Att. 2 Plans 250523.pdf

PDF 9 MB Posted

Attached to
GAOA SUF Forest Road 152 South Brule River Bridge Replacement Federal contract opportunity
Solicitation number
12445525B0004
Issued by
Department of Agriculture Forest Service

About this file

The document is a detailed set of engineering plans for the South Brule River Bridge Replacement project located in Superior National Forest, Cook County, Minnesota. The project involves replacing an existing two-span timber deck and beam bridge with a single-span spike laminated timber bridge on Forest Road 152. Key technical specifications include:

The new bridge will have a 38'-8" span length, 16'-0" clear roadway width, and 20" spike laminated timber deck. The design includes timber piling foundations with approximately 20-foot pile lengths and a required pile capacity of 30 tons per pile. The project incorporates specific environmental considerations, such as a Brule River Trout Stream restriction prohibiting in-stream work between September 15 and June 30. The road will be reconstructed with 4" asphalt pavement, 6" of MNDOT Class 5 base, and 4" of MNDOT Class 1 gravel, maintaining a similar profile to the existing road with slight modifications to road grade and cross-slope.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA SUF Forest Road 152 South Brule River Bridge Replacement, newest first.
File Type Posted
Abstract of Bids 250714.xls XLS spreadsheet
12445525B0004 Amendment 0001 250707.pdf PDF
Att. 4 Supplemental Specs 250220.pdf PDF
Att. 5 Project Map 250523.pdf PDF
Att. 6 NEPA 250523.pdf PDF
Att. 7 Wage Determination - MN20240231 250502.pdf PDF
IFB Solicitation 12445525B0004 250529.pdf PDF
Att. 1 Schedule of Items 250529.docx DOCX document
Att. 3 SOW 250523.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRESTON TRIPP Digitally signed by PRESTON TRIPP Date: 2025.01.08 15:13:22 -06'00'

Digitally signed by KYLE STOVER Date: 2025.01.10 15:46:49 -06'00'

Digitally signed by THOMAS HALL Date: 2025.01.23 14:01:15 -06'00'

JEFFREY DULKA

Digitally signed by JEFFREY DULKA

DN: CN=JEFFREY DULKA + OID.0.9.2342.19200300.100.1.1=12001002948495,

OU=Department of Agriculture, O=U.S. Government, C=US Location: USFS Northeast Region Reason: I am approving this document Contact Info: Regional Bridge & Structures Program Manager Date: 2025.01.29 14:47:49-06'00'

JOSIAH KIM Digitally signed by JOSIAH KIM Date: 2025.01.30 10:16:46 -06'00'

Brule River Trout Stream Restriction:

No in-stream work will be permitted between September 15 to June 30.

36 TEMPORARY BYPASS 1 LS

TIMBER WEARING SURFACE 1.9 MBM

EXISTING TYPICAL SECTION FR152 ROAD

STA 0+00 - 4+00

PROPOSED TYPICAL SECTION FR152 ROAD

STA 0+00 - 1+80.80

STA 2+19.47 - 4+00

FR152 CENTERLINE

FR152 CENTERLINE

15'

1'-0" SHLD

2'-0" 12'-0"

1'-0" SHLD

2'-0"

16'-0"

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 9/2

1 1 4:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_T

S.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

TYPICAL SECTION

01/05/2021

GS

GS

SP

C-02 3 26

COOPER

ENGINEERING

4" ASPHALT PAVEMENT, 2 EQUAL LAYERS

6" OF MNDOT CLASS 5

4" OF MNDOT CLASS 1

GRAVEL SURFACE

EXISTING CONTOUR

VARIES2:1 (TYP.)

VARIES

2.5:1(TYP.)

POINT REFEREED TO ON PROFILE GRADE(VARIES WITH STATION)

2% TYP4% 2% TYP 4%

3:1

EXISTING PROFILE SURFACE(VARIES WITH STATION)

3:1PROPOSED CONTOUR

RAILING @BRIDGE

CONSTRUCTION

AHEAD

CONSTRUCTION

AHEAD

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 9/2

1 1 3:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_G

N.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

MISCELLANEOUS

ROADWAY QUANTITIES

01/26/2021

GS

GS

SP

C-04 5 26

COOPER

ENGINEERING

OH

OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH

E

E

E

E

E

E

E

E

3+09.08

1+00.00 2+00.00

3+00.00

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

FOREST SERVICE

DEPAR TMENT OF AGRICU LT

UR

E

United States Department of Agriculture Forest Service

1/5 /21

2:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_C

M.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

EXISTING CONTOUR MAP

12/22/2020

GS

GS

SP

C-05 6 26

FR 152 CENTERLINE

EXISTING BRIDGE

EXISTING WINGWALL AND

TIMBER PILES

EDGE OF WATER(TYP.)

SO

U

TH

B

R U

LE

R

IV

ER

EDGE OF GRAVEL SURFACE

GRAPHIC SCALE

0 510 10

(IN FEET)

SOUTH BRULE RIVER

COOPER

EXISTING RIPRAP(TYP.)

OH

OH

OH

OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH

E

E

E

E

E

E

0+001+002+003+00

4+00

STA 1+80.80STA 2+19.47

OH OH OH OH OH OH OH OH OH

2+00 STA 1+80.80STA 2+19.47

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

FOREST SERVICE

DEPAR TMENT OF AGRICU LT

UR

E

United States Department of Agriculture Forest Service

1/2 9/2

1 1 4:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_P

P_

RE

CO

VE

R.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

PROPOSED CONTOUR

MAP

01/27/2021

GS

GS

SP

C-06 7 26

GRAPHIC SCALE

0 7.515 15

(IN FEET)

FR 152 CENTERLINE

EDGE OF WATER(TYP.)

EXISTING BRIDGE

EXISTING WINGWALL AND

TIMBER PILES

PROPOSED STRUCTURE

PROPOSED CONTOURS

WITH 3:1 SLOPE

EDGE OF ASPHALT

COOPER

ENGINEERING

SOUTH BRULE RIVER

SO

U

TH

B

R U

LE

R

IV

ER SLOPE INTERCEPT

PROPOSED CONTOURS NEAR BRIDGE

ELECTRIC POLE(TYP.)

OVERHEAD UTILITY LINE(TYP.)

EXISTING

CONTOURS(TYP.)

BOTTOM OF

EXISTING

SLOPE(TYP.)

TOP OF EXISTING

SLOPE(TYP.)

PROPOSED MNDOT

TYPE III RIPRAP

PROPOSED CONTOUR MAP NEAR BRIDGE

SCALE: 1IN = 10FT

EDGE OF GRAVEL

PROPOSED CONTOURS

MATCH EXISTING

OH

OH

OH

OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH

E

E

E

E

E

E

0+001+002+003+00

4+00

STA 1+80.80STA 2+19.47

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

FOREST SERVICE

DEPAR TMENT OF AGRICU LT

UR

E

United States Department of Agriculture Forest Service

1/2 9/2

1 1 4:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_P

P_

RE

CO

VE

R.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

SOIL EROSION CONTROL

01/28/2021

GS

GS

SP

C-07 8 26

GRAPHIC SCALE

0 7.515 15

COOPER

ENGINEERING

FR 152 CENTERLINE

EDGE OF WATER(TYP.)

SOUTH BRULE RIVER

SO

U

TH

B

R U

LE

R

IV

ER

PLACE EROSION MAT URBAN CLASS I TYPE B ON ALL SLOPES

SILT FENCE

EROSION CONTROL LEGEND

RIP RAP OR STONE DITCH CHECK

SLOPE INTERCEPT

TURBIDITY BARRIER

PROPOSED EROSION

CONTROL BLANKET(TYP.)

TURBIDITY BARRIER

PROPOSED SILT FENCE(TYP.)

REMOVE FOLLOWING STABILIZATION

SLOPE INTERCEPT

PROPOSED MNDOT

TYPE III RIPRAP

EL

EV

AT

IO

N (F

EE

T)

.8

.7

.7

.6

.5

.3

.5

.9

.2

.0

.9

.7

.5

.6

.8

.0

.2

.0

.2

.6

.9

.2

.5

.6

.7

.7

.7

.6

.5

.2

.9

.6

.3

.2

0+000+501+001+502+002+503+003+504+00

VCL = 50.00

K = 79.06

VP

C

ST

A

3+

.0

VP

C

EL

0.

VP

T

ST

A

3+

.0

VP

T

EL

0.

VPI STA 3+50.00

VPI EL 1640.575

VCL = 100.00

K = 68.97

VP

C

ST

A

0+

.0

VP

C

EL

0.

VP

T

ST

A

1+

.0

VP

T

EL

1.

VPI STA 1+25.00

VPI EL 1641.700

VCL = 100.00

K = 66.67

VP

C

ST

A 2+

.0

VP

C

EL

1.

VP

T

ST

A

3+

.0

VP

T

EL

0.

VPI STA 2+75.00

VPI EL 1641.700

OH

OH

OH

OH

OH

OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH

E

E

E

E

E

E

0+001+002+003+00

4+00

STA 1+80.80STA 2+19.47

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

FOREST SERVICE

DEPAR TMENT OF AGRICU LT

UR

E

United States Department of Agriculture Forest Service

1/2 9/2

1 1 4:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_P

P_

RE

CO

VE

R.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

PLAN AND PROFILE

01/27/2021

GS

GS

SP

C-08 9 26

100YR. WATER SURFACE

EL. : 1636.54(UPSTREAM) OBSERVED WATER EL. :

1632.28 (06.16.20)

REMOVE EXISTING STRUCTURE

STA 1+82.11 - STA 2+17.71

PROPOSED STRUCTURE

STA 1+80.00 - STA 2+19.47

ORIGINAL GROUND

REMOVE EXISTING STRUCTURE

STA 1+82.11 - STA 2+17.71

EXISTING STRUCTURE

2 SPAN TIMBER DECK AND BEAM BRIDGE

15'-0" CLEAR ROADWAY WIDTH

36'-0" TOTAL LENGTH

STA 1+82.11 - STA 2+17.71

PROPOSED STRUCTURE

SINGLE SPAN SPIKE LAMINATED TIMBER BRIDGE

16'-0" CLEAR ROADWAY WIDTH

38'-8" SPAN LENGTH(BACK TO BACK ABUTMENTS)

STA 1+80.80 - STA 2+19.47

BEGIN PROJECT, MATCH EXISTING GRADE

STA 0+00.00

N(Y): 865675.72 E(X): 3277788.39

END PROJECT, MATCH EXISTING GRADE

STA 4+00.00

N(Y): 865961.78 E(X): 3277509.31

PROPOSED EDGE OF ASPHALT

PROPOSED EDGE OF GRAVEL

MNDOT TYPE III RIPRAP

EDGE OF WATER(TYP.)

GRAPHIC SCALE

0 7.515 15

(IN FEET)

SOUTH BRULE RIVER

COOPER

ENGINEERING

1.50%

SO

U

TH

B R

U

LE

R

IV

ER

PROPOSED GROUND

EARTHWORK QUANTITIES

NAME TOTAL AREA(SQ.FT.) CUT(CU.YD.) FILL(CU.YD.) NET(CU.YD.)-FILL

NW CONTOUR AREA 1117.7600 17.5500 94.6600 77.1000

SE CONTOUR AREA 894.4600 12.0300 57.8700 45.8500

TOTAL 2012.2200 29.5800 152.5200 122.9500

SLOPE INTERCEPT(TYP.)

EXISTING GROUND(EL.=1640.00)

SPREADER BEAM

(6" X 12" X 15'-6")

PILE CAP(16" X 16"), B/CAP EL.=1638.2

100YR. WATER SURFACE

EL. : 1636.54(UPSTREAM)

NORMAL WATER

EL. : 1632.28

TIMBER PILING 9.9-INCH TIP Ø, APPROX.

13.5-INCH BUTT Ø

ESTIMATED LENGTH = 20 FT.

REQUIRED PILE CAPACITY = 30 TONS/PILE

RIPRAP WITH GEOTEXTILE FABRIC

STREAMBED EL.: 1630.5

20" SPIKE LAMINATED TIMBER DECK

RAILPOST SPACING

3'-0"

REQ'D

STRUCTURE BACKFILL

LIMITS OF BACKFILL

MIN. FREEBOARD AT Q100 BELOW SPREADER BM = 2 FT.,

BELOW DECK = 3 FT.

EL. = 1629.4

REMOVE

EXISTING STRUCTURE

1'-8"

5'-11" 5'-11" 5'-11" 5'-11" 5'-11" 5'-11"

1'-8"

BERM EL. = 1634.08

PROPOSED GROUND(EL.=1641.70)

4'-0"

MNDOT TYPE III RIPRAP

WINGWALL

END OF EXISTING

STRUCTURE

STA 2+17.71

END OF DECK/BACK OF EAST ABUTMENT

STA 1+80.80

END OF DECK/BACK OF WEST ABUTMENT

STA 2+19.47

END OF EXISTING

STRUCTURE

STA 1+82.11

FR 152 CENTERLINE

5' -9

TY

P.

TIMBER PILE 13.5" BUTT Ø

'-0

AS

PH

AL

T

LA

N E

38'-8" SPAN BACK TO BACK ABUTMENT

'-0

" C

LE

AR

R

O

AD

W

AY

W

ID

TH

36'-0" SPAN CLEAR HYDRAULICS OPENING

'-0 " O

U T

TO

O

U T

ST

R

U C

TU

R

E

7'-2"

30°

(TYP.)

6'-6"

1'- 9"

(T

YP

SPREADER BEAM

9'-0"

11'-5"

10'-3"

2' -0

G

R

AV

EL

1- 0"

SH

LD

2' -0

G

R

AV

EL

1- 0"

SH

LD

10:1

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 9/2

1 1 0:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_B

R.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

STRUCTURAL PLAN

1/28/2021

GS

GS

SP

C-09 10 26

COOPER

ENGINEERING

PLAN

SINGLE SPAN TIMBER BRIDGE

n WINGWALL

ELEVATION

NORMAL TO SOUTH BRULE RIVER

(IN FEET)

GENERAL NOTES

DRAWINGS SHALL NOT BE SCALED.

CONSTRUCTION REQUIREMENTS SHALL BE CONFORM

TO SECTION 557 OF FP-14 SPECIFICATIONS.

TIMBER CONNECTORS AND HARDWARE SHALL BE

INCLUDED IN THE BID ITEM "TREATED LUMBER AND

TIMBER" & "SPIKE GLULAM LAMINATED TIMBER PANEL

BRIDGE SUPERSTRUCTURE".

