Att. 1 - VHA Required Div 01 Spec Sections.pdf
PDF 108 KB Posted
- Attached to
- C1DA--Expand Diagnostic Space for Women's Health
- Solicitation number
- 36C77624R0043
About this file
This pre-solicitation notice seeks Standard Form 330 Architect-Engineer Qualifications packages for a project to expand diagnostic space for women's health at the Eugene J. Towbin Memorial Veterans Hospital Campus in North Little Rock, Arkansas. Key details include:
-
The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses and has an anticipated period of performance of 502 calendar days for design completion.
-
The notice provides submission instructions and evaluation criteria for SF 330s, which are due by February 16, 2024. The most highly qualified firms will be invited to written discussions, with the highest rated firm receiving a request for fee proposal.
-
Required design disciplines include architecture, communications distribution design, cost estimating, civil, electrical, environmental, fire protection, industrial hygiene, mechanical, plumbing, and structural engineering.
-
Evaluation criteria focus on professional qualifications of proposed personnel, capacity to complete the work on schedule, past performance, knowledge of the project locality, and experience providing construction period services.
-
The contracting agency is the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas. The anticipated contract award is in late March 2024.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.
01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements