Att B_Plans.pdf

PDF 9 MB Posted

Attached to
ITB - Cape Blanco Runway and Electrical Rehabilitation (Re-bid)
Solicitation number
S-10900-00007848
Issued by
Crook County, Siletz City, Oregon

About this file

This document contains the plans and specifications for the Cape Blanco State Airport Runway and Electrical Rehabilitation Project in Curry County, Oregon. The Oregon Department of Aviation is seeking one qualified contractor to perform the runway reconstruction and electrical rehabilitation work. The project includes reconstructing the 75-foot wide center section of the airport's runway, installing new pavement and electrical systems, and completing associated site work. The project is scheduled to commence in May 2024 and be completed by August 2024, with a total project duration not to exceed 180 calendar days.

The pricing for this project will be based on unit rates and lump sums. Two additive alternates are included to install runway edge lighting and Precision Approach Path Indicator (PAPI) systems. Funding for the project will come from state sources. Contractors must comply with all applicable state and federal requirements for the work.

View the file

Other files

File Type Posted
Addendum 2 Attachment.docx DOCX document
Bid tabulation~2.xlsx XLSX spreadsheet
Bid tab~38.xlsx XLSX spreadsheet
Att C_Bid Pricing Form.pdf PDF
Item P-602 - Emulsified Asphalt Prime Coat.pdf PDF
Q and A_10.6.docx DOCX document
00007848_ITB.docx DOCX document
Att A_FAA Standard Specifications.pdf PDF
6706-A - CAPE BLANCO RUNWAY PAVEMENT REPORT .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OREGON DEPARTMENT OF AVIATION

CAPE BLANCO STATE AIRPORT

RUNWAY AND ELECTRICAL

REHABILITATION PROJECT

JUNE 2023

SITE MAP

NO SCALE

VICINITY MAP

NO SCALE

SCALES ACCORDINGLY.

THIS SHEET, ADJUST

IF NOT ONE INCH ON

0" 1"

ORIGINAL DRAWING.

BAR IS ONE INCH ON

VERIFY SCALES

APPRBYNO. DATE REVISIONS

SHEET NO.

DRAWING NO.

DATE:

JUNE 2023

OREGON DEPARTMENT OF AVIATION

CAPE BLANCO STATE AIRPORT

RUNWAY AND ELECTRICAL REHABILITATION PROJECT

PROJECT NO: SCALE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

Y:

\P ro je ct s\

O re go n

D ep ar tm en t o f A vi at io n\

- C ap e Bl an co

R un w ay a nd

E le ct ric al D es ig n\ C

AD

W O

R

KI

N G

\G -1

C

O

VE

R S

H

EE

T.

dw g

AS NOTED40097.115.01

CENTURY

WEST

E N G I N E E R I N G

PORTLAND OFFICE

5500 MEADOWS ROAD

SUITE #250

LAKE OSWEGO, OR 97035

503.419.2130 OFFICE

JAK

RHH/JDN

PJM

FOR BIDDING PURPOSES ONLY

77595PE

OREGON

EXPIRES: 12/31/2024

G-1

COVER SHEET

SHEET INDEX

SHEET NO. DWG. NO. SHEET TITLE

1 G-1 COVER SHEET

2 G-2 SITE & SURVEY CONTROL

3 G-3 SITE & SAFETY PLAN

4 EC-1 EROSION CONTROL PLAN - RW 14-32 STA 0+00 TO STA 13+50

5 EC-2 EROSION CONTROL PLAN - RW 14-32 STA 13+50 TO STA 26+00

6 EC-3 EROSION CONTROL PLAN - RW 14-32 STA 26+00 TO STA 38+50

7 EC-4 EROSION CONTROL PLAN - RW 14-32 STA 38+50 TO STA 51+00

8 EC-5 EROSION CONTROL PLAN STANDARD NOTES

9 EC-6 EROSION CONTROL SITE SPECIFIC NOTES AND DETAILS

10 C-1 DEMOLITION PLAN - RW 14-32 STA 0+00 TO STA 12+50

11 C-2 DEMOLITION PLAN - RW 14-32 STA 12+50 TO STA 26+00

12 C-3 DEMOLITION PLAN - RW 14-32 STA 26+00 TO STA 38+50

13 C-4 DEMOLITION PLAN - RW 14-32 STA 38+50 TO STA 51+00

14 C-5 RUNWAY 14-32 PLAN AND PROFILE - STA 0+00 TO STA 13+00

15 C-6 RUNWAY 14-32 PLAN AND PROFILE - STA 13+00 TO STA 26+00

16 C-7 RUNWAY 14-32 PLAN AND PROFILE - STA 26+00 TO STA 39+00

17 C-8 RUNWAY 14-32 PLAN AND PROFILE - STA 39+00 TO STA 51+00

18 C-9 GRADING AND DRAINAGE PLAN - RW 14-32 STA 0+00 TO STA 11+50

19 C-10 GRADING AND DRAINAGE PLAN - RW 14-32 STA 11+50 TO STA 27+00

20 C-11 GRADING AND DRAINAGE PLAN - RW 14-32 STA 27+00 TO STA 42+50

21 C-12 GRADING AND DRAINAGE PLAN - RW 14-32 STA 42+50 TO STA 51+00

22 C13 RUNWAY 14-32 GRADING DETAIL - STA 0+00 TO STA 10+00

23 C14 RUNWAY 14-32 GRADING DETAIL - STA 10+00 TO STA 20+00

24 C15 RUNWAY 14-32 GRADING DETAIL - STA 20+00 TO STA 30+00

25 C16 RUNWAY 14-32 GRADING DETAIL - STA 30+00 TO STA 40+00

26 C17 RUNWAY 14-32 GRADING DETAIL - STA 40+00 TO STA 51+00

27 C-18 TYPICAL SECTIONS AND PAVING DETAILS

28 C-19 TYPICAL SECTIONS AND PAVING DETAILS

29 C-20 PAVEMENT MARKING PLAN - RW 14-32 STA 0+00 TO STA 27+00

30 C-21 PAVEMENT MARKING PLAN - RW 14-32 STA 27+00 TO STA 51+00

31 C-22 PAVEMENT MARKING PLAN - TAXIWAYS

32 C-23 PAVEMENT MARKING DETAILS

33 C-24 PAVEMENT MARKING DETAILS

34 E-1 ELECTRICAL SYMBOL LEGEND AND ABBREVIATIONS

35 E-2 LIGHTING AND SIGNAGE PLAN - RW 14-32 STA 0+00 TO STA 14+50

36 E-3 LIGHTING AND SIGNAGE PLAN - RW 14-32 STA 14+50 TO STA 26+00

37 E-4 LIGHTING AND SIGNAGE PLAN - RW 14-32 STA 26+00 TO STA 38+50

38 E-5 LIGHTING AND SIGNAGE PLAN - RW 14-32 STA 38+50 TO STA 51+00

39 E-6 ELECTRICAL ONE-LINE DIAGRAM

40 E-7 LIGHTING LOOP DIAGRAM

41 E-8 ELECTRICAL DETAILS AND SCHEDULE

42 E-9 ELECTRICAL PLAN, DETAILS, AND SCHEDULES

43 E-10 LIGHTING AND REFLECTOR DETAILS

44 E-11 RUNWAY 32 PAPI PLAN

45 E-12 RUNWAY 14 PAPI PLAN

46 E-13 PAPI DETAILS

47 E-14 REIL PLAN

48 E-15 REIL DETAILS

49 E-16 AIRPORT BEACON AND TOWER PLAN

50 E-17 ELECTRICAL BUILDING LAYOUT PLAN

51 E-18 BEACON TOWER DETAILS

52 E-19 WIND CONE PLAN AND DETAILS

53 E-20 GUIDANCE SIGN SCHEDULE AND DETAILS

PROJECT LOCATION

ATTACHMENT B

0+00 5+00 10+00 15+00 20+00 25+00

30+00 35+00 40+00 45+00 50+00 51+00

XX

G-2

SITE & SURVEY CONTROL PLAN

SCALE: 1"=100'

SURVEY CONTROL TABLE

NAVD 83 (2011)

POINT # NORTHING EASTING Elevation Description

1 457562.02 3845151.42 213.04 CNT 58" IR W RPC

2 458156.70 3877955.98 214.29 CNT 58" IR W RPC

3 458756.06 3844756.66 215.62 CNT 58" IR W RPC

4 459361.06 3844552.52 216.82 CNT 58" IR W RPC

5 459955.13 3844359.40 216.86 CNT 58" IR W RPC

6 460547.29 3844161.33 214.02 CNT 58" IR W RPC

7 461153.50 3843964.62 210.90 CNT 58" IR W RPC

8 461757.49 3843765.28 207.71 CNT 58" IR W RPC

9 462408.78 3843542.84 204.58 CNT 58" IR W RPC

10 459788.63 3843991.78 217.22 CNT 58" IR W RPC

11 459778.16 3843830.20 218.90 CNT MAG

NOTE: COMBINED FACTOR 0.99991106

LEGEND:

SURVEY CONTROL POINT

EXITING PAVEMENT EDGE

100 100 200

SCALE OF FEET

SCALE: 1"=100'

M

AT

C H

LI

N

E

ST

A

+0

0, S

EE

B

EL

O

W

SCALES ACCORDINGLY.

THIS SHEET, ADJUST

IF NOT ONE INCH ON

0" 1"

ORIGINAL DRAWING.

BAR IS ONE INCH ON

VERIFY SCALES

APPRBYNO. DATE REVISIONS

SHEET NO.

DRAWING NO.

DATE:

JUNE 2023

OREGON DEPARTMENT OF AVIATION

CAPE BLANCO STATE AIRPORT

RUNWAY AND ELECTRICAL REHABILITATION PROJECT

PROJECT NO: SCALE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

Y:

\P ro je ct s\

O re go n

D ep ar tm en t o f A vi at io n\

- C ap e Bl an co

R un w ay a nd

E le ct ric al D es ig n\ C

AD

W O

R

KI

N G

\G -2

SI

TE

S U

R

VE

Y C

O N

TR

O

L.

dw g

AS NOTED40097.115.01

CENTURY

WEST

E N G I N E E R I N G

PORTLAND OFFICE

5500 MEADOWS ROAD

SUITE #250

LAKE OSWEGO, OR 97035

503.419.2130 OFFICE

JAK

RHH/JDN

PJM

FOR BIDDING PURPOSES ONLY

77595PE

OREGON

EXPIRES: 12/31/2024

G-2

SITE & SURVEY CONTROL

M

AT

C H

LI

N

E

ST

A

+0

SE

E

AB

O

VE

Runway 14-32 Sta 0+00.00 N: 462428.78 E: 3843630.91

Runway 14-32 Sta 50+98.00 N: 457590.88 E: 3845239.94

POINT #1 POINT #2 POINT #3 POINT #4 POINT #5

POINT #6 POINT #9POINT #8POINT #7

MATCHLINE 1, SEE BELOW

MATCHLINE 3, SEE BELOW

MATCHLINE 1, SEE BELOW MATCHLINE 3, SEE BELOW

POINT #11

POINT #10

RUNWAY 14-32

RUNWAY 14-32

TAXIWAY B

TAXIWAY B

TAXIWAY A

TAXIWAY A

APRON

AIRPORT GATE

RUNWAY CENTERLINE

RUNWAY CENTERLINE

X

0+00 5+00 10+00 15+00 20+00 25+00 30+00 35+00 40+00 45+00 50+00 51+00

200 0 200 400

SCALE OF FEET

SCALE: 1"=200'

G-3

SITE WORK AREA & SAFETY PLAN

SCALE: 1"=200'

LEGEND:

PROPOSED PAVEMENT

LOW LEVEL BARRICADES,

PER

CONTRACTOR

HAUL/ACCESS ROADS

CONTRACTOR STAGING

AREA

RUNWAY SAFETY AREA

OBSTACLE-FREE ZONE

OBJECT FREE AREA

WORK AREA BOUNDARY

RUNWAY 14-32

SITE AND SAFETY NOTES:

1. CONTRACTOR'S ACCESS ROAD, HAUL ROADS, AND STAGING AREA SHALL BE CONSTRUCTED AND MAINTAINED AT CONTRACTOR'S EXPENSE. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION AT NO ADDITIONAL COST TO

THE OWNER.

2. PROTECT ALL PAVEMENT SURFACES FROM DAMAGE DUE TO CONSTRUCTION ACTIVITY. RESTORE DAMAGED PAVEMENT TO ORIGINAL OR

BETTER CONDITION AT NO COST TO THE OWNER.

3. PROVIDE FOR AND MAINTAIN PUBLIC PARKING AND ACCESS TO EXISTING AIRPORT HANGARS AND BUILDINGS AT ALL TIMES.

4. ACCESS TO THE WORK AREA MUST BE AUTHORIZED BY THE ENGINEER PRIOR TO WORK. NOTIFY THE ENGINEER A MINIMUM OF 72 HOURS

PRIOR TO BEGINNING WORK.

5. ANY WORK WITHIN 60 FEET OF THE RUNWAY CENTERLINE OR WITHIN 240 FEET OF THE RUNWAY END WILL REQUIRE A RUNWAY CLOSURE.

6. FOR RUNWAY CLOSURE, NOTIFY THE ENGINEER 45 CALENDAR DAYS IN ADVANCE OF THE CLOSURE. PLACE LIGHTED CLOSURE CROSSES

(CONTRACTOR SUPPLIED) AS SHOWN. PLACE LIGHTED AND WEIGHTED BARRICADES AT LOCATIONS SHOWN. MAXIMUM SPACING

BETWEEN BARRICADES SHALL BE 5'.

7. RETURN ALL EQUIPMENT TO STAGING AREA AT THE END OF EACH WORKDAY.

8. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHOWN THROUGHOUT THIS SET OF DRAWINGS ARE SHOWN AS APPROXIMATE

AND HAVE NOT BEEN INDEPENDENTLY VERIFIED. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES AND SURVEY MARKERS.

9. CONTRACTOR SHALL AVOID TRAVELING OUTSIDE OF WORK AREA BOUNDARIES UNLESS APPROVED BY THE ENGINEER.

10. CONTRACTOR SHALL CONTROL DUST AND SMOKE RELATED TO CONSTRUCTION ACTIVITIES AT ALL TIMES.

11. TOTAL PROJECT DURATION SHALL NOT EXCEED 180 CALENDAR DAYS.

12. CONTRACTOR TO PROVIDE PORTABLE RESTROOM FACILITIES FOR CONSTRUCTION.

13. CONTRACTOR TO PROVIDE 3'X3' ORANGE AND WHITE CHECKARD FLAG ON WORK VEHICLES AND EQUIPMENT PER SPECIFICATIONS.

CONSTRUCTION AREA NOTES:

· WORK AREA 1, 2, AND THE WINDCONE AREA SHALL BE CONSTRUCTED

CONCURRENTLY AND REQUIRES CLOSURE OF RUNWAY 14-32 AND ALL

TAXIWAYS.

G-3

SCALE: N.T.S.

G-3

LOW LEVEL BARRICADE DETAIL

ORANGE / WHITE STRIPE

HIGH REFLECTIVE SHEETING

BATTERY OR SOLAR POWERED RED

LENS STANDARD BARRICADE LIGHT

VARIES

8'-0"

10"

ELEVATION

FILL WITH WATER

OR SAND

SELF

CONNECTING

PINS

NOTES:

1. PLACE BARRICADES PER THE PLANS.

2. BARRICADES SHALL BE PROVIDED BY THE CONTRACTOR. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PLACING, FILLING, EMPTYING, MOVING, AND PROTECTING BARRICADES

THROUGHOUT THE DURATION OF THE PROJECT.

3. IF CONTRACTOR USES SANDBAGS TO ANCHOR BARRICADES, USE "DOUBLE BAGS" OR

OTHER MEASURES TO PREVENT SAND FROM LEAVING OR MIGRATING THROUGH BAG

FABRIC.

4. CONTRACTOR TO INSTALL 20 BY 20 INCH MIN FLAGS SECURED TO BARRICADE,

ALTERNATING ORANGE AND WHITE.

ORANGE

BODY

6'-0"

SCALES ACCORDINGLY.

THIS SHEET, ADJUST

IF NOT ONE INCH ON

0" 1"

ORIGINAL DRAWING.

BAR IS ONE INCH ON

VERIFY SCALES

APPRBYNO. DATE REVISIONS

SHEET NO.

DRAWING NO.

DATE:

JUNE 2023

OREGON DEPARTMENT OF AVIATION

CAPE BLANCO STATE AIRPORT

RUNWAY AND ELECTRICAL REHABILITATION PROJECT

PROJECT NO: SCALE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

Y:

\P ro je ct s\

O re go n

D ep ar tm en t o f A vi at io n\

- C ap e Bl an co

R un w ay a nd

E le ct ric al D es ig n\ C

AD

W O

R

KI

N G

\G -3

SI

TE

S

AF

ET

Y

PL

AN

.d w g

AS NOTED40097.115.01

CENTURY

WEST

E N G I N E E R I N G

PORTLAND OFFICE

5500 MEADOWS ROAD

SUITE #250

LAKE OSWEGO, OR 97035

503.419.2130 OFFICE

JAK

RHH/JDN

PJM

FOR BIDDING PURPOSES ONLY

77595PE

OREGON

EXPIRES: 12/31/2024

G-3

SITE & SAFETY PLAN

CONSTRUCTION AREA

AIRPORT RD

AIRPORT RD

TO HWY 101

CONTRACTOR

STAGING AREA

WINDCONE AND

SEGMENTED CIRCLE

WORK AREA 1

TAXIWAY A

TAXIWAY B

HAUL ROUTE

WORK AREA 2

LOW LEVEL

BARRICADES LOW LEVEL

BARRICADES

LOW LEVEL

BARRICADES

LIGHTED CLOSURE X LIGHTED CLOSURE X

250' 500' 75'

37.5'250'500' 37.5'

EEEEEEEEEEEEEEEEEEEEEEEEEEE

E

E E E E E E E E E E E E E E E E E E E E E E E E E E E

E E E E E E E E E E E E E E

E

J

J

G R

G R

G R

G R

G R

G R W Y W Y W Y W Y W Y W Y

W Y W Y W Y W Y W YW Y

E

J

J

UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP

UGP

UGP

UGP

UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP

21521

0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00

215 216

EC-1

EROSION CONTROL PLAN

SCALE: 1"=50'

STA 0+00 TO STA 13+50

EC-6

EC-1

EROSION CONTROL PLAN - RW 14-32 STA 0+00 TO STA 13+50

50 50 100

SCALE OF FEET

SCALE: 1"=50'

SCALES ACCORDINGLY.

THIS SHEET, ADJUST

IF NOT ONE INCH ON

0" 1"

ORIGINAL DRAWING.

BAR IS ONE INCH ON

VERIFY SCALES

APPRBYNO. DATE REVISIONS

SHEET NO.

DRAWING NO.

DATE:

JUNE 2023

OREGON DEPARTMENT OF AVIATION

CAPE BLANCO STATE AIRPORT

RUNWAY AND ELECTRICAL REHABILITATION PROJECT

PROJECT NO: SCALE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

Y:

\P ro je ct s\

O re go n

D ep ar tm en t o f A vi at io n\

- C ap e Bl an co

R un w ay a nd

E le ct ric al D es ig n\ C

AD

W O

R

KI

N G

\G -5

G

-9

ER

O

SI

O

N C

O N

TR

O

L.

dw g

AS NOTED40097.115.01

CENTURY

WEST

E N G I N E E R I N G

PORTLAND OFFICE

5500 MEADOWS ROAD

SUITE #250

LAKE OSWEGO, OR 97035

503.419.2130 OFFICE

JAK

RHH/JDN

PJM

FOR BIDDING PURPOSES ONLY

77595PE

OREGON

EXPIRES: 12/31/2024

M

AT

C H

LI

N

E

ST

A

+5 0, S

EE

S H

EE

T

EC

-2

RUNWAY 14-32

LEGEND:

SILT FENCE PER

EXISTING/PROPOSED FLOW

DIRECTION (SEE NOTE 7)

PROPOSED PAVEMENT

ELECTRICAL TRENCH

SEEDING LIMITS

58'

60'EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

RUNWAY SAFETY AREA

EXITING PAVEMENT EDGE

WORK AREA LIMITS

INSTALL SILT FENCE PER DETAIL

EC-6

INSTALL SILT FENCE PER DETAIL

EC-6

WORK AREA LIMITS

WORK AREA LIMITS

E

CONTRACTOR TO PROTECT CONSTRUCTION AREA AND

PROVIDE NOXIOUS WEED CONTROL AS NECESSARY

NOTES:

1. ALL EROSION CONTROL DEVICES SHALL BE INSTALLED AND INSPECTED BY THE ENGINEER PRIOR TO ANY

GROUND DISTURBING ACTIVITIES.

2. ALL AIRPORT PAVEMENTS SHALL BE KEPT FREE OF ALL FOREIGN OBJECT DEBRIS (FOD) BY SWEEPER OR VAC-TRUCK AS NEEDED OR AS DIRECTED BY THE ENGINEER. AT MINIMUM, THE PAVEMENT SURFACE WILL

BE SWEPT AT THE END OF THE WORK DAY.

3. WORK SHALL BE IN ACCORDANCE WITH OREGON DEQ 1200-C PERMIT FOR THE PROJECT.

4. PLACE SEDIMENT BARRIER (SILT FENCE) AROUND STOCK PILES AS NEEDED.

5. HYDROSEED STAGING AREAS, HAUL ROUTES, AND OTHER DISTURBED SURFACES, UNLESS OTHERWISE SHOWN, OUTSIDE OF DAYLIGHT LIMITS AT NO COST TO THE OWNER. HYDROSEEDING SHALL NOT OCCUR

ON GRAVEL SHOULDERS. REFER TO TECHNICAL SPECIFICATIONS FOR ADDITIONAL SEEDING

REQUIREMENTS.