GLU-LAM RAILING & DECK PANELS TO BE INCLUDED IN

THE BID ITEM, "SPIKE GLULAM LAMINATED TIMBER PANEL

BRIDGE SUPERSTRUCTURE".

BACKFILL PAY LIMITS. BACKFILL BEYOND PAY LIMITS

SHALL BE INCIDENTAL TO EXCAVATION FOR

STRUCTURES. LIMITS OF EXCAVATION SHALL BE

DETERMINED BY THE CONTRACTOR.

AT THE BACKFACE OF THE ABUTMENT ALL VOLUME

WHICH CANNOT BE PLACED BEFORE ABUTMENT

CONSTRUCTION AND IS NOT OCCUPIED BY THE NEW

STRUCTURE SHALL BE BACKFILLED WITH STRUCTURAL

BACKFILL.

ALL STATIONS AND ELEVATIONS ARE IN FEET.

BE

G

IN

P

R O

JE

C

T

ST

A 0+

EL

. 1

0.

C L

N W

. A

BU

T.

ST

A 1+

.4

EL

. 1

1.

C L

N E.

A

BU

T.

ST

A 2+

.8

EL

. 1

1.

EN

D

P R

O

JE

C T

ST

A

4+

EL

. 1

0.

PROFILE GRADE LINE

SCALE: 1IN = 40FT

SOUTH BRULE

R

IVER

N

K = 79.06

VCL = 50.00

K = 66.67

VCL = 100.00

K = 68.97

VCL = 100.00

0.00% 1.50% 0.63% 1.37%0.45% 1.45%

/2

.5

.3

.5

.9

.2

.0

.9

.7

.5

.5

.3

.5

.9

.2

.0

.9

.7

.5

1 1 2 2 3

DARK GRAYISH BROWN SAND AND GRAVEL, TRACE SILT, DAMP

GRAYISH BROWN SAND, WITH GRAVEL, LITTLE TO TRACE SILT, DAMP TO MOIST

BROWN SAND, WITH GRAVEL, TRACE SILT, WET

DARK GREENISH GRAY SAND, WITH GRAVEL, LITTLE SILT, WET

DARK GRAY SAND, WITH SILT, TRACE GRAVEL AND CLAY, WET

BROWN TO DARK GRAYISH BROWN SAND AND GRAVEL, TRACE SILT

BROWN SAND, WITH GRAVEL, TRACE SILT, DAMP

DARK GREENISH GRAY SAND, WITH GRAVEL, LITTLE TO WITH SILT, MOIST TO WET

DARK GRAY SAND, WITH SILT, TRACE GRAVEL, WET

BLACK AND GRAY BEDROCK(RQD=83)

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

FOREST SERVICE

DEPAR TMENT OF AGRICU LT

UR

E

United States Department of Agriculture Forest Service

1/2 9/2

1 1 3:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_P

P_

RE

CO

VE

R.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

SUBSURFACE

EXPLORATION

1/28/2021

GS

GS

SP

C-11 12 26

COOPER

ENGINEERING

NOTE:

BORING COMPLETED BY: PSI, INC, 06/15/2020

REPORT COMPLETED BY: PSI, INC, 08/28/2020

BORING DATE COMPLETED NORTHING(Y) EASTING(X)

1 06.15.2020 865,807.1400 3,277,663.5600 2 06.15.2020 865,824.2100 3,277,627.5600

GRAPHIC SCALE

0 510 10

(IN FEET)

B-1

B-2

SO

UT

H

BR

UL

E

RI

VE

R

TIMBER PILE(TIP Ø - 9.9",

APPROX. BUTT Ø - 13.5"),

ESTIMATED LENGTH = 20 FT.

REQUIRED PILE CAPACITY =

30 TONS/PILE

PILE TIP EL. = 1619.5

NOM. 3" TIMBER WEARING

SURFACE

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 7/2

1 1 5:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

AB

UT

ME

NT

D

ET

AI

LS

.D W

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

ABUTMENT DETAILS

1/18/2021

GS

GS

SP

C-13 14 26

COOPER

ENGINEERING

(IN FEET)

8" X 8" X 5'-6"

PILESTAY

2" X 8" X 1'-6"

FILLER WEDGE

20" SPIKE LAMINATED TIMBER DECK

3/4" X 26" MACHINE BOLT

WITH (2) 3" X 3" X 5/16" PLATE

WASHER (1)

3/4" X 23" MACHINE BOLT

WITH (1) 3" X 3" X 5/16" PLATE

WASHER @ PILESTAY AND

(1) 3/4" CUT WASHER EA.

@PILE

3" x 12"

ABUTMENT

BACKING

6" X 8" X 9'-0" CORNER NAILING BLOCK, FASTEN TO BACKING

WITH (4) 3/4" X 11" MACHINE BOLTS WITH (1) 3"Ø X 1/4" PLATE

WASHER @ CORNER NAILING BLOCK & (1) 3" X 3" X 5/16"

PLATE WASHER @ BACKING, ALL BOLTS TO HAVE (1) 3/4"

LOCK BUT EA. FASTEN TO CAP & BLOCK WITH (2) 3/4" X 14"

LAG SCREWS WITH (1) CUT WASHER EA. BEVEL CORNER

NAILING BLOCK IN SHOP

4" x 12" WING BACKING

3" x 12"

ABUTMENT

BACKING

13.5" BUTT Ø TIMBER PILE

60D NAILS, WING

BACKING TO CORNER

NAILING BLOCK, (TYP.)

