Att. 9 RACR Map 230124.pdf

PDF 2 MB Posted

Attached to
Lincoln Woods Trail Reconstruction on the White Mountain National Forest
Solicitation number
12445525B0009
Issued by

About this file

The image is a geospatial map depicting the Lincoln Woods Trail Reconstruction project in the White Mountain National Forest's Pemigewasset Ranger District. The map shows a detailed site layout with color-coded annotations for work sites, material stockpile areas, road and trail buffers, and an Inventoried Roadless Area (RACR). Specifically, the map highlights the Pemi East Side Road (built to replace the washed-out East Side Trail), with various work zones marked in yellow and red, and includes a scale of 0 to 1,000 feet. The map is dated January 24, 2023, and was created using data from VCGI and Maxar, showing the project's geographic context along NH State Highway 112 and the Lincoln Woods Trail.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Area

Pe m i E as t S id e Sp ur B

NH State Hwy 112

Pemi E ast

Side R oad

Li nc ol n

W oo ds T ra il

Ea st

S id e Tr ai l

VCGI, Maxar

0 1,000500 Feet

Work Site (approximate)

These area may be used for material stockpiles, vehicle turn arounds, site access or other needs associated with the project

Road or Trail with 10 foot buffers on each side

Pemi East Side Road (built to replace East Side Trail)

East Side Trail (washed out)

Inventoried Roadless Area (RACR)

Lincoln Woods Trail Reconstruction

Pemigewasset Ranger District White Mountain National Forest

January 24, 2023

File details come from the government source that posted it. Updated .