Att. 9 Bid Documents MECHANICAL.pdf

PDF 14 MB Posted

Attached to
Y1DA--618-181 Women's Clinic and Radiology Addition Minor Construction - Minneapolis VAMC (VA-24-00002581)
Solicitation number
36C77623R0193
Issued by

About this file

This document contains details regarding a federal solicitation for mechanical construction services. The solicitation number is 36C77623R0193 and is for the Women's Clinic and Radiology Addition project at the Minneapolis VA Medical Center. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The solicitation seeks mechanical construction and installation services to support additions to the Women's Clinic and Radiology department at the Minneapolis VAMC. The response due date and anticipated award date are not provided in this document.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHANICAL ABBREVIATIONS

AD AREA DRAIN

A.F.F. ABOVE FINISHED FLOOR

AFMS AIR FLOW MEASURING STATION

AHU AIR HANDLING UNIT

ANB ACID NEUTRALIZING BASIN

AP ACCESS PANEL

ARCH ARCHITECT

AS AIR SEPARATOR

BD BUTTERFLY DAMPER

B/G BELOW GRADE

BTU BRITISH THERMAL UNIT

BWV BACKWATER VALVE

CCF HUNDRED CUBIC FEET

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CL CENTER LINE

CLG CEILING

CO CLEAN OUT

CONTR CONTRACTOR

CONV CONVECTOR

CUH CABINET UNIT HEATER

CW COLD WATER

DB DECIBEL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIFF DIFFUSER

DISCH DISCHARGE

DMPR DAMPER

DN DOWN

DR DRAIN

DS DOWNSPOUT

DWG DRAWING

EAT ENTERING AIR TEMPERATURE

EDR EQUIVALENT DIRECT RADIATION

EP ELECTRIC-PNEUMATIC

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

EXP EXPANSION

F FAHRENHEIT

FC FAN COIL

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FHC FIRE HOSE CABINET

FHR FIRE HOSE RACK

FLR FLOOR

FLEX FLEXIBLE

FM FIRE MAIN

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FEET OR FOOT

F&T FLOAT AND THERMOSTATIC

FTG FOOTING

FTR FINNED TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLON

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HB HOSE BIBB

HD HEAD

HOA HANDS-OFF-AUTOMATIC

HTG HEATING

HTR HEATER

HVAC HEATING, VENTILATION,

AND AIR CONDITIONING

HYD HYDRANT

HW HOT WATER

GCO GRADE CLEANOUT

INSUL INSULATION

KW KILOWATT

LAT LEAVING AIR TEMPERATURE

LAV LAVATORY

LWT LEAVING WATER TEMPERATURE

MBH BTU PER HOUR (THOUSANDS)

MCF THOUSAND CUBIC FEET

MH MANHOLE

NC NOISE CRITERIA OR

NORMALLY CLOSED

NEG NEGATIVE

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

ORD OVERFLOW ROOF DRAIN

PD PRESSURE DROP OR DIFFERENCE

PE PNEUMATIC-ELECTRIC

PLBG PLUMBING

PRV PRESSURE REDUCING VALVE

OR POWER ROOF VENTILATOR

PSIA POUNDS/SQ INCH ABSOLUTE

PSIG POUNDS/SQ INCH GAUGE

PVC POLY VINYL CHLORIDE

RA RETURN AIR

RCP REINFORCED CONCRETE PIPE

RD ROOF DRAIN

RECIRC RECIRCULATING

REG REGISTER

RET RETURN

RH RELATIVE HUMIDITY

RHT REHEAT

RHC REHEAT COIL

RHW RECIRCULATED HOT WATER

RM ROOM

RPM REVOLUTIONS PER MINUTE

RPZ REDUCED ZONE BACKFLOW

PREVENTER

SA SUPPLY AIR

SAN SANITARY

SCFM CFM, STANDARD CONDITIONS

SD SMOKE DAMPER

SP STATIC PRESSURE

SPECS SPECIFICATIONS

SUP SUPPLY

SQ SQUARE

STM STEAM

TD TEMPERATURE DIFFERENCE

TEMP TEMPERATURE

TONS TONS OF REFRIGERATION

T-STAT THERMOSTAT

TYP TYPICAL

UB UP-BLAST

UG UNDERGROUND

UH UNIT HEATER

UR URINAL

V SANITARY VENT

VD VOLUME DAMPER

VEL VELOCITY

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

W SANITARY WASTE

W/ WITH

WC WATER CLOSET

WCO WALL CLEANOUT

WH WALL HYDRANT

W/0 WITHOUT

WTR WATER

PLUMBING

ACID VENT BELOW GRADE

ACID VENT ABOVE GRADE

ACID WASTE BELOW GRADE

ACID WASTE ABOVE GRADE

DEIONIZED WATER

FILTERED WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER (TEMP. INDICATED)

DOMESTIC RECIRC. HOT WATER

HARD COLD WATER

OVERFLOW STORM DRAIN BELOW GRADE

OVERFLOW STORM DRAIN ABOVE GRADE

REVERSE OSMOSIS WATER

SANITARY VENT BELOW GRADE

SANITARY VENT ABOVE GRADE

SANITARY WASTE

SANITARY SEWER

SOIL DRAINAGE TILE

SOFTENED COLD WATER

SOFTENED HOT WATER

TEMPERED WATER

STORM DRAIN BELOW GRADE

STORM DRAIN ABOVE GRADE

WELL WATER

EXISTING PLUMBING TO REMAIN

EXISTING PLUMBING TO BE REMOVED

AV

AV

AW

AW

DI

HARD

SDT

OSD

RO

V

V

SS

W

SOFT

SHW

TW

OSD

SD

SD

WW

MECHANICAL PIPING

BOILER FEED

CHILLED WATER SUPPLY

CHILLED WATER RETURN

COMPRESSED AIR (PSI INDICATED)

CONDENSATE DRAIN

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

FUEL OIL SUPPLY

FUEL OIL RETURN

FUEL OIL VENT

FUEL OIL FILL

GLYCOL SUPPLY

GLYCOL RETURN

HEAT RECOVERY SUPPLY

HEAT RECOVERY RETURN

HEATING WATER SUPPLY

HEATING WATER RETURN

LABORATORY VACUUM

LABORATORY AIR

LIQUIFIED PETROLEUM GAS

NATURAL GAS (PSI INDICATED)

PLANT VACUUM

PUMPED CONDENSATE

RADIATION WATER SUPPLY

RADIATION WATER RETURN

REFRIGERANT LIQUID

BF

CWS

CWR

10#A

CD

FOS

LV

GS

GR

HRS

HRR

HWR

HWS

LA

LPG

2#G

FOF

PV

PC

RADS

CS

CR

FOR

FOV

RADR

RL

REFRIGERANT SUCTION

REFRIGERANT HOT GAS BYPASS

REHEAT WATER SUPPLY

REHEAT WATER RETURN

REMOTE RADIATOR SUPPLY

REMOTE RADIATOR RETURN

SECONDARY HEATING WATER SUPPLY

SECONDARY HEATING WATER RETURN

SNOW MELT SUPPLY

SNOW MELT RETURN

STEAM SUPPLY (PSI INDICATED)

STEAM RETURN (PSI INDICATED)

EXISTING PIPING TO REMAIN

RRS

RS

RHG

RHR

RHS

RRR

SHWS

SHWR

SMS

SMR

10#STM

10#R

PLUMBING /PIPING

ELBOW DOWN

PIPE CAP

ELBOW UP

TEE, OUTLET UP

TEE, OUTLET DOWN

CONNECTION, BOTTOM

CONNECTION, TOP

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLEXIBLE CONNECTION

PIPE ANCHOR

ALIGNMENT GUIDE

CHECK VALVE

SHUTOFF VALVE

PLUG VALVE

COMBINATION BALANCE VALVE

AND FLOW METER

STRAINER

STRAINER W/BLOWDOWN

CAP AND VALVE

PRESSURE REDUCING VALVE

(SETTING AS NOTED, PSI)

MEDICAL GAS

MEDICAL VACUUM

WASTE ANESTHETIC GAS DISPOSAL

CARBON DIOXIDE

OXYGEN

NITROGEN

NITROUS OXIDE

MEDICAL AIR

WAGD

CO2

O

N

MV

N2O

MA

CONTROLS

AQUA STAT

TAMPERPROOF THERMOSTAT

HUMIDISTAT OR R.H. SENSOR

REFRIGERANT SENSOR

SMOKE DETECTOR

SPACE TEMPERATURE SENSOR

STATIC PRESSURE SENSOR

DUCTWORK

SUPPLY AIR

RETURN AIR

EXHAUST AIR

STANDARD BRANCH, NO SPLITTER -

SUPPLY FLOW TO RIGHT -

RETURN/EXHAUST FLOW TO LEFT

BELLMOUTH WITH BALANCING

DAMPER

FLEXIBLE DUCT

TURNING VANES

FLEXIBLE CONNECTION

MANUAL VOLUME DAMPER

MOTORIZED DAMPER

FIRE DAMPER & ACCESS

PANEL

SMOKE DAMPER &

ACCESS PANEL

COMBINATION FIRE/SMOKE

DAMPER & ACCESS PANEL

SUPPLY GRILLE OR REGISTER

T

T

P P

ROOM PRESSURE

MONITOR

H

R

SD

TS

SP

T THERMOSTAT

THERMOSTAT W/GUARDT

EXPANSION JOINT

AUTOMATIC CONTROL VALVE, 2-WAY

AUTOMATIC CONTROL VALVE, 3-WAY

AUTOMATIC AIR VENT

MANUAL AIR VENT

PRESSURE RELIEF/SAFETY

VALVES(SETTING AS NOTED, PSI)

DRAIN VALVE

BALL VALVE

BUTTERFLY VALVE

GLOBE ANGLE VALVE

0. S.& Y. VALVE

REDUCED PRESSURE ZONE

BACK FLOW PREVENTER

SOLENOID VALVE

FLOW LIMITING VALVE

DIAPHRAGM

GLOBE VALVE

REFRIGERANT SIGHT GLASS

GAS PRESSURE REGULATOR VALVE

BACKWATER VALVE

REFRIGERANT DRYER

FLOW DIRECTION

FLOW DIRECTION W/PITCH

DUPLEX STRAINER

PIPE UNION

PIPE FLANGE

PUMP

THERMOMETER

PRESSURE/TEMPERATURE TEST PORT

STEAM TRAP (TYPE INDICATED)

FLOW MEASURING STATION

(FLOW INDICATED)

FLOW SWITCH

PRESSURE GAUGE W/PIGTAIL &

PETCOCK

PRESSURE SWITCH

SHOCK ABSORBER

ELBOW

FLOOR DRAIN

DRAIN ABOVE

FLOOR SINK

WALL HYDRANT

HOSE BIBB

TEE

WALL CLEANOUT

ROOF DRAIN

CATCH BASIN

MANHOLE

HB

RETURN DUCT UP, NEGATIVE

PRESSURE

SUPPLY DIFFUSER/REGISTER

BLANKOFF INDICATED

RETURN OR EXHAUST GRILLE

OR REGISTER

SUPPLY DUCT UP, POSITIVE

PRESSURE

EXHAUST DUCT UP, NEGATIVE

PRESSURE

RETURN GRILLE/REGISTER

EXHAUST GRILLE/REGISTER

LINEAR DIFFUSER

CONCENTRIC DUCT TRANSITION

ECCENTRIC DUCT TRANSITION

RECTANGULAR-TO-ROUND DUCT

TRANSITION

VAV BOX

REHEAT COIL

VAV BOX W/REHEAT COIL

DUCT OFFSETS

DUCT CUTLINE

M

FD

VERTICALHORIZONTAL

FD

SD

VERTICAL

VERTICALHORIZONTAL

FSD FSD

RETURN DUCT DN, NEGATIVE

PRESSURE

SUPPLY DUCT DN, POSITIVE

PRESSURE

EXHAUST DUCT DN, NEGATIVE

PRESSURE

DROPRISE

FIRE PROTECTION

DFP

F FIRE PROTECTION

FIRE PROTECTION (DRY SYSTEM)

POST INDICATOR VALVE (PIV)

FIRE HYDRANT WITH SHUTOFF VALVE

RECESSED FIRE DEPT CABINET

SURFACE MOUNTED FIRE DEPT CABINET

FIRE PROTECTION RISER

UPRIGHT SPRINKLER HEAD W/GUARD

PENDANT SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

SIDEWALL SPRINKLER HEAD

BUTTERFLY VALVE W/TAMPER SWITCH

DETECTOR CHECK W/BYPASS METER

GRADE FIRE DEPT CONNECTION

FLUSH FIRE DEPT CONNECTION

FIRE DEPT VALVE W/CAP AND CHAIN

O.S. & Y. VALVE W/TAMPER SWITCH

DRY PIPE VALVE

PREACTION VALVE

GPM

AM

S

FS

PS

TS

FDVC

FDVC

FDV

TS

SD

HORIZONTAL

GAS COCK VALVE

CLEANOUT

WH

GR GRILLE

VAV VARIABLE AIR VOLUME

VTR VENT THROUGH ROOF

CARBON MONOXIDE SENSORCO

ANNOTATION

(4)A-12"Ø

GRILLE, REGISTER, &

DIFFUSER IDENTIFICATION

QUANTITY

CFM

TYPE

SIZE

X X

X X

X X

X X

DETAIL NUMBER

SHEET NUMBER

SECTION NUMBER

SHEET NUMBER

EQUIP DESIGNATION

EQUIP NUMBER

POINT OF CONNECTION, NEW TO EXISTING

POINT OF DISCONNECTION

FTR/RP 01

6'-5"

0.5

HYDRONIC FINNED TUBE

RADIATION & RADIANT

PANEL IDENTIFICATION

TYPE ACTIVE

ELEMENT

LENGTHGPM

EBR 01

6'-5"

ELECTRIC BASEBOARD

RADIATION

IDENTIFICATION

ACTIVE

ELEMENT

LENGTH

ZONE VALVE BOXZVB

AREA ALARM PANELAAP

MASTER ALARM PANELMAP

COMBINATION AREA/MASTER ALARM PANELCAP

NPCW NON-POTABLE COLD WATER

NPHW NON-POTABLE HOT WATER

INV INVERT

RLF RELIEF

FW

HW

RHW

GW GREASE WASTE

ISO ISOLATION EXHAUST

GEXH GREASE EXHAUST

MECHANICAL SYMBOLS LEGEND

EXISTING PIPING TO BE REMOVED

TYPE

DOMESTIC COLD WATERCW

CO2 CARBON DIOXIDE SENSOR

CLEAR WATER VENTCWV

CLEAR WATER WASTECWW

INTERRUPTIBLE GASIG

PROCESS AND LABORATORY

LABORATORY AIR

LABORATORY VACUUM

CLEAN DRY AIR

REVERSE OSMOSIS

DEIONIZED WATER

NITROGEN

HOUSE VACUUM

LV

CDA

RO

DI

LA

N

HV

PLANT VACUUMPV

ACID VENTAV

ACID WASTEAW

INSTRUMENT AIRIA

DOM. RECIRC. HOT WATER (TEMP. INDICATED)140 RHW

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

7301 OHMS LANE

SUITE #215

(952) 854-9302 TEL.

© PROPERTY OF ADVANCED

STRUCTURAL TECHNOLOGIES.

THIS DOCUMENT MAY NOT BE

USED OR COPIED WITHOUT THE

PRIOR WRITTEN CONSENT OF

ADVANCED STRUCTURAL

TECHNOLOGIES.

EDINA, MN 55439

ASTENG.COM

C R e v it P ro je c ts

\M

V A

M P

L S

W

C

M A

R ja s o n g o tt w a lt

.r v t

/2

/2

:1

:1

A

M

1375-M000

MECHANICAL TITLE SHEET WOMEN'S CLINIC AND

MAMMOGRAPHY ADDITION

1 VETERANS DRIVE

618-181

05/26/2023 JRG TNH15328

MECHANICAL SHEET LIST

SHEET

NUMBER SHEET NAME

1375-M000 MECHANICAL TITLE SHEET

1375-MH111 FIRST LEVEL HVAC PLAN

1375-MP111 FIRST LEVEL PIPING PLAN

1375-M121 MECHANICAL ROOF PLAN

1375-M400 MECHANICAL ROOM ENLARGED PLANS

1375-M500 AIR HANDLING UNIT DETAILS

1375-M501 BUILDING SYSTEM - PIPING AND FLOW DIAGRAMS

1375-M502 MECHANICAL DETAILS

1357-M503 MECHANICAL DETAILS

1375-M504 SEQUENCE OF OPERATION

1375-M600 MECHANICAL SCHEDULES

1375-M601 MECHANICAL/ ELECTRICAL SCHEDULES

1375-M602 MECHANICAL/ ELECTRICAL SCHEDULES

1375-FP111 FIRST LEVEL FIRE PROTECTION PLAN

1375-PG111 FIRST LEVEL MEDICAL GAS PLAN

1375-PG112 FIRST LEVEL MEDICAL GAS PLAN - DEDUCT ALT#1

1375-PP101 UNDERFLOOR PLUMBING PLAN

1375-PP111 FIRST LEVEL PLUMBING PLAN

1375-PP400 WASTE AND VENT RISER DIAGRAM

1375-PP401 DOMESTIC WATER DIAGRAM

1375-P500 PLUMBING DETAILS

1375-P600 PLUMBING/ ELECTRICAL SCHEDULES

SHEET TOTAL: 22

Name

Date Reg. No.

Jason R. Gottwalt, P.E.

41360

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

05/26/2023Revisions: Date:

benz Snapshot

MM

M

KEY NOTES:

GENERAL NOTES:

M

B

C

D

E

F

1 2 3 5 6

4 5.7

A

1.5 2.1

80-148

80-149

80-C1-06

80-120

80-119

80-118

80-C1-03

80-114

80-113

80-112 80-111

80-110

80-C1-02

80-C1-01

80-109

80-108

80-104

80-105

80-123

Unoccupied

Unoccupied

80-126

80-127

80-128 80-129 80-130

80-100

80-103

80-100A

80-101

80-131

80-C1-04

80-133

80-134

80-138

80-136 80-137

80-135

M400

12x10 x x x

16x12

10x10

20x14BOD: 14' - 7" x

12x12 x

10ø

8x12 x x x x

8x10

14x14 x

26x16 x

22x16 x x x x x x

44x24

32x18 30x16

10x10

10x12

38x18 34x18 x x

18x14BOD: 14' - 7" x x

48x18 x ø x

16x14

12x10

16x16 UP

(EF 01)

VAV

1-03

VAV

1-10

VAV

1-04

VAV

1-05

VAV

1-06

VAV

1-07

VAV

1-08

VAV

1-09

VAV

1-11

VAV

1-14

VAV

1-13

VAV

1-12

VAV

1-21

VAV

1-18

VAV

1-16

VAV

1-17

VAV

1-15

VAV

1-22

VAV

1-27

VAV

1-19

VAV

1-28

VAV

1-26

VAV

1-23

VAV

1-20

VAV

1-24

VAV

1-25

VAV

1-29

VAV

1-30

VAV

1-02

(2)A-10"

J-8"

G-12"

A-10"

H-8"

(2)A-10"

H-12"

(2)A-10"

A-6" 50 J-8"

A-6"

A-6"

H-8"

H-12"

J-8"

A-8"

A-8"

H-10"

A-10"

A-8"

A-8"

J-8"

H-8"

A-8"

J-8"

H-8"

(2)A-10"

H-10"

J-8"

(2)F-8"

H-8"

(2)B-6" x

(2)A-10"

H-10"

(2)A-10"

H-10"

J-8"

A-8"

A-8" 135 A-8"

A-8"

A-8"

H-8"

H-8"

H-8"

A-6"

(3)A-10"

A-10"

A-10"

H-8"

H-8"

A-8"

H-8"

A-8"

A-8"

H-8"

A-8"

H-8"

A-8"

H-8"

H-8"

A-8" 135 J-8"

A-8"

A-8"

H-8"

H-8"

H-8"

A-8"

J-8"

J-8"

(10)B-6"

12x8

10x10

G-16"

(5)A-10"

G-16"

(3)A-8"

H-8"

H-8"

H-8"

H-10"

H-8"

G-14"

J-8"

(2)B-8"

B-6"

A-8"

A-10"

A-8"

H-10"

A-8"

14x14

10x12

10x6

38x18

12x10

A-8"

A-8"

D-6"

6ø

B-6"

G-14"

24x14 x 416x10 x

8ø

G-16"

G-14"

A-10"

H-14" x

RISE

DROP

R

IS

E

R

IS

E

RISE

D R

O P

DROP

10x12

UP

DN

ø ø ø ø

10x10 x

24x12

RISE

12ø

38x18

38x18

R

IS

E

R

IS

E x x

18x12

22x12

F-12"

26x16

80-106

80-107

E-12"

(2)F-12" x

A-8"

D-6"

80-124 ø

28x16

BOD: 14' - 9"

BOD: 11' - 9"

38x16

BOD: 14' - 5"

BOD: 13' - 0"

K-6"

K-6"

BOD: 13' - 7"

BOD: 12' - 0"

60x24 x x x x

REFER TO M400 FOR DUCT

SIZING, NOTES, & DETAILS

WITHIN MECHANICAL ROOM

H-6"

H-6"

K-6"

K-6"

K-6"

E-12"

VAV

1-32 x

C-12x10

C-12x10

A-8"

A-8"

A-8"

A-8"

A-8"

16ø

J-8"

ELECTRICAL

80-150

A.

B.

C.

D.

E.

F.

G.

H.

COORDINATE ALL DUCTWORK ROUTING WITH ALL OTHER TRADES TO

INSURE ADEQUATE CLEARANCES FOR PLUMBING, ELECTRICAL

CONDUIT, STRUCTURAL SUPPORTS, PIPING, ETC. ANY UNAVOIDABLE

CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE

ARCHITECT/ENGINEER OF RECORD. PROVIDE ALL OFFSETS AND

TRANSITIONS AS REQUIRED FOR A CLEAN INSTALLATION.

SUPPORT ALL DUCTWORK DIRECTLY TO STRUCTURE. DO NOT

SUPPORT ANY DUCTS FROM DUCTWORK, CONDUIT, OR OTHER PIPING

ENCOUNTERED.

UNLESS NOTED OTHERWISE, ALL TAKE-OFFS TO VAV BOXES SHALL BE

THE SAME SIZE AS THE VAV INLET CONNECTION.

UNLESS NOTED OTHERWISE, ALL TAKE-OFFS TO DIFFUSERS, GRILLES

AND REGISTERS SHALL BE THE SAME SIZE AS THE DIFFUSER NECK OR

GRILLE/REGISTER CONNECTION.

ALL FIRE, SMOKE, AND COMBINATION FIRE/SMOKE DAMPERS

INSTALLED IN SHAFT WALLS SHALL BE INSTALLED TO ALLOW FOR

SERVICE OF THEIR FUSABLE LINK/ACTUATOR PER FACILITY

STANDARDS. ANY CONFLICTS WHICH WILL PREVENT ACCESS SHALL BE

BROUGHT TO THE ATTENTION OF THE ARCHITECT AND ENGINEER OF

RECORD.

MECHANICAL CONTRACTOR SHALL REVIEW ARCHITECTURAL CEILING

PLANS FOR LOCATIONS OF GYPSUM BOARD. DO NOT INSTALL VALVES,

VAV BOXES, SENSOR, OR DAMPERS ABOVE GYPSUM BOARD CEILINGS.

MECHANICAL CONTRACTOR SHALL REVIEW ARCHITECTURAL CEILING

PLANS FOR LOCATIONS OF GYPSUM BOARD CEILINGS AND

BULKHEADS. ADJUST PIPE AND DUCT THAT RUN PARALLEL TO

BULKHEAD FRAMING TO BE EITHER OUTSIDE OF FRAMING OR

BETWEEN FRAMING. MECHANICAL CONTRACTOR SHALL COORDINATE

WITH GENERAL CONTRACTOR FOR MODIFIED BULKHEAD FRAMING

WHERE EXISTING AND NEW PIPING AND DUCT WILL CAUSE

INTERFERENCE.

PROVIDE EACH NEW SUPPLY DIFFUSER/GRILLES WITH A SINGLE BLADE

TAKE-OFF DAMPER WITH QUADRANT LOCKING DEVISE. PERFORM ALL

BALANCING OF NEW DIFFUSERS THROUGH THOSE TAKE-OFF

DAMPERS. ALL NEW RETURN/EXHAUST GRILLES WILL BE PROVIDED

WITH OPPOSED BLADE BALANCING DAMPERS POSITIONED UPSTREAM

PAST A MINIMUM OF ONE TRANSITION FOR SOUND ABATEMENT.

BALANCING ANY DIFFUSERS/GRILLES USING INTEGRAL DAMPERS WILL

NOT BE AN APPROVED METHOD OF BALANCING.

DO NOT ROUTE DUCTWORK OVER THIS ROOM.

PROVIDE AND INSTALL FOUR (4) DUROZONE , EXTERNAL GEAR DRIVEN

CABLE OPERATED DAMPER IN LOCATION SHOWN. PROVIDE TWO (2)

WITH 15'-0" CABLES AND TWO (2) WITH 5'-0" CABLES. VERIFY CABLE

LENGTHS. (BALANCING OF RETURN AIR DIFFUSERS IN ROOMS 80-100,

80-103, 80-104 AND 80-124.)

PROVIDE AND INSTALL TWO (2) DUROZONE, EXTERNAL GEAR DRIVEN

CABLE OPERATED DAMPER IN LOCATION SHOWN. PROVIDE TWO (2)

WITH 19'-0" CABLES. VERIFY CABLE LENGTHS. (BALANCING OF SUPPLY

AIR DIFFUSERS IN ROOM 80-101.)

PROVIDE AND INSTALL TWELVE (12) DUROZONE, EXTERNAL GEAR

DRIVEN CABLE OPERATED DAMPER IN LOCATION SHOWN. PROVIDE

FOUR (4) WITH 26'-0" CABLES, THREE (3) WITH 24'-0", THREE (3) WITH

22'-0" CABLES, AND TWO (2) WITH 15'-0" CABLES. VERIFY CABLE

LENGTHS. (BALANCING OF SUPPLY AIR DIFFUSERS IN ROOMS 80-100.)

C

2 3 6 75.7

A

2.1

B

80-126

80-127 80-129

80-100

80-100A

80-101

80-131

80-C1-04

80-133

80-134

Unoccupied

80-138

80-136 80-137

80-135

22x16 x

44x24

32x18 30x16

18x14BOD: 14' - 7" x

16x14 12x10

16x16 UP

(EF 01)

VAV

1-03

VAV

1-10

VAV

1-04

VAV

1-05

VAV

1-06

VAV

1-07

VAV

1-08

VAV

1-09

VAV

1-11

VAV

1-14

VAV

1-13

VAV

1-12

VAV

1-02

J-8"

A-8"

A-8"

H-10"

A-10"

A-8"

J-8"

J-8"

(2)F-8"

H-8" x

H-8" 135H-8"

H-8"

10x10

10x12

10x6

A-8"

24x14 x

16x10

G-16"

G-14"

RISE

R

IS

E

RISE

10x10 x

24x12

18x12

22x12

F-12"

E-12"

(2)F-12" x ø

28x16

BOD: 14' - 9"

BOD: 13' - 0"

H-6"

H-6"

K-6"

K-6"

E-12"

E

F

2 32.1

80-119

80-118

BOD: 14' - 7"

x

10ø

10x10

38x18 x x

VAV

1-27

VAV

1-28

VAV

1-26

VAV

1-29

A-10"

J-8"

(10)B-6"

12x8

G-16"

RISE

R

IS

E

BOD: 14' - 5"

K-6"

D

2 32.1

80-123

80-135 x

12x12 8x12 x

44x24

10x12 x

48x18

VAV

1-10

VAV

1-09

VAV

1-26

VAV

1-25

J-8"

A-6"

(3)A-10"

10x10

14x14

A-8"

RISE

DROP

10x12

RISE

38x18

R

IS

E

R

IS

E ø

BOD: 11' - 9"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

7301 OHMS LANE

SUITE #215

(952) 854-9302 TEL.

© PROPERTY OF ADVANCED

STRUCTURAL TECHNOLOGIES.

THIS DOCUMENT MAY NOT BE

USED OR COPIED WITHOUT THE

PRIOR WRITTEN CONSENT OF

ADVANCED STRUCTURAL

TECHNOLOGIES.

EDINA, MN 55439

ASTENG.COM

C R e v it P ro je c ts

\M

V A

M P

L S

W

C

M A

R ja s o n g o tt w a lt

.r v t

/2

/2

:1

:1

A

M

1375-MH111

FIRST LEVEL HVAC PLAN WOMEN'S CLINIC AND

MAMMOGRAPHY ADDITION

1 VETERANS DRIVE

618-181

05/26/2023 JRG TNH15328

1/8" = 1'-0"

FIRST LEVEL HVAC PLAN

Name

Date Reg. No.

Jason R. Gottwalt, P.E.

41360

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

05/26/2023

1/8" = 1'-0"

FIRST LEVEL HVAC PLAN - DEDUCT ALTERNATE #3

1/8" = 1'-0"

FIRST LEVEL HVAC PLAN - DEDUCT ALTERNATE #4

1/8" = 1'-0"

FIRST LEVEL HVAC PLAN - DEDUCT ALTERNATER #5

Revisions: Date:

L

IG

H T

E D

L

IG

H T

E D

L

IG

H T

E D

R E

M O

V A

B L

E L

IG

H

T E

D L

IG

H

T E

D

R E

M O

V A

B L

E

R E

M O

V A

B L

E

R E

M O

V A

B L

E

R E

M O

V A

B L

E

L

IG

H T

E D

KEY NOTES:

GENERAL NOTES:

B

C

D

E

F

1 2 3 5 6

4 5.7

A

1.5 2.1

HOUSEKEEPING

AIDES CLOSET

80-148

TELECOMMUNICATIONS

ROOM

80-149

CORRIDOR

80-C1-06

TOILET, STAFF

80-119

TOILET, EXAM

ROOM

80-118

CORRIDOR

80-C1-03

EXAM ROOM

80-114

TOILET, EXAM

ROOM

80-113

EXAM ROOM

80-112

EXAM ROOM

80-111

EXAM ROOM

80-110

PATIENT

CORRIDOR

80-C1-02

PATIENT

CORRIDOR

80-C1-01

M.H. CONSULT

ROOM

80-109

M.H. CONSULT

ROOM

80-108

SHARED

MEDICAL APPT.

ROOM

80-104

CONSULT ROOM

(NEIGHBORS)

80-105

STORAGE

MEDICAL

EQUIPMENT

80-123

PROCEDURE

ROOM,

GYNECOLOGY

80-126

EXAM ROOM

80-127

EXAM ROOM

80-128

EXAM ROOM

80-129

NEGATIVE AIR

EXAM ROOM

80-130

GENERAL

WAITING

80-100

LACTATION

ROOM

80-103

VESTIBULE

80-100A

RECEPTION

80-101TOILET

BARIATRIC

80-131

CORRIDOR

80-C1-04

STERILE

STORAGE

80-133

UTILITY ROOM

CLEAN

80-134

BREAK AND

LOCKER ROOM

80-138

UTILITY ROOM

SOILED

80-136

TOILET, STAFF

80-137

WORKSTATION

PROGRAM

COORDINATOR

80-135

VAV

1-02

VAV

1-03 VAV

1-04

VAV

1-05

VAV

1-06

VAV

1-07

VAV

1-08

VAV

1-09

VAV

1-10

VAV

1-11

VAV

1-12

VAV

1-13

VAV

1-14

VAV

1-15

VAV

1-16

VAV

1-17

VAV

1-20

VAV

1-21

VAV

1-23

VAV

1-22

VAV

1-24

VAV

1-25

VAV

1-26

VAV

1-27

VAV

1-29

VAV

1-30

VAV

1-18

VAV

1-19

T VAV 1-03 TVAV 1-04 TVAV 1-05 TVAV 1-06

T VAV 1-07

T

FTR

VAV 1-08

T VAV 1-14

TVAV 1-13TVAV 1-12

TVAV 1-11

T VAV 1-10

TVAV 1-09

T VAV 1-25

T VAV 1-28

T VAV 1-26

T VAV 1-24

T VAV 1-23

T VAV 1-22T VAV 1-27

TVAV 1-30

T VAV 1-29

T

FTR

VAV 1-15

T

FTR

VAV 1-16

TVAV 1-17

TVAV 1-20

T VAV 1-18

T VAV 1-19

M400

VAV

1-28

AC

1-01

7' - 6"

FTR 01

16' - 0"

FTR 01

7' - 0"

FTR 01

3' - 6"

FTR 01

18' - 0"

FTR 01

14' - 0"

FTR 02

6' - 0"

FTR 02

7' - 6"

FTR 01

3' - 0"

FTR 02

4' - 6"

FTR 01

3' - 0"

FTR 02

4' - 0"

FTR 01

T

FTR

AC 1-01

T

FTR

T

FTR

2" SMS

2" SMR

2" SMS

2" SMR

SHWP

1-01

CONSULT ROOM

(NEIGHBORS)

80-106

CONSULT ROOM

(NEIGHBORS)

80-107

TVAV 1-21

PACT AREA

80-124

13 13 13

13131313 13 13

BALANCE FINNED

TUBE AT FLOOR -

2.5 GPM

ABOVE CEILING -

1.2 GPM

BALANCE FINNED

TUBE AT FLOOR -

1.1 GPM

ABOVE CEILING -

0.5 GPM

3.4 GPM

1.0 GPM 0.6 GPM

SNOWMELT

MANIFOLD #1

SNOWMELT

MANIFOLD #2

1230 SQ FT AREA SERVED BY SNOWMELT MANIFOLD #2. SPACE

TUBING TO ACHIEVE 185 BTU/SQ FT. RESULTS TO AN ESTIMATED

10 ZONES EACH WITH 250' OF 5/8" PEX TUBING. SNOW MELT

SYSTEM MANUFACTURER TO PROVIDE COMPLETE ZONING

PLANS FOR REVIEW AND APPROVAL BY ENGINEER-OF-RECORD.