4" x 12" WING

BACKING BOARDS

4" x 14" WING CAP

13.5" BUTTØ TIMBER PILE

3/4"Ø X 24" MACHINE

BOLT WITH (1) 3" X 3" X

5/16" PLATE WASHER @

WING CLEAT & (1) 3/4"

CUT WASHER @ PILE,

ALL BOLTS TO HAVE (1)

3/4" LOCK NUT EA. FIELD

DRILL

SECTION A-A

1' -2

3'

-0

6"

CORNER NAILING BLOCK DETAIL -

PLAN VIEW BELOW PILE CAP

SECTION B-B

3/4"Ø X 36" DOME HEAD DRIVE SPIKE,

DECK TO ABUTMENT CAP

8" X 8" X 5'-6"

PILESTAY

PILE AND PILE CAP CONNECTION

3/4"Ø X 30" DRIFT PIN,

CAP TO PILING (1)

16" X 16" ABUTMENT CAP

13.5" BUTT Ø TIMBER PILE

NOTES:

(1) PROVIDE 2"-3" OF CLEARANCE BETWEEN THE MACHINE

BOLT AND DRIFT PIN(VERTICAL) DURING THE FIELD DRILL.

(1)

3' -0

PA

N

EL

C

3' -0

PA

N

EL

A

3' -0

PA

N

EL

C 3'

-0

PA

N

EL

C

3' -0

PA

N

EL

C

7'-2" 7'-2" 7'-2" 7'-2" 7'-2"

'-6

3' -0

PA

N

EL

B

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 8/2

1 1 0:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_B

R.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

SUPERSTRUCTURE

SECTIONS AND DETAILS

01/18/2021

GS

GS

SP

C-14 15 26

COOPER

ENGINEERING

16"X16"X21'-4" PILE CAP

ABUTMENT CURB

BLOCK

6"X12" SCUPPER

6"X12" CURB

12"(TYP.)

SECTION THROUGH DECK @ ABUTMENT

SECTION THROUGH DECK @ SPREADER BEAM

SCALE: 1IN = 2FT

16'-0" CLEAR ROADWAY

℄ ROADWAY

18'-0" OUT TO OUT OF DECKS

2'-8"

PANEL "A"

3'-0"

PANEL "B"

3/4"Ø X 32" DM. HD. BOLTS

WITH (1) 3" X 3" X 5/16" ⅊

WASHER AND (1) 3/4" LOCK

NUT PER BOLT

4" X 20" DECK PANELS

6" X 12" X 15'-6" SPREADER BEAM

5/8" X 19" DOME HEAD

DRIVE SPIKE, PANEL

SHIPLAP JOINT,(TYP.)

PANEL A

PANEL C

PANEL B

CONNECTION BETWEEN DECK PANELS

SCALE: 1IN = 1FT

C'BORE 2"Ø X 4" DEEP

PANEL A PANEL BPANEL C

NOTCH FOR 6 1/8" X 1 1/4" X 2'-6 1/8"

INTERNAL STEEL PLATE

DECK PANEL AND SPREADER BEAM - PLAN VIEW

SCALE: 1IN = 5FT

NOTES:

1 WEDGE LONGITUDINAL DECK PANELS WITH GAPS OVER 1/2" BETWEEN BOTTOM OF THE

DECK AND TOP OF THE SPREADER BEAM WITH PRESERVATIVE TREATED WEDGES

MATCHING DECK TREATMENT.

ANCHOR WEDGE IN PLACE BY PROVIDING SCREW AT BUTT END OF WEDGE OR PRE-DRILLED

HOLE THROUGH WEDGE, NO SPLITS ARE ALLOWED IN WEDGES. LENGTH OF WEDGE TO BE

MINIMUM OF 50% LONGER THAN CONTACT WIDTH OF SPREADER BEAM.

USE STRONG-DRIVE SDWH TIMBER-HEX HDG SCREW, STRONG-DRIVE SDWH TIMBER-HEX SS

SCREW, OR EQUIVALENT, LENGTH DEPENDENT ON DEPTH OF WEDGE.

3/4"Ø X 24" DM. HD. DRIVE

SPIKE, DECK TO CAP(TYP.)

1'-6"(TYP.)

8"

12"

6"

12" 12"16"8"

12"

6" 8"

8"

5"

LOWER SHILAP SPLICE

5/8" X 32" ASTM A722

STRESSING ROD

WITH (1) 3" X 4" X 1/2"

⅊ WASHER 10

UPPER SHILAP SPLICE

STRESSING ROD ATTACHMENT DETAIL

1IN = 1FT

PANEL A PANEL C PANEL B

2'-8"

PANEL "C"

2'-8"

PANEL "C"

2'-8"

PANEL "C"

2'-8"

PANEL "C"

4"(TYP.)