6. REFER TO DRAWING EC-5 FOR EROSION AND SEDIMENT CONTROL STANDARD NOTES AND DRAWING EC-6

FOR EROSION AND SEDIMENT CONTROL ADDITIONAL NOTES.

7. PROPOSED IMPROVEMENTS DOES NOT CHANGE THE EXISTING FLOW DIRECTION.

EEE

E E E E E E E E E E E E E E E E E E E E E E E E E E

EEEEEEEEEEEEEEEE EEEEEEEEEEEEEEEE

W W W W W W

W W W W W W

E

E

E

E

E

E E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

EE

B B

B B

J

E

E

E

E

J

W Y W Y

W Y W Y W Y W Y

E

E

E

E

E

UGP

UGP

UGP

UGP

UGP

UGPUGPUGPUGPUGP

UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP

UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP

UGP

14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00218

217217

EE

X

E E

UGPUGP

OH POH POH P

UGP

X

XXXXX

EC-2

EROSION CONTROL PLAN

SCALE: 1"=50'

STA 13+50 TO STA 26+00

EC-2

EROSION CONTROL PLAN - RW 14-32 STA 13+50 TO STA 26+00

50 50 100

SCALE OF FEET

SCALE: 1"=50'

SCALES ACCORDINGLY.

THIS SHEET, ADJUST

IF NOT ONE INCH ON

0" 1"

ORIGINAL DRAWING.

BAR IS ONE INCH ON

VERIFY SCALES

APPRBYNO. DATE REVISIONS

SHEET NO.

DRAWING NO.

DATE:

JUNE 2023

OREGON DEPARTMENT OF AVIATION

CAPE BLANCO STATE AIRPORT

RUNWAY AND ELECTRICAL REHABILITATION PROJECT

PROJECT NO: SCALE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

Y:

\P ro je ct s\

O re go n

D ep ar tm en t o f A vi at io n\

- C ap e Bl an co

R un w ay a nd

E le ct ric al D es ig n\ C

AD

W O

R

KI

N G

\G -5

G

-9

ER

O

SI

O

N C

O N

TR

O

L.

dw g

AS NOTED40097.115.01

CENTURY

WEST

E N G I N E E R I N G

PORTLAND OFFICE

5500 MEADOWS ROAD

SUITE #250

LAKE OSWEGO, OR 97035

503.419.2130 OFFICE

JAK

RHH/JDN

PJM

FOR BIDDING PURPOSES ONLY

77595PE

OREGON

EXPIRES: 12/31/2024

M

AT

C H

LI

N

E

ST

A

+5 0, S

EE

S H

EE

T

EC

-1

MATCHLINE 1, SEE LEFT

MATCHLINE 1, SEE RIGHT

M

AT

C H

LI

N

E

ST

A

+0 0, S

EE

S H

EE

T

EC

-3

RUNWAY 14-32

AIRPORT GATE

NEW SEGMENTED

CIRCLE

TAXIWAY B

EC-6

EC-6

E

LEGEND:

BIOFILTER INLET PROTECTION PER

SILT FENCE PER

EXISTING/PROPOSED FLOW

DIRECTION (SEE NOTE 7)

CONSTRUCTION ENTRANCE

PROPOSED PAVEMENT

ELECTRICAL TRENCH

SEEDING LIMITS

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

RUNWAY SAFETY AREA

EXITING PAVEMENT EDGE

WORK AREA LIMITS

CONSTRUCTION STAGING AREA,

STOCKPILE, PORTABLE TOILET

58'

60'

58'

60'

CONTRACTOR TO PROTECT CONSTRUCTION AREA AND

PROVIDE NOXIOUS WEED CONTROL AS NECESSARY

INSTALL SILT FENCE PER DETAIL

EC-5

INSTALL SILT FENCE PER DETAIL

EC-6

INSTALL SILT FENCE PER DETAIL

EC-6WORK AREA LIMITS

WORK AREA LIMITS

WORK AREA LIMITS

INSTALL CONSTRUCTION ENTRANCE

PER DETAIL

EC-6

EC-6

CONTRACTOR STAGING AREA, PORTABLE TOILET,

AND SOIL STOCKPILE TO OCCUR WITHIN THIS AREA

NOTES:

1. ALL EROSION CONTROL DEVICES SHALL BE INSTALLED AND INSPECTED BY THE ENGINEER PRIOR TO ANY

GROUND DISTURBING ACTIVITIES.

2. ALL AIRPORT PAVEMENTS SHALL BE KEPT FREE OF ALL FOREIGN OBJECT DEBRIS (FOD) BY SWEEPER OR VAC-TRUCK AS NEEDED OR AS DIRECTED BY THE ENGINEER. AT MINIMUM, THE PAVEMENT SURFACE WILL

BE SWEPT AT THE END OF THE WORK DAY.

3. WORK SHALL BE IN ACCORDANCE WITH OREGON DEQ 1200-C PERMIT FOR THE PROJECT.

4. PLACE SEDIMENT BARRIER (SILT FENCE) AROUND STOCK PILES AS NEEDED.

5. HYDROSEED STAGING AREAS, HAUL ROUTES, AND OTHER DISTURBED SURFACES, UNLESS OTHERWISE SHOWN, OUTSIDE OF DAYLIGHT LIMITS AT NO COST TO THE OWNER. HYDROSEEDING SHALL NOT OCCUR ON GRAVEL SHOULDERS. REFER TO TECHNICAL SPECIFICATIONS FOR ADDITIONAL SEEDING REQUIREMENTS.

6. REFER TO DRAWING EC-5 FOR EROSION AND SEDIMENT CONTROL STANDARD NOTES AND DRAWING EC-6

FOR EROSION AND SEDIMENT CONTROL ADDITIONAL NOTES.

7. PROPOSED IMPROVEMENTS DOES NOT CHANGE THE EXISTING FLOW DIRECTION.

SEEDING FOR

TREE REMOVAL

E E E E E E E E E E E E E E E E E E E E E E E E E E

EEEEE EEEEEEEEEEEEEEEEEEE

EEEEEEEEEEEEEE

W W W W W W

W W W W

E

E

E

E

E

E

E

E E

E

E E

E

E

E

E

E

E

B

B

B

B

J

Y WY W

Y WY WY WY W

UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP

UGPUGPUGPUGPUGPUGPUGP

UGP

UGP

UGPUGP

UGP

UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP

CB CB

CBCB

SD

SD

SD

SDSD SD

SD

211212213214216217

26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00

215216217 212

EC-3

EROSION CONTROL PLAN

SCALE: 1"=50'

STA 26+00 TO STA 38+50

EC-3

EROSION CONTROL PLAN - RW 14-32 STA 26+00 TO STA 38+50

50 50 100

SCALE OF FEET

SCALE: 1"=50'

SCALES ACCORDINGLY.

THIS SHEET, ADJUST

IF NOT ONE INCH ON

0" 1"

ORIGINAL DRAWING.

BAR IS ONE INCH ON

VERIFY SCALES

APPRBYNO. DATE REVISIONS

SHEET NO.

DRAWING NO.

DATE:

JUNE 2023

OREGON DEPARTMENT OF AVIATION

CAPE BLANCO STATE AIRPORT

RUNWAY AND ELECTRICAL REHABILITATION PROJECT

PROJECT NO: SCALE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

Y:

\P ro je ct s\

O re go n

D ep ar tm en t o f A vi at io n\

- C ap e Bl an co

R un w ay a nd

E le ct ric al D es ig n\ C

AD

W O

R

KI

N G

\G -5

G

-9

ER

O

SI

O

N C

O N

TR

O

L.

dw g

AS NOTED40097.115.01

CENTURY

WEST

E N G I N E E R I N G

PORTLAND OFFICE

5500 MEADOWS ROAD

SUITE #250

LAKE OSWEGO, OR 97035

503.419.2130 OFFICE

JAK

RHH/JDN

PJM

FOR BIDDING PURPOSES ONLY

77595PE

OREGON

EXPIRES: 12/31/2024

M

AT

C H

LI

N

E

ST

A

+0 0, S

EE

S H

EE

T

EC

-2

M

AT

C H

LI

N

E

ST

A

+5 0, S

EE

S H

EE

T

EC

-4

RUNWAY 14-32

BIOFILTER INLET

PROTECTION

BIOFILTER INLET

PROTECTION

BIOFILTER INLET

PROTECTION

BIOFILTER INLET

PROTECTION

BIOFILTER INLET

PROTECTION

TAXIWAY A

EC-6

EC-6

EC-6

CONTRACTOR TO PROTECT CONSTRUCTION AREA AND

PROVIDE NOXIOUS WEED CONTROL AS NECESSARY

NOTES:

1. ALL EROSION CONTROL DEVICES SHALL BE INSTALLED AND INSPECTED BY THE ENGINEER PRIOR TO ANY

GROUND DISTURBING ACTIVITIES.

2. ALL AIRPORT PAVEMENTS SHALL BE KEPT FREE OF ALL FOREIGN OBJECT DEBRIS (FOD) BY SWEEPER OR VAC-TRUCK AS NEEDED OR AS DIRECTED BY THE ENGINEER. AT MINIMUM, THE PAVEMENT SURFACE WILL

BE SWEPT AT THE END OF THE WORK DAY.

3. WORK SHALL BE IN ACCORDANCE WITH OREGON DEQ 1200-C PERMIT FOR THE PROJECT.

4. PLACE SEDIMENT BARRIER (SILT FENCE) AROUND STOCK PILES AS NEEDED.

5. HYDROSEED STAGING AREAS, HAUL ROUTES, AND OTHER DISTURBED SURFACES, UNLESS OTHERWISE SHOWN, OUTSIDE OF DAYLIGHT LIMITS AT NO COST TO THE OWNER. HYDROSEEDING SHALL NOT OCCUR

ON GRAVEL SHOULDERS. REFER TO TECHNICAL SPECIFICATIONS FOR ADDITIONAL SEEDING

REQUIREMENTS.

6. REFER TO DRAWING EC-02 FOR EROSION AND SEDIMENT CONTROL STANDARD NOTES AND DRAWING

EC-03 FOR EROSION AND SEDIMENT CONTROL ADDITIONAL NOTES.

