This document is a solicitation for the replacement of a septic system at the Lakewood Ranger District Office of the Chequamegon-Nicolet National Forest in Lakewood, Wisconsin. The U.S. Department of Agriculture Forest Service is seeking quotes for the project, which is subject to the Construction Wage Rate Requirements statute. The solicitation is set aside for small businesses. There will be a mandatory site visit on March 14, 2024 at 9:00 a.m. Central time for interested contractors to inspect the location. Quotes are due by the date specified in the solicitation. Contractors must be registered in the System for Award Management to be eligible for award. The solicitation and supporting documents are posted in SAM.gov and no hard copies will be provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION
VICINITY MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture Forest Service
LAKEWOOD SEPTIC
ON THE LEFT SIDE OF HIGHWAY 32 ENTERING LAKEWOOD FROM THE SOUTH
SYSTEM REPLACEMENT
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER DATE
DISTRICT RANGER DATE
6/2 3/2
2 1 5:
T
NO
EL
S :\P
RO
JE
CT
S\
U2
U
SF
S
P
RO
JE
CT
S\
DE
SI
GN
\L
AK
EW
OO
D\
DR
AW
IN
GS
\D
W G\
LA
KE
W
OO
D
TI
TL
E.
DW
G;
WISCONSIN
OCONTO COUNTY
(R9) EASTERN REGION
CHEQUAMEGON - NICOLET NATIONAL FOREST
LAKEWOOD-LAONA RANGER DISTRICT
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-01 TITLE SHEET
C-01 PROJECT LOCATION
C-02 EXISTING CONDITIONS AND REMOVALS
C-03 PROPOSED SITE PLAN
C-04 DETAILS
C-05 DETAILS
C-06 TREATMENT TANK DETAILS
E-01 ELECTRICAL PLAN
E-02 ELECTRICAL PANELS AND SPC SCHEDULE
USFS BUILDING ON
HWY 32
FINAL REVIEW DRAWINGS
WELL
SEPCSEPV
SEPV
A/C
A/C
SEPC
SIGN
SIGN
POST
POST
SEPV
C
E
E
G
G
G
T
T
T
T T
NGS
SA
N
SA
N
G
25' 50'0'
N
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
6/2 3/2
2 1 5:
T
NO
EL
S :\P
RO
JE
CT
S\
U2
U
SF
S
P
RO
JE
CT
S\
DE
SI
GN
\L
AK
EW
OO
D\
S
UB
MI
TT
AL
\L
AK
EW
OO
D
SI
TE
.D
W G;
R9
EASTERN REGION
LAKEWOOD SEPTIC
SYSTEM
REPLACEMENT
CHEQUAMEGON-NICOLET
NATIONAL FOREST
LAKEWOOD-LAONA RANGER
DISTRICT
PROJECT LOCATION
06/23/2022
TLD
TTN
TLD
U21040
C-01
25' 50'
USFS GARAGE
BUILDING
USFS ADMIN BUILDING
ASPHALT PARKING LOT
EDGE OF PAVEMENT
CP 1
CP 3
CP 2
CP 4
EXISTING DRAIN FIELD (APPROX)
(TO BE ABANDONED)
REMOVE EXISTING
SEPTIC TANK
HW
Y 32
EXISTING DRAIN FIELD (APPROX)
(TO BE ABANDONED)
REMOVE EXISTING
SEPTIC TANK
EXISTING
GAS SERVICE LINE
CONCRETE
SIDEWALK
CONCRETE
SIDEWALK
SHED
EXISTING
GAS SERVICE LINE
EXISTING POWER LINE
SEPV
A/C
A/C
SEPC
SIGN
SIGN
POST
POST
SEPV
C
E
E
G
G
G
T
T
T
T T
NGS
SA
N
SA
N
G
25' 50'0'
N
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
6/2 3/2
2 1 5:
T
NO
EL
S :\P
RO
JE
CT
S\
U2
U
SF
S
P
RO
JE
CT
S\
DE
SI
GN
\L
AK
EW
OO
D\
S
UB
MI
TT
AL
\L
AK
EW
OO
D
SI
TE
.D
W G;
R9
EASTERN REGION
LAKEWOOD SEPTIC
SYSTEM
REPLACEMENT
CHEQUAMEGON-NICOLET
NATIONAL FOREST
LAKEWOOD-LAONA RANGER
DISTRICT
EXISTING CONDITIONS
AND REMOVALS
06/23/2022
TLD
TTN
TLD
U21040
C-02
25' 50'
USFS GARAGE
BUILDING
USFS ADMIN BUILDING
ASPHALT PARKING LOT
EDGE OF PAVEMENT
CP 1
CP 3
CP 2
CP 4
EXISTING DRAIN FIELD (APPROX)
(TO BE ABANDONED)
REMOVE EXISTING
SEPTIC TANK
HW
Y 32
EXISTING DRAIN FIELD (APPROX)
(TO BE ABANDONED)
REMOVE EXISTING
SEPTIC TANK
EXISTING
GAS SERVICE LINE
CONCRETE
SIDEWALK REMOVE
CONCRETE
SIDEWALK
CONTROL
POINT X Y ELEV. DESCRIPTION
1 444046.152 327800.265 1279.121 CP/CP1 MNS
2 443951.938 327968.65 1272.044 CP/CP2 MNS
3 444123.32 327993.853 1271.223 CP/CP3 SNS NE 20'' RED MPL
4 443847.009 328103.422 1272.892 CP/CP4 SNS
TREE LINE
TREE LINE
EXISTING UTILITIES
(APPROX. LOCATIONS)
SHED
CUT AND PLUG
EXISTING SANITARY PIPE
TO BE ABANDONED
CUT AND PLUG
EXISTING SANITARY SEWER
TO BE ABANDONED.
BM-1 CGSS
EL = 1270.36
X: 444103.59 Y: 328062.19
ELECTRICAL TRANSFORMER
CABINET
AIR CONDITIONING
CONDENSER
NOTES:
1. THE TANKS SHALL BE PUMPED BY A LICENSED SEPTIC HAULER PRIOR
TO REMOVAL
2. REMOVE EXISTING TANKS, OBSERVATION PIPES, AND VENT PIPES.
SEPV
A/C
A/C
SEPC
SIGN
SIGN
POST
POST
SEPV
C
E
E
G
G
G
T
T
T
T T
NGS
SAN
SAN
25' 50'0'
N
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
6/2 3/2
2 1 5:
T
NO
EL
S :\P
RO
JE
CT
S\
U2
U
SF
S
P
RO
JE
CT
S\
DE
SI
GN
\L
AK
EW
OO
D\
S
UB
MI
TT
AL
\L
AK
EW
OO
D
SI
TE
.D
W G;
R9
EASTERN REGION
LAKEWOOD SEPTIC
SYSTEM
REPLACEMENT
CHEQUAMEGON-NICOLET
NATIONAL FOREST
LAKEWOOD-LAONA RANGER
DISTRICT
PROPOSED SITE PLAN
06/23/2022
TLD
TTN
TLD
U21040
C-03
PROPOSED 1600 GAL
DOUBLE COMPARTMENT TANK
PROPOSED 2900 GAL
DOUBLE COMPARTMENT TANK
EXISTING UNDERGROUND
GAS UTILITY
EXISTING WELL
230 LF OF 2" HDPE FORCEMAIN. SLOPE
BACK TO TANK @ 2% SLOPE (MIN.)
(INSTALL BETWEEN TREES. DO NOT
REMOVE TREES WITHOUT PRE-APPROVAL
BY THE CONTRACTING OFFICER)
140 LF OF 2" HDPE
FORCEMAIN. SLOPE
BACK TO TANK @2%
SLOPE (MIN.)
BM-1 CGSS
EL = 1270.36
X: 444103.59 Y: 328062.19
HW
Y 32
RANGER STATION
BUILDING
GARAGE
PROPOSED DRAIN FIELD.
CELL ELEVATION = 1270.50
SILT FENCE
POSITION DRAIN FIELD
CELLS TO AVOID TREES.
NO TREES SHALL BE
REMOVED OR DAMAGED
DURING CONSTRUCTION.
CONNECT TO EXISTING 4" PVC
SANITARY LATERAL OUTSIDE OF
BUILDING. (CONTRACTOR TO
LOCATE LATERAL IN FIELD.)
REMOVE AND REPLACE
CONCRETE SIDEWALK TO
NEAREST JOINT.
CP 3
CP 4
CP 2
CP 1
EXISTING UTILITIES
(APPROX. LOCATIONS)
NOTES:
1. THE CONTRACTOR SHALL FIELD VERIFY THE INVERT ELEVATIONS OF BOTH BUILDING
SEWER LATERALS. SET TANKS TO ACHIEVE A MINIMUM 2% SLOPE ON NEW SEWER
LATERALS AND ALLOW FLOW BACK FROM FORCE MAIN AT A MINIMUM OF 2%.
2. CONTRACTOR SHALL REFERENCE THE IN GROUND ABSORPTION CELL DESIGN
INCLUDED IN THE SPECIFICATIONS FOR SEPTIC SYSTEM DESIGN DETAILS.
3. INSULATE ALL SANITARY SEWERS (GRAVITY AND FORCE MAINS) THAT ARE NOT BURIED
6.5 FEET AND WHEN A SEWER CROSSES A PAVED SURFACE, WATERLINE OR SEWER.
4. CONTRACTOR TO REPLACE SIDEWALK. RUNNING AND CROSS SLOPES, AND LANDING
AT BASE OF STAIRS SHALL BE INSTALLED IN ACCORDANCE WITH ARCHITECTURAL
BARRIERS ACT STANDARDS.
CONTROL
POINT X Y ELEV. DESCRIPTION
1 444046.152 327800.265 1279.121 CP/CP1 MNS
2 443951.938 327968.65 1272.044 CP/CP2 MNS
3 444123.32 327993.853 1271.223 CP/CP3 SNS NE 20'' RED MPL
4 443847.009 328103.422 1272.892 CP/CP4 SNS
RIM ELEVATION = ± 1268.50
30 LF OF 4" PVC SANITARY SEWER
@ 2% (MIN.) SLOPE. MATCH
EXISTING LATERAL INVERT.
ELECTRICAL TRANSFORMER
CABINET
AIR CONDITIONING
CONDENSER
RIM ELEVATION = ± 1275.70
20 LF OF 4" PVC SANITARY SEWER @ 2% (MIN.)
SLOPE. MATCH EXISTING LATERAL INVERT.
COMMENTS AND NOTES FROM SOIL TESTING AND POWTS DESIGN
COMPANY:
SITE COMMENTS:
THE TEST AREA CONSISTS OF AN OUTWASH PLAIN THAT HAS AN EARTHY
FILL OVERBURDEN (APPROX. 35-40") RESULTING FROM THE ORIGINAL
CONSTRUCTION OF THE OFFICE BUILDING. TO ENSURE THE
INFILTRATIVE SURFACE IS INSTALLED INTO THE MOST PERMEABLE SOIL,
IT IS SUGGESTED THAT THE SYSTEM BE INSTALLED IN THE IN-SITU
UNDERLYING OUTWASH FRACTION.
- THE INFILTRATIVE DEPTH OF CELLS WILL BE: 1270.50'
- A DOUBLE COMPARTMENT SEPTIC TANK/PUMP CHAMBER IS
DESIGNED TO SERVE THE GARAGE WHICH WILL ACT AS A LIFT
STATION TO DOSE THE EXPECTED LOW VOLUME OF WASTEWATER
TO A COMMON SEPTIC TANK LOCATED IN CLOSER PROXIMITY TO
THE OFFICE BUILDING.
- THE SOILS WITHIN THE TEST AREA ARE EXCESSIVELY WELL
DRAINED AND CAN UTILIZE A 0.7' GPD/FT2 DESIGN SOIL LOADING
RATE (DSLR).
- BASED ON A DSLR OF 0.7 GPD/FT2, 1550 SQUARE FEET OF
ABSORPTION AREA WILL BE REQUIRED.
- IF EZ FLOW MEDIA IS USED, THEN (3) 3'X110' CELLS WILL BE
REQUIRED (33 TOTAL UNITS).
- IF INFILTRATOR Q4 CHAMBERS ARE USED, THEN (3) 3' X 104' CELLS
WILL BE REQUIRED (76 TOTAL UNITS).
- THE SITE IS CURRENTLY, MAINLY LAWN.
- AREA EVALUATED EAST OF THE GARAGE, NEAR S.T.H. 32
REVEALED SOILS UNSUITABLE FOR AN IN-GROUND POWTS DUE TO
SEASONAL HIGH GROUNDWATER.
OTHER:
- THE SITE HAS SEVERAL MATURE TREES AND 1 OR 2 MAY HAVE TO
BE REMOVED.
- THE TEST AREAS SHOULD REMAIN FREE OF ANY DISTURBANCE; NO
HEAVY EQUIPMENT TRAFFIC, NO FILLING, CUTTING, OR GRADING
SHOULD TAKE PLACE IN OR AROUND THE PROPOSED POWTS
SYSTEM AREA.
- THE ABSORPTION SYSTEM SHOULD BE INSTALLED WHEN SOIL
CONDITIONS ARE DRY.
- IT IS THE RESPONSIBILITY OF THE OWNERS (I.E. THE GOVERNMENT
CO) AND SEPTIC CONTRACTOR TO KNOW WHERE THE PROPOSED
POWTS SITE IS AND TO ENSURE THAT THE SITE IS NOT
COMPROMISED (FILLING, GRADING, COMPACTION OR OTHER
VEHICLE AND EQUIPMENT TRAFFIC, ETC.)
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
6/2 3/2
2 1 5:
T
NO
EL
S :\P
RO
JE
CT
S\
U2
U
SF
S
P
RO
JE
CT
S\
DE
SI
GN
\L
AK
EW
OO
D\
S
UB
MI
TT
AL
\L
AK
EW
OO
D
SI
TE
.D
W G;
R9
EASTERN REGION
LAKEWOOD SEPTIC
SYSTEM
REPLACEMENT
CHEQUAMEGON-NICOLET
NATIONAL FOREST
LAKEWOOD-LAONA RANGER
DISTRICT
DETAILS
06/23/2022
TLD
TTN
TLD
U21040
C-04
1. CONTRACTOR SHALL HAVE ALL EROSION CONTROL DEVICES IN PLACE AND APPROVED BY THE GOVERNMENT CONTRACTING
OFFICER (CO) PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY.
2. ALL EROSION CONTROL DEVICES SHALL BE INSPECTED BY THE CONTRACTOR. CLEANING, ADJUSTING AND REPLACING EROSION CONTROL DEVICES SHALL BE COMPLETED AS NECESSARY THROUGHOUT CONSTRUCTION. ALL EROSION CONTROL DEVICE MEASURES SHALL BE IN WORKING CONDITION AT THE END OF EACH WORK DAY. THE CONTRACTOR SHALL PERFORM SITE INSPECTIONS AT LEAST ONCE PER WEEK AND FOLLOWING EACH RAIN EVENT OF 12 INCH OR MORE. ALL EROSION CONTROL MAINTENANCE SHALL BE COMPLETED WITHIN 24 HOURS OF THE INSPECTION. THE CONTRACTOR IS RESPONSIBLE
FOR MAINTAINING WRITTEN REPORTS OF ALL SITE INSPECTION CONDUCTED.
3. EROSION CONTROL DEVICES SHALL BE INSTALLED ACCORDING TO THE PLANS AND SPECIFICATIONS OR AS DIRECTED BY THE
CO.
4. DURING STORM SEWER, WATER MAIN AND SANITARY SEWER CONSTRUCTION, EXCAVATED MATERIAL SHALL BE PLACED ON THE HIGH SIDE OF THE TRENCH. ALL TRENCH WATER SHALL BE DISCHARGED INTO A SETTLING BASIN OR THROUGH A FILTERING DEVICE PRIOR TO RELEASE. AT THE END OF EACH DAY, THE TRENCH SHALL BE BACK FILLED, COMPACTED AND
STABILIZED.
5. EROSION CONTROL IS THE RESPONSIBILITY OF THE CONTRACTOR UNTIL FINAL ACCEPTANCE OF THIS PROJECT. EROSION CONTROL MEASURES AS SHOWN SHALL BE THE MINIMUM PRECAUTIONS THAT WILL BE ALLOWED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECOGNIZING AND CORRECTING ALL EROSION CONTROL PROBLEMS THAT ARE A RESULT OF CONSTRUCTION ACTIVITIES. ADDITIONAL EROSION CONTROL MEASURES, AS REQUESTED IN WRITING BY THE STATE OR
LOCAL INSPECTORS, OR THE CO, SHALL BE INSTALLED WITHIN 24 HOURS.
6. EXISTING VEGETATION SHALL BE REMOVED ONLY AS NECESSARY TO PERFORM CONSTRUCTION ACTIVITIES. CLEARING OF LARGER AREAS THAT ARE CLEARLY OUTSIDE THE LIMITS OF CONSTRUCTION SHALL NOT BE PERMITTED.
7. ALL DISTURBED AREAS SHALL BE RESTORED AND VEGETATED AS SOON AS POSSIBLE AFTER DISTURBANCE. THIS INCLUDES
TOPSOIL, SEED, AND MULCH OR EMAT.
8. EROSION CONTROL DEVICES SHALL NOT BE REMOVED UNTIL THE AREAS SERVED HAVE BEEN ESTABLISHED TO THE CO'S
SATISFACTION.
9. ALL EROSION CONTROL FACILITIES SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS SET
FORTH IN THE PLAN OR THE "WISCONSIN STORMWATER MANUAL".
10. SITE DISTURBANCE SHALL BE COMPLETED WITHIN 30 DAYS OF THE INITIAL DISTURBANCE OR WITHIN 7 DAYS OF REACHING
THE FINAL GRADE.
11. THE CONTRACTOR IS RESPONSIBLE FOR WATERING NEWLY SEEDED AREAS DURING THE SUMMER WHENEVER A WEEK PASSES WITHOUT A RAIN EVENT OF 12 INCH OR GREATER. THIS IS INCIDENTAL TO THE SEEDING ITEM AND SHALL CONTINUE UNTIL
THE AREAS HAVE ESTABLISHED VEGETATIVE COVER SATISFACTORY TO THE CO.
12. REMOVE SEDIMENT DEPOSITS WHEN BUILD UP EXCEEDS 12 OF THE EROSION CONTROL DEVICE (CHECK DAM, WEEPER DAM, SILT FENCE ETC.) STORAGE CAPACITY.
13. ALL DISTURBED SLOPES EXCEEDING 20% SHALL BE STAKED WITH EROSION MAT.
14. IF EROSION BECOMES PROBLEMATIC, ANIONIC POLYMERS WILL BE UTILIZED AS A TEMPORARY SOIL BINDING AGENT TO
REDUCE EROSION.
15. WATER PUMPED FROM THE SITE SHALL BE TREATED BY TEMPORARY SEDIMENTATION BASINS OR OTHER APPROPRIATE CONTROL MEASURES. SUCH SEDIMENTATION BASINS SHALL HAVE A DEPTH OF AT LEAST 3 FEET, BE SURROUNDED BY SNOW FENCE OR EQUIVALENT BARRIER AND HAVE SUFFICIENT SURFACE AREA TO PROVIDE A SURFACE SETTLING RATE OF NOT MORE THAN 1500 GALLONS PER SQUARE FOOT PER DAY. THIS WATER MAY NOT BE DISCHARGED IN A MANNER THAT CAUSES EROSION OF THE SITE, A NEIGHBORING SITE, OR THE BED OR BANKS OF THE RECEIVING WATER.
16. LIMIT GRADING TO AREAS SHOWN ON THE PLANS. NO MATERIALS STORAGE, VEHICULAR TRAFFIC, OR GRADING MAY OCCUR IN UNDISTURBED OR BUFFER AREAS. SHOULD CONSTRUCTION REQUIRE ADDITIONAL DISTURBANCE, CONSULT THE CO PRIOR
TO ESTABLISH PROPER EROSION CONTROL.
17. SOIL STOCKPILES SHALL BE SURROUNDED BY SILT FENCE AT LEAST 10 FEET AWAY FROM THE STOCKPILE. NO STOCKPILE SHALL BE PLACED WITHIN 20 FEET OF A DRAINAGE WAY OR STRUCTURE. SOIL STOCKPILES THAT ARE INACTIVE FOR MORE THAN 14 CONSECUTIVE DAYS SHALL BE STABILIZED WITH SEED AND MULCH, EROSION MAT, POLYMER OR COVERED.
18. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE IF DEWATERING WILL BE NECESSARY. IF DEWATERING IS NEEDED CONTRACTOR MUST FOLLOW TECHNICAL STANDARD 1061. THIS STANDARD IS AVAILABLE AT HTTP://dnr.wi.gov/topic/stormwater/documents/Dewatering_1061.pdf.
19. ALL TOPSOILING, SEEDING AND MULCHING SHALL BE ACCOMPLISHED IN ACCORDANCE WITH APPLICABLE SECTIONS OF THE PLANS AND SPECIFICATIONS AS WELL AS TECHNICAL STANDARD 1058 AND 1059. THESE STANDARDS ARE AVAILABLE ON THE DNR WEBSITE AT HTTP://dnr.wi.gov/topic/Stormwater/standards/const_standards.html.
20. IMMEDIATELY STABILIZE ALL DISTURBED AREAS THAT WILL REMAIN INACTIVE FOR 14 DAYS OR LONGER. BETWEEN SEPTEMBER 15 AND OCTOBER 15; STABILIZE WITH MULCH, TACKIFIER AND A PERENNIAL SEED MIXED WITH WINTER WHEAT.
ANNUAL OATS OR ANNUAL RYE, AS APPROPRIATE FOR REGION AND SOIL TYPE; OCTOBER 15 THROUGH COLD WEATHER:
STABILIZE WITH A POLYMER AND DORMANT SEED MIX AS APPROPRIATE FOR REGION AND SOIL TYPE.
EROSION CONTROL NOTES:
IS USED.
GEOTEXTILE FABRIC
ALLOWED IF A WOVEN
8'-0" POST SPACINGNOTE:
3" MAX.
FOLD
FLOW
3'-0" MAX.
3'-0" MAX.
3'-0" MAX.
3'-0" MAX.
2' -0
FLOW DIRECTION
(WHEN REQUIRED BY THE ENGINEER)
FLOW DIRECTION
FLOW DIRECTION 1
TRENCH DETAIL
WOOD POSTS
4' MIN. LENGTH
2' MIN. DEPTH IN
GROUND
GEOTEXTILE FABRIC ONLY
BACKFILL & COMPACT TRENCH
WITH EXCAVATED SOIL
ATTACH FABRIC TO POSTS WITH WIRE
STAPLES OR WOODEN LATH & NAILS
SUPPORT CORD
GEOTEXTILE FABRIC
TIEBACK BETWEEN FENCE
POST & ANCHOR
SILT
FENCE
ANCHOR STAKE
MIN. 18" LONG
GEOTEXTILE
FABRIC
EXCESS
FABRIC
SILT FENCE TIE BACK
NOTE: ADDITIONAL POST DEPTH
OR TIE BACKS MAY BE REQUIRED
IN UNSTABLE SOILS
SILT FENCE
SCALE : NTS
C-04
NOTES:
1. FOR MANUAL INSTALLATIONS THE TRENCH SHALL BE A MINIMUM OF
4" WIDE & 6" DEEP TO BURY AND ANCHOR THE GEOTEXTILE FABRIC.
FOLD MATERIAL TO FIT TRENCH AND BACKFILL & COMPACT TRENCH
WITH EXCAVATED SOIL.
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
6/2 3/2
2 1 5:
T
NO
EL
S :\P
RO
JE
CT
S\
U2
U
SF
S
P
RO
JE
CT
S\
DE
SI
GN
\L
AK
EW
OO
D\
S
UB
MI
TT
AL
\L
AK
EW
OO
D
SI
TE
.D
W G;
R9
EASTERN REGION
LAKEWOOD SEPTIC
SYSTEM
REPLACEMENT
CHEQUAMEGON-NICOLET
NATIONAL FOREST
LAKEWOOD-LAONA RANGER
DISTRICT
DETAILS
06/23/2022
TLD
TTN
TLD
U21040
C-05
PROPOSED OR EXISTING SUBGRADE
NOTES:
1. STANDARD TRENCH COMPACTION
ALL BACKFILL MATERIAL SHALL BE PLACED IN LIFTS NOT TO EXCEED 12" BEFORE COMPACTION UNLESS AUTHORIZED BY THE USFS DUE TO THE CHARACTER OF THE MATERIAL AND THE COMPACTING EQUIPMENT. EACH LIFT SHALL BE MECHANICALLY COMPACTED TO THE
REQUIRED DENSITY PRIOR TO PLACING SUCCEEDING LIFTS OF BACKFILL MATERIAL.
2. SECTION 1:
MECHANICALLY COMPACTED BEDDING AS REQUIRED BY THE SPECIFICATIONS. COMPACTION ACHIEVED WITH SMALLER PLATE
COMPACTOR.
3. SECTION 2:
COMPACTION OF BACKFILL WITH BOMAG OR HOE-PAC OR SIMILAR EQUIPMENT SHALL NOT BEGIN UNTIL THE DEPTH OF BACKFILL
MATERIAL IS TWO (2) FEET ABOVE THE TOP OF PIPE.
4. IF UNSTABLE MATERIAL EXISTS AT BOTTOM OF TRENCH AN ADDITIONAL 6" OF BEDDING SHALL BE
ADDED UNDER THE PIPE.
5. IF PIPE TRENCH IS IN ROCK A MINIMUM OF 6" OF BEDDING UNDER THE PIPE IS REQUIRED.
12" MIN.
VARIES
(SECTION 2)
GRANULAR BACKFILL
SANITARY SEWER PIPE
6" MIN.
(SECTION 1)
BEDDING/COVER
SANITARY SEWER TRENCH
SCALE : NTS
C-03
4" THICK - 4' X 8' SHEET POLYSTYRENE
INSULATION OVER PIPE
EXISTING UNDERGROUND UTILITY
BEDDING MATERIAL AS REQUIRED
DITCH AS SHOWN IN
NEW UNDERGROUND
CONSTRUCTION
COMPACTED GRANULAR
COVER MATERIAL NOTES:
1. INSULATION BOARD SHALL BE CLOSED CELL
EXTRUDED POLYSTYROFOAM.
2. OVERLAP ALL INSULATION BOARD JOINTS
OR SEAMS BY 1' MINIMUM.
3. POLYSTYRENE BOARD SHALL BE
MANUFACTURED BY UPJOHN, DOW, OR
APPROVED EQUAL
4' TYPICAL
OR AS SPECIFIED IN
SPECIAL PROVISIONS
PROPOSED SANITARY
INSULATION DETAIL
SCALE : NTS
C-03
CONCRETE SIDEWALK
SCALE : NTS
C-03
1" X 34"
RUBBER GASKET
LID HANDLE
ANCHOR CHAIN
TO MH RISER
PROVIDE A LOCKING MECHANISM FOR
COVER. CHAIN WITH LOCK IS SHOWN.
WLP1000/600-MR
TANK SPECIFICATIONS
DIMENSIONS
WALL: 3"
BOTTOM: 3"
COVER: 5"
MANHOLE: CONCRETE RISERS PER SHEET C-06
HEIGHT: 56"
LENGTH: 12'-6"
WIDTH: 7'-0"
BELOW INLET: 42"
LIQUID LIMIT: 36"
WEIGHT: 14,970 LBS.
INLET AND OUTLET
4" CAST-A-SEAL BOOT OR EQUAL GASKET
LIQUID CAPACITY: 27.88 GAL/IN (SEPTIC)
16.76 GAL/IN (PUMP)
LOADING DESIGN: 8'-0" UNSATURATED SOIL
TANK CAN BE USED AS:
SEPTIC/SEPTIC, SEPTIC/PUMP, OR SEPTIC/SIPHON
COVER: MIX DESIGN #8 (NO FIBER)
TANK: MIX DESIGN #10 (STRUCTURAL FIBER)
CUSTOMIZED TANKS:
FOR CUSTOM TANKS CONTACT WIESER CONCRETE
SEE SHEET C-06
FOR RISER DETAILS
WLP1800/1100
TANK SPECIFICATIONS
DIMENSIONS
WALL: 3"
BOTTOM: 5"
COVER: 6"
MANHOLE: CONCRETE RISERS PER SHEET C-06
HEIGHT: 63 3/4 "
LENGTH: 15'-4"
WIDTH: 8'-6"
BELOW INLET: 50"
LIQUID LIMIT: 43"
WEIGHT: BOTTOM 18,017 LBS.
COVER 9,300 LBS.
INLET AND OUTLET
4" CAST-A-SEAL BOOT OR EQUAL GASKET
LIQUID CAPACITY: 41.86 GAL/IN (SEPTIC)
25.58 GAL/IN (PUMP)
LOADING DESIGN: 8'-0" UNSATURATED SOIL
TANK CAN BE USED AS:
SEPTIC/SEPTIC, SEPTIC/PUMP, OR SEPTIC/SIPHON
COVER: MIX DESIGN #8 (NO FIBER)
TANK: MIX DESIGN #9 (SMALL FIBER)
CUSTOMIZED TANKS:
FOR CUSTOM TANKS CONTACT WIESER CONCRETE
SEE SHEET C-06
FOR RISER DETAILS
TANK SPECIFICATIONS
SCALE : NTS
C-03
CONCRETE COVER
SCALE : NTS
C-03
COMPACTED SUBGRADE
4" CONCRETE PAVEMENT
4" DENSE GRADED BASE 3/4"
#4 BAR @ 18" O.C. W/ 3" SIDE
EDGE CLEARANCE, SUPPORT
WITH CHAIRS MID-DEPTH.
FILTER
FILTER
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
6/2 3/2
2 1 5:
T
NO
EL
S :\P
RO
JE
CT
S\
U2
U
SF
S
P
RO
JE
CT
S\
DE
SI
GN
\L
AK
EW
OO
D\
S
UB
MI
TT
AL
\L
AK
EW
OO
D
SI
TE
.D
W G;
R9
EASTERN REGION
LAKEWOOD SEPTIC
SYSTEM
REPLACEMENT
CHEQUAMEGON-NICOLET
NATIONAL FOREST
LAKEWOOD-LAONA RANGER
DISTRICT
TREATMENT TANK
DETAILS
06/23/2022
TLD
TTN
TLD
U21040
C-06
4 IN SCH 80 PVC PIPE - 12" MIN. ABOVE GRADE & >10FT.
FROM DOOR, WINDOW OR FRESH AIR INTAKE. INCLUDE
ACTIVATED CARBON VENT FILTER BY POLYLOCK OR
APPROVED EQUAL.
FOR SEPTIC TANK, APPROVED LOCKING MANHOLE
COVER WITH PADLOCK AND WARNING LABEL
(SEE DETAIL C-05)
TO CONTROL
PANEL
4 SCH 80 PVC VENT PIPE - 12"
MIN. ABOVE GRADE & >10FT.
FROM DOOR, WINDOW OR FRESH
AIR INTAKE. INCLUDE ACTIVATED
CARBON VENT FILTER BY
POLYLOCK OR APPROVED EQUAL. TO CONTROL
PANEL
GRADEGRADE
4" M
IN
" M
IN
FILTER
2 PUMPS
CONCRETE
BLOCK
OFF
LEAD ON
ALARM
4" M
IN
1/4" WEEP HOLE
APPROVED JOINTS
WITH APPROVED PIPE
3 FT. ONTO SOLID SOIL
" M
IN
6 IN. OF APPROVED BEDDING UNDER TANK
DOSE VOLUME @ 10% OF DAILY FLOW
4" M
IN
" M
IN
FILTER
2 PUMPS
CONCRETE
BLOCK
OFF
ALARM
4" M
IN
1/4" WEEP HOLE
APPROVED JOINTS
WITH APPROVED PIPE
3 FT. ONTO SOLID SOIL
" M
IN
6 IN. OF APPROVED BEDDING UNDER TANK
DOSE VOLUME @ 10% OF DAILY FLOW
APPROVED JOINTS
WITH APPROVED PIPE
3 FT. ONTO SOLID SOIL
FOR SEPTIC TANK, APPROVED LOCKING MANHOLE
COVER WITH PADLOCK AND WARNING LABEL
(SEE DETAIL C-05)
36" X 36" I.D. RISER
W/ 36" X 36 " ALUMINUM
ACCESS HATCH. CONCRETE -
5000 PSI MIN.
REINFORCEMENT & SECTIONS -
PER ASTM C478
JOIN SEALANT - HIGH GRADE EZ
STICK
PUMP NOTES:
TWO GOULDS SEWAGE EFFLUENT PUMPS MODEL PE 41 (0.4 HP), OR EQUIVALENT. SET
PUMP FLOAT SWITCHES AT ELEVATIONS SHOWN IN TABLES BELOW. HIGH WATER FLOAT
ALARMS SHALL BE PROVIDED TO WARN OF PUMP FAILURE. PUMPS, FLOATS, AND
HIGHWATER ALARM TO BE CONTROLLED BY A SJE RHOMBUS CUSTOM CONTROL PANEL FOR
SINGLE PHASE, OR EQUIVALENT. PUMP TANKS TO HAVE STAINLESS STEAL GUIDE RAILS
ATTACHED TO PUMPS FOR EASE OF INSTALLATION AND SERVICING AS PER MANUFACTURE'S
INSTALLATION GUIDELINES (ITT CENTRO PRO SERIES A10, OR EQUIVALENT).
SEPTIC TANK RISERS CAN BE
CONCRETE OR HDPE WITH A 24"
MIN DIAMETER WITH LOCKABLE
(HDPE OR SCREWS) COVERS
2" SCH 80
PVC
2" SCH
80 PVC
24" I.D. MIN24" I.D. MIN
24" I.D. MIN24" I.D. MIN
TRANSITION
TO 2" HDPE TRANSITION
TO 2" HDPE
S: S:
LAG ON18
LEAD ON
LAG ON18
36" X 36" I.D. RISER
W/ 36" X 36 " ALUMINUM ACCESS
HATCH. CONCRETE - 5000 PSI MIN.
REINFORCEMENT & SECTIONS - PER
ASTM C478
JOIN SEALANT - HIGH GRADE EZ STICK
INSTALL FIVE(5)
SS CABLE HOOKS
WITHIN 12" OF
ACCESS HATCH
INSTALL FIVE(5)
SS CABLE HOOKS
WITHIN 12" OF
ACCESS HATCH
4" SCH 80
PVC
LOW LEVEL
ALARM4"
LOW LEVEL
ALARM4"
SEPV
A/C
A/C
SEPC
SIGN
SIGN
POST
POST
SEPV
C
E
E
G
G
G
T
T
T
T T
NGS
SAN
SAN
25' 50'0'
N
DRAWING TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
6/2 3/2
2 1 5:
T
NO
EL
S :\P
RO
JE
CT
S\
U2
U
SF
S
P
RO
JE
CT
S\
DE
SI
GN
\L
AK
EW
OO
D\
S
UB
MI
TT
AL
\L
AK
EW
OO
D
SI
TE
.D
W G;
R9
EASTERN REGION
LAKEWOOD SEPTIC
SYSTEM
REPLACEMENT
CHEQUAMEGON-NICOLET
NATIONAL FOREST
LAKEWOOD-LAONA RANGER
DISTRICT
ELECTRICAL PLAN
06/23/2022
DJH
TTN
DJH
U21040
E-01
25' 50'
USFS GARAGE
BUILDING
USFS ADMIN BUILDING
ASPHALT PARKING LOT
EDGE OF PAVEMENT
CP 1
CP 3
CP 2
CP 4
HW
Y 32
GAS SERVICE
(APPROX)
EXISTING
GAS SERVICE LINE
CONCRETE
SIDEWALK
CONCRETE
SIDEWALK
EXISTING
ELECTRICAL
EXISTING PANEL B
LOCATED IN BASEMENT
EXISTING PANEL G
LP
LP
USFS ADMIN BUILDING
NOTES:
1. COORDINATE EXACT ROUTE OF NEW UNDERGROUND WIRING AT SITE
WITH EXISTING UNDERGROUND UTILITIES AND NEW WORK OF OTHER
TRADES. ALL WIRING SHALL BE IN CONDUIT. POWER WIRING SHALL BE
IN A SEPARATE CONDUIT FROM SIGNAL WIRING.
2. PROVIDE AND INSTALL A NEW CIRCUIT OF 2 - #8 AND 1 - #10 GRD IN 1”
CONDUIT FROM NEW CIRCUIT BREAKER IN EXISTING PANEL TO
CONTROL PANEL, AND FROM CONTROL PANEL TO DUPLEX PUMPS OF
NEW LIFT STATION. CONDUIT EXPOSED WITHIN THE GARAGE SHALL BE
EMT. CONDUIT EXPOSED ON THE EXTERIOR AND PENETRATING EARTH
SHALL BE GALVANIZED RIGID. BURIED CONDUIT SHALL BE SCHEDULE 80
PVC. TERMINATE CONDUCTORS ON MAIN LUGS OF CONTROL PANEL.
INSTALL ALL WIRING (POWER, CONTROL, AND MONITORING) FROM
CONTROL PANEL TO PUMPS.
3. PROVIDE AND INSTALL TWO 6” x 6” x 10'-0” POSTS THAT HAVE BEEN
PRESSURE-TREATED FOR GROUND CONTACT. BURY POSTS WITH A
MINIMUM OF 4-FEET OF THE POST IN THE GROUND - FIRMLY TAMPING
BACKFILL SOIL EVERY 12”. PROVIDE AND SECURELY ATTACH A PIECE OF
PRESSURE-TREATED 4' x 4' x 3/4" AC-GRADE PLYWOOD TO THE POSTS
AT APPROXIMATELY 60” ABOVE GRADE AS MEASURED TO THE TOP OF
THE PLYWOOD. CUT PLYWOOD TO SIZE - SLIGHTLY LARGER THAN THE
CONTROL PANEL. SECURELY ATTACH CONTROL PANEL TO PLYWOOD.
4. PROVIDE AND INSTALL A 2P-30A CIRCUIT BREAKER IN EXISTING PANEL.
PROVIDE AND INSTALL AN UPDATED TYPEWRITTEN CIRCUIT DIRECTORY
ON A LABEL WITH AN ADHESIVE BACKING ON INSIDE COVER OF PANEL.
5. PROVIDE AND INSTALL CONTINUOUS CABLES (NO SPLICES) IN CONDUIT
(SEPARATE FROM THE POWER WIRING TO PUMPS) FROM CONTACTS IN
CONTROL PANEL TO FLOATS IN TANK. CONDUIT EXPOSED AND
PENETRATING EARTH SHALL BE GALVANIZED RIGID. BURIED CONDUIT
SHALL BE SCHEDULE 80 PVC. CABLES SHALL BE MINIMALLY COMPRISED
OF 2 - #18 AWG CONDUCTORS. SET FLOATS AT ELEVATION IN TANK AS
DIRECTED BY TANK SUPPLIER. CABLES SHALL BE LONG ENOUGH TO
COVER ENTIRE LENGTH FROM THE FINAL POSITION OF EACH FLOAT IN
THE TANK TO THE ASSOCIATED CONTACT IN THE CONTROL PANEL.
CONTRACTOR TO CONFIRM REQUIRED LENGTH ACCORDING TO FIELD
CONDITIONS.
6" X 6" X 10' POST
(SEE E-02 NOTE 2)
CONDUIT
SEALANT
CONTROL PANEL
1" WIRE
CONDUIT
CONTROL PANEL
SCALE : NTS
E-01
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
6/2 3/2
2 1 5:
T
NO
EL
S :\P
RO
JE
CT
S\
U2
U
SF
S
P
RO
JE
CT
S\
DE
SI
GN
\L
AK
EW
OO
D\
S
UB
MI
TT
AL
\L
AK
EW
OO
D
SI
TE
.D
W G;
R9
EASTERN REGION
LAKEWOOD SEPTIC
SYSTEM
REPLACEMENT
CHEQUAMEGON-NICOLET
NATIONAL FOREST
LAKEWOOD-LAONA RANGER
DISTRICT
ELECTRICAL PANELS AND
SPC SCHEDULE
06/23/2022
DJH
TTN
DJH
U21040
E-02
| Signature1: | |
| 2023-03-23T14:01:53-0500 | |
| JUSTIN BLAKE |
| 2023-03-29T14:16:57-0500 | |
| MICHAEL BROWN |