Att. 3 Drawings 250820.pdf

PDF 2 MB Posted

Attached to
WMF Gilead Trail Bridge Superstructure Replacement Federal contract opportunity
Solicitation number
12445525Q0091
Issued by
Department of Agriculture Forest Service

About this file

These are engineering design documents for the Gilead Bridge Redesign project, located in the White Mountain National Forest in Oxford County, Maine, prepared by the USDA Forest Service's Eastern Region (R9). The project involves redesigning an existing bridge, with detailed technical specifications for a steel bridge featuring W24 x 68 steel girder beams, a 12-foot clear width, 4-inch laminated deck panels, and a complete railing system. The design includes specific construction requirements such as using AASHTO M270 Grade 50 steel, treated lumber, and precise attachment methods for deck panels, backing boards, and structural components. Technical details specify a 61.3-foot span, 60.3-foot bridge length, and 12-foot width, with additional specifications for foundation, abutment modifications, signage, and bridge identification placard installation.

View the file

Other files for this federal contract opportunity

Other files attached to WMF Gilead Trail Bridge Superstructure Replacement, newest first.
File Type Posted
12445525Q0091 Amd 0003 250925.pdf PDF
12445525Q0091 Amd 0001 250917.pdf PDF
Site visit QA 250917.pdf PDF
12445525Q0091 Amd 0002 250923.pdf PDF
Site visit sign in 250917.pdf PDF
Att. 5 Wage Determination ME20250001 250221.pdf PDF
Att. 1 Statement of Work 250820.pdf PDF
12445525Q0091 250826.pdf PDF
Att. 2 Supplemental Specs 250820.pdf PDF
Att. 4 Gilead Bridge Failing Report 250820.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .