ATT A - Special Provisions and Specifications_MP352.6~2.pdf
PDF 209 KB Posted
- Attached to
- US101 MP352. 6 - Lone Ranch Slide
- Solicitation number
- S-73000-00016164
- Issued by
- Crook County, Oregon
About this file
This is a Special Provisions and Specifications document prepared by the Oregon Department of Transportation (ODOT) for a construction contract involving landslide repair and roadwork improvements on US Highway 101 at milepost 352.6 near Lone Ranch in Coos County, Oregon. The scope of work includes temporary traffic control, erosion control installation and maintenance, removal and reconstruction of existing rock inlay, excavation and disposal of landslide material and native soil, furnishing and placement of stone embankment material, installation of a subsurface drain system with an 8-inch drain pipe replacement, installation of drainage geotextile, and modification of roadway drainage as directed. The project is managed by Jessica Spann at the ODOT Coquille office and incorporates the 2024 Oregon Standard Specifications for Construction with specific modifications detailed throughout the document. Traffic lane closures are permitted at all times on US 101, and contractors must submit either an Agency Traffic Control Plan or a Contractor-Modified Traffic Control Plan at least 5 calendar days before the preconstruction conference, along with documentation of any existing tourist-oriented directional signs and business logo signs within project limits.
The contract specifications require contractors to comply with extensive environmental protection requirements, including NPDES permit compliance where applicable, erosion and sediment control measures, water quality standards, and migratory bird protection protocols that prohibit vegetation clearing and nesting habitat disturbance between March 1 and September 1 without written approval. Payment terms include lump sum compensation for general excavation, measurement by ton for stone embankment materials, and no separate payment for removal of structures, clearing and grubbing, and other incidental work. The document mandates that contractors repair or replace any temporary traffic control devices found in marginal or unacceptable condition at no additional cost to ODOT, maintain access to bus stops and pedestrian-accessible routes, and implement containment measures to prevent pollutants from entering state and U.S. waters. An Inadvertent Discovery Plan has been developed for the project and is available from the Engineer, and contractors must notify the Engineer in writing a minimum of 10 calendar days before starting any activities that could harm nesting birds.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00016164 Bid Results.xlsx | XLSX spreadsheet | |
| ATT B - Plans_MP352.6~1.pdf | ||
| ATT C Bid Pricing Form_~4.xlsx | XLSX spreadsheet | |
| 00016164 Invitation to Bid.docx | DOCX document | |
| Existing Utility line additional Information.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHEMENT A
SPECIAL PROVISONS & SPECIFICATIONS FOR
US101: MP 352.6 – Lone Ranch Slide Repair
SCOPE
The work to be completed under this Contract is located along the Oregon Pacific Coast Highway (US101) in Coos County, OR, at MP352.6. All work under this project consists of supplying the materials, equipment, labor and incidentals required to perform the following tasks as described in the Contract plans and specifications:
1. Provide temporary work zone traffic control, complete.
2. Install and maintain erosion control.
3. Remove and reconstruct exiting rock inlay.
4. Excavate and dispose of landslide, native soil behind existing rock inlay.
5. Furnish and place stone embankment material.
o Rock particles smaller than 2’ may be salvaged and incorporated into additional SEM of the appropriate gradation.
6. Subsurface drain system.
o Remove and replace the 8 Inch drain pipe.
o Furnish and install granular drain backfill material.
o Furnish and install drainage geotextile, type 2.
o Modify roadway drainage as directed in the field.
7. Perform additional and incidental work as detailed in the Contract plans and specifications and as directed.
PROJECT INFORMATION
General information pertaining to this project may be obtained from the following:
Jessica Spann, Project Manager 307 Highway 42 Coquille, OR Phone: (541) 315-5999 Email: Jessica.SPANN@ODOT.Oregon.gov
APPLICABLE STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS
2024 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION: The 2024 Oregon Standard Specifications for Construction (Standard Specifications) include detailed technical specifications in Parts 00200 through 03000 inclusive (Technical Specifications) that apply to this ITB and the resulting Contract. Some sections of the Technical Specifications are identified and modified herein, Specifications. Sections of the Technical Specifications not modified remain applicable to the Contract according to their original terms. Unless they are identified herein, Specifications, sections of the Standard Specifications in Part 00100 (General Conditions) are not applicable to this Contract. Bidders can also access this information at the following Internet address:
https://www.oregon.gov/ODOT/Business/Pages/Standard_Specifications.aspx
Silence of Specifications: The apparent silence of the specifications as to any detail, or the apparent omission of a detailed description concerning any point, shall be regarded as meaning that the highest value commercial practices are to prevail and that only materials and workmanship of first quality are to be used.
SECTION 00210 – MOBILIZATION
Comply with Section 00210 of the Standard Specifications.
SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC
Comply with Section 00220 of the Standard Specifications modified as follows:
00220.01(b) Abbreviations – Delete this subsection.
00220.02(a) General Requirements - Add the following bullets to the end of the bullet list:
• When an abrupt edge is created by excavation, protect traffic according to the "Excavation Abrupt Edge" and the "Typical Abrupt Edge Delineation" configurations shown on the Standard Drawings.
00220.02(b) Temporary Pedestrian Accessible Route Plan – Add the following bullet(s) to the end of the bullet list:
• Maintain access to bus stops and Pedestrian Accessible Routes.
00220.40(e)(1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following:
Traffic Lanes may be closed on the Oregon Coast Highway (US 101) when allowed, shown, or directed during the following periods of time except as specified in 00220.40(e)(2):
Single Lane Closures - One Traffic Lane on the Oregon Coast Highway (US101) may be closed during the following times: at all times.
SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL
Comply with Section 00221 of the Standard Specifications modified as follows:
00221.06 Traffic Control Plan - Replace this subsection with the following subsection:
00221.06 Traffic Control Plan and Tourist-Oriented Directional and Business Logo Signs –
(a) Traffic Control Plan - Submit one of the following, 5 Calendar Days before the preconstruction conference:
(1) Agency Traffic Control Plan - If the Contractor intends to use the Agency TCP without modification, a written notification indicating that the Agency TCP will be used without modification.
(2) Contractor-Modified Traffic Control Plan - The Contractor may request to use a Contractor-modified Agency TCP, or a TCP developed by the Contractor. Do not use a modified TCP, or a TCP developed by the Contractor, unless approved by the Engineer.
Use the Agency TCP unless a modified TCP, or a TCP developed by the Contractor is accepted.
The Engineer is not obligated to consider any modified Agency TCP or a TCP developed by the Contractor. The Agency will not be liable to the Contractor for failure to accept or act upon any request for a modified Agency TCP or a TCP developed by the Contractor.
To conserve time and funds, the Contractor may first submit a written request for a preliminary review by the Engineer. The request should contain a description of the proposal together with a rough estimate of anticipated dollar and time impacts. The Engineer will, within a reasonable time, respond to the Contractor in writing whether or not the request would be considered by the Agency.
If requesting a Contractor-modified Agency TCP, or a TCP developed by the Contractor, at a minimum the request shall meet all requirements of the Contract documents and comply with the Project transportation management plan (TMP). Provide the following information:
• Stamped Working Drawings according to 00150.35 that include the proposed TCP showing all TCM and quantities of TCD.
• A TPAR plan that includes:
• Details and features used to provide pedestrian accessibility.
• Pedestrian staging Plans at a scale no smaller than 1 inch = 50 feet.
• Temporary alternate facilities or detour routes for pedestrian traffic.
• Staging sequences and details for Work affecting vehicular, pedestrian, and bicycle traffic.
• Proposed order and duration of the TCM.
• A detailed temporary striping plan.
If the Contractor’s request to use a Contractor-modified Agency TCP, or a TCP developed by the Contractor is approved in whole or in part, acceptance will be made by a Change Order.
The Engineer will establish prices that represent a fair measure of the value of Work to be added, changed, or deleted as a result of any accepted modifications to the Agency TCP or an accepted TCP developed by the Contractor.
Once a TCP has been accepted by the Engineer, any additional modifications must be submitted by the Contractor for Agency review following the procedure described above.
The Engineer is not obligated to consider additional modifications to a previously approved TCP.
(b) Tourist-Oriented Directional and Business Logo Signs - Submit one of the following for approval, at least 5 Calendar Days before the preconstruction conference:
(1) No Signs - If there are no tourist-oriented directional (TOD) or business logo signs on the Project, a written notification that no TOD or business logo signs exist within the Project limits or
(2) Signs - Submit one copy of a sketch map of the Project showing all existing TOD and business logo signs and a written narrative describing how these signs will be kept in service and protected throughout all the construction stages. If modifications are necessary, submit updated information to the Engineer for approval at least 21 Calendar Days before the change is needed.
00221.60 Temporary Traffic Control Devices – Replace the paragraph that begins “TCD delivered to the Project Site found…” with the following paragraph:
Repair or replace TCD delivered to the Project Site found to be in “marginal” or “unacceptable” condition, at no additional cost to the Agency.
00221.90(b) Temporary Protection and Direction of Traffic – Replace the bullet that begins “Providing, Surfacing, maintain…” with the following bullet:
• Providing, surfacing, maintaining, removing, and restoring the TPAR.
SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS
Comply with Section 00222 of the Standard Specifications.
SECTION 00223 - WORK ZONE TRAFFIC CONTROL LABOR AND VEHICLES
Comply with Section 00223 of the Standard Specifications.
SECTION 00224 – TEMPORARY TRAFFIC CHANNELIZING DEVICES
Comply with Section 00224 of the Standard Specifications.
SECTION 00280 - EROSION AND SEDIMENT CONTROL
Comply with Section 00280 of the Standard Specifications modified as follows:
00280.00 Scope - Replace the paragraph that begins "This Work also consists of providing temporary …" with the following paragraphs and bullets:
This Work also consists of providing temporary erosion and sediment control (ESC) measures and furnishing, installing, moving, operating, maintaining, inspecting, and removing ESC throughout the Project area according to the Standard Drawings, the erosion and sediment control plan (ESCP), the Specifications, or as directed, until the site is permanently stabilized. Included also is the monitoring of weather, of stormwater and receiving waters, the reporting of monitoring observations, the reporting of corrective actions (when necessary) and the updates and revisions of the ESCP, including ESCP cover sheet, necessary to keep it representative of current site conditions and compliant with the NPDES 1200-CA, 1200-CN, OR 1200-C permit if applicable.
Conditions requiring NPDES 1200 permits are as follows:
• Projects with one acre of ground disturbance or more on Agency owned land are regulated under the Agency’s 1200-CA permit.
• When Project Work on Agency owned land disturbs less than one acre, but ground disturbances on non-Agency owned lands combined with Project ground disturbances on Agency owned land total one acre or more the Agency Project Work will be regulated by the Agency’s 1200-CA permit. The Contractor is responsible for acquiring the 1200-C permit for all areas of disturbance on non-Agency owned land.
When the combined areas of disturbance of all Project related activities is less than one acre, no NPDES 1200 permit coverage is required.
Delete the paragraph that begins “When contaminants, pollutants or hazardous materials…”.
Add the following paragraph to the end of this subsection:
The Agency’s NPDES 1200-CA permit is not applicable to this Project. Comply with all applicable conditions of this Section.
00280.02 Definitions - Delete the definition Wet Season Work
00280.04 Erosion and Sediment Control Plan on Agency Controlled Lands - Replace the bullet that begins “Information required under 1200-CA…” with the following bullet:
• Information required under 1200-CA permit, if applicable.
00280.06 Erosion and Sediment Control Manager - Delete this subsection.
00280.14(a) Plastic Sheeting - Replace the bullet that begins “Plastic Sheeting - Minimum 6-mil thick…” with the following bullet:
• Plastic Sheeting - Minimum 6-mil thick polyethylene plastic sheeting or plastic sheeting that meets or exceeds the performance properties outlined in ASTM D4397.
SECTION 00290 - ENVIRONMENTAL PROTECTION
Comply with Section 00290 of the Standard Specifications modified as follows:
Add the following subsection:
00290.30(a)(7) Water Quality:
• Do not discharge water contaminated by pollutants including sediment, drilling fluids and waste, concrete, grout, or water contained within a work area isolation, into any waters of the State or U.S. or conveyances draining thereto until it has been treated using Materials such as those listed in 00280.15 or 00280.16 or by pumping to a vegetated upland location.
Do not allow Project discharges to increase the concentration of any pollutant in the receiving water to a level that exceeds the limits prescribed by OAR 340-041.
• Do not use permanent stormwater quality treatment facilities to treat construction runoff unless prescribed by an ESCP approved under Section 00280.
• If construction discharge water is released using an outfall or diffuser port, do not exceed velocities more than 4 feet per second, and do not exceed an aperture size of 1 inch.
• Implement containment measures adequate to prevent pollutants from entering waters of the State or U.S. Such pollutants include but are not limited to construction and demolition materials, waste spoils, fuel or petroleum products, detergents, silt, welding slag and grindings, concrete sawcutting by-products and sandblasting abrasives.
00290.36(a) Migratory Birds - Add the following to the end of this subsection:
Do not disturb migratory bird nesting habitat (shrubs, trees, and structures), or clear vegetation from March 1 to September 1 of each year without prior written approval from the Engineer. Notify the Engineer, in writing, a minimum of 10 Calendar Days prior to starting activities that could harm nesting birds.
00290.51 Protection of Sensitive Cultural Sites - Add the following to the end of this subsection:
An Inadvertent Discovery Plan (IDP) has been developed for this project. The IDP is available from the Engineer.
SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Comply with Section 00310 of the Standard Specifications and modified as follows:
Measurement
00310.80 Measurement - No separate measurement will be made for removal of structures and obstructions.
Payment
00310.90 Payment – No separate or additional payment will be made. This work is considered incidental to performing the work under Section 00330.
SECTION 00320 - CLEARING AND GRUBBING
Comply with Section 00320 of the Standard Specifications modified as follows:
00320.80 Measurement - No separate measurement will be made for clearing and grubbing.
00320.90 Payment – No separate or additional payment will be made. This work is considered incidental to performing the work under Section 00330.
SECTION 00330 – EARTHWORK
Comply with Section 00330 of the Standard Specifications modified as follows:
00330.81 Measurement - No separate measurement will be made for general excavation. Work under removal of structures and obstruction and clearing and grubbing are incidental and will have no separate measurement.
00330.82 Embankment Basis Measurement – Stone Embankment shall be measured by the ton.
00330.93(d) General Excavation - Payment for general excavation shall be lump sum.
00330.94(b) Stone Embankment - Payment for stone embankment shall be by the ton.
Where neither the Special Provisions nor the bid schedule indicate separate payment for the work under this section, perform the work as incidental for which no separate measurement or payment will be made.
SECTION 00350 - GEOSYNTHETIC INSTALLATION
Comply with Section 00350 of the Standard Specifications.
SECTION 00430 – SUBSURFACE DRAINS
Comply with Section 00430 of the Standard Specifications.
SECTION 02320 – GEOSYNTHETICS
Comply with Section 02320 of the Standard Specifications.