimensions may vary with different materials.
See special details or Standard Drawings as called for on plans.
sections, or other measures).
treament (Slope ends, culvert embankment protection, paved end slopes, safety end
7. Open ends of pipes normally require a site specific design, and may require special
For elliptical pipe increase X and Y dimensions by percent of ellipse.
13 4
12 to 36
8 *
8 *
8 *
8 *
4 *
8 *
8 *
8 *
8 *
1:31:21:1.51:31:21:1.51:31:21:1.5 1:31:21:1.5
1:31:21:1.51:1.5 1:2 1:3
SIZE
CORRUGATED STRUCTURAL PLATE (Dimension in inches) CORRUGATED (Dimension in inches)
SIZEB1 B1
SLOPES
SIZE
ROUND
EQUIVALENT
SPAN RISE XSLOPES
RISESPAN
XX
RISESPAN
SIZE X Y
SIZE
B1
SLOPES SLOPES
X
SLOPES
Y X & Y
SLOPES
ALTERNATE - 2ALTERNATE - 1
CORRUGATED (Dimension in inches) CORRUGATED STRUCTURAL PLATE (Dimension in inches)
CIRCULAR OR ELLIPTICAL PIPEARCH PIPE
SHOWING LENGTH OF END PROJECTIONS
LONGITUDINAL SECTION
PARTIAL BEVEL
LONGITUDINAL SECTION
STEP BEVEL
CIRCULAR OR ELLIPTICAL PIPEARCH PIPE
C B A
C B A
ARCH PIPE
CIRCULAR OR ELLIPTICAL PIPE SECTION
5. Slope protection required for hydraulic installations. See Table A on Std. Dwg. RD317.
than design headwater or tailwater elevation respectively whichever is greater.
4. Minimum elevation of top of riprap at inlet and outlet is one diameter (D) or one foot higher
3. All embankment slopes to be warped where required to provide end projections as shown.
2. See Std. Dwgs. RD300 or RD304 for installation details.
requirements for plate arrangements.
1. All dimensions are subject to necessary tolerances to meet manufacturer's
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD317
AND RIPRAP PADS
PROTECTION
CULVERT EMBANKMENT
R D
.d g n
30-JUN-2022N/A
J U
N
12 3
2B B 2B when directed
Riprap protection
W general note 4
See Std. Drg. RD316, D
T general note 4
See Std. Drg. RD316, D
T on plans or directed
Cutoff wall when shown when directed
Riprap protection
W
B
T = Thickness of riprap blanket, see Table A.
D = Diameter of circular barrel or rise of arch pipe, box, or open-bottom arch.
B = Diameter of circular barrel or span of arch pipe, box, or open-bottom arch.
general note 4
See Std. Drg. RD316, D
T when directed
Riprap protection
BB
W
B listed dimension.
* L is the greater of 4B or the
TABLE A - Embankment Slope Protection
See special details or Standard Drawings as called for on plans.
end sections, or other measures).
treatment (sloped ends, culvert embankment protection, paved end slopes, safety
2. Open ends of pipes normally require a site specific design, and may require special
1. See Std. Drg's. RD300 & RD304 for installation details.
c) Riprap pad, end view
W slope protection.
the width of the embankment pad is the larger of 5B or
3 Top width (W) of the riprap loose riprap.
Class 200 and Class 700
2 Use riprap geotextile under rock in order to place riprap.
1 Do not excavate non-erodible
B
Riprap Class T Distance
36 Inches *
24 Inches *
18 Inches
12 Inches
TABLE B - Riprap Pad Dimensions
Class
Riprap
(ft)
L *
(ft)
T
5.6
4.3
3.3
2.3
4B or 3.3
4B or 2.0
4B or 1.6
4B or 1.3 protection
Embankment
b) Riprap pad with cutoff wall, elevation view
L (See Table B)
L (See Table B)
a) Riprap pad without cutoff wall, elevation view
Cutoff wall
Riprap geotextile culvert invert thickness under
Pad should be full
Riprap geotextile
Channel bottom
T (See Table B)
Embankment protection
Outlet invert
W= Width of top of riprap pad, ft
T = Thickness of riprap pad, ft
L = Length of bottom of riprap pad, ft
B = Diameter or span of conduit, ft
T (See Table B)
A
A
B
B
C
C
B2 11 B2
Riprap pad riprap and embankment
* Riprap geotextile required between on plans or directed
Cutoff wall when shown
Wingwall and headwall
EMBANKMENT PROTECTION
RIPRAP PADS
HEADWALL AND WINGWALLS
SLOPED OR PROJECTING END
SLOPED END WITH SLOPE PAVING
SECTION A-A
SECTION B-B
SECTION C-C
RIPRAP PAD NOTES:
GENERAL NOTES FOR ALL DETAILS:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD320
60" MAXIMUM PIPE SIZE
FOR CULVERTS
PAVED END SLOPE
R D
.d g n
15-JAN-2016RD07-02
J U
L
B
B
A
A
X rad.
18"
Span
4"
X welded wire reinf.
4x4-W4xW4 slope paving
Concrete mi n.
4"
Pipe
Arch
Pipe
Arch
Pipe
Arch
(1) Areas for multiple installations are as shown on the plans.
(Inches)
Diameter
Pipe
Nominal
PAVED END SLOPE AREA
SQUARE FEET
1:3 SLOPE 1:4 SLOPE 1:6 SLOPE
Pipe
Circular
Pipe
Circular Pipe
Circular
PAVED END SLOPE AREA TABLE
CIRCULAR PIPE CULVERT
ANCHOR BOLT DETAILS
ARCH PIPE CULVERT
SECTION A-A
SECTION B-B
POLYPROPYLENE PIPE
HDPE, OR
CONCRETE, PVC
METAL PIPE
CORR.
END VIEW (HALF SECTION)
TOP VIEW
SIDE VIEW
TOP VIEW
END VIEW
SIDE VIEW
A
B
A
B
(Typ.)
18" rad.
pipe polypropylene
PVC, HDPE, or
Concrete, of pipe to conform to crown
Shape concrete slab pipe metal
Corr.
(Typ.)
when req'd.
Anchor bolt, welded wire reinf.
4x4-W4xW4 as required
Bend anchor bolts min.
18"
D min.
18"
D
D
D m in
2D mi n.
D
S iz e
D
(See general note 9) where directed
Riprap protection as reqd.
Slope Concrete pipe shown welded wire reinf.
4x4-W4xW4 as reqd.
