ATT C Bid Pricing Form~1.xls

XLS spreadsheet 28 KB Posted

Attached to
MIM Grinding and Paving I-5 MP 34-36
Solicitation number
S-73000-00013021
Issued by
Jackson County, Oregon

About this file

This document is a Bid Pricing Form for an unspecified transportation or infrastructure project, with a comprehensive line-item breakdown of construction or roadway improvement work. The bid includes nine specific line items covering project elements such as mobilization, temporary work zone traffic control, pollution control plan, pavement removal, asphalt materials, road markers, rumble strips, and pavement markings. Quantities range from 0.2 tons of emulsified asphalt to 5,750 square yards of pavement removal, and include 93 mono-directional white markers and 8,239 linear feet of wet weather pavement marking tape.

Despite the detailed line items, all unit prices are currently listed as $0.00, which suggests this is a template or draft pricing form awaiting specific cost inputs from the bidding contractor. The total bid amount is consequently shown as $0.00, indicating the document is in a preparatory stage prior to formal submission. The form appears designed for a competitive bidding process for a road or highway improvement project, with precise specifications for each work component, though specific project location, sponsoring agency, and bid submission details are not included in this pricing form.

View the file

Other files

File Type Posted
00013021 ITB~1.docx DOCX document
00013021 Bid Results.xlsx XLSX spreadsheet
Att B Specifications.docx DOCX document
00013021 ITB.docx DOCX document
Special Procurement_Public Notice_REQ-DASOBO-00071630.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Bid Pricing Form ITB #:_________ Name of Firm:_______________________ Bid pricing must be based on meeting the Delivery Requirements stated in ITB section 2.4.

Bidder offers to furnish all materials, equipment and labor in strict accordance with the ITB and its attached Specifications on the basis of the total bid amount and/or unit prices as follows:

Bid ItemDescriptionUnitQuantityUnit PriceTotal Price
1MobilizationLS1$0.00$0.00
2Temporary Work Zone Traffic Control, CompleteLS1$0.00$0.00
3Pollution Control PlanLS1$0.00$0.00
4Cold Plane Pavement Removal, 2” DeepSQYD5750$0.00$0.00
5Emulsified Asphalt for Tack CoatTON0.2$0.00$0.00
6PG76-22ERTON647.5$0.00$0.00
7Mono-Directional White Type IAR MarkersEACH93$0.00$0.00
8Gap Pattern Rumble StripsMILE0.81$0.00$0.00
9Pavement Marking Tape, Grooved, Patterned, Wet WeatherFOOT8239$0.00$0.00
TOTAL BID AMOUNT$0.00

Sheet2

EST.UNITTOTAL
ITEMDESCRIPTIONQTY.UNITPRICEPRICE
1
2
3
4
5
6
7
8
9
10
TOTAL BID AMOUNT

Sheet3

File details come from the government source that posted it. Updated .