7. PROPOSED IMPROVEMENTS DOES NOT CHANGE THE EXISTING FLOW DIRECTION.

INSTALL SILT FENCE PER DETAIL

EC-6

WORK AREA LIMITS

EC-6

EC-6

E

LEGEND:

BIOFILTER INLET PROTECTION PER

SILT FENCE PER

EXISTING/PROPOSED FLOW

DIRECTION (SEE NOTE 7)

CONSTRUCTION ENTRANCE

PROPOSED PAVEMENT

ELECTRICAL TRENCH

SEEDING LIMITS

EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

RUNWAY SAFETY AREA

EXITING PAVEMENT EDGE

WORK AREA LIMITS

CONSTRUCTION STAGING AREA,

STOCKPILE, PORTABLE TOILET

58'

60'

58'

60'

EC-6

BIOFILTER INLET

PROTECTION

INSTALL SILT FENCE PER DETAIL

EC-6

WORK AREA LIMITS

CONTRACTOR STAGING AREA,

PORTABLE TOILET, AND SOIL

STOCKPILE TO OCCUR WITHIN THIS AREA

E E E E E E E E E E E E E E E E E E E E E E E E E

E

EEEEEEEEEEEEEEEEEEEEEEEEE

E E E E E E E E E E E E E

E E

EEEEEEEEEEEEEEEEEEEEEEEEE

E

J

J

R G

R G

R G

R G

R G

R GY WY WY WY WY WY W

Y WY WY WY WY WY W

E

J

J

UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP

UGP

UGP

UGP

UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP

CB CB CB

CBCB

SD SD

6207208209

39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 50+98

EC-4

EROSION CONTROL PLAN

SCALE: 1"=50'

STA 38+50 TO STA 51+00

EC-4

EROSION CONTROL PLAN - RW 14-32 STA 38+50 TO STA 51+00

SCALES ACCORDINGLY.

THIS SHEET, ADJUST

IF NOT ONE INCH ON

0" 1"

ORIGINAL DRAWING.

BAR IS ONE INCH ON

VERIFY SCALES

APPRBYNO. DATE REVISIONS

SHEET NO.

DRAWING NO.

DATE:

JUNE 2023

OREGON DEPARTMENT OF AVIATION

CAPE BLANCO STATE AIRPORT

RUNWAY AND ELECTRICAL REHABILITATION PROJECT

PROJECT NO: SCALE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

Y:

\P ro je ct s\

O re go n

D ep ar tm en t o f A vi at io n\

- C ap e Bl an co

R un w ay a nd

E le ct ric al D es ig n\ C

AD

W O

R

KI

N G

\G -5

G

-9

ER

O

SI

O

N C

O N

TR

O

L.

dw g

AS NOTED40097.115.01

CENTURY

WEST

E N G I N E E R I N G

PORTLAND OFFICE

5500 MEADOWS ROAD

SUITE #250

LAKE OSWEGO, OR 97035

503.419.2130 OFFICE

JAK

RHH/JDN

PJM

FOR BIDDING PURPOSES ONLY

77595PE

OREGON

EXPIRES: 12/31/2024

50 50 100

SCALE OF FEET

SCALE: 1"=50'

M

AT

C

H

LI

N E

ST

A

+5

0, S

EE

S

H

EE

T

EC

-3

RUNWAY 14-32

BIOFILTER INLET

PROTECTION

BIOFILTER INLET

PROTECTION

BIOFILTER INLET

PROTECTION BIOFILTER INLET

PROTECTION

BIOFILTER INLET

PROTECTION

INLET FILTER

PROTECTION, SEE DETAIL

EC-6

EXISTING DRAINAGE

DITCH TO BE PROTECTED

EC-5

EC-6

EC-6

EC-6

E

LEGEND:

BIOFILTER INLET PROTECTION PER

SILT FENCE PER

EXISTING/PROPOSED FLOW

DIRECTION (SEE NOTE 7)

PROPOSED PAVEMENT

SEEDING LIMITS

58'

60'EXISTING MAJOR CONTOUR

EXISTING MINOR CONTOUR

PROPOSED MAJOR CONTOUR

PROPOSED MINOR CONTOUR

RUNWAY SAFETY AREA

EXITING PAVEMENT EDGE

58'

60'

CONTRACTOR TO PROTECT CONSTRUCTION AREA AND

PROVIDE NOXIOUS WEED CONTROL AS NECESSARY

INSTALL SILT FENCE PER DETAIL

EC-6

WORK AREA LIMITS

INSTALL SILT FENCE PER DETAIL

EC-5

WORK AREA LIMITS

NOTES:

1. ALL EROSION CONTROL DEVICES SHALL BE INSTALLED AND INSPECTED BY THE ENGINEER PRIOR TO ANY

GROUND DISTURBING ACTIVITIES.

2. ALL AIRPORT PAVEMENTS SHALL BE KEPT FREE OF ALL FOREIGN OBJECT DEBRIS (FOD) BY SWEEPER OR VAC-TRUCK AS NEEDED OR AS DIRECTED BY THE ENGINEER. AT MINIMUM, THE PAVEMENT SURFACE WILL

BE SWEPT AT THE END OF THE WORK DAY.

3. WORK SHALL BE IN ACCORDANCE WITH OREGON DEQ 1200-C PERMIT FOR THE PROJECT.

4. PLACE SEDIMENT BARRIER (SILT FENCE) AROUND STOCK PILES AS NEEDED.

5. HYDROSEED STAGING AREAS, HAUL ROUTES, AND OTHER DISTURBED SURFACES, UNLESS OTHERWISE SHOWN, OUTSIDE OF DAYLIGHT LIMITS AT NO COST TO THE OWNER. HYDROSEEDING SHALL NOT OCCUR

ON GRAVEL SHOULDERS. REFER TO TECHNICAL SPECIFICATIONS FOR ADDITIONAL SEEDING

REQUIREMENTS.

6. REFER TO DRAWING EC-5 FOR EROSION AND SEDIMENT CONTROL STANDARD NOTES AND DRAWING EC-6

FOR EROSION AND SEDIMENT CONTROL ADDITIONAL NOTES.

7. PROPOSED IMPROVEMENTS DOES NOT CHANGE THE EXISTING FLOW DIRECTION.

EC-5

EROSION CONTROL PLAN STANDARD NOTES

SCALES ACCORDINGLY.

THIS SHEET, ADJUST

IF NOT ONE INCH ON

0" 1"

ORIGINAL DRAWING.

BAR IS ONE INCH ON

VERIFY SCALES

APPRBYNO. DATE REVISIONS

SHEET NO.

DRAWING NO.

DATE:

JUNE 2023

OREGON DEPARTMENT OF AVIATION

CAPE BLANCO STATE AIRPORT

RUNWAY AND ELECTRICAL REHABILITATION PROJECT

PROJECT NO: SCALE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

Y:

\P ro je ct s\

O re go n

D ep ar tm en t o f A vi at io n\

- C ap e Bl an co

R un w ay a nd

E le ct ric al D es ig n\ C

AD

W O

R

KI

N G

\G -5

G

-9

ER

O

SI

O

N C

O N

TR

O

L.

dw g

AS NOTED40097.115.01

CENTURY

WEST

E N G I N E E R I N G

PORTLAND OFFICE

5500 MEADOWS ROAD

SUITE #250

LAKE OSWEGO, OR 97035

503.419.2130 OFFICE

JAK

RHH/JDN

PJM

FOR BIDDING PURPOSES ONLY

77595PE

OREGON

EXPIRES: 12/31/2024

CONTRACTOR TO PROTECT CONSTRUCTION AREA AND

PROVIDE NOXIOUS WEED CONTROL AS NECESSARY

1. INCLUDE A LIST OF ALL PERSONNEL (BY NAME AND POSITION) THAT ARE RESPONSIBLE FOR THE DESIGN, INSTALLATION AND MAINTENANCE OF STORMWATER CONTROL MEASURES (E.G. ESCP DEVELOPER, BMP INSTALLER (SEE SECTION 4.10), AS WELL AS THEIR INDIVIDUAL RESPONSIBILITIES. (SECTION 4.4.C.II)

2. VISUAL MONITORING INSPECTION REPORTS MUST BE MADE IN ACCORDANCE WITH DEQ 1200-C PERMIT

REQUIREMENTS. (SECTION 6.5)

3. INSPECTION LOGS MUST BE KEPT IN ACCORDANCE WITH DEQ 1200-C PERMIT REQUIREMENTS. (SECTION 6.5.Q)

4. RETAIN A COPY OF THE ESCP AND ALL REVISIONS ON SITE AND MAKE IT AVAILABLE ON REQUEST TO DEQ, AGENT, OR THE LOCAL MUNICIPALITY. (SECTION 4.7)

5. THE PERMIT REGISTRANT MUST IMPLEMENT THE ESCP. FAILURE TO IMPLEMENT ANY OF THE CONTROL MEASURES OR PRACTICES DESCRIBED IN THE ESCP IS A VIOLATION OF THE PERMIT. (SECTION 4 AND 4.11)

6. THE ESCP MUST BE ACCURATE AND REFLECT SITE CONDITIONS. (SECTION 4.8)

7. SUBMISSION OF ALL ESCP REVISIONS IS NOT REQUIRED. SUBMITTAL OF THE ESCP REVISIONS IS ONLY UNDER SPECIFIC CONDITIONS. SUBMIT ALL NECESSARY REVISION TO DEQ OR AGENT WITHIN 10 DAYS.

(SECTION 4.9)

8. SEQUENCE CLEARING AND GRADING TO THE MAXIMUM EXTENT PRACTICAL TO PREVENT EXPOSED INACTIVE

AREAS FROM BECOMING A SOURCE OF EROSION. (SECTION 2.2.2)

9. CREATE SMOOTH SURFACES BETWEEN SOIL SURFACE AND EROSION AND SEDIMENT CONTROLS TO

PREVENT STORMWATER FROM BYPASSING CONTROLS AND PONDING. (SECTION 2.2.3)

10. IDENTIFY, MARK, AND PROTECT (BY CONSTRUCTION FENCING OR OTHER MEANS) CRITICAL RIPARIAN AREAS AND VEGETATION INCLUDING IMPORTANT TREES AND ASSOCIATED ROOTING ZONES, AND VEGETATION AREAS TO BE PRESERVED. IDENTIFY VEGETATIVE BUFFER ZONES BETWEEN THE SITE AND SENSITIVE AREAS (E.G. WETLANDS), AND OTHER AREAS TO BE PRESERVED, ESPECIALLY IN PERIMETER AREAS. (SECTION 2.2.1)

11. PRESERVE EXISTING VEGETATION WHEN PRACTICAL AND RE-VEGETATE OPEN AREAS. RE-VEGETATE OPEN AREAS WHEN PRACTICABLE BEFORE AND AFTER GRADING OR CONSTRUCTION. IDENTIFY THE TYPE OF

VEGETATIVE SEED MIX USED. (SECTION 2.2.5)

12. MAINTAIN AND DELINEATE ANY EXISTING NATURAL BUFFER WITHIN THE 50-FEET OF WATERS OF THE STATE.

(SECTION 2.2.4)

13. INSTALL PERIMETER SEDIMENT CONTROL, INCLUDING STORM DRAIN INLET PROTECTION AS WELL AS ALL

SEDIMENT BASINS, TRAPS, AND BARRIERS PRIOR TO LAND DISTURBANCE. (SECTIONS 2.1.3)

14. CONTROL BOTH PEAK FLOW RATES AND TOTAL STORMWATER VOLUME, TO MINIMIZE EROSION AT OUTLETS

AND DOWNSTREAM CHANNELS AND STREAMBANKS. (SECTIONS 2.1.1 AND 2.2.16)

15. CONTROL SEDIMENT AS NEEDED ALONG THE SITE PERIMETER AND AT ALL OPERATIONAL INTERNAL STORM DRAIN INLETS AT ALL TIMES DURING CONSTRUCTION, BOTH INTERNALLY AND AT THE SITE BOUNDARY.