Slope joint construction
Raked surface length as req'd.
" dia.,2 1Pipe
1" (Typ.)
than 24" dia.
Culvert larger
4" lap
" m in.
Not required for concrete pipe.
centers around entire perimeter at end of pipes over 24" size.
Anchor bolts to be ASTM A307 galv., equally spaced at a max. of 18"
(Normal to centerline of embankment) min.
18"
D m in
S p a n mi n.
Sp an
R is e
(Typ.)
when req'd.
Anchor bolt, (See general note 9) where directed
Riprap protection as reqd.
Slope welded wire reinf.
4x4-W4xW4
Corr. metal arch pipe as reqd.
Slope span
D
9. See Std. Dwg. RD317 for culvert embarkment protection and riprap pads (When reqd.).
8. See Std. Dwg. RD321 for removable safety bars (When reqd.).
measures). See special details or Standard Drawings as called for on plans.
(Slope ends, culvert embankment protection, paved end slopes, safety end sections, or other
7. Open ends of pipes normally require a site specific design, and may require special treament
6. All concrete shall be commercial grade concrete.
noted otherwise.
" clear of nearest face of concrete unless shown or2
5. All metal reinforcement shall be placed 1
" in 10' .8 variations shall not exceed
" unless noted otherwise. Slope paving surface4
4. All exposed conc. edges shall be chamfered
3. For multiple pipe installations, see Std. Dwgs. RD300 & RD304.
material.
placing impervious material at the inlet. Cutoff collars may be used in lieu of impervious
2. When using pervious bedding and backfill, it is desirable to prevent seepage and piping by not less than 12".
1. When rock is encountered, cut off wall depth or may be reduced to rock line but
GENERAL NOTES FOR ALL DETAILS ONTHIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD325
CORRUGATED METAL PIPE
COUPLING BANDS FOR
R D
.d g n
REVISED DETAILS AND NOTES01-2023
20-JAN-2023N/A
J A
N
⅝
½
⅜
⅝
⅝
½
Band 7"
W
(In) Pipe Dia.
(In) Pipe Dia.W (In)
Ann.Hel. Bolts "2
# Of W (in)
Ann.Hel.
24-84
18-84
12-15
6-10
2-3
36-120
36-84
Bolts "2
# Of
Dim. A
C o rr u g a ti o n s
60-84
24-54
12-21
84-120
60-84
36-54
Rods # Of
Rods # Of
"x
(in) W
(in) W
"x anchors, when required.
See Std. Dwgs. RD330 and RD332 for pipe slope8.
engineer.
or other insulating material as approved by the a full width neoprene gasket or coated with asphalt connected, the connecting band shall be used with To prevent galvanic action when unlike metals are7.
diameters over 42".
bands of two or more pieces are required for pipe pipe diameters up to and including 42". Coupling One or two piece coupling bands are optional for6.
Standard Specifications.
tested for water tightness in accordance with the Joints for sanitary sewers and siphons are to be5.
". 16 3diameter, the gasket thickness may be centering on the joint. For pipes 12" or less in thick of a width equal to the band width and
" 8 3 vulcanized) synthetic, closed-cell sponge rubber all coupling bands shall be (butt-cemented or installations when shown on the plans. Gaskets for irrigation pipes, storm sewers, and other Watertight joints with gaskets are required for4.
corrugation and pipe diameter shown may be used.
width coupling band indicated for the band type, used as an acceptable alternate, the minimum Under conditions where concrete pipe may be3.
that used for the pipe.
aluminum pipe shall be of the same thickness as nominal thickness. Coupling bands for corrugated 0.109" nominal thickness nor less than 0.052" than that used for the pipe but not more than pipes may be two numerical thicknesses lighter Coupling bands for corrugated iron and steel2.
shall be galvanized or aluminum coated.
All steel coupling bands and connection hardware1.
TYPE E
TYPE DTYPE BTYPE A
HELICAL COUPLINGANNULAR COUPLING
CONNECTION ANGLE DETAIL
TOP VIEW
END VIEW END VIEW
COUPLING BAND DIMPLE DETAIL
" Corrugations2 1"x3
22 3"x1" Corrugations
(In) Pipe Dia.
(In) Rod Dia.
Narrow Band Wide Band
Req'd. above 42" dia.
to 42" diameter.
Second angle conn. opt.
Band (See general note 4) where required Watertight joint gasket
"16 32"x2"x
" bolts2 and toe of angle of corrugation at heel fillet weld at crest Rivet, spotweld or bolts "2
Band
Pipe Band
Pipe with cut washers " carriage bolts8
32 -
W W joints req'd. for watertight (Sigma) clips
Band
(See general note 4) where required Watertight joint gasket with cut washers " carriage bolts8
32 -pipe corrugated Helically
Helical pipe
Band
Pipe
(See general note 6) where required Watertight joint gasket
Cast lug
Band
4 - Rods and lugs
Cast lug
Pipe as reqd. to fit the helix angle.
Dimension A: 7" min. between dimples
" bolts2 13 -
Pipe
Band min 12"
"16 32"x2"x to fit the helix angle 8 spaces as reqd.
"2
(For 6"-10" dia. pipes)
(For 12"-30" dia. pipes)
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD327
CORRUGATED METAL PIPE
COUPLING BANDS FOR
R D
.d g n
REVISED DETAILS AND NOTES01-2023
20-JAN-2023N/A
J A
N are required for pipe diameters over 42 inches.
up to and including 42 inches. Coupling bands of two or more pieces
4. One or two piece coupling bands are optional for pipe diameters
. "16 in diameter, the gasket thickness may be the band width and centering on the joint. For pipes 12 inches or less thick of a width equal to "8 synthetic, closed-cell sponge rubber
Gaskets for all coupling bands shall be (butt-cemented or vulcanized) storm sewers, and other installations when shown on the plans.
3. Watertight joints with gaskets are required for irrigation pipes, approved by the engineer.
gasket or coated with asphalt or other insulating material as the connecting band shall be used with a full width neoprene
2. To prevent galvanic action when unlike metals are connected, not shown.
1. See Std. Dwgs. RD325 and RD326 for general notes, and details provide a tensile strength of 7500 lbs are permissible.
Design variations in fasteners (Straps, bars, & welds) which
NOTE:
provide a tensile strength of 7500 lbs are permissible.
Design variations in fasteners (Straps, bars, & welds) which
NOTE:
Coupling band sealant where required
Watertight joint gasket or
Forged steel bar
" dia.8
(Typ.)
" square hole16
(Typ.)