1'-10"

2'-6 1 8 "

1 14"

1 8"

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 7/2

1 1 5:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

AB

UT

ME

NT

D

ET

AI

LS

.D W

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

RAILING DETAILS

1/18/2021

GS

GS

SP

C-15 16 26

COOPER

ENGINEERING

(IN FEET)

8" X 12" X 3'-6" RAILPOST,

10" X 12" X 3'-6" RAILPOST

@ RAIL SPLICE LOCATIONA

A

10 1/2" X 6" GLU-LAM RAIL

10 1/2" X 6" X 8" GLU-LAM RAILPOST

BLOCK, 10 1/2" X 6" X 10" GLU-LAM

RAILPOST BLOCK @ RAIL SPLICE

12" X 6" CURB, S1S1E

12" X 6" SCUPPER, S1S1E

4"Ø SPLIT RINGS,

CURB TO SCUPPER,

SCUPPER TO DECK

1 1/4" X 26" DM. HD. BOLT (A449)

WITH (2) 51/2" X 8" X 1/4" PLATE

WASHER, POST TO CURB

5/8" X 26" DM. HD. BOLT (A449)

WITH (1) 3" X 3" X 1/4" PLATE

WASHER EA.

3/4" X 30" DM. HD. DR. SPK.,

RAILPOST TO DECK

3/4" X 30" DM. HD. DR. SPK.,

DECK REINFORCEMENT

3/4" X 32" DM. HD. BOLT (A449) WITH

(1) 4" X4" X 5/16" PLATE WASHER

(UNDER NUT) & (1) 4"Ø WASHER

(UNDER HEAD) PER BOLT, CURB TO

DECK

4"

1 2"

1 2" B

EV

EL

R

AI

LP

O

ST

12"

3" 5"

3"

5"

6'-3"

20" SPIKE LAMINATED

TIMBER DECK

BITUMINOUS WEARING SURFACE

8" X 12" X 3'-6" RAILPOST10" X 12" X 3'-6" RAILPOST

10 1/2" X 6" X 8" GLU-LAM

RAILPOST BLOCK

10 1/2" X 6" X 10"

GLU-LAM

RAILPOST BLOCK

10 1/2" X 6" X 12'-6" GLU-LAM RAIL

BRIDGE RAILING - PLAN VIEW SECTION A-A @ RAILPOST WOOD RAIL ELEVATION

(FRONT VIEW)

WOOD RAIL ELEVATION

(BACK VIEW)

RAILPOST DRILLING DETAIL

@SPLICE

BRIDGE RAILPOST BEVEL DETAIL

11" 11" 10

3"

5"

6" X 12" CURB

6" X 12" X 3'-0" SCUPPER

10 1/2" X 6" GLU-LAM RAIL

3/4" X 30" DM. HD. DR. SPK.,

DECK REINFORCEMENT, (TYP.)

6" X8" X 1/4" PLATE WASHER

10 1/2" X 6" GLU-LAM RAIL

10 1/2" X 6" X 8" GLU-LAM RAILPOST BLOCK

2' -8

AT

IO

N (F

EE

T)

OFFSET (FEET)

0+00.00

0 10 20 30 40 500-10-20-30-40-50

EL

EV

AT

IO

N (F

EE

T)

OFFSET (FEET)

0+25.00

0 10 20 30 40 500-10-20-30-40-50

.0

0.

1639.17

0.00

.0

0.

1639.17

0.00

1638.94 -11.47

1638.94 11.47

.0

.8

.9

-2 1.

2.0%2.0%4.0% 4.0%

2.0:1

2.0:1

.2

0.

1639.42

0.00

.2

0.

1639.42

0.00

1639.19

-11.47

1639.19

11.47

.8

.6

.2

-2 3.

2.0%2.0%4.0% 4.0%

2.0:1 2.0:1

TAPER FILL FROM STA 0+00(EXISTING

CONDITION) TO STA 0+25 SHOWN ABOVE

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 9/2

1 1 3:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_X

S.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

ROAD CROSS-SECTIONS

01/05/2021

GS

GS

SP

C-16 17 26

COOPER

(IN FEET)

AT

IO

N (F

EE

T)

OFFSET (FEET)

0+50.00

0 10 20 30 40 500-10-20-30-40-50

EL

EV

AT

IO

N (F

EE

T)

OFFSET (FEET)

0+75.00

0 10 20 30 40 500-10-20-30-40-50

.6

0.

1639.78

0.00

.6

0.

1639.78

0.00

1639.55

-11.47

1639.55

11.47

.2

.5

.9

-2 4.

2.0%2.0%4.0% 4.0%

2.0:1 2.0:

.2

.4

.5

-3 3.

.9

0.

1640.14

0.00

.9

0.

1640.14

0.00

1639.91 -11.47

1639.91

11.47 3.0:1

3.0:1

2.0%2.0%4.0% 4.0%

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 9/2

1 1 3:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_X

S.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

ROAD CROSS-SECTIONS

01/05/2021

GS

GS

SP

C-17 18 26

COOPER

AT

IO

N (F

EE

T)

OFFSET (FEET)

0+87.29

0 10 20 30 40 500-10-20-30-40-50

EL

EV

AT

IO

N (F

EE

T)

OFFSET (FEET)

1+00.00

0 10 20 30 40 500-10-20-30-40-50

.4

.2

.0

-1 1.

1640.30

0.00 1640.30

0.00

1640.07

-11.47

1640.07 11.47

3.0:1 3.0:1

2.0%2.0%4.0% 4.0%

.7

.9

.5

-3 4.

.2

0.

1640.46 0.00

.2

0.

1640.46 0.00

1640.23

-11.47

1640.23 11.47

3.0:13.0:1

2.0%2.0%4.0% 4.0%

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 9/2

1 1 3:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_X

S.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

ROAD CROSS-SECTIONS

01/05/2021

GS

GS

SP

C-18 19 26

COOPER

AT

IO

N (F

EE

T)

OFFSET (FEET)

1+25.00

0 10 20 30 40 500-10-20-30-40-50

EL

EV

AT

IO

N (F

EE

T)

OFFSET (FEET)

1+50.00

0 10 20 30 40 500-10-20-30-40-50

.8

.3

.4

-3 5.

.5

0.

1640.69 0.00

.5

0.

1640.69 0.00

1640.46 -11.47

1640.46 11.47

3.0:1 3.0:1

2.0%2.0%4.0% 4.0%

.3

.3

.8

-3 4.

.6

0.

1640.82 0.00

.6

0.

1640.82 0.00

1640.59

-11.47

1640.59 11.47

3.0:1 3.0:1

2.0%2.0%4.0% 4.0%

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 9/2

1 1 3:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_X

S.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

ROAD CROSS-SECTIONS

01/05/2021

GS

GS

SP

C-19 20 26

COOPER

AT

IO

N (F

EE

T)

OFFSET (FEET)

1+65.00

0 10 20 30 40 500-10-20-30-40-50

EL

EV

AT

IO

N (F

EE

T)

OFFSET (FEET)

1+75.00

0 10 20 30 40 500-10-20-30-40-50

.3

.2

.6

-1 1.

1640.85 0.00

1640.85 0.00

1640.62 -11.47

1640.62 11.47

3.0:1 3.0:1

2.0%2.0%4.0% 4.0%

.3

.2

.9

-3 7.

.7

0.

1640.87

0.00

.7

0.

1640.87

0.00

1640.64

-11.47

1640.64

11.47

3.0:1 3.0:1

2.0%2.0%4.0% 4.0%

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 9/2

1 1 3:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_X

S.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

ROAD CROSS-SECTIONS

01/05/2021

GS

GS

SP

C-20 21 26

COOPER

AT

IO

N (F

EE

T)

OFFSET (FEET)

1+80.80

0 10 20 30 40 500-10-20-30-40-50

EL

EV

AT

IO

N (F

EE

T)

OFFSET (FEET)

2+19.67

0 10 20 30 40 500-10-20-30-40-50

.0

.2

.6

-1 1.

1640.87

0.00

1640.87

0.00

1640.64

-11.47

1640.64 11.47

3.0:1 3.0:1

2.0%2.0%4.0% 4.0%

.8

.9

.6

-1 1.

1640.87

0.00

1640.87

0.00

1640.64

-11.47

1640.64 11.47

3.0:1 3.0:1

2.0%2.0%4.0% 4.0%

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 9/2

1 1 3:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_X

S.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

ROAD CROSS-SECTIONS

01/05/2021

GS

GS

SP

C-21 22 26

COOPER

AT

IO

N (F

EE

T)

OFFSET (FEET)

2+25.00

0 10 20 30 40 500-10-20-30-40-50

EL

EV

AT

IO

N (F

EE

T)

OFFSET (FEET)

2+50.00

0 10 20 30 40 500-10-20-30-40-50

.3

.2

.8

-4 3.

.7

0.

1640.87 0.00

.7

0.

1640.87 0.00

1640.64

-11.47

1640.64

11.47 3.0:1

3.0:1

2.0%2.0%4.0% 4.0%

.2

.4

.6

-4 1.

.6

0.

1640.82

0.00

.6

0.

1640.82

0.00

1640.59 -11.47

1640.59

11.47 3.0:1

3.0:1

2.0%2.0%4.0% 4.0%

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 9/2

1 1 3:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_X

S.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

ROAD CROSS-SECTIONS

01/05/2021

GS

GS

SP

C-22 23 26

COOPER

AT

IO

N (F

EE

T)

OFFSET (FEET)

2+57.96

0 10 20 30 40 50 600-10-20-30-40-50-60

EL

EV

AT

IO

N (F

EE

T)

OFFSET (FEET)

2+75.00

0 10 20 30 40 500-10-20-30-40-50

.9

.2

.5

-1 1.

1640.78

0.00

1640.78

0.00

1640.55

-11.47

1640.55 11.47

3.0:1 3.0:1

2.0%2.0%4.0% 4.0%

.2

.0

.4

-1 1.

1640.68 0.00

1640.68 0.00

1640.45

-11.47

1640.45

11.47 3.0:13.0:1

2.0%2.0%4.0% 4.0%

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 9/2

1 1 3:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_X

S.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

ROAD CROSS-SECTIONS

01/05/2021

GS

GS

SP

C-23 24 26

COOPER

AT

IO

N (F

EE

T)

OFFSET (FEET)

3+00.00

0 10 20 30 40 500-10-20-30-40-50

EL

EV

AT

IO

N (F

EE

T)

OFFSET (FEET)

3+50.00

0 10 20 30 40 500-10-20-30-40-50

.1

.6

.8

-3 3.

.2

0.

1640.44 0.00

.2

0.

1640.44 0.00

1640.22

-11.47

1640.22 11.47

3.0:13.0:1

2.0%2.0%4.0% 4.0%

.6

0.

1639.78 0.00

.6

0.

1639.78 0.00

1639.55 -11.47

1639.55

11.47

.5

.9

.2

-2 4.

2.0%2.0%4.0% 4.0%

2.0:12.0:

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 9/2

1 1 3:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_X

S.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

ROAD CROSS-SECTIONS

01/05/2021

GS

GS

SP

C-24 25 26

COOPER

AT

IO

N (F

EE

T)

OFFSET (FEET)

3+75.00

0 10 20 30 40 500-10-20-30-40-50

EL

EV

AT

IO

N (F

EE

T)

OFFSET (FEET)

4+00.00

0 10 20 30 40 500-10-20-30-40-50

.3

0.

1639.52

0.00

.3

0.

1639.52

0.00

1639.30 -11.47

1639.30

11.47 16

.0

.4

.5

-2 2.

2.0%2.0%4.0% 4.0%

2.0:12.0:

.2

0.

1639.36 0.00

.2

0.

1639.36 0.00

1639.13

-11.47

1639.13 11.47

.6

.8

.1

-1 3.

2.0%2.0%4.0% 4.0% 3.0:12.0:

DRAWN

DESIGNER

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

1/2 9/2

1 1 3:

G

SA

GG

U G:

\20

-P

RO

J\2

3\S

UP

ER

IO

R

FR

2-

6.3 3 S

OU

TH

B

RU

LE

R

IV

ER

\C 3D

\S

HE

ET

SP

LA

N\

_X

S.

DW

G;

(R09)

EASTERN REGION

SOUTH BRULE

RIVER BRIDGE

REPLACEMENT

SUPERIOR NATIONAL

FOREST

GUNFLINT RANGER DISTRICT

ROAD CROSS-SECTIONS

01/05/2021

GS

GS

SP

C-25 26 26

COOPER

1-COVERSHEET
Sheets and Views
COVERSHEET
2-GENERAL NOTES
Sheets and Views
General Notes
3-TYPICAL SECTION
Sheets and Views
PLOT
4-TRAFFIC CONTROL
Sheets and Views
PLOT
5-MISQ
Sheets and Views
MISQ
6-Existing Contour Map
Sheets and Views
EXISTING CONTOUR MAP (2)
7-PROPOSED CONTOUR
Sheets and Views
Proposed Contour
8-Soil Erosion & Water Diversion
Sheets and Views
Soil Erosion
9-Plan & Profile
Sheets and Views
Plan & Profile
10-GENERAL PLAN
Sheets and Views
GENERAL PLAN
11-GENERAL PLAN
Sheets and Views
GENERAL PLAN II
12-SUBSURFACE
Sheets and Views
Subsurface
13-AbutmentPLAN
Sheets and Views
Abutment Plan and Elevation
OLE1
14-Abutment Details
Sheets and Views
Abutment Details
OLE1
15-Spreader Beam
Sheets and Views
Spreader Beam
16-Railing Details
Sheets and Views
Railing Details
OLE1
17-Cross-section (1)
Sheets and Views
Cross-Section
18-Cross-section (2)
Sheets and Views
Cross-Section (2)
19-Cross-section (3)
Sheets and Views
Cross-Section (3)
20-Cross-Section (4)
Sheets and Views
Cross-Section (4)
21-Cross-Section (5)
Sheets and Views
Cross-Section (5)
22-Cross-Section (6)
Sheets and Views
Cross-Section (6)
23-Cross-Section (7)
Sheets and Views
Cross-Section (7)
24-Cross-Section (8)
Sheets and Views
Cross-Section (8)
25-Cross-Section (9)
Sheets and Views
Cross-Section (9)
26-Cross-Section (10)
Sheets and Views
Cross-Section (10)

File details come from the government source that posted it. Updated .