About this file
This document is a Schedule of Items for the Green Mountain National Forest (GMNF) Road Maintenance project for 2025, detailing road reconditioning and culvert maintenance work to be completed by August 1, 2025.
The project encompasses seven road segments across multiple Vermont towns within the GMNF, totaling 25.03 miles of road work. The segments include: Ripton Road 54 (Natural Turnpike, 3.25 miles), Goshen Road 24 (Moosalamoo, 0.46 miles), Goshen Road 24A (Moosalamoo Spur, 0.45 miles), Hancock Road 39 (Texas Gap, 1.83 miles), Granville Road 39D (Texas Gap Spur, 0.29 miles), Mt. Tabor Road 10 (Danby, 10.06 miles), and Somerset/Stratton Road 71 (Somerset, 8.69 miles). Roads are designated at maintenance levels 2, 3, or 4. The grading cost section identifies three line items: Item 30317 for Road Reconditioning, Roadbed, Compaction Method A (Level 2) at 0.00 miles; Item 30318 for Road Reconditioning, Roadbed, Compaction Method A (Levels 3 & 4) at 25.03 miles; and Item 60707 for Cleaning Culvert in Place at 25.03 miles. Unit prices and total cost calculations remain to be completed as part of the contractor's proposal.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE
Mileposts Mile
Ripton 54 Natural Turnpike FR 59 to MP 3.25 4 0.00 3.25 3.25 0.00 3.25 3.25 Goshen 24 Moosalamoo FR 32 to Campground 3 0.00 0.46 0.46 0.00 0.46 0.46 Goshen 24A Moosalamoo Spur FR 24 to End of Loop 3 0.00 0.45 0.45 0.00 0.45 0.45 Hancock 39 Texas Gap End of Asphalt to MP 2.66 3 0.83 2.66 1.83 0.00 1.83 1.83 Granville 39D Texas Gap Spur MP 2.66 on FR 39 3 0.00 0.29 0.29 0.00 0.29 0.29 Mt. Tabor 10 Danby End of Asphalt to Peru TH6 4 3.35 13.41 10.06 0.00 10.06 10.06
Somerset/Stratton 71 Somerset MP 6.16 to End at Kelley Stand 4 6.16 14.85 8.69 0.00 8.69 8.69
TOTALS: 0.00 25.03 25.03
Item Number Unit Unit Price Cost
30317 Mile
30318 Mile
60707 Mile
Total:
GRADING COST
- - - - - - Road Information - - - - - -
ROAD
RECON.
LEVEL 3&4
ROAD
RECON.
LEVEL 2LocationNameRoad No.Town Name Maint.
Level
Cleaning Culvert in Place
Description Road Reconditioning, Roadbed, Compaction Method A (Level 2) 0.00
Quantity
25.03Road Reconditioning, Roadbed, Compaction Method A (Level 3 & 4)
25.03
GMNF ROAD MAINTENANCE -2025
SEGMENT
2025 Schedule of Items (To be completed by August 1, 2025)
Start End Length
CLEANING
CULVERTS
IN PLACE
(per mile)