(SECTIONS 2.2.6 AND 2.2.13)

16. ESTABLISH CONCRETE TRUCK AND OTHER CONCRETE EQUIPMENT WASHOUT AREAS BEFORE BEGINNING

CONCRETE WORK. (SECTION 2.2.14)

17. APPLY TEMPORARY AND/OR PERMANENT SOIL STABILIZATION MEASURES IMMEDIATELY ON ALL DISTURBED AREAS AS GRADING PROGRESSES. TEMPORARY OR PERMANENT STABILIZATION MEASURES ARE NOT REQUIRED FOR AREAS THAT ARE INTENDED TO BE LEFT UNVEGETATED, SUCH AS DIRT ACCESS ROADS OR

UTILITY POLE PADS. (SECTIONS 2.2.20 AND 2.2.21)

18. ESTABLISH MATERIAL AND WASTE STORAGE AREAS, AND OTHER NON-STORMWATER CONTROLS. (SECTION 2.3.7)

19. KEEP WASTE CONTAINER LIDS CLOSED WHEN NOT IN USE AND CLOSE LIDS AT THE END OF THE BUSINESS DAY FOR THOSE CONTAINERS THAT ARE ACTIVELY USED THROUGHOUT THE DAY. FOR WASTE CONTAINERS THAT DO NOT HAVE LIDS, PROVIDE EITHER (1) COVER (E.G., A TARP, PLASTIC SHEETING, TEMPORARY ROOF) TO PREVENT EXPOSURE OF WASTES TO PRECIPITATION, OR (2) A SIMILARLY EFFECTIVE MEANS DESIGNED TO PREVENT THE DISCHARGE OF POLLUTANTS (E.G., SECONDARY CONTAINMENT). (SECTION 2.3.7)

20. PREVENT TRACKING OF SEDIMENT ONTO PUBLIC OF PRIVATE ROADS USING BMPS SUCH AS: CONSTRUCTION ENTRANCE, GRAVELED (OR PAVED) EXITS AND PARKING AREAS, GRAVEL ALL UNPAVED ROADS LOCATED ONSITE, OR USE AN EXIT TIRE WASH. THESE BMPS MUST BE IN PLACE PRIOR TO LAND-DISTURBING

ACTIVITIES. (SECTION 2.2.7)

21. WHEN TRUCKING SATURATED SOILS FROM THE SITE, EITHER USE WATER-TIGHT TRUCKS OR DRAIN LOADS

ON SITE. (SECTION 2.2.7.F)

22. CONTROL PROHIBITED DISCHARGES FROM LEAVING THE CONSTRUCTION SITE, I.E., CONCRETE WASH-OUT, WASTEWATER FROM CLEANOUT OF STUCCO, PAINT AND CURING COMPOUNDS. (SECTIONS 1.5 AND 2.3.9)

23. ENSURE THAT STEEP SLOPE AREAS WHERE CONSTRUCTION ACTIVITIES ARE NOT OCCURRING ARE NOT

DISTURBED. (SECTION 2.2.10)

24. PREVENT SOIL COMPACTION IN AREAS WHERE POST-CONSTRUCTION INFILTRATION FACILITIES ARE TO BE

INSTALLED. (SECTION 2.2.12)

25. USE BMPS TO PREVENT OR MINIMIZE STORMWATER EXPOSURE TO POLLUTANTS FROM SPILLS; VEHICLE AND EQUIPMENT FUELING, MAINTENANCE, AND STORAGE; OTHER CLEANING AND MAINTENANCE ACTIVITIES; AND WASTE HANDLING ACTIVITIES. THESE POLLUTANTS INCLUDE FUEL, HYDRAULIC FLUID, AND OTHER OILS FROM VEHICLES AND MACHINERY, AS WELL AS DEBRIS, FERTILIZER, PESTICIDES AND HERBICIDES, PAINTS, SOLVENTS, CURING COMPOUNDS AND ADHESIVES FROM CONSTRUCTION OPERATIONS. (SECTIONS 2.2.15

AND 2.3)

26. PROVIDE PLANS FOR SEDIMENTATION BASINS THAT HAVE BEEN DESIGNED PER SECTION 2.2.17 AND

STAMPED BY AN OREGON PROFESSIONAL ENGINEER. (SECTION 2.2.17.A)

27. IF ENGINEERED SOILS ARE USED ON SITE, A SEDIMENTATION BASIN/IMPOUNDMENT MUST BE INSTALLED.

(SECTIONS 2.2.17 AND 2.2.18)

28. PROVIDE A DEWATERING PLAN FOR ACCUMULATED WATER FROM PRECIPITATION AND UNCONTAMINATED

GROUNDWATER SEEPAGE DUE TO SHALLOW EXCAVATION ACTIVITIES. (SEE SECTION 2.4)

29. IMPLEMENT THE FOLLOWING BMPS WHEN APPLICABLE: WRITTEN SPILL PREVENTION AND RESPONSE PROCEDURES, EMPLOYEE TRAINING ON SPILL PREVENTION AND PROPER DISPOSAL PROCEDURES, SPILL KITS IN ALL VEHICLES, REGULAR MAINTENANCE SCHEDULE FOR VEHICLES AND MACHINERY, MATERIAL DELIVERY AND STORAGE CONTROLS, TRAINING AND SIGNAGE, AND COVERED STORAGE AREAS FOR WASTE

AND SUPPLIES. (SECTION 2.3)

30. USE WATER, SOIL-BINDING AGENT OR OTHER DUST CONTROL TECHNIQUE AS NEEDED TO AVOID

WIND-BLOWN SOIL. (SECTION 2.2.9)

31. THE APPLICATION RATE OF FERTILIZERS USED TO REESTABLISH VEGETATION MUST FOLLOW MANUFACTURER'S RECOMMENDATIONS TO MINIMIZE NUTRIENT RELEASES TO SURFACE WATERS. EXERCISE CAUTION WHEN USING TIME-RELEASE FERTILIZERS WITHIN ANY WATERWAY RIPARIAN ZONE. (SECTION 2.3.5)

32. IF AN ACTIVE TREATMENT SYSTEM (FOR EXAMPLE, ELECTRO-COAGULATION, FLOCCULATION, FILTRATION, ETC.) FOR SEDIMENT OR OTHER POLLUTANT REMOVAL IS EMPLOYED, SUBMIT AN OPERATION AND MAINTENANCE PLAN (INCLUDING SYSTEM SCHEMATIC, LOCATION OF SYSTEM, LOCATION OF INLET, LOCATION OF DISCHARGE, DISCHARGE DISPERSION DEVICE DESIGN, AND A SAMPLING PLAN AND FREQUENCY) BEFORE OPERATING THE TREATMENT SYSTEM. OBTAIN ENVIRONMENTAL MANAGEMENT PLAN APPROVAL FROM DEQ BEFORE OPERATING THE TREATMENT SYSTEM. OPERATE AND MAINTAIN THE

TREATMENT SYSTEM ACCORDING TO MANUFACTURER'S SPECIFICATIONS. (SECTION 1.2.9)

33. TEMPORARILY STABILIZE SOILS AT THE END OF THE SHIFT BEFORE HOLIDAYS AND WEEKENDS, IF NEEDED.

THE REGISTRANT IS RESPONSIBLE FOR ENSURING THAT SOILS ARE STABLE DURING RAIN EVENTS AT ALL

TIMES OF THE YEAR. (SECTION 2.2)

34. AS NEEDED BASED ON WEATHER CONDITIONS, AT THE END OF EACH WORKDAY SOIL STOCKPILES MUST BE STABILIZED OR COVERED, OR OTHER BMPS MUST BE IMPLEMENTED TO PREVENT DISCHARGES TO SURFACE

WATERS OR CONVEYANCE SYSTEMS LEADING TO SURFACE WATERS. (SECTION 2.2.8)

35. SEDIMENT FENCE: REMOVE TRAPPED SEDIMENT BEFORE IT REACHES ONE THIRD OF THE ABOVE GROUND

HEIGHT AND BEFORE FENCE REMOVAL. (SECTION 2.1.5.B)

36. OTHER SEDIMENT BARRIERS (SUCH AS BIOBAGS): REMOVE SEDIMENT BEFORE IT REACHES TWO INCHES

DEPTH ABOVE GROUND HEIGHT AND BEFORE BMP REMOVAL. (SECTION 2.1.5.C)

37. CATCH BASINS: CLEAN BEFORE RETENTION CAPACITY HAS BEEN REDUCED BY FIFTY PERCENT. SEDIMENT BASINS AND SEDIMENT TRAPS: REMOVE TRAPPED SEDIMENTS BEFORE DESIGN CAPACITY HAS BEEN

REDUCED BY FIFTY PERCENT AND AT COMPLETION OF PROJECT. (SECTION 2.1.5.D)

38. WITH 24 HOURS, SIGNIFICANT SEDIMENT THAT HAS LEFT THE CONSTRUCTION SITE, MUST BE REMEDIATED.

INVESTIGATE THE CAUSE OF THE SEDIMENT RELEASE AND IMPLEMENT STEPS TO PREVENT A RECURRENCE OF THE DISCHARGE WITHIN THE SAME 24 HOURS. ANY IN-STREAM CLEAN UP OF SEDIMENT SHALL BE

PERFORMED ACCORDING TO THE OREGON DEPARTMENT OF STATE LANDS REQUIRED TIMEFRAME.

(SECTION 2.2.19.A)

39. THE INTENTIONAL WASHING OF SEDIMENT INTO STORM SEWERS OR DRAINAGE WAYS MUST NOT OCCUR.

VACUUMING OR DRY SWEEPING AND MATERIAL PICKUP MUST BE USED TO CLEAN UP RELEASED SEDIMENTS.

(SECTION 2.2.19)

40. DOCUMENT ANY PORTION(S) OF THE SITE WHERE LAND DISTURBING ACTIVITIES HAVE PERMANENTLY CEASED OR WILL BE TEMPORARILY INACTIVE FOR 14 OR MORE CALENDAR DAYS. (SECTION 6.5.F)

41. PROVIDE TEMPORARY STABILIZATION FOR THAT PORTION OF THE SITE WHERE CONSTRUCTION ACTIVITIES CEASE FOR 14 DAYS OR MORE WITH A COVERING OF BLOWN STRAW AND A TACKIFIER, LOOSE STRAW, OR AN ADEQUATE COVERING OF COMPOST MULCH UNTIL WORK RESUMES ON THAT PORTION OF THE SITE.

(SECTION 2.2.20)

42. DO NOT REMOVE TEMPORARY SEDIMENT CONTROL PRACTICES UNTIL PERMANENT VEGETATION OR OTHER COVER OF EXPOSED AREAS IS ESTABLISHED. ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED, ALL TEMPORARY EROSION CONTROLS AND RETAINED SOILS MUST BE REMOVED AND DISPOSED OF PROPERLY, UNLESS NEEDED FOR LONG TERM USE FOLLOWING TERMINATION OF PERMIT COVERAGE.

(SECTION 2.2.21)

EROSION/SEDIMENT CONTROL PLAN (ESCP) NOTES:

REFER TO NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORMWATER DISCHARGE PERMIT, ISSUED BY OREGON DEPARTMENT OF ENVIRONMENTAL QUALITY PURSUANT TO ORS 468B.050 AND SECTION 402 OF THE FEDERAL CLEAN WATER ACT.

EROSION/SEDIMENT INSPECTION FREQUENCY

SITE CONDITION MINIMUM FREQUENCY

1. ACTIVE PERIOD. ON INITIAL DATE THAT LAND DISTURBANCE ACTIVITIES COMMENCE.

WITHIN 24 HOURS OF ANY STORM EVENT, INCLUDING RUNOFF FROM

SNOW MELT, THAT RESULTS IN DISCHARGE FROM THE SITE. AT LEAST

ONCE EVERY 14 DAYS, REGARDLESS OF WHETHER STORMWATER RUNOFF

IS OCCURRING.

2. INACTIVE PERIODS GREATER

THAN FOURTEEN (14)

CONSECUTIVE CALENDAR

DAYS.

THE INSPECTOR MAY REDUCE THE FREQUENCY OF INSPECTIONS IN ANY

AREA OF THE SITE WHERE THE STABILIZATION STEPS IN SECTION 2.2.20

HAVE BEEN COMPLETED TO TWICE PER MONTH FOR THE FIRST MONTH,

NO LESS THAN 14 CALENDAR DAYS APART, THEN ONCE PER MONTH.

3. PERIODS DURING WHICH THE

SITE IS INACCESSIBLE DUE TO

INCLEMENT WEATHER.

IF SAFE, ACCESSIBLE AND PRACTICAL, INSPECTIONS MUST OCCUR DAILY

AT A RELEVANT DISCHARGE POINT OR DOWNSTREAM LOCATION OF THE

RECEIVING WATERBODY.

4. PERIODS DURING WHICH

CONSTRUCTION ACTIVITIES

ARE SUSPENDED AND RUNOFF

IS UNLIKELY DUE TO FROZEN

CONDITIONS.

VISUAL MONITORING INSPECTIONS MAY BE TEMPORARILY SUSPENDED.

IMMEDIATELY RESUME MONITORING UPON THAWING, OR WHEN WEATHER

CONDITIONS MAKE DISCHARGES LIKELY.

5. PERIODS DURING WHICH

CONSTRUCTION ACTIVITIES

ARE CONDUCTED AND RUNOFF

IS UNLIKELY DUE TO FROZEN

CONDITIONS.

VISUAL MONITORING INSPECTIONS MAY BE REDUCED TO ONCE A MONTH.

IMMEDIATELY RESUME MONITORING UPON THAWING, OR WHEN WEATHER

CONDITIONS MAKE DISCHARGES LIKELY.

AUTHORIZED NON-STORMWATER DISCHARGES:

1. WATER AND ASSOCIATED DISCHARGES FROM EMERGENCY FIREFIGHTING ACTIVITIES;

2. FIRE HYDRANT FLUSHING;

3. PROPERLY MANAGED LANDSCAPE IRRIGATION;

4. WATER USED TO WASH EQUIPMENT AND VEHICLES (EXCLUDING THE ENGINE, UNDERCARRIAGE, AND WHEELS/TIRES) PROVIDED THERE IS

NO DISCHARGE OF SOAPS, SOLVENTS, OR DETERGENTS USED;

5. WATER TO CONTROL DUST;

6. POTABLE WATER INCLUDING UNCONTAMINATED WATER LINE FLUSHINGS;

7. EXTERNAL BUILDING WASHDOWN, PROVIDED SOAPS, SOLVENTS, AND DETERGENTS ARE NOT USED, AND EXTERNAL SURFACES DO NOT

CONTAIN HAZARDOUS SUBSTANCES;

8. PAVEMENT WASH WATERS, PROVIDED SPILLS OR LEAKS OF TOXIC OR HAZARDOUS SUBSTANCES HAVE NOT OCCURRED (UNLESS ALL SPILL MATERIAL HAS BEEN REMOVED) AND WHERE SOAPS, SOLVENTS, AND DETERGENTS ARE NOT USED. DIRECTING PAVEMENT WASH WATERS INTO ANY SURFACE WATER, STORM DRAIN INLET, OR STORMWATER CONVEYANCE IS PROHIBITED, UNLESS THE CONVEYANCE IS CONNECTED TO A SEDIMENT BASIN, SEDIMENT TRAP, OR SIMILARLY EFFECTIVE CONTROL FOR THE POLLUTANTS PRESENT. PER 2.2.19.b, HOSING OF ACCUMULATED SEDIMENTS ON PAVEMENT INTO ANY STORMWATER CONVEYANCE IS PROHIBITED;

9. UNCONTAMINATED AIR CONDITIONING OR COMPRESSOR CONDENSATE;

10. UNCONTAMINATED, NON-TURBID DISCHARGES OF GROUNDWATER OR SPRING WATER;

11. FOUNDATION OR FOOTING DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH PROCESS MATERIALS SUCH AS SOLVENTS OR

CONTAMINATED GROUNDWATER; AND

12. CONSTRUCTION DEWATERING ACTIVITIES (INCLUDING GROUNDWATER DEWATERING AND WELL DRILLING DISCHARGE ASSOCIATED WITH

THE REGISTERED CONSTRUCTION ACTIVITY), PROVIDED THAT:

12.1. THE WATER IS LAND APPLIED IN A WAY THAT RESULTS IN COMPLETE INFILTRATION WITH NO POTENTIAL TO DISCHARGE TO A SURFACE WATER OF THE STATE, OR THE USE OF A SANITARY OR COMBINED SEWER DISCHARGE IS AUTHORIZED WITH LOCAL

SEWER DISTRICT APPROVAL; OR

12.2. BEST MANAGEMENT PRACTICES AND A TREATMENT SYSTEM APPROVED BY DEQ OR AGENT (SEE SECTION 1.2.9) ARE USED TO

ENSURE COMPLIANCE WITH DISCHARGE AND WATER QUALITY REQUIREMENTS IN SECTION 2.4.

POLLUTANT-GENERATING ACTIVITIES:

1. STORMWATER DISCHARGE FOR THE SITE DOES NOT REACH "WATERS OF THE STATE". POLLUTANT-GENERATING ACTIVITIES FOR THE

SITE INCLUDE CLEARING, GRUBBING, STRIPPING, EXCAVATION, BACKFILL, COMPACTION, ASPHALT PAVEMENT AND ASPHALT PAINTING.

STORAGE OF POLLUTANTS AND FUELING AND MAINTENANCE OF EQUIPMENT SHALL OCCUR IN CONTRACTORS STAGING AREA.

SCALE: N.T.S.

SILT FENCE 1

EC-6

TOP VIEW

NOTES:

FRONT VIEW SIDE VIEW

1. BURY BOTTOM OF FILTER FABRIC 6"

MIN. VERTICALLY BELOW GRADE.

2. 2" x 2" FIR, PINE, OR STEEL FENCE

POSTS.

3. STITCHED LOOPS TO BE INSTALLED

UPHILL SIDE OF SLOPE.

4. COMPACT NATIVE FILL IN ALL AREAS

OF FILTER FABRIC TRENCH.

6"

8 FT MAXIMUM

ANGLE BOTH ENDS OF SEDIMENT FENCE

TO ASSURE SOIL IS TRAPPED.

INTERLOCKED

2" x 2" POSTS

AND ATTACH.

EC-6

BIOFILTER INLET PROTECTION

SCALE: N.T.S.

TYPICAL BIOFILTER BAGS.

PLACE AT INLETS AND

CULVERT ENTRANCES.

EC-6

EROSION CONTROL SITE SPECIFIC NOTES AND DETAILS

SCALES ACCORDINGLY.

THIS SHEET, ADJUST

IF NOT ONE INCH ON

0" 1"

ORIGINAL DRAWING.

BAR IS ONE INCH ON

VERIFY SCALES

APPRBYNO. DATE REVISIONS

SHEET NO.

DRAWING NO.

DATE:

JUNE 2023

OREGON DEPARTMENT OF AVIATION

CAPE BLANCO STATE AIRPORT

RUNWAY AND ELECTRICAL REHABILITATION PROJECT

PROJECT NO: SCALE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

Y:

\P ro je ct s\

O re go n

D ep ar tm en t o f A vi at io n\

- C ap e Bl an co

R un w ay a nd

E le ct ric al D es ig n\ C

AD

W O

R

KI

N G

\G -5

G

-9

ER

O

SI

O

N C

O N

TR

O

L.

dw g

AS NOTED40097.115.01

CENTURY

WEST

E N G I N E E R I N G

PORTLAND OFFICE

5500 MEADOWS ROAD

SUITE #250

LAKE OSWEGO, OR 97035

503.419.2130 OFFICE

JAK

RHH/JDN

PJM

FOR BIDDING PURPOSES ONLY

77595PE

OREGON

EXPIRES: 12/31/2024

FLOW

FLOW

GRATE#5 REBAR #5 REBAR

SEWN 6"

OVERLAP

#5 REBAR

SEWN 6"

OVERLAP

FILTERED

WATER

NOTES:

1. INSTALL PREFABRICATED FILTER INSERT - TYPE 3 PER ODOT STANDARD

DRAWING RD1010.

2. INSTALLATION, MAINTENANCE, AND REMOVAL OF SEDIMENT SHALL BE

INCIDENTAL TO "TEMPORARY EROSION AND POLLUTION CONTROL." NO

SEPARATE MEASUREMENT OR PAYMENT SHALL BE MADE.

EC-6

PREFABRICATED FILTER

INSERT - TYPE 3 DETAIL

SCALE: N.T.S.

CONTRACTOR TO PROTECT CONSTRUCTION AREA AND

PROVIDE NOXIOUS WEED CONTROL AS NECESSARY

NARRATIVE:

PART I

1. PERMIT REGISTRATION INFORMATION

1.1. DATE: JANUARY 2023

1.2. PROJECT NAME: CAPE BLANCO STATE AIRPORT RUNWAY AND

ELECTRICAL REHABILITATION

1.3. COMPANY NAME: OREGON DEPARTMENT OF AVIATION

1.4. EMAIL: ANTHONY.BEACH@ODAV.OREGON.GOV

1.5. PREPARED BY: SEE TITLE BLOCK INFORMATION

2. OREGON PROFESSIONAL CERTIFICATION INFORMATION

2.1. THIS PROJECT DOES COVER MORE THAN 20 ACRES.

2.2. THIS PROJECT DOES NOT REQUIRE ENGINEERED FACILITIES.

2.3. THE ESCP HAS BEEN PREPARED AND STAMPED BY AN OREGON

REGISTERED PROFESSIONAL ENGINEER,

JAMES KIRBY, PE

5500 MEADOWS ROAD, SUITE 250, LAKE OSWEGO, OR 97035

503-419-2130, JKIRBY@CENTURYWEST.COM

3. INSPECTOR QUALIFICATION INFORMATION

3.1. MARK HAGEDORN, PE (CESCL #CWTA-71811285, EXP. 4/6/25)

1020 SW EMKAY DRIVE, SUITE 100, BEND, OR 97702

541-322-8962, MHAGEDORN@CENTURYWEST.COM

4. NARRATIVE SITE DESCRIPTION

4.1. THE CAPE BLANCO STATE AIRPORT RUNWAY RECONSTRUCTION

PROJECT WILL RECONSTRUCT 75' WIDE CENTER OF THE AIRPORT'S

RUNWAY. IN GENERAL, EXISTING PAVEMENTS HAVE COMPLETELY

DETERIORATED AND THIS PROJECT WILL FULLY RECONSTRUCT THE

PAVEMENT SECTION OVER THE EXISTING FOOTPRINT.

4.2. NEW PAVEMENT SECTIONS WILL CONSIST OF ASPHALT AND

AGGREGATE IMPORTED FROM LOCAL QUARRIES. ONSITE SOILS WILL

BE UTILIZED FOR EARTH FILL. GEOTECHNICAL REPORT DESCRIBES

SOILS AS VARIABLE COMBINATIONS OF SAND AND SILT ACROSS SITE.

NRCS ASSIGNS THESE SOILS A MODERATE ERODIBILITY FACTOR (K)

OF 0.37.

5. TMDL AND 303(D) LISTING

5.1. NEAREST WATERBODY DOES NOT HAVE TMDL OR 303(d)

REQUIREMENTS.

6. NATURAL BUFFER ZONE

6.1. NO WATERS OF THE STATE EXIST WITHIN THE PROJECT SITE OR

WITHIN 50 FEET OF THE SITE.

7. ENGINEERED SOILS

7.1. ENGINEERED SOILS ARE NOT USED ON SITE.

SPILL PROCEDURES:

1. IF MEDICAL EMERGENCY AND/OR ADDITIONAL ASSISTANCE IS REQUIRED,

CALL 911.

2. AVOID CONTACT AND MOVE AWAY OR UPWIND FORM THE SPILL IF UNSURE

IF SAFE.

3. KEEP NON-EMERGENCY INDIVIDUALS OUT OF AREA.

4. CONTROL AND CONTAIN THE SPILL.

5. CLEAN UP WHAT YOU CAN.

6. REPORT THE SPILL TO OREGON EMERGENCY RESPONSE SYSTEM

(1-800-452-0311) IF:

6.1. OIL REACHES A WATER OF THE STATE

6.2. LAND OIL SPILLS GREATER THAN 42 GALLONS

6.3. REPORTABLE QUANTITIES AND HAZARDOUS MATERIALS PER 40 CFR

PART 302.

7. APPROPRIATELY DISPOSE OF CLEANUP MATERIALS.

8. REFER TO EPA'S EMERGENCY RESPONSE WEBSITE TO DETERMINE IF

REPORTABLE AND CALL 1-800-424-8802 IF REQUIRED.

9. CONTINUE LONG TERM CLEANUP.

10. COMPLETE AND SUBMIT SPILL RELEASE REPORT FORM WITH OREGON DEQ.

FERTILIZER APPLICATION AND STORAGE :

1. FERTILIZER IS INCLUDED IN HYDROSEED MIXTURE. FERTILIZER

SHALL NOT BE STORED ONSITE.

2. FERTILIZER SHALL BE APPLIED PER MANUFACTURERS

RECOMMENDED APPLICATION RATE.

3. APPLY FERTILIZER DURING TIME OF YEAR TO MAXIMIZE

VEGETATIVE UPTAKE AND GROWTH.

4. AVOID APPLICATION BEFORE HEAVY RAINS.

5. DO NOT APPLY TO FROZEN GROUND AND/OR STORMWATER

CHANNELS.

6. COMPLY WITH LOCAL, STATE, AND FEDERAL FERTILIZER LAWS .

SITE INFORMATION

AREA TYPE SIZE (AC)

TOTAL PROPERTY 162

TOTAL DISTURBED 10.81

TOTAL DISTURBED

IMPERVIOUS 9.94

TOTAL DISTURBED

PERVIOUS 0.87

SEEDING INFORMATION

SEED PLS

(LBS/AC)

FINE FESCUE 26.7

PERENNIAL

RYEGRASS 4.8

KENTUCKY

BLUEGRASS 1.7

COLONIAL

BENTGRASS 3.15

CHECKLIST OF REQUIRED ELEMENTS:

PART III

THE FOLLOWING LIST ADDRESSES CHECKLIST ITEMS THAT ARE NOT

OTHERWISE DESCRIBED IN THESE PLANS AND NOTES.

1. GIVEN THE DEPTH OF GROUNDWATER FROM THE PROJECT

GEOTECHNICAL REPORT, DEWATERING SHOULD NOT BE NECESSARY.

2. THE FOLLOWING ITEMS DO NOT EXIST AND ARE NOT PROPOSED FOR

THE SITE:

2.1. SEPTIC DRAIN FIELDS

2.2. DRY WELLS

2.3. DRINKING WATER WELLS

2.4. PLANTERS

ANTICIPATED SCHEDULE AND BMPS:

PART II

1. ANTICIPATED SCHEDULE

1.1. ANTICIPATED START DATE FOR WORK IS MAY 2024.

1.2. ANTICIPATED END DATE FOR WORK IS AUGUST 2024; NO TEMPORARY

STOP DATES ARE ANTICIPATED.

1.3. FINAL STABILIZATION AND REMOVAL OF TEMPORARY STORMWATER

CONTROLS IS ANTICIPATED TO OCCUR IN AUGUST 2024.

2. ANCIPATED BMP SCEDULE

2.1. CONSTRUCTION ENTRANCE: MAY - AUGUST 2024

2.2. INLET PROTECTION: MAY - AUGUST 2024

2.3. SEDIMENT BARRIERS: MAY - AUGUST 2024

2.4. HYROSEEDING: JULY - AUGUST 2024

RAIN GAUGE:

1. THE REFERENCE RAIN GAUGE FOR THE PROJECT SHALL

BE DW5081 PORT ORFORD.

MATCH EXISTING GRADE

100'

B

B

AC

C

ES

S R

O

AD

' R

M

IN

20' MIN.

8" MIN, UNLESS OTHERWISE

SPECIFIED BY SOILS ENGINEER.

ORIGINAL GRADE

4" - 1" OPEN GRADED

AGGREGATE

FILTER FABRIC

PLAN

N.T.S.

SECTION B-B

N.T.S.

NOTES:

1. INSTALL CONSTRUCTION ENTRANCE PER ODOT

STANDARD DRAWING RD1000 OR OTHER

APPROVED EQUAL FROM ODOT STANDARD

DRAWINGS OR OREGON DEQ BEST

MANAGEMENT PRACTICES MANUAL.

2. INSTALLATION, MAINTENANCE, AND REMOVAL

OF CONSTRUCTION ENTRANCE SHALL BE

INCIDENTAL TO "EROSION CONTROL." NO

SEPARATE MEASUREMENT OR PAYMENT SHALL

BE MADE.

EC-6

CONSTRUCTION

ENTRANCE DETAIL

SCALE: N.T.S.

UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP

UGP

UGP

UGP

UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP

0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00ST

AR

T:

+0 0.

ST

A:

+5

8.

O

FF

: 1

.0 0'

L

ST

A:

+5

8.

O

FF

: 1

.0 0'

L

C-1

DEMOLITION PLAN

SCALE: 1"=50'

STA 0+00 TO STA 12+50

C-1

DEMOLITION PLAN - RW 14-32 STA 0+00 TO STA 12+50

SCALES ACCORDINGLY.

THIS SHEET, ADJUST

IF NOT ONE INCH ON

0" 1"

ORIGINAL DRAWING.

BAR IS ONE INCH ON

VERIFY SCALES

APPRBYNO. DATE REVISIONS

SHEET NO.

DRAWING NO.

DATE:

JUNE 2023

OREGON DEPARTMENT OF AVIATION

CAPE BLANCO STATE AIRPORT

RUNWAY AND ELECTRICAL REHABILITATION PROJECT

PROJECT NO: SCALE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

Y:

\P ro je ct s\

O re go n

D ep ar tm en t o f A vi at io n\

- C ap e Bl an co

R un w ay a nd

E le ct ric al D es ig n\ C

AD

W O

R

KI

N G

\C -1

C

-4

D

EM

O P

LA

N

S.

dw g

AS NOTED40097.115.01

CENTURY

WEST

E N G I N E E R I N G

PORTLAND OFFICE

5500 MEADOWS ROAD

SUITE #250

LAKE OSWEGO, OR 97035

503.419.2130 OFFICE

JAK

RHH/JDN

PJM

FOR BIDDING PURPOSES ONLY

77595PE

OREGON

EXPIRES: 12/31/2024

M

AT

C H

LI

N

E

ST

A

+5 0, S

EE

S H

EE

T

C -2

RUNWAY 14-32

50 50 100

SCALE OF FEET

SCALE: 1"=50'

LEGEND:

PROPOSED PAVEMENT EDGE

PAVEMENT REMOVAL

PAVEMENT MARKING REMOVAL

SAWCUT LINE

EXISTING PAVEMENT EDGE

EXISTING ELECTRICAL CONDUIT

EXISTING RUNWAY EDGE LIGHT

DEMOLITION KEYED NOTES:

REMOVE AND DISPOSE OF THE LIGHT FIXTURE AND THE

CONTENTS WITHIN THE CAN, THEN FILL EXISTING CAN WITH

CONCRETE. FINISH FLUSH WITH EXISTING CONCRETE PAD

(P-101-5.3).

ABANDON WIRING AND CONDUIT IN PLACE

EXISTING TREES WITHIN AREA FOR PAPI ELECTRICAL

EQUIPMENT TO BE CUT AT GROUND LEVEL. TREES TRUNKS

TO BE REMOVED AND DISPOSED OFF-SITE. STUMPS WITHIN

PAPI CONCRETE PAD TO BE GRUBBED, OUTSIDE PAD AREA

TO REMAIN IN PLACE (P-151). SEE SHEET E-10 FOR PAPI

CONSTRUCTION.

REMOVE EXISTING PAVEMENT. REMOVE EXISTING BASE

ROCK NECESSARY FOR RUNWAY PAVEMENT

RECONSTRUCTION (P-101-5.1). SEE TYPICAL SECTIONS ON

SHEETS C-18 & C-19

EXISTING FALLEN TREE TRUNKS TO BE REMOVED AND

DISPOSED OFF-SITE (P-151). AREA TO BE GRADED LEVEL,

INCIDENTAL TO P-151.

2 1 2 1 2 1 2 1 2 1 2 1

12 12 12

12 12

3 3

200'

13'

300'

759'

212.5'

SAWCUT EXISTING PAVEMENT FOR REMOVAL (P-101-5.1).

PROTECT EXISTING ASPHALT PAVEMENT THROUGHOUT

CONSTRUCTION.

SAWCUT EXISTING PAVEMENT FOR REMOVAL TO INSTALL

ELECTRICAL SYSTEM, 3 FT WIDE (P-101-5.1). RUNWAY EDGE

LIGHTING SYSTEM AND REILS TO BE INSTALLED IF ADDITIVE

ALTERNATE 1 IS AWARDED.

SAWCUT EXISTING PAVEMENT FOR REMOVAL TO INSTALL

ELECTRICAL SYSTEM, 3 FT WIDE (P-101-5.1). PAPI SYSTEM

ELECTRICAL SYSTEM TO BE INSTALLED IF ADDITIVE

ALTERNATE 2 IS AWARDED.

EXISTING BRUSH AND VEGETATION WITHIN AREA FOR PAPI

ELECTRICAL EQUIPMENT TO BE CUT AT GROUND LEVEL.

BRUSH AND VEGETATION TO BE REMOVED AND DISPOSED

OFF-SITE. BRUSH AND VEGETATION WITHIN PAPI CONCRETE

PAD TO BE GRUBBED, OUTSIDE PAD AREA TO REMAIN IN

PLACE (P-151). SEE SHEET E-10 FOR PAPI CONSTRUCTION.

6 6

37.5'

37.5'

37.5'

37.5'

8 8

88 9

37'

EXISTING BRUSH AND VEGETATION TO BE REMOVED AND

DISPOSED OFF-SITE (P-151). AREA TO BE GRADED LEVEL,

INCIDENTAL TO P-151.

101111

EXISTING TREE REMOVAL

AREA OF FALLEN TREES

TO BE CLEARED

BRUSH & VEGETATION REMOVAL

FOR PAPI

BRUSH & VEGETATION REMOVAL

UGP

UGP

UGP

UGPUGPUGPUGPUGPUGPUGPUGP

UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP

UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP

UGP

13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00

ST

A:

5+

.9

O

FF

: 7

5.

' L

ST

A:

8+

.2

O

FF

: 7

5.

' L

UGPUGP

OH POH POH P

UGP

X

XXXXX

C-2

DEMOLITION PLAN - RW 14-32 STA 12+50 TO STA 26+00

SCALES ACCORDINGLY.

THIS SHEET, ADJUST

IF NOT ONE INCH ON

0" 1"

ORIGINAL DRAWING.

BAR IS ONE INCH ON

VERIFY SCALES

APPRBYNO. DATE REVISIONS

SHEET NO.

DRAWING NO.

DATE:

JUNE 2023

OREGON DEPARTMENT OF AVIATION

CAPE BLANCO STATE AIRPORT

RUNWAY AND ELECTRICAL REHABILITATION PROJECT

PROJECT NO: SCALE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

Y:

\P ro je ct s\

O re go n

D ep ar tm en t o f A vi at io n\

- C ap e Bl an co

R un w ay a nd

E le ct ric al D es ig n\ C

AD

W O

R

KI

N G

\C -1

C

-4

D

EM

O P

LA

N

S.

dw g

AS NOTED40097.115.01

CENTURY

WEST

E N G I N E E R I N G

PORTLAND OFFICE

5500 MEADOWS ROAD

SUITE #250

LAKE OSWEGO, OR 97035

503.419.2130 OFFICE

JAK

RHH/JDN

PJM

FOR BIDDING PURPOSES ONLY

77595PE

OREGON

EXPIRES: 12/31/2024

M

AT

C H

LI

N

E

ST

A

+5 0, S

EE

S H

EE

T

C -1

MATCHLINE 1, SEE LEFT

MATCHLINE 1, SEE RIGHT

M

AT

C H

LI

N

E

ST

A

+0 0, S

EE

S H

EE

T

C -3

RUNWAY 14-32

50 50 100

SCALE OF FEET

SCALE: 1"=50'

C-2

DEMOLITION PLAN

SCALE: 1"=50'

STA 12+50 TO STA 26+00

21 1 12 12 12 12 2

1 2 1 1 1 12 2 2 2

TAXIWAY B

TAXIWAY B

EXISTING FENCE

PER AERIAL

DEMOLITION KEYED NOTES:

REMOVE AND DISPOSE OF THE LIGHT FIXTURE AND THE

CONTENTS WITHIN THE CAN, THEN FILL EXISTING CAN WITH

CONCRETE. FINISH FLUSH WITH EXISTING CONCRETE PAD

(P-101-5.3).

ABANDON WIRING AND CONDUIT IN PLACE

SAWCUT AND PAVEMENT REMOVAL FOR CONCRETE

ENCASED ELECTRICAL DUCT (P-101-5.1).

REMOVE EXISTING TREES WITHIN AREA FOR BEACON AND

ELECTRICAL BUILDING. TREES AND ROOTS TO BE REMOVED

AND DISPOSED OFF-SITE FOR BEACON TOWER AND

BUILDING (P-151). SEE SHEET E-15 FOR BEACON AND

ELECTRICAL BUILDING CONSTRUCTION.

REMOVE EXISTING SEGMENTED CIRCLE (PAINTED TIRES)

AND DISPOSE OFF-SITE (INCIDENTAL TO L-107-5.2).

REMOVE EXISTING WINDCONE (INCIDENTAL TO L-107-5.1).

SEE SHEET E-19 FOR WIND CONE CONSTRUCTION.

REMOVE EXISTING PAVEMENT. REMOVE EXISTING BASE

ROCK NECESSARY FOR RUNWAY PAVEMENT

RECONSTRUCTION (P-101-5.1). SEE TYPICAL SECTIONS ON

SHEETS C-18 & C-19

PAVEMENT MARKING REMOVAL PER P-620-5.1

SAWCUT EXISTING PAVEMENT FOR REMOVAL (P-101-5.1).

PROTECT EXISTING ASPHALT PAVEMENT THROUGHOUT

CONSTRUCTION.

SAWCUT EXISTING PAVEMENT FOR REMOVAL TO INSTALL

ELECTRICAL SYSTEM, 3 FT WIDE (P-101-5.1). RUNWAY EDGE

LIGHTING SYSTEM AND REILS TO BE INSTALLED IF ADDITIVE

ALTERNATE 1 IS AWARDED.

TYP

5TYP

LEGEND:

PROPOSED PAVEMENT EDGE

PAVEMENT REMOVAL

PAVEMENT MARKING REMOVAL

SAWCUT LINE

EXISTING PAVEMENT EDGE

EXISTING TREE REMOVAL

EXISTING ELECTRICAL CONDUIT

EXISTING RUNWAY EDGE LIGHT

AIRPORT GATE

9 1

37.5'

37.5'

9 10

11 11

UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP

UGPUGPUGPUGPUGPUGPUGP

UGP

UGP

UGPUGP

UGP

UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGP

CB CB

CBCB

SD

SD

SD

SDSD SD

SD

26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00 38+00

ST

A:

2+

.9

O

FF

: 7 5.

' L

ST

A:

5+

.8

O

FF

: 7

5.

' L C-3

DEMOLITION PLAN - RW 14-32 STA 26+00 TO STA 38+50

SCALES ACCORDINGLY.

THIS SHEET, ADJUST

IF NOT ONE INCH ON

0" 1"

ORIGINAL DRAWING.

BAR IS ONE INCH ON

VERIFY SCALES

APPRBYNO. DATE REVISIONS

SHEET NO.

DRAWING NO.

DATE:

JUNE 2023

OREGON DEPARTMENT OF AVIATION

CAPE BLANCO STATE AIRPORT

RUNWAY AND ELECTRICAL REHABILITATION PROJECT

PROJECT NO: SCALE:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

Y:

\P ro je ct s\

O re go n

D ep ar tm en t o f A vi at io n\

- C ap e Bl an co

R un w ay a nd

E le ct ric al D es ig n\ C

AD

W O

R

KI

N G

\C -1

C

-4

D

EM

O P

LA

N

S.

dw g

AS NOTED40097.115.01

CENTURY

WEST

E N G I N E E R I N G

PORTLAND OFFICE

5500 MEADOWS ROAD

SUITE #250

LAKE OSWEGO, OR 97035

503.419.2130 OFFICE

JAK

RHH/JDN

PJM

FOR BIDDING PURPOSES ONLY

77595PE

OREGON

EXPIRES: 12/31/2024

M

AT

C H

LI

N

E

ST

A

+0 0, S

EE

S H

EE

T

C -2

M

AT

C H

LI

N

E

ST

A

+5 0, S

EE

S H

EE

T

C -4

RUNWAY 14-32

50 50 100

SCALE OF FEET

SCALE: 1"=50'

C-3

DEMOLITION PLAN

SCALE: 1"=50'

STA 26+00 TO STA 38+50

1 2

1 2

1 2

1 2

1 2

1 2

1 2

1 2 1 2

2 1 2

TAXIWAY A

4 4

4 4

DEMOLITION KEYED NOTES:

REMOVE AND DISPOSE OF THE LIGHT FIXTURE AND THE

CONTENTS WITHIN THE CAN, THEN FILL EXISTING CAN WITH

CONCRETE. FINISH FLUSH WITH EXISTING CONCRETE PAD

(P-101-5.3).

ABANDON WIRING AND CONDUIT IN PLACE

SAWCUT AND PAVEMENT REMOVAL FOR CONCRETE

ENCASEMENT ELECTRICAL DUCT (P-101-5.1).

PROTECT EXISTING CATCH BASIN AND STORM LINE

THROUGH OUT CONSTRUCTION

REMOVE EXISTING PAVEMENT. REMOVE EXISTING BASE

ROCK NECESSARY FOR RUNWAY PAVEMENT

RECONSTRUCTION (P-101-5.1). SEE TYPICAL SECTIONS ON

SHEETS C-18 & C-19

PAVEMENT MARKING REMOVAL PER P-620-5.1

SAWCUT EXISTING PAVEMENT FOR REMOVAL (P-101-5.1).

PROTECT EXISTING ASPHALT PAVEMENT THROUGHOUT

CONSTRUCTION.

SAWCUT EXISTING PAVEMENT FOR REMOVAL TO INSTALL

ELECTRICAL SYSTEM, 3 FT WIDE (P-101-5.1). RUNWAY EDGE

LIGHTING SYSTEM AND REILS TO BE INSTALLED IF ADDITIVE

ALTERNATE 1 IS AWARDED.

LEGEND:

PROPOSED PAVEMENT EDGE

PAVEMENT REMOVAL

PAVEMENT MARKING REMOVAL

SAWCUT LINE

EXISTING PAVEMENT EDGE

EXISTING TREE REMOVAL

EXISTING ELECTRICAL CONDUIT

EXISTING RUNWAY EDGE LIGHT

37.5'

37.5'

7 8

37.5'

37.5'

7 8

UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .