Att. 11 Road Repairs TO - Plans 250505.pdf

PDF 4 MB Posted

Attached to
Green Mountain General Roads/Civil Construction IDIQ Federal contract opportunity
Solicitation number
12445526Q0039
Issued by
Department of Agriculture Forest Service

About this file

This is a design and construction specification document for road repair work on the Green Mountain National Forest in Vermont. The project encompasses repairs to Forest Roads (FR) 35, 50, 59, 70, 83, and 273 across the Rochester and Manchester Ranger Districts in Addison, Rutland, Bennington, and Windham Counties.

The work includes culvert removal and replacement, roadside ditch reconditioning, and roadway surface repairs. Specific tasks vary by road: FR 35 requires 827 linear feet of ditch reconditioning; FR 55 involves removal of one existing culvert and replacement with a 35-foot corrugated plastic pipe (CPP); FR 59 requires removal and replacement of one 18-inch CPP with a 40-foot unit; FR 70 requires removal and replacement of one existing culvert with a 60-foot 24-inch CPP; FR 83 involves removal and replacement of one 18-inch CPP with a 30-foot unit; and FR 273 requires 528 linear feet of ditch reconditioning. All materials and construction shall conform to USDOT Federal Highway Administration Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14). The contractor must provide equipment inspection schedules 14 days prior to mobilization, implement spill prevention plans with onsite spill kits, minimize soil disturbance through erosion controls, restore all disturbed areas outside work limits, and remove all waste materials and unused excavated material from National Forest land at contractor expense. The project is based on limited field investigation, requiring contractors to verify all dimensions and bring discrepancies to the Contracting Officer's Representative (COR) before advancing work.

View the file

Other files for this federal contract opportunity

Other files attached to Green Mountain General Roads/Civil Construction IDIQ, newest first.
File Type Posted
Att. 1 Solicitation Terms and Conditions 260506.pdf PDF
Sol_12445526Q0039_Amd_0002.pdf PDF
Att. 6 Road Maintenance TO - Schedule of Items 250505_Update.pdf PDF
260421 GMF General Road-Civil Construction IDIQ - RFI log for Q and A.xlsx XLSX spreadsheet
Att. 1 Solicitation Terms and Conditions 260421.docx DOCX document
Att. 10 Road Repairs TO - Schedule of Items 250505_Update.pdf PDF
Att. 11 Road Repairs TO - Plans 250505_Update.pdf PDF
Sol_12445526Q0039_Amd_0001.pdf PDF
Att. 12 Road Repairs TO - FSSS 250505.docx DOCX document
Att. 9 Road Maintenance TO - Wage Determination 251203.pdf PDF
Att. 6 Road Maintenance TO - Schedule of Items 250505.pdf PDF
HOW TO FOLLOW PROJECTS ON SAM FOR EMAIL ALERTS.pdf PDF
Att. 4 Green Mountain National Forest Maps 250505.docx DOCX document
Att. 3 Experience Project Data Sheet 250505.docx DOCX document
Att. 1 Solicitation Terms and Conditions.docx DOCX document
Att. 5 Description_Specifications_Statement of Work for Task Orders.docx DOCX document
Att. 13 Road Repairs TO - Maps 250505.pdf PDF
Att. 8 Road Maintenance TO - Maps 250505.pdf PDF
Att. 10 Road Repairs TO - Schedule of Items 250505.pdf PDF
Att. 7 Road Maintenance TO - SOW 250505.pdf PDF
Att. 14 Road Repairs TO - Wage Determination 260102.pdf PDF
Att. 2 Past Performance Questionnaire 250505.doc DOC document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET OF

United States Department of Agriculture

Forest Service

001 005

2025 GMNF ROAD REPAIRS

FR 35, 50, 59, 70, 83 & 273

1/3 0/2

5 1 6:

S

CO

FF

EY

C

:\U

SE

RS

\S

CO

FF

EY

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

TJ

PG

PN

ZM

P0 6P

CQ

ZW

CA

MU

LQ

\20

G

MF

L_

RO

AD

R

EP

AI

RS

_D

ET

AI

LS

.D

W G;

STATE OF VERMONT

ADDISON, RUTLAND, BENNINGTON & WINDHAM COUNTY(S)

R-09 EASTERN REGION

GREEN MOUNTAIN NATIONAL FOREST

ROCHESTER & MANCHESTER RANGER DISTRICTS

INDEX OF SHEETS

SHEET SHEET TITLE DATE

G-01 COVER SHEET 1/29/2025

C-01 NOTES AND TYPICAL ROAD REPAIR DETAILS 1/29/2025

C-02 FR 35 & 55 PROJECT MAPS & WORKLISTS 1/29/2025

C-03 FR 59 & 70 PROJECT MAPS AND WORKLISTS 1/29/2025

C-04 FR 83 & 273 PROJECT MAP AND WORKLIST 1/29/2025

PROJECT LOCATION MAPS

NOT TO SCALE

V A

R I E

S

M

I N

2'-0" MIN.

REMOVE ALL STANDING AND DOWN TREES AND

WOODY VEGETATION WITHIN THESE LIMITS TO

THE TOP OF CUT OR MAX. 5'-0" ABOVE INVERT

1H (TYP.)

1V

REMOVE ALL SILT &

DEBRIS

DITCH RECONDITIONING DETAIL

NOT TO SCALE

VARIES (4' MIN)

ROADWAY WIDTH

C

L

3 - 5% SLOPE FOR DITCH RELIEF

MATCH TO

EXISTING SIDE

SLOPES

M I N

TYPICAL CULVERT PROFILE FOR 18"- 48" DIA.

NOT TO SCALE

MATCH EXISTING

GRADE OF ROAD

4" BEDDING MINIMUM

INVERT OF

CULVERT TO BE

PLACED AT INVERT

OF DITCH OR

CHANNEL

DO NOT RAISE OUTLET

ABOVE ORIGINAL

GROUND OR STREAM

BED. INSTALL OUTLET

DITCH TO DRAIN

MATCH TO

EXISTING SIDE

SLOPES

M

I N

1'-0"

MIN.

BEDDING

MATCH EXISTING

GRADE OF ROAD

SURFACE

M

I N

BACKFILL MATERIAL

TYPICAL CULVERT SECTION FOR 18"- 48" DIA.

NOT TO SCALE

AGGREGATE SURFACE COURSE

2-4% 2-4%

C

L

ROADWAY WIDTH

MATCH EXISTING

6" MINIMUM (12" MAXIMUM)

AGGREGATE SURFACE COURSE,

6" LIFTS, COMPACTION METHOD B

AGGREGATE BASE COURSE, 6" LIFTS,

GRADING C, COMPACTION METHOD B.

DEPTH VARIES ACCORDING TO

WASHOUT SITE.

SEE DITCH DETAIL THIS

SHEET

TYPICAL ROADWAY SECTION

NOT TO SCALE

3 MIN. H (TYP)

1 V

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/3 0/2

5 1 6:

S

CO

FF

EY

C

:\U

SE

RS

\S

CO

FF

EY

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

TJ

PG

PN

ZM

P0 6P

CQ

ZW

CA

MU

LQ

\20

G

MF

L_

RO

AD

R

EP

AI

RS

_D

ET

AI

LS

.D

W G;

R-09

EASTERN REGION

2025 GMNF

ROAD REPAIRS

GREEN MOUNTAIN

NATIONAL FOREST

ROCHESTER & MANCHESTER

RANGER DISTRICTS

NOTES AND TYPICAL

ROAD REPAIR DETAILS

01/29/2025

S. COFFEY

S. COFFEY

D. Donahue

C-01 002 005

GENERAL NOTES:

1. THIS TASK ORDER INCLUDES, BUT IS NOT LIMITED TO, CULVERT REMOVAL AND

REPLACEMENT, AND RECONDITIONING ROADSIDE DITCHES.

2. ALL LOCATIONS SHALL BE FLAGGED BY THE FOREST SERVICE.

3. ALL DIMENSIONS, ANGLES, BEARINGS, AND ELEVATIONS ARE BASED ON LIMITED

FIELD INVESTIGATION.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING

FIELD MEASUREMENTS OF ALL EXISTING FEATURES TO ASSURE CONSISTENCY WITH

THE PROPOSED CONSTRUCTION. ANY DISCREPANCIES IN DIMENSIONS, CHARACTER

OR EXTENT OF THE EXISTING FEATURES SHALL BE BROUGHT TO THE ATTENTION OF

THE C.O.R. BEFORE ADVANCING THE WORK.

4. ALL MATERIALS AND CONSTRUCTION SHALL CONFORM TO THE SUPPLEMENTAL

SPECIFICATIONS ATTACHED TO THE BASE IDIQ/BPA CONTRACT, AND TO THE US

DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION

STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON

FEDERAL HIGHWAY PROJECTS, FP-14, U.S. CUSTOMARY UNITS AND ITS LATEST

REVISION.

5. ALL SOIL MOVING EQUIPMENT SHALL BE FREE OF SOIL, NON-NATIVE INVASIVE

SPECIES, AND OF OTHER DEBRIS THAT COULD CONTAIN OR HOLD SEEDS PRIOR TO

BEING DELIVERED TO AND REMOVED FROM THE PROJECT SITE. EQUIPMENT SHALL

BE CONSIDERED FREE OF NON-NATIVE OR INVASIVE SPECIES AND OTHER SUCH

DEBRIS WHEN A VISUAL INSPECTION BY THE COR DOES NOT DISCLOSE SUCH

MATERIAL PRESENT.

6. CONTRACTOR SHALL PROVIDE A SCHEDULE FOR WORK INCLUDING A PROPOSED

TIME AND LOCATION FOR EQUIPMENT INSPECTION A MINIMUM OF 14 DAYS PRIOR TO

MOBILIZATION.

7. ALL SERVICING AND REFUELING OF EQUIPMENT SHALL BE DONE AT A LOCATION

APPROVED BY THE COR.

8. THE CONTRACTOR SHALL PROVIDE A SPILL PREVENTION PLAN AND SHALL PROVIDE

A SPILL KIT ON SITE AT ALL TIMES DURING CONSTRUCTION. THIS SHALL BE PAID FOR

INDIRECTLY TO ALL OTHER CONTRACT ITEMS.

9. THE CONTRACTOR SHALL MINIMIZE THE AMOUNT OF DISTURBED SOIL EXPOSED TO

EROSION FROM WIND AND WATER BY USING VEGETATIVE AND STRUCTURAL

CONTROLS AND PROPER TIMING AND SEQUENCING OF ACTIVITIES.

10. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE

CONTRACTOR'S OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO THEIR

ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.

11.CULVERT BEDDING AND BACKFILL MATERIAL, PLACEMENT, AND COMPACTION SHALL

BE IN ACCORDANCE WITH FP-14 SPECIFICATIONS. ALL COSTS SHALL BE PAID FOR

INDIRECTLY UNDER ITEM 60202a & 60202b.

12. ALL WASTE MATERIAL, INCLUDING CULVERTS AND UNUSED EXCAVATED MATERIAL,

SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF

OFF U.S. GOVERNMENT (NATIONAL FOREST) LAND. THERE ARE NO GOVERNMENT

APPROVED DISPOSAL SITES OR PITS.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/3 0/2

5 1 6:

S

CO

FF

EY

C

:\U

SE

RS

\S

CO

FF

EY

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

TJ

PG

PN

ZM

P0 6P

CQ

ZW

CA

MU

LQ

\20

G

MF

L_

RO

AD

R

EP

AI

RS

_D

ET

AI

LS

.D

W G;

R-09

EASTERN REGION

2025 GMNF

ROAD REPAIRS

GREEN MOUNTAIN

NATIONAL FOREST

ROCHESTER & MANCHESTER

RANGER DISTRICTS

FR 35 & 55 PROJECT

MAPS & WORKLISTS

01/29/2025

S. COFFEY

S. COFFEY

D. Donahue

C-02 003 005

FR 35 & 55 PROJECT LOCATION MAP

NOT TO SCALE

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/3 0/2

5 1 6:

S

CO

FF

EY

C

:\U

SE

RS

\S

CO

FF

EY

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

TJ

PG

PN

ZM

P0 6P

CQ

ZW

CA

MU

LQ

\20

G

MF

L_

RO

AD

R

EP

AI

RS

_D

ET

AI

LS

.D

W G;

R-09

EASTERN REGION

2025 GMNF

ROAD REPAIRS

GREEN MOUNTAIN

NATIONAL FOREST

ROCHESTER & MANCHESTER

RANGER DISTRICTS

FR 59 & 70 PROJECT

MAPS & WORKLISTS

01/29/2025

S. COFFEY

S. COFFEY

B.AUSTIN

C-03 004 005

FR 59 & 70 PROJECT LOCATION MAP

NOT TO SCALE

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/3 0/2

5 1 6:

S

CO

FF

EY

C

:\U

SE

RS

\S

CO

FF

EY

\A

PP

DA

TA

\L

OC

AL

\B

OX

\B

OX

E

DI

T\

DO

CU

ME

NT

S\

TJ

PG

PN

ZM

P0 6P

CQ

ZW

CA

MU

LQ

\20

G

MF

L_

RO

AD

R

EP

AI

RS

_D

ET

AI

LS

.D

W G;

R-09

EASTERN REGION

2025 GMNF

ROAD REPAIRS

GREEN MOUNTAIN

NATIONAL FOREST

ROCHESTER & MANCHESTER

RANGER DISTRICTS

FR 83 & 273 PROJECT

MAP & WORKLIST

01/29/2025

S. COFFEY

S. COFFEY

D. Donahue

C-04 005 005

FR 83 & 273 PROJECT LOCATION MAP

NOT TO SCALE

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Sheets and Views
2025 GMFL_Road Repairs_DETAILS-COVERSHEET
OLE1
2025 GMFL_Road Repairs_DETAILS-C-01
OLE1
2025 GMFL_Road Repairs_DETAILS-C-02
OLE1
2025 GMFL_Road Repairs_DETAILS-C-03
OLE1
2025 GMFL_Road Repairs_DETAILS-C-04
OLE1

File details come from the government source that posted it. Updated .