325 SQ FT AREA SERVED BY SNOWMELT MANIFOLD #1.

SPACE TUBING TO ACHIEVE 185 BTU/SQ FT. RESULTS

TO AN ESTIMATED 3 ZONES EACH WITH 250' OF 5/8"

PEX TUBING. SNOW MELT SYSTEM MANUFACTURER

TO PROVIDE COMPLETE ZONING PLANS FOR REVIEW

AND APPROVAL BY ENGINEER-OF-RECORD.

1 1/2" SMS

1 1/2" SMR

1 1/2" SMS

1 1/2" SMR

REFER TO M400 FOR PIPE

SIZING, NOTES, & DETAILS

WITHIN MECHANICAL ROOM

1" HWS 1 1/2" HWS

3" HWR 3" HWR

2" HWS2" HWS

3" HWR

2" HWS

/2

H W

R

/2

H W

S

/2

H W

S

/2

H W

R

H

W S

3" HWS

1 1/2" HWR

2 1/2" HWR

3" HWS

1 1/2" HWR1" HWR 1" HWR

3" HWS

/4

H

W S

/4

H

W R

3/4" HWR

3" HWS

/4

H

W S

H W

R

H

W R

1 1/2" HWR

1 1/2" HWS

H W

S

H

W R

1 1/2" HWS

1" HWR

1" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWS

3/4" HWR

BALANCE FINNED

TUBE AT FLOOR -

0.6 GPM

ABOVE CEILING -

0.3 GPM

BALANCE FINNED

TUBE AT FLOOR -

0.6 GPM

ABOVE CEILING -

0.3 GPM

H

OFFICE NURSE

MANAGER

80-120

OFFICE

MEDICAL

DIRECTOR

80-121

WORKSTATION -

RN CARE

MANAGER

80-122

EXAM ROOM

CANCER

SCREEN

80-117

EXAM ROOM

GYNECOLOGY

80-116

EXAM ROOM

80-115

PROCEDURE

ROOM,

MAMMOGRAPHY

80-140

RADIOLOGIST

READ ROOM

80-139

STORAGE

MAMMO

EQUIPMENT

80-142

PROCEDURE

ROOM,

MAMMOGRAPHY

80-143

OFFICE

MAMMOGRAPHY

SUPERVISOR

80-141

PROCEDURE

ROOM, BREAST

ULTRASOUND

80-144

WORKROOM

80-132

TOILET,

IMAGING

80-145

PROCEDURE

ROOM,

UROLOGY

80-125

TOILET

PROCEDURE

ROOM

80-126A

PACT AREA

80-124

PACT AREA

80-124 MEDICATION

ALCOVE

80-160

ELECTRICAL

80-150

/4

H

W R

/4

H

W S

MOISTURE SENSOR

(ON ROOF)

1 DO NOT ROUTE PIPING OVER THIS ROOM.

ROUTE 3/4" HEATING WATER SUPPLY AND RETURN PIPING DOWN IN

WALL TO MANIFOLD. PROVIDE 24"X24" RECESSED WALL BOX WITH

PRIMED STEEL PANEL TO ENCLOSE MANIFOLD. LOCATE A LOCKABLE

ACCESS DOOR IN DRESSING ROOM 80-146A. PAINT TO WALL COLOR.

LOCATE FTR-02 ABOVE CEILING, NEAR EXTERIOR OF BUILDING.

PEDESTAL FTR HAS DOUBLE ROW ELEMENTS ALONG ENTIRE LENGTH.

CONTRACTOR TO USE TOP ROW FOR SUPPLY WATER CONNECTION,

AND BOTTOM ROW TO RETURN WATER. CONCEAL PIPING BETWEEN

WALL PENETRATION AND FTR COVER AS MUCH AS POSSIBLE

OFFSET PIPING TO AVOID STRUCTURAL BEAM.

BALANCE FINNED TUBE RADIATION TO GPM INDICATED.

PROVIDE TWO CONTROL VALVES. ONE VALVE TO SERVE FINNED TUBE

RADIATION LOCATED AT THE FLOOR. ANOTHER VALVE TO SERVE

FINNED TUBE RADIATION LOCATED IN CEILING PLENUM. BALANCE TO

GPMS INDICATED ON PLAN.

INSTALL THERMOSTAT ABOVE CEILING.

PROVIDE SNOW MELT SYSTEM TO COVER THE AREA INDICATED.

VERIFY EXACTY POINT OF TERMINATION INTO EXISTING SIDEWALK

COVERED BY PCC SNOWMELT. SNOW MELT SYSTEM SHALL BE FULLY

DESIGNED BY THE SNOW MELT MANUFACTURER AND VERIFIED BY THE

ENGINEER. SYSTEM SIZED AT 185 BTUH/SQ FT. INCLUDE MOISTURE

SENSOR AND PACKAGED SNOWMELT CONTROLLER TO BE INTEGRATED

TO BUILDING AUTOMATION. SEE SPECIFICATIONS AND SEQUENCE OF

OPERATIONS FOR ADDITIONAL INFORMATION.

SNOW MELT MANIFOLD LOCATION. INSTALL MANIFOLD WITHIN A WALL

MOUNTED, IP65 RATED, ELECTRICAL BOX WITH ALL PIPING

PENETRATION TO/FROM BOTTOM SIDE (APPROXIMATELY 24"X24"X8").

ROUTE 1.5" SNOWMELT SUPPLY AND RETURN PIPING THROUGH

EXTERIOR WALL TO ENTER INTO MANIFOLD BOX FROM BOTTOM.

PROVIDE IN FLOOR RADIATION WITHIN HATCHED AREA. AREA IS

APPROXIMATELY 185 SQUARE FEET. RADIATION SYSTEM SHALL BE

FULLY DESIGN BY THE IN FLOOR RADIATION MANUFACTURER AND

VERIFIED BY THE ENGINEER. SYSTEM SIZED AT 30 BTUH/ SQ FT. SEE

SPECIFICATION FOR ADDITIONAL INFORMATION.

DASHED SQUARE BOX REPRESENTS 24"X24" ACCESS AREA FOR BOTH

VAV BOX ACTUATOR AND REHEAT COIL PIPING COMPONENTS SHOWN

ON DETAIL 12/M502. LOCATE VAV BOX 2 FEET ABOVE CEILING MAXIMUM.

PROVIDE A 24"X24" ACCESS PANEL TO ALLOW FOR SERVICE OF

SNOWMELT MANIFOLDS WITHIN WALL CAVITY SHOWN. PROVIDE SHEET

METAL ENCLOSURE AND MOUNTING BRACKETS FOR MANIFOLDS AND

ROUTE ALL PEX TUBING THROUGH FOUNDATION WALL SLEEVES

DESCRIBED IN KEY NOTE BELOW. NOTE WALL SLEEVE WILL BE BELOW

GRADE AND SHOULD BE PROVIDED WITH WIDE RADIUS ELBOW, OR

DEPRESSION IN SLAB TO ACCOMODATE.

PROVIDE 8" UNDERGROUND PIPING SLEEVES (EXACT QUANTITY TBD)

FOR ALL SUPPLY AND RETURN PEX PIPING THROUGH FOUNDATION

WALL. SLEEVE SHALL HAVE LINK SEAL ASSEMBLIES AND INFILLED WITH

EXPANDABLE FOAM TO SEAL ALL GAPS BETWEEN PEX TUBING.

PROVIDE ROOF MOUNTED MOISTURE SENSOR FOR MAIN ENTRY

SIDEWALK SNOWMELT SYSTEMS, TEKMAR MODEL 95 OR EQUAL. NOTE

THIS SENSOR WILL BE INDEPENDANT OF ADJACENT PCC SNOWMELT

SYSTEM. COORDINATE SENSOR LOCATION WITH ARCHITECT/ENGINEER

WITHIN SHOP DRAWING SUBMITTALS PRIOR TO INSTALLATION.

PROVIDE NEW 2" PC AND 1-1/2" HPS VALVES AT THIS LOCATION.

COORDINATE OUTAGE WITH VA FACILITIES TO ISOLATE MAINS TO

ALLOW FOR TAKE-OFF TEE TO BE INSTALLED.

EXISTING 1" PC VALVE NOT LARGE ENOUGH. LEAVE IN PLACE.

ROUTE 3/4" PIPING HWS & HWR PIPING BEHIND COLUMN. CONCEAL

WITHIN CHASE WALL AS REQUIRED.

PROVIDE A HUMIDISTAT (IN ADDITION TO DEDICATED THERMOSTAT) TO

CONTINUALLY RECORD BOTH TEMPERATURE AND RELATIVE HUMIDITY

OF STERILE STORAGE AREA. COORDINATE STORAGE OF DATA LOGS

WITH VA COR FOR APPROPRIATE METHOD OF SAVING DATA.

PROVIDE A LAMINATED AS-BUILT DRAWING OF ALL SNOWMELT TUBING

ZONES/LAYOUT WITHIN MANIFOLD BOX FOR REFERENCE USE.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO REVIEW

ACCESSIBILITY TO AREAS OUTSIDE THE CONSTRUCTION LIMITS TO

DETERMINE APPROXIMATE AMOUNT OF OVERTIME REQUIRED TO

PERFORM ALL MECHANICAL WORK INDICATED. COORDINATION OF

SCHEDULES WITH ADJACENT DEPARTMENTS AND CLEANING OF ALL

DEBRIS AFTER EACH WORK SHIFT SHOULD BE ASSUMED IN THE BASE

BID SCOPE.

ANY MAJOR OUTAGES INDICATED ON THESE DRAWINGS SHALL BE

SCHEDULED TO BE PERFORMED AFTER NORMAL BUSINESS HOURS OR

DURING WEEKEND PERIODS TO MINIMIZE DISRUPTION.

COORDINATE ALL NEW PIPE ROUTING WITH ALL OTHER TRADES TO

ENSURE ADEQUATE CLEARANCES FOR DUCTWORK, ELECTRICAL

CONDUIT, STRUCTURAL SUPPORTS, PIPING, ETC. ANY UNAVOIDABLE

CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE

ARCHITECT/ENGINEER OF RECORD. PROVIDE ALL OFFSETS AND

TRANSITIONS AS REQUIRED FOR A CLEAN INSTALLATION.

SUPPORT ALL PIPING DIRECTLY TO STRUCTURE. DO NOT SUPPORT

ANY PIPING FROM DUCTWORK, CONDUIT, OR OTHER PIPING

ENCOUNTERED.

WHERE MECHANICAL SYSTEMS TO REMAIN ARE DAMAGED, OR

DISTURBED, DURING THE COURSE OF CONSTRUCTION THE

CONTRACTOR WILL BE RESPONSIBLE TO REMOVE DAMAGED

PORTIONS AND INSTALL NEW PRODUCTS OF EQUAL QUALITY AND

FUNCTIONALITY.

ALL EXISTING PIPING THROUGH NEW FIRE RATED WALLS SHALL BE

ADEQUATELY FIRE SEALED AS REQUIRED.

THE MECHANICAL CONTRACTOR SHALL MAINTAIN ACCURATE RECORD

DRAWINGS SHOWING ALL DISCREPANCIES WITH ANY EXISTING PIPING

INDICATED OR REVISIONS TO THE NEW PLUMBING LAYOUTS. ALL

CHANGES WILL BE UPDATED WITHIN THE FINAL RECORD DRAWING SET.

THE SMALLEST ALLOWABLE PIPE SIZE FOR HEATING WATER SUPPLY

AND RETURN WILL BE 3/4".

UNLESS NOTED OTHERWISE, HEATING WATER SUPPLY AND RETURN

PIPING TAKE-OFFS TO REHEAT COILS SHALL BE 3/4" DIAMETER.

HEATING WATER SUPPLY AND RETURN PIPING TAKE-OFFS SHALL BE

OFF THE TOP OF MAIN.

PROVIDE 1/2" DRAIN VALVE AT NEW HEATING WATER SUPPLY AND

RETURN PIPE LOW POINTS, DOWNSTREAM OF ISOLATION VALVES.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

7301 OHMS LANE

SUITE #215

(952) 854-9302 TEL.

© PROPERTY OF ADVANCED

STRUCTURAL TECHNOLOGIES.

THIS DOCUMENT MAY NOT BE

USED OR COPIED WITHOUT THE

PRIOR WRITTEN CONSENT OF

ADVANCED STRUCTURAL

TECHNOLOGIES.

EDINA, MN 55439

ASTENG.COM

C R e v it P ro je c ts

\M

V A

M P

L S

W

C

M A

R ja s o n g o tt w a lt

.r v t

/2

/2

:1

:2

A

M

1375-MP111

FIRST LEVEL PIPING PLAN WOMEN'S CLINIC AND

MAMMOGRAPHY ADDITION

1 VETERANS DRIVE

618-181

05/26/2023 JRG TNH15328

1/8" = 1'-0"

FIRST LEVEL PIPING PLAN

Name

Date Reg. No.

Jason R. Gottwalt, P.E.

41360

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

05/26/2023Revisions: Date:

GENERAL NOTES:

EF

6"RD-1

3,460 SQFT

INCLUDES 370

SQFT SIDEWALL

6"RD-1

3,310 SQFT

INCLUDES 370

SQFT SIDEWALL

6"RD-1

3,400 SQFT

INCLUDES 370

SQFT SIDEWALL

6"RD-1

3,450 SQFT

INCLUDES 370

SQFT SIDEWALL

6"ORD-1

3,460 SQFT

INCLUDES 370

SQFT SIDEWALL

6"ORD-1

3,310 SQFT

INCLUDES 370

SQFT SIDEWALL

6"ORD-1

3,400 SQFT

INCLUDES 370

SQFT SIDEWALL

6"ORD-1

3,450 SQFT

INCLUDES 370

SQFT SIDEWALL

4" VTR

4" VTR

4" VTR

IGV

3"ORD-1

223 SQFT

INCLUDES 168

SQFT SIDEWALL

3"RD-1

225 SQFT

INCLUDES 168

SQFT SIDEWALL

2" STEAM RELIEF VENTS

R

' - 0

" 18"x18" PENETRATION FOR

16"X16" EXHAUST DUCT DOWN

52"x52" PENETRATION FOR

48"X48" INTAKE DUCT DOWN

3"ORD-1

260 SQFT

3"RD-1

260 SQFT

PROVIDE NEW ROOFTOP HYDRANT,

WOODFORD MODEL SRH-MS, WITH

DOUBLECHECK BACKFLOW

PREVENTER, ASSE 1052 APPROVED.ACCU

SERVING

CRAC-01

REFRIGERANT PIPING DOWN THROUGH

ROOF. PROVIDE CURBED DOGHOUSE TO

PROTECT FROM WATER INFILTRATION.

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

COORDINATE ALL DUCTWORK, PIPING AND PLUMBING ROUTING WITH

ALL OTHER TRADES TO INSURE ADEQUATE CLEARANCES FOR

DUCTWORK, PLUMBING, ELECTRICAL CONDUIT, STRUCTURAL

SUPPORTS, PIPING, ETC. ANY UNAVOIDABLE CONFLICTS SHALL BE

BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER OF

RECORD. PROVIDE ALL OFFSETS AND TRANSITIONS AS REQUIRED FOR

A CLEAN INSTALLATION.

THE EXACT LOCATION OF EQUIPMENT ROUGH-INS SHALL BE VERIFIED

WITH THE STAMPED APPROVED SHOP DRAWINGS PRIOR TO ANY FIELD

INSTALLATION.

SUPPORT ALL DUCTWORK, PIPING AND PLUMBING DIRECTLY TO

STRUCTURE. DO NOT SUPPORT ANY PIPING FROM DUCTWORK,

CONDUIT, OR OTHER PIPING ENCOUNTERED.

THE MECHANICAL CONTRACTOR SHALL MAINTAIN ACCURATE RECORD

DRAWINGS SHOWING ALL DISCREPANCIES WITH ANY EXISTING PIPING

INDICATED OR REVISIONS TO THE NEW DUCTWORK, PIPING AND

PLUMBING LAYOUTS. ALL CHANGES WILL BE UPDATED WITHIN THE

FINAL RECORD DRAWING SET.

MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO REVIEW

ACCESSIBILITY TO AREAS OUTSIDE THE CONSTRUCTION LIMITS TO

DETERMINE APPROXIMATE AMOUNT OF OVERTIME REQUIRED TO

PERFORM ALL MECHANICAL WORK INDICATED. COORDINATION OF

SCHEDULES WITH ADJACENT DEPARTMENTS AND CLEANING OF ALL

DEBRIS AFTER EACH WORK SHIFT SHOULD BE ASSUMED IN THE BASE

BID SCOPE.

ANY MAJOR OUTAGES INDICATED ON THESE DRAWINGS SHALL BE

SCHEDULED TO BE PERFORMED AFTER NORMAL BUSINESS HOURS OR

DURING WEEKEND PERIODS TO MINIMIZE DISRUPTION.

WHERE MECHANICAL SYSTEMS TO REMAIN ARE DAMAGED, OR

DISTURBED, DURING THE COURSE OF CONSTRUCTION THE

CONTRACTOR WILL BE RESPONSIBLE TO REMOVE DAMAGED PORTIONS

AND INSTALL NEW PRODUCTS OF EQUAL QUALITY AND FUNCTIONALITY.

ALL EXISTING PIPING THROUGH NEW FIRE RATED WALLS SHALL BE

ADEQUATELY FIRE SEALED AS REQUIRED.

HEATING WATER SUPPLY AND RETURN PIPING TAKE-OFFS SHALL BE

OFF THE TOP OF MAIN.

PROVIDE 1/2" DRAIN VALVE AT NEW HEATING WATER SUPPLY AND

RETURN PIPE LOW POINTS, DOWNSTREAM OF ISOLATION VALVES.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

7301 OHMS LANE

SUITE #215

(952) 854-9302 TEL.

© PROPERTY OF ADVANCED

STRUCTURAL TECHNOLOGIES.

THIS DOCUMENT MAY NOT BE

USED OR COPIED WITHOUT THE

PRIOR WRITTEN CONSENT OF

ADVANCED STRUCTURAL

TECHNOLOGIES.

EDINA, MN 55439

ASTENG.COM

C R e v it P ro je c ts

\M

V A

M P

L S

W

C

M A

R ja s o n g o tt w a lt

.r v t

/2

/2

:1

:1

A

M

1375-M121

MECHANICAL ROOF PLAN WOMEN'S CLINIC AND

MAMMOGRAPHY ADDITION

1 VETERANS DRIVE

618-181

05/26/2023 JRG TNH15328

1/8" = 1'-0"

MECHANICAL ROOF PLAN

Name

Date Reg. No.

Jason R. Gottwalt, P.E.

41360

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

05/26/2023Revisions: Date:

KEY NOTES:

GENERAL NOTES:

B

C

D

A

1.5

HOUSEKEEPING

AIDES CLOSET

80-148

TELECOMMUNICATIONS

ROOM

80-149

VAV

1-01

M400 x x x x

AHU

1-01 x ø

J-8"

A-6"

(2)A-14"

(2)G-14"

C-12x10

I-18x12

60x30

70x30

42ø ø x

RISE

RISE

48X48 UP

THROUGH ROOF

TO IGV-01

x

70x30 DN

60x30 DN

118" (L) x 46" (H)

LOUVER WITH 36"

DEEP PLENUM

60x24 x

M400 VAV

1-31

RF

32x18

SUPPLY DUCT

SMOKE DETECTOR

RETURN DUCT

SMOKE DETECTOR

12x10

C-12x10

C-12x10

I-18x12

CRAC

1 PROVIDE AND INSTALL RUSKIN, MODEL PRD18, PRESSURE RELIEF

DOOR. SET BLOWOUT PRESSURE AT 4.0" W.C. LOCATE ON SIDE OF

DUCT WHERE SHOWN.

ROUTE 3" STEAM AND 2" PUMPED CONDENSATE PIPING THROUGH

WALL AS REQUIRED. REFER TO DRAWING MP111 FOR

CONTINUATION AND CONNECTION INTO PCC PIPING MAINS.

ROUTE 4" CHILLED WATER SUPPLY AND RETURN PIPING THROUGH

EXISTING WALL CONSTRUCTION, COORDINATE WITH ARCHITECTURAL

AND STRUCTURAL DETAILS. REFER TO DRAWING MP111 FOR

CONTINUATION AND CONNECTION INTO PCC PIPING MAINS.

3" HEATING WATER SUPPLY AND RETURN PIPING TO PENETRATE NEW

PRECAST PANEL AS REQUIRED. REFER TO DRAWING MH111 FOR

CONTINUATION AND CONNECTION INTO PCC PIPING MAINS.

ROUTE 3/4" CONDENSATE PIPE FROM COOLING COIL DRAIN TO FLOOR

DRAIN. USE MANUFACTURER FAN DATA TO CALCULATE TRAP DEPTH.

COORDINATE A MINIMUM OF 36" CLEARANCE IN FRONT OF VFD

CONTROLLER MOUNTED TO AHU. COORDINATE ON-SITE WIRING AND

INSTALLATION REQUIREMENTS WITH MANUFACTURER AND

ELECTRICAL SUBCONTRACTOR AS REQUIRED. PERFORM START-UP

AND PROGRAMMING WITH CONTROLS CONTRACTOR ASSISTANCE.

INTEGRAL FACE AND BYPASS STEAM COIL TO BE PROVIDED WITH

TWO(2) INTERNALLY SEPARATE PIPING CIRCUITS. DOUBLE-UP ALL

CONTROLS AND PIPING COMPONENTS PER PIPING DIAGRAM ON

DRAWING M501. COORDINATE PRIMARY CIRCUIT WITH SIDE THAT

INCLUDES TRAP MONITORING INTEGRATED WITH BAS.

NOT USED.

NOT USED.

NOT USED.

NOT USED.

INLINE PUMPS FOR SNOWMELT SYSTEM ARE SIZED FOR REDUNDANT

OPERATION AND ARRANGED IN PARALLEL USING MOUNTING

BRACKETS SECURED TO WALL WITH NEOPRENE ISOLATION. REFER

TO PIPING DIAGRAM FOR ALL REQUIRED COMPONENTS.

STEAM TRAPS AND CONDENSATE PIPING ALONG BACK SIDE OF UNIT

TO ALLOW ENOUGH ELEVATION TO SLOPE TO FLASH TANK WITHOUT

PIT. COORDINATE HUMIDIFIER / PREHEAT COIL MOUNTING HEIGHTS.

ROUTE 3/4" CONDENSATE PIPE FROM HUMIDIFIER DRAIN TO FLOOR

DRAIN. PROVIDE APPROPRIATELY SIZED P-TRAP WITH CLEANOUT.

MECHANICAL CONTRACTOR TO PROVIDE 15" RAIL TO PROTECT

STEAM AND CHILLED WATER ASSEMBLIES USING A ULINE SAFETY

GUARD MODEL H-7719 (OR H-7721) AND TWO(2) ULINE SAFETY POSTS

MODEL H-3715. MECHANICAL CONTRACTOR TO VERIFY LAYOUT.

MECHANICAL CONTRACTOR TO PROVIDE THREE(3) ULINE SAFETY

GUARDS MODEL H-4899 AND FOUR(4) ULINE SAFETY POSTS MODEL

H-3715. CONTRACTOR TO VERIFY WITH COND PUMP EQUIPMENT.

PROVIDE A 118"X46" DRAINABLE BLADE LOUVER (VERIFY EXACT

OPENING SIZE WITH PRECAST PANEL SUPPLIER). LOUVER SHALL BE

A GREENHECK MODEL EHM-601 OR EQUAL AND COME WITH A

1/2"X1/2" STAINLESS STEEL BIRDSCREEN SECURED TO BACKSIDE OF

ASSEMBLY. LOUVER FINISH SHALL BE AAMA 2605 COATING

CONSISTING OF 2-COAT OF 70% KYNAR (SUBMIT 6"X6" METAL COLOR

SAMPLES TO ARCHITECT FOR APPROVAL. INCLUDE A FLANGE ON ALL

SIDES TO CONCEAL ROUGH EDGES OF WALL OPENING AND SECURE

AS REQUIRED WITH HIGH GRADE SEALANT/CAULKING.

NOTE THAT ALL PRECAST PANELS UNDERNEATH THIS LOUVER SHALL

BE REMOVABLE TO ALLOW EQUIPMENT TO BE TRANSPORTED INTO

BUILDING AFTER PRECAST PANELS AND ROOF ARE INSTALLED. ALSO

NOTE THAT THIS ENTRY POINT MAY STILL REQUIRE A CRANE TO

LOWER INTO THIS CONFINED AREA BEHIND BUILDING

ROUTE 1-1/2" 125# STEAM TO STEAM CONDENSATE PUMP SCP 01

REDUCE DOWN TO 3/4" PIPE FOR CONNECTION TO EQUIPMENT.

PROVIDE EITHER STEEL TUBING OR UNISTRUT STAND, OR HIGH 12"

CONCRETE BASE, FOR RETURN FAN SUPPORT ABOVE FLOOR. REFER

TO DETAIL 2/M503 UTILITY SET RETURN FAN MOUNTING.

ROUTE 2" 30# STEAM RETURN FROM HEATING COIL, HUMIDIFIER AND

HEAT EXCHANGERS, 1" 30# STEAM RETURN FROM STEAM MAIN DRIP

TRAPS AND 1" 125# STEAM RETURN FROM HIGH PRESSURE STEAM

TRAP TO SEPARATE FLASH TANK CONNECTIONS. REFER TO M501

FOR PIPING SCHEMATIC.

PROVIDE AN AIR HANDLER ACCESS DOOR ON BACK SIDE OF AIR

HANDLING UNIT. REFER TO SHEET M500 FOR LOCATION.

A.

B.

C.

D.

E.

F.

G.

H.

COORDINATE ALL DUCTWORK ROUTING WITH ALL OTHER TRADES TO

INSURE ADEQUATE CLEARANCES FOR PLUMBING, ELECTRICAL

CONDUIT, STRUCTURAL SUPPORTS, PIPING, ETC. ANY UNAVOIDABLE

CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE

ARCHITECT/ENGINEER OF RECORD. PROVIDE ALL OFFSETS AND

TRANSITIONS AS REQUIRED FOR A CLEAN INSTALLATION.

SUPPORT ALL DUCTWORK DIRECTLY TO STRUCTURE. DO NOT

SUPPORT ANY DUCTS FROM DUCTWORK, CONDUIT, OR OTHER PIPING

ENCOUNTERED.

UNLESS NOTED OTHERWISE, ALL TAKE-OFFS TO VAV BOXES SHALL BE

THE SAME SIZE AS THE VAV INLET CONNECTION.

UNLESS NOTED OTHERWISE, ALL TAKE-OFFS TO DIFFUSERS, GRILLES

AND REGISTERS SHALL BE THE SAME SIZE AS THE DIFFUSER NECK OR

GRILLE/REGISTER CONNECTION.

ALL FIRE, SMOKE, AND COMBINATION FIRE/SMOKE DAMPERS INSTALLED

IN SHAFT WALLS SHALL BE INSTALLED TO ALLOW FOR SERVICE OF

THEIR FUSIBLE LINK/ACTUATOR PER FACILITY STANDARDS. ANY

CONFLICTS WHICH WILL PREVENT ACCESS SHALL BE BROUGHT TO THE

ATTENTION OF THE ARCHITECT AND ENGINEER OF RECORD.

MECHANICAL CONTRACTOR SHALL REVIEW ARCHITECTURAL CEILING

PLANS FOR LOCATIONS OF GYPSUM BOARD. DO NOT INSTALL VALVES,

VAV BOXES, SENSOR, OR DAMPERS ABOVE GYPSUM BOARD CEILINGS.

MECHANICAL CONTRACTOR SHALL REVIEW ARCHITECTURAL CEILING

PLANS FOR LOCATIONS OF GYPSUM BOARD CEILINGS AND BULKHEADS.

ADJUST PIPE AND DUCT THAT RUN PARALLEL TO BULKHEAD FRAMING

TO BE EITHER OUTSIDE OF FRAMING OR BETWEEN FRAMING.

MECHANICAL CONTRACTOR SHALL COORDINATE WITH GENERAL

CONTRACTOR FOR MODIFIED BULKHEAD FRAMING WHERE EXISTING

AND NEW PIPING AND DUCT WILL CAUSE INTERFERENCE.

PROVIDE EACH NEW SUPPLY DIFFUSER/GRILLES WITH A SINGLE BLADE

TAKE-OFF DAMPER WITH QUADRANT LOCKING DEVISE. PERFORM ALL

BALANCING OF NEW DIFFUSERS THROUGH THOSE TAKE-OFF DAMPERS.

ALL NEW RETURN/EXHAUST GRILLES WILL BE PROVIDED WITH

OPPOSED BLADE BALANCING DAMPERS POSITIONED UPSTREAM PAST A

MINIMUM OF ONE TRANSITION FOR SOUND ABATEMENT. BALANCING

ANY DIFFUSERS/GRILLES USING INTEGRAL DAMPERS WILL NOT BE AN

APPROVED METHOD OF BALANCING.

B

C

D

A

1.5

M400

S T

M

2" SMR

2" SMS

UH

1-02

HEX

1-03

UH

1-01

AHU

1-01

TELECOMMUNICATIONS

ROOM

80-149

HOUSEKEEPING

AIDES CLOSET

80-148

T UH 1-01

TUH 1-02

T VAV 01

T V

A V

-0

FT

SCP

SMP

0-01

SMP

0-02AS

0-02

ET

0-02

2" STEAM VENTS

UP THRU ROOF

GFS

0-02

S T

M

R

C W

R

C W

S

M400

NOTE THAT ALL END OF MAIN

DRIP TRAPS TO BE ROUTED BACK

TO FLASH TANK WITH DEDICATED

PIPING, NOT ALL SHOWN ON PLAN

VIEW FOR LEGIBILITY PURPOSES.

1 1/4" 30#STM

P C

P C

/2

S T

M

/2

S T

M

1 1/2" 125#STM

/2

R

2" PC

TVAV 31

ELECTRICAL

80-150 CRAC

FIRST LEVEL

0"

LEVEL 1 INTERSTITIAL

10'-3 1/2"

TOP OF ROOF SLAB

18'-8"

Grade -1'-0"

TOP OF PRECAST PANEL

20'-8"

1.5

M400

FIRST FLOOR

0' - 0"

T.O. ROOF SLAB

18' - 8"

T.O. PARAPET

20' - 11"

ROOF

13' - 5"

T/ PARAPET

14' - 8 1/2"

STORM RESISTANT LOUVER, SEE

DRAWING M400 KEY NOTES

24"X24" INSULATED

DOOR ACCESS PANEL

WITH CAM LATCHES

PROVIDE CLEARANCE

AROUND REAR OF AHU

FOR SERVICE ACCESS

36" DEEP PLENUM CONSTRUCTED OF

GALAVANIZED STEEL AND COVERED IN 3"

FIBERBOARD INSULATION WITH FSK FACING

(SLOPE BOTTOM TO DRAIN OUT LOUVER FACE)

RETURN/EXHAUST FAN MOUNTED

ON SPRING ISOLATOR SECURED

TO TALL 12" EQUIPMENT PAD.

24x60

24x60

70x30

AHU

1-01

80x24 44x24 18x32

3" HWR

FIRST LEVEL

0"

LEVEL 1 INTERSTITIAL

10'-3 1/2"

TOP OF ROOF SLAB

18'-8"

Grade -1'-0"

BC A

M400

FIRST FLOOR

0' - 0"

T.O. ROOF SLAB

18' - 8"

ROOF

13' - 5"

T/ PARAPET

14' - 8 1/2"

30x70 x

24x60 14x18

10x12 x x

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

7301 OHMS LANE

SUITE #215

(952) 854-9302 TEL.

© PROPERTY OF ADVANCED

STRUCTURAL TECHNOLOGIES.

THIS DOCUMENT MAY NOT BE

USED OR COPIED WITHOUT THE

PRIOR WRITTEN CONSENT OF

ADVANCED STRUCTURAL

TECHNOLOGIES.

EDINA, MN 55439

ASTENG.COM

C R e v it P ro je c ts

\M

V A

M P

L S

W

C

M A

R ja s o n g o tt w a lt

.r v t

/2

/2

:1

:2

A

M

1375-M400

MECHANICAL ROOM ENLARGED

PLANS

WOMEN'S CLINIC AND

MAMMOGRAPHY ADDITION

1 VETERANS DRIVE

618-181

05/26/2023 JRG TNH15328

1/4" = 1'-0"

ENLARGED MECHANICAL ROOM - HVAC PLAN

MECHANICAL ROOM - ISOMETRIC

1/4" = 1'-0"

ENLARGED MECHANICAL ROOM - PIPING PLAN

Name

Date Reg. No.

Jason R. Gottwalt, P.E.

41360

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

05/26/2023

1/4" = 1'-0"

MECHANICAL ROOM SECTION AT LOUVER (FACING NORTH)

1/4" = 1'-0"

MECHANICAL ROOM SECTION LOOKING TOWARD AHU (FACING WEST)

Revisions: Date:

C H W

EP1

A

A

Drain Conn.

R

S

R

S

D D

ID

(A) 72 2145 lbs

(B) 136 5194 lbs

(C) 48 1200 lbs

(D) 6 243 lbs

(E) 78 4023 lbs

(F) 72 1990 lbs

20Ga Galv Foam 20Ga 304 SS Foam 20Ga Galv Foam

ID

PL1

CHW

M8

SF

M15 FF

PL2

HUM

VIFB

CB1

6 6 6 6 6

RA

RA

OSA

ITEM # DESCRIPTION FURNISHED BY: INSTALLED BY:

LOW VOLTAGE

(WIRE AND CONDUIT)

LINE POWER

(WIRE AND CONDUIT) OTHER NOTES

BUILDING AUTOMATION CONTROL PANELS

(INCLUDES UNITARY CONTROLLERS & MCU)

CC CC CC CC (SEE NOTE) HIGH VOLTAGE WIRING VIA LICENSED ELECTRICIAN PAID THROUGH CC BID

VAV BOX ACTUATOR CC MC/EM (NOTE 1) CC CC/EC (SEE NOTE 2)

1) MC MAY OPT TO HAVE VAV CONTROLLER FACTORY MOUNTED, OR FIELD INSTALLED AT EXPENSE OF MC

2) CC TO INCLUDE ALL ELECTRIAL COSTS FOR 120/1 CONNECTIONS TO 24 VOLT TRANSFORMER

3 VAV BOX CONTROLLER CC CC CC CC/EC (SEE NOTE) CC TO INCLUDE ALL ELECTRICAL COSTS FOR 120/1 CONNECTIONS TO 24 VOLT TRANSFORMER

AUTOMATIC CONTROL DAMPERS

(DUCT OR PLENUM MOUNTED) CC MC CC EC (SEE NOTE) CC TO SUBCONTRACT EC FOR WIRING 120/1 DAMPER ACTUATORS, ALL LOW VOLTAGE BY CC4

AUTOMATIC CONTROL DAMPERS

(AHU OR EQUIPMENT MOUNTED) EM (WITHIN MC BID) EM CC EC (SEE NOTE) CC TO SUBCONTRACT EC FOR WIRING 120/1 DAMPER ACTUATORS, ALL LOW VOLTAGE BY CC5

6 MANUAL ISOLATION VALVES PC PC NA NA -

7 AUTOMATIC CONTROL VALVES CC PC CC EC (SEE NOTE) CC TO SUBCONTRACT EC FOR WIRING TO 120/1 VALVE ACTUATORS, ALL LOW VOLTAGE BY CC

PIPE INSERTION DEVICES AND TAPS

(THERMOWELLS, FLOW OR PRESS. SENSORS)

CC PC CC NA CC TO COORDINATE INSTALLED LOCATION WITH PC FOR WELL, OR TAP INSTALLATION8

DUCT MOUNTED SENSORS

(TEMPERATURE, HUMIDSTAT, ETC.)

CC CC/MC (SEE NOTE) CC NA MC TO SEAL ALL DUCT PENETRATIONS AS REQUIRED FOR DUCT LEAKAGE RATING9

AIR HANDLING UNIT MOUNTED SENSORS

(TEMPERATURE, HUMIDSTAT, ETC.)

CC CC/MC (SEE NOTE) CC NA MC TO INSURE PENETRATIONS THROUGH AIR HANDLER CASING WILL NOT IMPACT LEAKAGE RATING10

11 DUCT MOUNTED AIRFLOW SENSORS CC CC/MC (SEE NOTE) CC NA MC TO SEAL ALL DUCT PENETRATIONS AS REQUIRED FOR DUCT LEAKAGE RATING

12 AHU/FAN MOUNTED AIRFLOW SENSORS EM (WITHIN MC BID) EM (SEE NOTE) CC NA EQUIPMENT MANUFACTURER TO INSTALL/POSITION AND PROVIDE SITE CALIBRATION INSTRUCTIONS

13 CURRENT SWITCHES CC CC CC EC (SEE NOTE) EC TO COORDINATE HIGH VOLTAGE WIRING INSTALLATION WITH CC FOR PLACEMENT OF SENSOR

VARIABLE FREQUENCY DRIVES

(PUMPS, INDIV. FANS, ETC.)

CC EC CC EC (SEE NOTE) EC TO COORDINATE HIGH VOLTAGE WIRING INSTALLATION WITH CC FOR PLACEMENT OF SENSOR14

VARIABLE FREQUENCY DRIVES

(AHU OR FACTORY MOUNTED EQUIPMENT) EM (WITHIN MC BID) EC (NOTE1) CC EC (NOTE 2)

1) EC TO CONFIRM SINGLE OR MULTIPLE POINT CONNECTION SUBMITTALS

2) EC TO COORDINATE HIGH VOLTAGE WIRING INSTALLATION WITH DRWINGS/CC PRIOR TO BID

BOILER CONTROL PACKAGES EM (SEE NOTE) EM/PC CC EC

EM TO VERIFY PACKAGES CONTROLS ARE COMPATIBLE WITH CC SYSTEMS. EM RESPONSIBLE FOR ANY GATEWAYS, SENSORS OR

PROTOCOL CONVERSION REQUIRED FOR FULL INTEGRATION TO BAC.

CHILLER CONTROL INTERFACE EM (SEE NOTE) EM/PC CC EC

EM TO VERIFY PACKAGES CONTROLS ARE COMPATIBLE WITH CC SYSTEM. EM RESPONSIBLE FOR ANY GATEWAYS, SENSORS OR

PROTOCOL CONVERSION REQUIRED FOR FULL INTEGRATION TO BAC.

CHILLER/BOILER PROVIDED FLOW SWITCHES AND

EXTERNALLY MOUNTED SAFETY DEVICES EM PC CC EC ALL TRADES TO COORDINATE WITH EQUIPMENT SUPPLIER PRIOR TO BIDS.18

19 COOLING TOWER BASIN HEATERS EM CC EC ALL TRADES TO COORDINATE WITH EQUIPMENT SUPPLIER PRIOR TO BIDS

20 REFRIGERANT MONITORS CC CC EC (SEE NOTE) CC TO INCLUDE ALL ELECTRICAL COSTS ASSOCIATED 120/1 CONNECTIONS TO CONTROL PANEL

21 BOILER SHUT DOWN SWITCH(ES) CC CC EC (SEE NOTE) CC TO PAY ALL ELECTRICAL COSTS ASSOCIATED WITH HIGH VOLTAGE CONNECTION TO SHUNT TRIP BREAKER

22 ROOM PRESSURE MONITORS CC CC NA CC TO INTEGRATE ALL ROOM PRESSURE MONITORS INTO BAC FOR REMOTE ALARM MONITORING

PC

CC

CC

CC

MEDICAL GAS ALARM PANELS

(FOR BOTH AREA OR MASTER) PC PC MC OR PC EC (SEE NOTE)

EC TO INCLUDE ALL ELECTRICAL COSTS ASSOCIATED WITH 120___

CONNECTIONS TO ALARM PANEL. PC TO INCLUDE ALL LOW

VOLTAGE WIRING BETWEEN ALARM PANEL AND REMOTE SENSORS.

COMPUTER ROOM COOLING UNIT

(WITH FACTORY MOUNTED CONTROLS) EM (WITHIN MC BID) EM/MC CC NA

EM TO CONFIRM COMPATIBILITY WITH CC SYSTEM. ANY REQUIRED GATEWAYS (SITELINK PANELS), OR NETWORK INTEGRATION

CARDS TO BE INCLUDED WITH MANUFACTURER'S QUOTE IF NECESSARY.

PACKAGED RTU CONTROLS EM (WITHIN MC BID) EM/MC CC NA25

FIRE/SMOKE DAMPERS

(WITH DUCT MOUNTED SMOKE DETECTORS) MC MC (NOTE 1) FAC EC (NOTE 2)

1) DAMPER AND ANY LOOSE DUCT DETECTORS TO BE INSTALLED/MOUNTED BY MC.

2) DAMPERS WITH 120/1 VOLT POWER CONNECTIONS BY EC. MC TO COORDINATE DURING BID.

FIRE/SMOKE DAMPERS

(CONTROLLED FROM AREA DETECTORS) MC MC (NOTE 1) FAC EC (NOTE 2)27

AHU SMOKE DETECTORS MC MC CC/FAC (SEE NOTE) NA

CC TO MOUNT SENSORS AND WIRE INTO BAC. FAC TO PROVIDE MODULE TO INTEGRATE INTO FIRE ALARM SYSTEM TO DIRECTLY

SHUT-DOWN UNIT.

DAMPER END SWITCHES

(BOTH MOTORIZED CONTROL DAMPERS) CC MC CC EC (SEE NOTE) CC TO SUBCONTRACT EC FOR WIRING TO 120/1 DAMPER ACTUATORS, ALL LOW VOLTAGE BY CC.29

DAMPER END SWITCHES

(FIRE/SMOKE DAMPERS) MC MC CC (SEE NOTE) NA CC TO COORDINATE ANY ADDITIONAL INTEGRATION WITH FAC AS REQUIRED.30

EM TO CONFIRM COMPATIBILITY WITH CC SYSTEM. ANY REQUIRED GATEWAYS (SITELINK PANELS), OR NETWORK INTEGRATION

CARDS TO BE INCLUDED WITH MANUFACTURER'S QUOTE.

1) DAMPER AND ANY LOOSE DUCT DETECTORS TO BE INSTALLED/MOUNTED BY FAC.

2) DAMPERS WITH 120/1 VOLT POWER CONNECTIONS BY EC. MC TO COORDINATE DURING BID.

31 STARTERS AND HOA SWITCHES EC CC EC EC AND CC TO COORDINATE TYPE AND LOCATION FOR EACH PIECE OF EQUIPMENT IDENTIFIED.EC

KEY:

CC = CONTROLS CONTRACTOR *

MC = MECHANICAL CONTRACTOR **

EC = ELECTRICAL CONTRACTOR

PC = PIPING OR PLUMBING CONTRACTOR **

GC = GENERAL CONTRACTOR

EM = EQUIPMENT MANUFACTURER

FAC = FIRE ALARM CONTRACTOR

OWN = OWNER'S FACILITY ENGINEERS

*CONTROLS CONTRACTOR MAY BE SUBCONTRACTED OR DIRECT CONTRACT TO OWNER, ALL ITEMS WITH TABLE APPLY IN EITHER SCENARIO.

*** MECHANICAL AND PIPING/PLUMBING CONTRACTS COMBINE INTO SINGLE CONTRACT IN MOST PROJECTS.

NOTE = MANUFACTURER'S PROVIDING LOOSE CONTROL COMPONENTS (FLOW SWITCHES, TEMP SENSORS, ETC.) WILL BE COMPLETELY MOUNTED/WIRED/ INSTALLED BY THE CONTRACTOR PURCHASING THAT EQUIPMENT. ONLY LOW VOLTAGE CONNECTIONS TO BAC BY CC.

MATRIX OF RESPONSIBILITIES FOR BUILDING AUTOMATION CONTROLS COMPONENTS

1 2 3 4

PRE-FILTERS.

HEATING COIL.

COOLING COIL.

HUMIDIFIER.

SUPPLY FAN.

FINAL FILTER.

CHANNEL BLENDER

KEY NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

7301 OHMS LANE

SUITE #215

(952) 854-9302 TEL.

© PROPERTY OF ADVANCED

STRUCTURAL TECHNOLOGIES.

THIS DOCUMENT MAY NOT BE

USED OR COPIED WITHOUT THE

PRIOR WRITTEN CONSENT OF

ADVANCED STRUCTURAL

TECHNOLOGIES.

EDINA, MN 55439

ASTENG.COM

C R e v it P ro je c ts

\M

V A

M P

L S

W

C

M A

R ja s o n g o tt w a lt

.r v t

/2

/2

:1

:2

A

M

1375-M500

AIR HANDLING UNIT DETAILS WOMEN'S CLINIC AND

MAMMOGRAPHY ADDITION

1 VETERANS DRIVE

618-181

05/26/2023 JRG TNH15328

NO SCALE

AHU 1-01

Name

Date Reg. No.

Jason R. Gottwalt, P.E.

41360

I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota.

05/26/2023Revisions: Date:

R

S

R

S

D

M

IN

[1 m m

2"-30#R

STEAM

CONDENSATE

RETURN

TEMPERATURE SWITCH

SCALE POCKET

HUMIDIFIER

CONTROL VALVE

TO HUMIDISTAT

MANIFOLD PIPE ADAPTERS

STEAM SUPPLY

ON-OFF CONTROL VALVE DUCT CROSS SECTION

NOTE:

SEE MANUFACTURER'S PIPING RECOMMENDATIONS FOR FINAL LAYOUT

D U

C T

H E

IG

H

T

H1 /3

H /3

H /3

H

CONTROL VALVE

(TYPICAL)

RETURN

SUPPLY

BALL OR

BUTTERFLY

VALVE

STRAINER

COOLING

COIL

A

A

THERMOMETER

(TYPICAL)

AUTOMATIC AIR AIR VENT PIPED TO F.D. AND ALSO INCLUDE BALL

VALVE FOR MANUAL VENT (TYPICAL)

NOTES:

1. PIPE COILS COUNTER-FLOW TO AIR FLOW.

2. LOCATE UNIONS TO ALLOW FOR COIL REMOVAL.

3. MOUNT THERMOMETERS AND GAUGES NO MORE THAN 8'-0" A.F.F.

4. REDUCE TO CALIBRATED ORIFICE BALANCING VALVE AS REQUIRED.

5. WINTER OPERATION: CLOSE CWS AND CWR ISOLATION VALVES AT MAINS AND DRAIN

CHILLED WATER COIL, LEAVE DRAIN VALVES OPEN. OPEN LOCKING BALL VALVE TO

ALLOW AIR FROM AIR HANDLING UNIT DRY VALVE.

6. COOLING SEASON: CLOSE LOCKING BALL VALVE AND DRAIN VALVES. OPEN CWS AND

CWR ISOLATION VALVES AT MAINS.

PRESSURE

GAUGE WITH

VALVE

(TYPICAL)

SEE NOTES 5

& 6 BELOW

AIR HANDLING UNIT STEAM PREHEAT

COIL PIPING DETAIL (2-WAY VALVE)

NO SCALE4b

AIR HANDLING UNIT COOLING COIL

PIPING DETAIL (2-WAY VALVE)

NO SCALE4a

SUPPLY "B"

RETURN "B"

STRAINER (TYPICAL)

SUPPLY "A"

HEAT EXCHANGER

RETURN "A"

BUTTERFLY VALVE

(TYPICAL)

MODULATING 2-WAY

CONTROL VALVE

(TYPICAL)

FLANGE (TYPICAL)

THERMOSTAT

(TYPICAL)

PRESSURE GAUGE

(TYPICAL)

T

PLATE AND FRAME

EXCHANGER PIPING DETAIL

NO SCALE4c

STEAM HUMIDIFIER DETAIL (for AH1WC-01) NO SCALE4e

SARCO TRAP MONITOR TIED

INTO BUILDING AUTOMATION

REDUCER

(TYPICAL)

UNION

(TYPICAL)

DUAL 50/50 STEAM SYSTEM CONTROL VALVES FOR

DEDICATED MV CIRCUITS (see dwgs)

FROM STEAM MAIN

DRIP TRAP

ASSEMBLY

TO CONDENSATE

RETURN

FLOAT AND THERMOSTATIC SIZED FOR 3

TIMES NORMAL COIL LOAD. PROVIDE

ONE(1) WITH REMOTE STEAM MONITOR

TO BUILDING AUTOMATION

STRAINER

(TYPICAL)

GATE VALVE

(TYPICAL)

FLEX CONNECTION

STRAINER WITH

BLOW DOWN

VALVE

VACUUM BREAKER

AIR VENT

SARCO TRAP MONITOR TIED INTO

BUILDING AUTOMATION

SARCO TRAP MONITOR TIED

INTO BUILDING AUTOMATION

PRESSURE GAUGE

BALL VALVE

CHECK VALVE

UNION

TRAP PUMP WITH

STEAM MOTIVE

VALVE/CAP FOR FUTURE STEAM

CONDENSATE RETURNS

FULL SIZE BY-PASS PIPED

TO FLOOR DRAIN

BASKET STRAINER

-1

/2

P C

ASME RATED FLASH TANK WITH 2 RETURN TAPS

-1"HIGH PRESSURE CONDENSATE

-2"LOW PRESSURE CONDENSATE AND

LOW PRESSURE DRIP RETURNS

HIGH PRESSURE CONDENSATE FROM DRIP TRAP

AT STEAM MOTIVE CONDENSATE PUMP

PROVIDE SUPPORTS HIGH ENOUGH FROM

BOTTOM OF PIT TO ALLOW FOR PITCHED

DRAIN INTO CONDENSATE PUMP

2"VENT THROUGH ROOF

PRESSURE GAUGE WITH

PIGTAIL AND VALVE

STRAINER WITH

BLOWDOWN VALVE

STEAM TRAPS (X2) WITH SARCO

MONITOR ON PRIMARY TRAP

DIRT LEG

GLYCOL FEEDER SYSTEM

WITH TANK AND PUMP

2" TO SNOW MELT DISTRIBUTION

MANIFOLDS

2" FROM SNOW MELT

DISTRIBUTION MANIFOLDS

THERMOMETER (TYP)

STRAINER W/ BLOWDOWN VALVE

AND CAP (TYP)

PRESSURE GAUGE (TYP)

1"

1"

3/4"

EXPANSION

TANK

AUTOMATIC

AIR VENT AIR VENT

DRAIN

AUTOMATIC

QUICK CONNECT

PIPE TO FLOOR DRAIN

BLOWDOWN

VALVE

DRAIN VALVE

WITH HOSE END

TEMPERATURE

SENSOR

TEST PLUG

MANUAL AIR

VENT (TYP)

TWO-WAY VALVE

UNION, TYPICAL

BUTTERFLY OR BALL

VALVE, TYPICAL

WATER TO WATER BRAZED

PLATE HEAT EXCHANGER

TO 1ST FLOOR FTR

AND VAV REHEAT COILS

VESTIBULE/LOBBY UNDERFLOOR HEAT

SMP

0-02

SMP

0-01

ET

0-02

AS

0-02

HEX

1-03

(50% PROPYLENE)

GFS

0-02

SUPPLY/RETURN PIPING MANIFOLDS IN LOCKABLE

WALL PANEL IN ROOM 80-145A

2"-30#R

PISTON VALVE

HIGH PRESSURE MOTIVE STEAM SUPPLY TO BE

TRAPPED AND FREE OF CONDENSATE

FT

SCP

CIRC PUMP SHWP 1-01

FOR RADIANT FLOORING

NOTE THAT STEAM COIL HAS 2

SEPARATED INTERNAL PIPING

CIRCUITS. PRIMARY CIRCUIT

WILL HAVE MONITORED STEAM

TRAP WITH BACK-UP CIRCUIT

FOR EMERGENCY OR 100%

OUTDOOR AIR OPERATION.

TEST TEE (TYP.)

1-1/4"-30#STM

MANIFOLD

TEST TEE (TYP)

LOW PRESSURE CONDENSATE

FOR END OF MAIN DRIP TRAPS

NOTE THAT CONTRACTOR WILL BE RESPOSIBLE TO SEPARATELY PROVIDE DEDICATED

STEAM LINES FOR BOTH HIGH PRESSURE CONDENSATE, AND LOW PRESSURE CONDENSATE

FOR NON-MODULATING END OF MAIN DRIPS. THOSE PIPES ARE NOT DIRECTLY SHOWN ON

THIS FLOW DIAGRAM OR PLAN VIEW DETAILS.

VENT THRU

ROOF

PIPE REDUCER 2" TO 3/4"

RIGHT BEFORE CONNECTION

SAFETY RELIEF SET FOR 150 PSIG

S

T M

S

T M

OUTLINE SPECIFICATION FOR NEW PISTON VALVES:

Piston valves shall be KLINGER model KVN, or equal, with integral bypass valve (bypass valve to also be a smaller version of the primary piston valve). Any other manufacturer submitted for equivalency shall pass the highest quality requirements of ISO 9001: 2008 along with a helium leakage test at the factory.