Spot welds Band sheet
"4
"x84
Tension strapBolt bar
(See general note 3)
"4
"8
" 2
BOLT BAR DETAIL
WATERTIGHT JOINT
TENSION STRAP
DETAIL A
TOP
FRONT
FLAT BAND OR DIMPLE BAND
TYPE K
(FOR PIPE EXTENSIONS ONLY)
or helical end with reformed end
New pipe extension with helical end
Extg. pipe
(See table A)
W connector
Band angle connector
Bar & Strap bolt (Typ.)
"x6" carriage 2
BAND ANGLE CONNECTOR DETAIL
DOUBLE BAR & STRAP CONNECTOR DETAIL
Band Type
Steel
Aluminum
Corrugations (In)
Pipe Dia.
(In)
Min. W Gasket Type
Sleeve
Sleeve
54-144
54-84
12-48
54-96
54-84
12-48
"2 1"x3
* 3"x1" 5"x1"
"2 1"x3
* 3"x1" 5"x1"
TABLE A
* Arch pipe only
Insulating material connecting band
Standard
(See general note 2)
Type varies with pipe of unlike material
Extending existing pipe culvert
CONNECTION DETAILS
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
bolt (Typ.)
"x6" carriage 2 the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD330
METAL
PIPE SLOPE ANCHORS
R D
.d g n
07-JAN-2013N/A
J U
L
(See general note 3)
"16
"4
ANCHOR ASSEMBLY ALTERNATE "A"
PLATE DETAIL 1BPLATE DETAIL 1A
DRIVE PLUG
(CAST IRON)
DRIVE POINT
PIPE STAKES
DETAIL "A"
U BOLT
ANCHOR ASSEMBLY ALTERNATE "B"
TYPE ITYPE II
(CAST IRON)
WITHOUT CABLEWITH CABLE
" cable clamp8
(See general note 6)
Coupling band
(See general note 6) plate required (Typ.)
" bolts through2
One on each side wire rope, galvanized.
" common cable or8
See Plate Detail side of pipe
Pipe stakes each
Cables and cable clamps to be used when specified.
"8
"8
"4
1 "8
"4
"2
"4 11 "16
"16
"4
"8
6" parallel to the centerline of the pipe.
* Length of band coupler measured b a n d c o u p le r b a n d c o u p le r o r
" slots (6)4 3"x16
2"x3" slot (1)
"x1" slots (7)4
" slots (2)4 3"x32
2"x3" slot (1)
(Typ.)
" chamfer4 slots (2)
"2 1"x116
1" rad.
" rad.2
U bolt "2
Weld
One on each side wire rope, galvanized.
" common cable or8
Two on each side " cable clamps.8
52 -
" min.16
4"
2" dia.
Weld of pipe each side Pipe stakes
"4
(See optional fabrication Detail "A") " round steel for pipe over 8"4
" round steel for 8" pipe2
24" 8" t o
"8" to
"4
" U bolt2
" holes16
" plate2
"8
(Optional fabrication for identical upper and lower pipe clamp parts.)
3"
(Cables and cable clamps to be used when specified.)
lo n g d ia s td p ip e d ia s td p ip e
Drive plug p lu g a n d d ri v e p o in t
C ri m p p ip e t o f a s te n d ri v e point Drive
2" dia. std. pipe ** Fabricate collar from
1 Collar
Weld or point Flatten
" rad. (Typ.)4
"8
3" dia.
"2
"16
"16
"8
" dia. max.8
See Std. Dwgs. RD326 and RD327.
" bolts through plate with Anchor Assembly Alternate "A".2
16. Use 2 piece coupling bands with
". Hot-dip galvanize after fabrication.4
15. Plate material to be ASTM A36
4. Place slope anchor assemblies on 20' max. centers on slopes 20% or greater.
Pipe stakes to extend 6" above plate.
3. Either Type 1 or Type 2 pipe stakes may be used with either anchor assembly alternate at the contractor's option.
Alternate "A" to be used with helically corrugated pipe.
2. Either Alternate "A" or Alternate "B" anchor assembly may be used at contractor's option for annularly corrugated pipe.
1. All pipe stakes and hardware to be hot-dip galvanized after fabrication.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD364
TYPE G-1, G-2, G-2M, & G-2MA
CONCRETE INLETS
R D
.d g n
21-JUL-2015N/A
J U
L
4" drain pipe
Base drain, m in
INLET TYPE W W
G-1
G-2, G-2M, G-2MA
"8 71'-8"8
72'-8
"8 33'-3 "8
32'-3
TYPE G-1, G-2, G-2M
TYPE G-2MA
WITHOUT SUMP
DETAIL A
TABLE A
SECTION A - A
SECTION B - B
SECTION C-C
C C
PLAN
PLAN
B
B
A A
(See general note 5)
Tracer wire when directed
Shape bottom m in (T y p
6" W
W
6" b r e a k
G r a d e
Finish grade
(See general note 9) when required
" preformed filler,4
Subgrade
(See general note 5)
Tracer wire
(See general note 11)
(Typ.)
Pipe connection varies
(See general note 3)
Sump
"2
(See general note 4)
Curb (Type var.)
Aggr. backfill n o r m a l
6"
V a r ie s
W6" 6"
W
Normal pavement slope
(See general note 2)
Frame & grate see inlet G-2
For details not shown, face of concrete unless shown or noted otherwise
All reinforcement to be placed 2" clear of nearest
NOTE:
#4 bars @ 6"
#4 bars "2
(See general note 2)
Frame & grate
6'-0"
"4
2'-46"
"4
3'-4
(See general note 10)
Pay limit for conc. inlet
6"
1'-6"
6"
V a r ie s m in
Top of curb
4" drain pipe (Typ.)
Base drain, (Typ.)
Aggr. backfill
Subgrade
(See general note 5)
Tracer wire (Typ.)
(See general note 11)
(Typ.)
Pipe connection varies
(See general note 3)
Sump normal
6"
(See general note 11)
(Typ.)
Pipe connection varies flow line
Depressed gutter flow line
Normal gutter
(Typ.)
Slope 1:12 nom.
(See general note 9) when required
" preformed filler,4
Top back of curb
Top face of curb
(Typ.)
Aggr. backfill
4" drain pipe (Typ.)
Base drain, (See general note 9) when required
" preformed filler,4
Concrete inlet
(See general note 2)
Frame & grate
(See general note 5)
Tracer wire (Typ.)
Normal gutter flow line
11. See Std. Dwg. RD339 for pipe to structure connections.
10. See Std. Dwg. RD363 for gutter transition section, when curb and gutter are required.
" preformed filler (in concrete pavement or gutter only) to extend through thickness of concrete.4
9.
8. All concrete shall be commercial grade concrete.
7. Location, elevation, diameter, slope, and number of pipe(s) varies, see project plans.
6. Max. pipe diameter varies with pipe material.
5. See Std. Dwg. RD336 for tracer wire details, or approved alternate.
4. For curb details, see Std. Dwgs. RD700 & RD701.
3. Provide sump only where shown on plans, and allowed by jurisdiction. See Detail A for inlet without sump.
For frame and grate details, see Std. Dwg. RD365.
Type 1 grate allowed only in locations not subject to bicycle or pedestrian use.
2. Graphics show G-1 inlet with Type 2 grate. See Table A for inlet dimensions.
crushed aggregate shall be provided. All precast inlets shall conform to requirements of ASTM C913.
"-04
1. Where precast inlets are used as an alternate to cast-in-place inlets, a 4" compacted leveling bed of sand or
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD365
FOR CONCRETE INLETS
FRAMES & GRATES
R D
.d g n
14-JUL-2014N/A
J U
L all bars
Both ends "16
"4
4 corners "4 32'-4 h e x b a r o f e q u iv a le n t a r e a r o u n d r e c t.
o r
C r o s s b a r s h e x b a r o f e q u iv a le n t a r e a r o u n d r e c t.
o r
C r o s s b a r s flat bar each end
"2
"x28
"x2" or 8
(Typ.)
" on center8 at 1
" flat bars2
"x28
Bearing bars
T y p ic a l a ll b a rs see general note 3
For cross bars, third inner bar and every outer bars both ends, Typical "16
"2
2" b a r s o n c e n te r s
1'-9"
(Bicycle-safe) edge flat bars
" sq.2
"x22
"8
1'-9
2 each end
"x3" bolt8 angle (Typ.)
"8
"x 2
3"x2
"4
1'-10
"4
4 anchors
"4
4 corners
T y p
" (Typ.)2
2 each end
"x3" bolt8 5 "
2 each end
"x3" bolt8
(Typ.)
" on center8 at 1
" flat bars2
"x28
Bearing bars flat bar each end
"2
"x28
"x2" or 8 see general note 3
For cross bars, third inner bar and every outer bars both ends, Typical
"2
2T y p ic a l a ll b a rs
3 "16
2'-3"
"2
1'-1 "2
1'-1 b a r s o n c e n te r s
(2 grates required per inlet, as shown)
(Bicycle-safe)
2"
2 each end
"x3" bolt8
"8
2'-3 edge flat bars
" sq.2
"x22 angle (Typ.)
"8
"x 2
3"x2
"4
4 anchors
" (Typ.)2
T y p
(Typ.)
sq. edge flat bar
"2
"x28
"2
(Typ.)
sq. edge flat bars
"4
"x2'-62
"x28
Bearing bars
"2
"2
2'-3"
Spacing 3" O.C.
(See general note 2)
5. Cast iron grate and frame are acceptable alternates. See ODOT's QPL.
4. Hot dip galvanize after fabrication.
resistance welded or electroforged to bearing bars.
" cross bars shall be flush with the top of grate surface and may be fillet welded,8
3.
2. Type 1 grate allowed only in locations not subject to bicycle or pedestrian use.
1. For inlet details, see appropriate inlet standard drawing(s).
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
(TYPE 1)
G-2, G-2M, G-2MA, CG-2 GRATE
(TYPE 2)
G-2, G-2M, G-2MA, CG-2 GRATE
(TYPE 2)
G-1, CG-1 GRATE
G-1, CG-1 FRAME G-2, G-2M, G-2MA, CG-2 FRAME
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD376
CAP AND INLET ADJUSTMENT
STRUCTURES, SIPHON BOX, INLET
MISCELLANEOUS DRAINAGE
R D
.d g n
14-JUL-2014N/A
J U
L
36"
50"
X
Y
6"8"
6"
Ditch flow
V a ri a b le specified
Pipe as
18" min.
36" W min.
36"
#4 hoop
8"
6" (See general note 6)
Ditch flow
W36"
36"
W
W
Y
X
(For details not shown, see Std. Dwg. RD366)
ADJUST EXISTING INLETCONCRETE INLET CAP
SIPHON BOX
SIPHON BOX AND COVER
SIPHON BOX COVER
PLANPLAN
PLAN
END VIEW
PLAN
END VIEW
AA
SECTION A-ASECTION A-A
AA
SECTION A-A
AA
SECTION A-A
AA
of ditch to suit size of pipe and shape determined by the Engineer shape of opening to be
Dimension ''W'' and size and
(See general note 7)
Pipe connection varies (Typ.)
Ditch flowline
7. See Std. Dwg. RD339 for pipe to structure connections.
6. Alignment of ditch, siphon box, and pipe varies, see project plans.
5. All precast products shall conform to requirements of ASTM C913.
4. Max. pipe diameter varies with pipe material.
3. See Std. Dwg. RD336 for tracer wire details.
RD364.
Size frame and grate to match dimensions of siphon box used, see Std. Dwg.
2. If metal frame and grate is reqd. conform to details for Type 1grate.
concrete unless otherwise shown or noted.
1. All reinforcement to be placed a minimum of 2" clear of nearest face of
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
note 3)
(See general
Tracer wire Top of bank at 12" ctrs. max.
#4 bars spaced equally
#4 hoop note 3)
(See general
Tracer wire bars at 12" ctrs. max.
All reinforcement to be #4
NOTE:
at 12" ctrs. max.
#4 bars spaced equally pressure treated.
All wood shall be
NOTE:
16d nail (Typ.)
Anchor bolts deck plank size
Top planks to match
Anchor bolts
Do not countersink into planks bolts, washers, and nuts.
x12" galv. anchor2
4 -
" gap between planks2
Lay with
3"x6" or 3"x8" plank deck.
ea. end of each plank
2 - 16d nails (Typ.)
grade
Finish m in
3 4 m in measurements.
X & Y dimensions to be determined by field
NOTE:
Asph. conc. surfacing wall thkn.2
6" norm.
Extg. inlet
3" clear of top face of concrete.
" min.2 face of concrete and 3
" min. clear of bottom2 cap 1
Place bars in concrete inlet
@ equal spacing
10-#4 bars
@ equal spacing
8-#4 bars Extg. grate
Finish grade m in measurements.
X & Y dimensions to be determined by field
NOTE:
Extg. grate
6" norm.
Extg. inlet the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD380
CORRUGATED PIPE
ALUMINUM AND STEEL
FILL HEIGHT TABLES FOR
R D
.d g n
08-JUL-2013N/A
J U
L
1.0
1.0
1.0
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.5
1.5
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.5
1.5
1.5
1.5
1.5
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.5
1.5
1.5
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
2.0
2.0
2.0
2.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.0
2.0
2.0
2.0
2.0
1.5
1.5
1.5
1.5
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
.168.064 .079 .109 .138
MAXIMUM COVER (Ft.)MAXIMUM COVER (Ft.)
.064 .079 .109 .138 .168.064.060 0.075
MAXIMUM COVER (Ft.)
.060 .075 .105 .135 .164
MAXIMUM COVER (Ft.)
SPECIFIED THICKNESS (In.)
DIAMETER
(In.) (Ft.)
COVER
MINIMUM
(Ft.)
COVER
MINIMUM
(Ft.)
COVER
MINIMUM
(Ft.)
COVER
MINIMUM
(Ft.)
COVER
MINIMUM
(Ft.)
COVER
MINIMUM
(Ft.)
COVER
MINIMUM
(Ft.)
COVER
MINIMUM
(Ft.)
COVER
MINIMUM
(Ft.)
COVER
MINIMUMSPECIFIED THICKNESS (In.) SPECIFIED THICKNESS (In.)
DIAMETER
(In.)
SPECIFIED THICKNESS (In.) SPECIFIED THICKNESS (In.)
MAXIMUM COVER (Ft.)MAXIMUM COVER (Ft.)
SPECIFIED THICKNESS (In.)
WELDED OR LOCK SEAMLOCK SEAM WELDED OR LOCK SEAMLOCK SEAMLOCK SEAMLOCK SEAM
"4 1"x2
11 "2 1"x3
22 3"x1" and 5"x1""4 1"x2
11 "2 1"x3
22 3"x1"
.060 .075 .105 .135 .164 note 9)
(See general be increased, shown can these values
5"x1",
6. Heavy solid line denotes boundary between minimum cover requirements.
5. For multiple pipe installations, see Std. Dwg. RD300.
be approved by the Senior Standards Engineer.
4. For ODOT, pipes with maximum cover greater than those shown in the Tables shall
Geo-Environmental Section.
3. For ODOT, pipes with diameters greater than 72" must be reviewed by the
2. Minimum height of cover is least vertical distance from top of pipe to subgrade.
1. Maximum height of cover is greatest vertical distance from top of pipe to finish grade.
GENERAL NOTES FOR ALL TABLES ON THIS SHEET:
Maximum fill height for 3"x1" can be increased by up to 12% over values shown for pipe size 54" and larger.
9. 5"x1" corrugation can be used as an alternate for 3"x1" corrugation.
8. For minimum thickness, see AASHTO M197, M218, and M274.
See special details or Standard Drawings as called for on plans.
culvert embankment protection, paved end slopes, safety end sections, or other measures).
7. Open ends of pipes normally require a site specific design, and may require special treatment (Sloped ends, FILL HEIGHT TABLE FOR CORRUGATED CIRCULAR PIPE
STEEL
HELICALPIPEHELICAL
ALUMINUM
PIPE
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD398
CULVERT ID MARKER
R D
.d g n
01-JUL-2020RD11-01
J U
L
Mile point for rivet hole locations
See dwg. no. TM570
12345
ODOT
D panelStyle:working_panelRoundCorners:0constructPanelMode:0constructPanels:36|24|18levels:GSCOLORFILL|GSBWFILL|GSOUTLINE
TYPE 2 MARKER
TYPE 2 MARKER INSTALLATION
3.5"
1.33"
.67"
1"
.25"
.5"
.75" Non-reflective green tape band
.5"
1", (typ.)
.25" (typ.)
s e e n o te s a n d o r
B ri d g e s tr u c tu re I
D
D ra in a g e f a c il it y I
D
D F
I) black, (typ. all) non-reflectorized
Type C font paddle non-reflective
White
1"
2" m in
Fo g lin e
Ed ge o f p av em en t
Ed ge o f p av em en t
Fo g lin e
In cr ea se m ile p oi nt
Culvert inlet
Culvert inlet
Culvert inlet
Culvert inlet
In cr ea se m ile p oi nt
Barrel B
Barrel A
Edge of pavem ent
Fog Line typ. rivet holes
Paddle with typ. holes
Paddle with
Headwall
Wingwall
12345
ODOT
D
(See Note 8) rivets and washers aluminum blind
(4) 3/16" dia.
steel post with paddle to type 1U
Fasten Type 2 marker
(See Note 8)
MULTIPLE PIPES
SINGLE DRAINAGE FACILITY
SINGLE PIPE
SINGLE DRAINAGE FACILITY
2" m in .4"
6"-12"Varies
(See Note 8)
MULTIPLE DRAINAGE FACILITY
Varies
4"
6"-12"
INSTALLATION
CONCRETE HEADWALL
edge of pavement and letters facing
Type 2 marker, numbers edge of pavement lane, numbers facing post parallel to travel mounted on steel
Type 2 marker paddle pavement lane, numbers facing edge of on steel post parallel to travel
Type 2 marker paddle mounted facing edge of pavement post parallel to travel lane, numbers
Type 2 marker paddle mounted on steel line
Ground slope
Steep concrete anchors with 4 (3/16" X 2") concrete wall
Fasten to with inlet side of first culvert fused thermoplastic tape. Place in line
Type 1 marker, Type B Green preformed
GUARDRAIL INSTALLATION
(See notes 1, 3 and 9) rivets and washers, aluminum blind
(4) 3/16" dia.
steel post with paddle to type 1U
Fasten Type 2 marker
INSTALLATION
CONCRETE BARRIER
Inlet concrete barrier
Precast median
Type 2 marker concrete anchors wall with 2 (3/16" X 2")
Fasten to concrete side of culverts tape. Place in line with inlet preformed fused thermoplastic
Type 1 marker, Type B Green first culvert (see note 10) in line with inlet side of thermoplastic tape. Place
Green preformed fused
Type 1 marker, Type B
.2
NOTES:
10. Install only a Type 1 marker or a Type 2 marker on concrete barrier.
Type 2 marker on slope side of barrier.
9. Steep slopes where guardrail or concrete barrier are present, install
Engineering Technical Services Branch.
Maintenance Hydraulic Engineer in the Hydraulic Unit of the contact the Senior Culvert Hydraulic Engineer or the Senior Culvert
8. For more information on Single and Multiple Drainage Facilities, marker when a culvert has a span equal to or greater than 6 feet.
7. Bridge Structure ID: Place the assigned ID number on the Type 2 marker when the culvert span is less than 6 feet. (Example D10123).
6. Drainage Facility ID: Place the assigned DFI number on the Type 2
5. On divided highways placing markers on the outlet side is optional.
side of highway.
4. On non-divided highways place markers only at the culvert inlet inconspicuous to traffic.
3. Install Type 2 culvert markers parallel to travel lane and with the inlet.
2. Place Type 1 marker on inlet edge of the pavement directly in line details.
1. See Standard Drawing TM571 for 'Type 1U Steel Post Dimensions' the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
RD610
DETAILS
PAVEMENT (ACP)
ASPHALT CONCRETE
R D
.d g n
25-JUL-2017N/A
J U
L
1" in 5'
Feather base course Taper 1" in 5'
AT GRAVEL APPROACHES
METHOD OF FEATHERING ACP PAVEMENT
OR BRIDGE ENDS WHEN NOT OVERLAYING THE BRIDGE
ACP PAVEMENT MATCH AT PROJECT ENDS
METHOD OF MATCHING EXTG. ACP INLAY SURFACING
TABLE 1
METHOD A *
METHOD B *
TAPER LENGTHS
ACP wearing course
(When present)
Feather ACP base course
Extg. pvmt.
See "EDGE DETAIL"
Extg. pvmt.
wearing course thkn.
ACP unfeathered
See project plans for method.
Taper (See Table 1)
Cold plane pvmt. removal
Taper (See Table 1)
Cold plane pvmt. removal
Posted Speed Taper Length
1" per 50' 45 mph
1" per 100'> 45 mph
See "EDGE DETAIL"
Extg. pvmt.
wearing course thkn.
ACP unfeathered top ACP base course
Construct non-feathered
(See "EDGE DETAIL")
Top of ACP base, Extg. pvmt.
ACP wearing course
(When present)
Feather ACP base course
Extg. gravel surfacewearing course thkn.
ACP unfeathered
Thkn. - Var. (2" to 0)
Aggr. base
Thkn. - Var. (2" to 0)
(When present)
Asph. conc. base course
(Thkn. as shown on plans)
ACP wearing course
Extg. pvmt.
Thkn. - 2"
(When present)
ACP base course e x tg p v m t.
E d g e o f
See "EDGE DETAIL"
ACP wearing courseExtg. pvmt.
See "EDGE DETAIL"
Extg. A.C. pvmt.
Cold plane pvmt. removal
(Inlay to extg. asphalt conc. pvmt.)
not acceptable
Mill edge as shown
Nom. depth
Sawcut & seal
EDGE DETAIL
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
may be placed steeper
Slope of individual layer layers to be 1:1
Overall slope of succesive
MULTI-LAYER PAVEMENT CONSTRUCTION
p a v e m e n t
E d g e f see project plans
Slope varies, Successive layers cement treated base mix bituminous base or
First layer of ACP, plant
(NEW CONSTRUCTION)
SAFETEY EDGE FOR ASPHALT CONCRETE
PORTLAND CEMENT CONCRETE PAVEMENT OVERLAY
SAFETY EDGE FOR
(INCLUDING MILL, INLAY AND OVERLAY)
SAFETY EDGE FOR ASPHALT CONCRETE RECONSTRUCTION
p a v e m e n t
E d g e o f (6'-0" or less)
Shoulder width see project plans
Slope varies, A p p r o x
M in backing material
New shoulder
Safety edge concrete pavement surface
New portland cement pavement
Existing concrete to 1:2
Sl. 1:1
T p a v e m e n t
E d g e o f (6'-0" or less)
Shoulder width see project plans
Slope varies, p a v e m e n t
E d g e f
(6'-0" or less)
Shoulder width see project plans
Slope varies, p a v e m e n t
E d g e o f (6'-0" or less)
Shoulder width see project plans
Slope varies, p a v e m e n t
E d g e o f (6'-0" or less)
Shoulder width see project plans
Slope varies, p a v e m e n t
E d g e o f (6'-0" or less)
Shoulder width see project plans
Slope varies, SAFETY EDGE PLACED WITH LIFTS
SAFETY EDGE PLACED ONLY WITH FINAL LIFT
SINGLE COURSE OVERLAY
PAVEMENT THICKNESS (T) 5" OR LESS
n o te
S e e g e n e r a l
M in
A p p r o x material
Existing shoulder material
Shoulder backing to 1:22
Sl. 1:1
Safety edge
Sl. 1:4 to 1:6
Lift 1
Lift 2 pavement
Existing
Additional pavement surface
New asphalt for shoulder paving
Prepare existing ground n te
S e e g e n e r a l for shoulder paving
Prepare existing ground material
Existing shoulder
T pavement
Existing surface New asphalt
Lift 1
Lift 2 material
Shoulder backing
Sl. 1:4 to 1:6 to 1:22 1Sl. 1:1
Safety edge material
Shoulder backing
Sl. 1:4 to 1:6 to 1:22 1Sl. 1:1
Safety edge m in for shoulder paving Prepare existing groundpavement
Existing detail below construction, see Multi-layer pavement surface New asphalt
T material
Shoulder backing
Sl. 1:4 to 1:6 to 1:22 1Sl. 1:1
Safety edge
A p p ro x
Sl. 1:1
M in material
Shoulder backing
Sl. 1:4 to 1:6 to 1:22 1Sl. 1:1
Safety edge
A p p ro x
Sl. 1:1
M in
Lift 1
Lift 2
M in
Additional pavement
Base material
Base material
Lift 2
Lift 1 Additional pavement surface Asphalt surface Asphalt
T
Finish grade with a 1:1 sloped face below the safety edge.
depth of "T" > 5", construct the safety edge to a depth of 5" approximately thickness of the surface and intermediate courses. For total new asphalt For total new asphalt depth of "T"≤5", construct the safety edge to the full4.
obstructions.
Do not construct safety edge at intersections, paved drives, or other3.
pavement surface.
to 1:2 measured from the 2
1Construct the safety edge at a slope of 1:12.
is 2" or greater, except where indicated in the plans.
travel lane or edge of paved shoulders), where the wearing surface thickness Safety edges are required at the outside edges of the paved roadway (edge of1.
T
RD615
DETAILS
SURFACE EDGE
R D
.d g n
TITLE CHANGED, REVISED DETAILS AND NOTES07-2021
19-JUL-2021N/A
-J
U L -2
PAVEMENT THICKNESS (T) GREATER THAN 5"
RD700
CURBS
R D
.d g n
20-JUL-2020N/A
J U
L
6"
E specify in plans
Var. 24" or 30"
6"
E
" rad.4
Batter 6:1
" rad.4 see gutter pan notes
Slope varie s, T y p
2" (Typ.)
(See general note 11)
STANDARD CURB MOUNTABLE CURB
CURB ENDING DETAIL
MOUNTABLE CURB AND GUTTERCURB AND GUTTER
MOUNTABLE CURB
LOW PROFILE MODIFICATION FOR KEYWAY
WEEP HOLE DETAIL
VALLEY GUTTER
O.D.O.T. & City of Portland Standard "H"=16"
" rad.4
1:4 slope
6:1
Batter
(Slope var.)
Finish grade see gutter pan notes
Slope varie s, 12"
LOW PROFILE MOUNTABLE CURB AND GUTTER
" rad.4 or specifiy in plans
18" norm.
a s d ir e c te d o n p la n s o r v a r y a s s h o w n
(Where shown on plans)
** 0" at curb ramp n o r m
1.5' 4.5'
6'
Face of curb
"2
" R
1 " to joint filler (Full depth)
Preformed expansion
Asph. conc. pvmt. (ACP)
Grade of roadway upon extension of curb.
To be removed
(Slope var.)
Finish grade
" rad.4
Batter 6:1
" rad.8 m in
H v a ri a b le
E
(See general note 11)
6"
E
(See general note 11)
3" rad.
(Slope var.)
Finish grade
Batter 6:1
(Slope var.)
Finish grade m in
Batter 6:1
3" rad.
3" rad.
" rad.8
(Slope var.)
Finish grade
Batter 6:1 allowed by jurisdiction.
Vary where shown on plans, and
Vary slope as reqd. for drainage.
Slope 4.0% max. at curb ramps.
Slope 5.0% normal.
GUTTER PAN NOTES:
specify in plans
Var. 24" or 30"
6"
6" Normal curb
V a r
E see gutter pan notes
Slope varie s, Slop e va
r. (1 :4 m ax.)
Top of curb " (Max.)4
Bottom of curb
Gutter line
Batter 6:1 for each 1" difference in ''E''.
having a slope of 1:1 or steeper). Minimum desirable transition length shall be 20'
(''E'' Is the total vertical dimension of those curb surfaces
4. Transitions shall be used to connect curbs of different exposures ''E''.
3. Const. curb contraction joints at 15' maximum spacing, and at ends of each inlet and curb ramp.
ends of each driveways.
2. Const. curb expansion joints at 200' maximum spacing, and at points of tangency, and at curb. Vary as shown on plans or as directed. O.D.O.T standard "E"=7".
1. Curb exposure ''E'' = 6" to 9", as measured vertically from flowline to highest point on
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
or as directed as shown on plans
8" norm., vary
(Slope var.)
Finish grade
" rad.4 3" rad.4
1:4 slope
* 0" for Truck Apron thkn. (4" min.)
Future sidewalk be poured at the same time curb and sidewalk will not
Form shelf into curb when
2"
(Type var.)
curb and gutter
Curb, or
(Where req'd.)
3" PVC pipe, (Type var.)
curb and gutter
Curb, or weep hole
3" dia.
(Slope var.)
Finish grade
5%
(Where shown on plans, and allowed by jurisdiction)
(Where shown on plans)
Var.
V a r
12"
(Slope var.)
Finish grade
20"
40"
20"
" rad.4
#4 @ 12" centers (Slope var.)
Finish grade
" rad.4
T y p .)centers
#4 @ 7"
6"
"8
1 "8
" rad.8
" rad.8
(Finished surface)
5.0%
(Finished surface
5.0%
11. On or along state highways, curb and gutter is required at curb ramp.
10. For curb ramp details, see Std. Dwgs. RD900 series.
9. For drainage curbs, see Std. Dwg. RD701.
8. For sidewalk details, and monolithic curb & sidewalk, see Std. Dwgs. RD720 & RD721.
7. Dimensions adjacent to radii are measured to the point of intersection of curb surfaces.
6. Dimensions are nominal, vary to conform with curb machine approved by the engineer.
surface slope), unless otherwise shown, or as directed.
5. Tops of all curbs shall slope toward the roadway at 1.5% max. (Max. 2.0% finished the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
RD1030
TYPE 2, 3 AND 4
SEDIMENT BARRIER
R D
.d g n
REMOVED CALC BOOK NUMBERS01-2021
20-JAN-2021N/A
J A
N
A
PLAN
NOT TO SCALE NOT TO SCALE
A
F lo w sand bags
Biofilter or
F lo w
BARRIER SPACING
INSTALL PARALLEL ALONG CONTOURS AS FOLLOWS
ON SLOPE
SPACING
MAXIMUM
% SLOPE% SLOPE
10% Flatter
10 % 15
15 % 20
20 % 30
Steeper than 30%
1:10 or Flatter
10 X 7.5
7.5 X 5
5 X 3
Steeper than 1:3
300'
150'
100'
50'
25'
BIOFILTER BAG / SAND BAG BARRIER - TYPE 2 AND 4
SECTION A-A
Flow Pt. "A"
Pt. "B"
Countersink 3"
(Type 2 only)
2 stakes per bag
Slope
L
2"x2"x36" stakes
PLAN
SECTION A-A
FIBER ROLL BARRIER - TYPE 3
A A
12" overlap
Stagger joints Wattles
4' max.
Stake spacing
12" Overlap
Flow
Flow Flow
Countersink 3"
Flow
Slope
Pt. "B"
Pt. "A"
Barr ier s paci ng (s ee ta ble)
2"x2"x36" stakes
Type 4 - Sand bags
Type 3 - Wattles
Type 2 - Biofilter bags point "B".
elevation of point "A" is less than or equal to the elevation of
2. For Type 2 and Type 4 barriers, space bags (L) so that the placed on paved surface.
undisturbed ground a min. of 12". Omit stakes if bags are
1. For Type 2 barrier, drive stakes flush with top of bag and into
NOTES:
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November 30, 2025
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
RD1055
MATTING
SLOPE AND CHANNEL
R D
.d g n
REMOVED CALC BOOK NUMBERS01-2021
20-JAN-2021N/A
J A
N matting
Channel liner
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
H>3' AND TERMINAL SLOPE
TOP OF BANK ANCHOR TRENCH,
FIGURE A1:
ANCHOR TRENCH, H<3'
TOP OF BANK
FIGURE A2:
NOT TO SCALE
CHANNEL CHECK SLOT
FIGURE A3:
NOT TO SCALE
6"
NOT TO SCALE
ROCK BACKFILL
CHANNEL CHECK SLOT WITH
FIGURE A4:
NOT TO SCALE
ANCHOR TRENCH
INITIAL CHANNEL
FIGURE A5:
STAPLES
SLOPE MATTING ISOMETRIC VIEW
CHANNEL MATTING ISOMETRIC VIEW
Terminal slope
See Figure A5
A1 or A2)
(See figure anchor trench
Top of bank to bottom of channel
H=Height, top of bank staggered spacing, Stake at 24" Beginning edge, 12" OC or Figure A2
See Figure A1
6" min.
overlap overlap
6" min.
slope
Toe of matting
Slope o v e rl a p m in
1" 1/2"
12"
4'
Swale
Compacted soil
Bank with soil and compact
Fill anchor trench Compacted soil Compacted soil
14" riprap
Class 50
Compacted
6" m in m in ballast
Aggregate
H
(see Figure A3 or Figure A4)
Check slot at 25' intervals, accepted.
or photodegradable components will not be biodegradable product. Matting with plastic
8. Matting Types A through E: Furnish fully mat back under 4" and fasten.
Extend mat 24" beyond toe of slope; fold7.
at 24" OC
Stagger alternate rows of fasteners placed6.
Overlap upper mat over lower mat, and fasten.5.
Place fastener at 12" OC on matting edges4.
away from prevailing winds.
Install matting so edge overlaps are shingled3.
Install matting vertically down slope.2.
seeding is applied (where applicable).
1. Install matting on smooth soil surface after
NOTES:
accepted.
Matting with plastic or photodegradable components will not be
9. Matting Types A through E: Furnish fully biodegradable product.
and terminal slope anchor at upstream end.
Construct initial anchor trench at downstream end of matting8.
Fasten matting interior at 24" OC with staggered spacing.7.
fasten 12" OC (Fig. A2).
Anchor top edge of side channel matting in trench and6.
downstream matting. Fasten 12" OC
Lap upstream matting end 12" over beginning edge of5.
liner mat.
overlap and stapling pattern for each additional side channel channel liner matting and fasten edges 12" OC Continue
Overlap side channel liner matting edges 6" over the center4.
and at the end of each mat (Fig. A3 or A4).
Construct check slots across channel bottom at 25' spacing3.
pipe outlet.
outfalls, place mat under pipe 12" minimum upstream from
Anchor upstream end of mat with check slot for culvert
Install channel liner matting, in the direction of water flow.2.
(where applicable).
1. Install matting on smooth soil surface after seeding is applied
TM500
STANDARD DETAIL BLOCKS
PAVEMENT MARKING
T M
.d g n
Changed Min. widths for CH, TM, TM-40, and TS07-2020
07-01-2020N/A
DISABLED PARKING DETAIL (white)
4" white edge line
Edge of pavement
17'
1'
20'
4"
Direction of Traffic
36° 36°
3'
4'
36°
4'
LL
L
L
LL
LL
L
LLL
LL
L
TS
LL
LL
L
L
LL
4'
Direc tion o f Tra ffic
36° 3'
L
9'
3'
8" white line
1'
20'
4'
4" 8 " white line
12'12'12'
L For traversable medianL
9'
3'
L
12'
LL
1'
' 6
1'
For Centerline
DLL DLL-2
36°
36° 3'
Direction of Traffic
BYLD
L E G E N D
36°
Direction of Traffic
CH
For lane lines in drop lanes
For lane lines in acceleration/deceleration lanes
40'
40'
40'
10'
10'
40'
For lane extensions and bike lane extensions For lane extensionsFor lane extensions
TM-40
30'10'
8'
40'
20'
30'
10'
40' 40'
30'
30'
(Typ.)
Wheel Stop
YD
NPL
YBWB
TWL
WD-2
NPR
ND
Direction of Traffic
YLD
TM
4 " space
NDW
Thru Traffic Side
WD
D
YW-2W
2'
4" space
36°
36°
L
4" space
4" space
4"
4"
30'
4" YELLOW LINE
4" WHITE BROKEN LINE
4" space
LL
L
L
LL
LL L
L
LL
8'8'
6'6' 6'
2'2'
8'
1' space
8'
4" YELLOW BROKEN LINE
8" WHITE LINE4" WHITE LINE
10'
40'40'
8'
2'
1'
1'
1'
8" WHITE DOTTED LANE LINE4" WHITE DOTTED LANE LINE
Yellow Line Narrow Double
Yellow Line Narrow Double
YIELD LINE (white) for field layout angle orientation for field layout angle orientation for field layout angle orientation striping plans
Lane line dimensions are shown on the Or Thru Traffic Side
Direction Of Traffic, Increasing Stationing
1' WHITE BARS AT 20' SPACING
CHEVRON BARS
BICYCLE YIELD LINE (white)
4" YELLOW LINES
NO-PASS RIGHT
Yellow Line Narrow Double for field layout angle orientation
4" white line
R o u te
A c c e s s ib le w h ite lin e
1' WHITE BARS AT 20' SPACING
TRANSVERSE SHOULDER BARS
4" YELLOW DOTTED LINE
4" white line
1' YELLOW BARS AT 40' SPACING
TRANSVERSE MEDIAN BARS
distance between left turn refuges exceeds 200' For use at painted medians where
Increasing Stationing Increasing Stationing
Yellow Line Narrow Double
2' (Typ.)
8" WHITE DOTTED LINE 4" WHITE DOTTED LINE
1' YELLOW BARS AT 20' SPACING
TRANSVERSE MEDIAN BARS
3' 5"
4" YELLOW LINES
NO-PASS LEFT
4" YELLOW LINES
TWO-WAY LEFT TURN
TWO 4" WHITE LINES
NARROW DOUBLE NO-LANE CHANGE
TWO 4" YELLOW LINES
DOUBLE NO-PASS
TWO 4" YELLOW LINES
NARROW DOUBLE NO-PASS
(thru traffic side )
HC
4.5' min.
min.
4.5' min.
4.5' min.
4.5' the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2025 - November…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .