Att. 1 Schedule of Items 250606.docx
DOCX document 27 KB Posted
- Solicitation number
- 12445525B0009
- Issued by
-
Department of Agriculture Forest Service
About this file
The document is a Schedule of Items for the Lincoln Woods Trail Reconstruction project located in the White Mountain National Forest, Grafton County, New Hampshire. The project involves comprehensive trail reconstruction with a completion deadline of 10/1/2026, encompassing multiple construction and environmental management tasks. Key items include mobilization, construction survey, soil erosion control (using temporary culvert pipes, silt fence, floating turbidity curtain), site clearing, bridge and fence removal, rock excavation, structural backfill, site grading, riprap installation, roadway aggregate placement, and split rail fence installation. The solicitation is set aside for small businesses, governed by Davis-Bacon and Related Acts (DBRA), and requires contractors to be active in SAM.gov. A mandatory site visit is scheduled for 6/12/2025 at 9:30 a.m. Eastern at the Lincoln Woods Trailhead parking lot, with point of contact Scott Lees. The project is issued as an Invitation to Bid (IFB) by the U.S. Department of Agriculture Forest Service, with all questions due by 6/27/2025, and funding availability is pending, with the government reserving the right to cancel the solicitation.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF ITEMS
Lincoln Woods Trail Reconstruction White Mountain National Forest Pemigewasset Ranger District Grafton County, New Hampshire Completion Date: 10/1/2026
| Item Number |
| Description |
| Pay Unit |
| Qty |
| Unit Price |
| Amount |
| 15101-0000 |
| Mobilization |
| LPSM |
| 1 |
| $ |
| $ |
| 0002 |
| 15211-0000 |
| Construction Survey and Staking, Method II , Tolerance B |
| MILE |
| 0.1 |
| $ |
| $ |
| 0003 |
| 15705-0500 |
| Soil Erosion Control, Temporary Culvert Pipe |
| LNFT |
| 20 |
| $ |
| $ |
| 15705-0100 |
| Soil Erosion Control, Silt Fence |
| LNFT |
| 340 |
| $ |
| $ |
| 0005 |
| 15705-2000 |
| Soil Erosion Control, Floating Turbidity Curtain |
| LNFT |
| 600 |
| $ |
| $ |
| 0006 |
| 15706-1600 |
| Soil Erosion Control, Stabilized Construction Exit |
| EACH |
| 1 |
| $ |
| $ |
| 15706-2200 |
| Soil Erosion Control, Filter Bag |
| EACH |
| 2 |
| $ |
| $ |
| 20101-0000 |
| Clearing and Grubbing |
| ACRE |
| 0.5 |
| $ |
| $ |
| 20301-0400 |
| Removal of Bridge |
| EACH |
| 1 |
| $ |
| $ |
| 20302-0700 |
| Removal of Fence |
| LNFT |
| 75 |
| $ |
| $ |
| 20421-0000 |
| Rock Excavation |
| CUYD |
| 260 |
| $ |
| $ |
| 20803-0000 |
| Structural Backfill |
| CUYD |
| 500 |
| $ |
| $ |
| 20815-0000 |
| Cofferdams |
| LPSM |
| 1 |
| $ |
| $ |
| 21202-0000 |
| Site Grading |
| SQYD |
| 2300 |
| $ |
| $ |
| 25105-1000 |
| Keyed Riprap, Method A, Class 10 |
| CUYD |
| 2400 |
| $ |
| $ |
| 0016 |
| 30203-2140 |
| Roadway Aggregate, Method 2, Surface Course, 6-inch Depth |
| SQYD |
| 600 |
| $ |
| $ |
| 61901-2500 |
| Fence, Split Rail, 3 rail |
| LNFT |
| 75 |
| $ |
| $ |
| 62901-0000 |
| Rolled Erosion Control Product |
| SQYD |
| 700 |
| $ |
| $ |
Items Total
Pay Unit Key:
LPSM – Lump Sum LNLF – Linear Foot CUCY – Cubic Yard SQYD – Square Yard