Att 9 -Phoenix stormwater construction mgmt brochure 2023.pdf
PDF 2 MB Posted
- Solicitation number
- 36C77626R0075
About this file
This is a guide document from the City of Phoenix Water Services Department addressing stormwater pollution prevention requirements for construction projects.
The document outlines mandatory best management practices (BMPs) and regulatory compliance requirements for construction sites to prevent stormwater pollution. Key prevention measures include closing paint and chemical containers when inactive, containing all concrete washouts with dirt berms lined with plastic, conducting periodic BMP inspections, and covering soil and sand piles after use. Sediment is identified as the largest construction-related pollutant, requiring protection of storm drain inlets and dry wells through erosion control measures such as straw wattles, filter socks, drainage swales, and silt fences. The document mandates compliance with City Code 32C and requires projects disturbing one or more acres to obtain coverage under the Arizona Construction General Permit (CGP). Required documentation includes a Storm Water Management Plan (SWMP) for City Code 32C projects and a Storm Water Pollution Prevention Plan (SWPPP) for CGP projects, with both plans and permits displayed at site entrances. Regular site inspections by qualified inspectors are mandatory, and construction control measures must be installed and maintained per approved plans. Final stabilization of exposed soil and submission of a Notice of Termination (NOT) are required upon project completion for CGP-covered projects. Contact information is provided for the Phoenix Environmental Services Division and Stormwater Management Section at 602-262-1859 and the Stormwater Hotline at 602-256-3190.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREVENTING POLLUTION
All paint or chemical containers must be closed when inactive, after work, or during rain.
All concrete washouts must be contained.
A dirt berm lined with plastic is sufficient.
Conduct periodic inspections to be sure all BMPs are functioning properly and haven’t been compromised.
Check BMPs and inlets after large rain events. Check in with your storm water contact with any questions.
Ineffective or damaged BMPs must be replaced ore repaired.
Cover piles of dirt or sand after use to reduce erosion. Properly store and dispose of wastes.
Train employees and subcontractors about storm water requirements.
Your site must be stabilized before filing for a Notice of Termination (NOT).
CONTACT US
Email: ask.water@phoenix.gov Stormwater Hotline: 602-256-3190 Commercial Hotline: 602-495-7412 Environmental Services Division:
602-262-1859
To report illegal storm drain dumping:
phoenix.gov/stormwater | 602-256-3190
For more information on Cease the Grease or F.O.G. recycling programs:
phoenix.gov/esd | 602-262-7251
For water or sewer emergencies:
602-262-6251 (8am-5pm) 602-261-8000 (Evenings and weekends)
WATER SERVICES DEPARTMENT
ENVIRONMENTAL SERVICES DIVISION
STORMWATER MANAGEMENT SECTION
PHOENIX.GOV/WATER /PHXWATER
PREVENT
STORMWATER
POLLUTION
STORMWATER
AWARENESS
CONSTRUCTION
MANAGEMENT
STORMWATER
POLLUTION
A GUIDE TO CONSTRUCTION
MANAGEMENT BEST
MANAGEMENT PRACTICES
SEDIMENT IS THE
BIGGEST POLLUTANT
Protect inlets to the storm drain system and dry wells from soil and chemicals.
Minimize erosion and sedimentation with Best Management Practices (BMPs) like straw wattles, filter socks, drainage swales, silt fences, etc.
Stabilize inactive soil or sand piles with vegetation, a tarp, or perimeter control.
Lay riprap at exits of site to reduce track out, and sweep up track out when it does occur.
Maintain your BMPs. They should be checked regularly for integrity.
Any paints or chemicals not in use must be covered. Put a lid on it!
LET’S TALK PAPERWORK
Permits: All construction must follow City Code 32C. Projects disturbing one or more acres must also obtain coverage under the Arizona Construction General Permit (CGP).
The City of Phoenix will not issue a Grading and Drainage permit without a state authorization number.
Plan: Chapter 32C requires a Storm Water Management Plan (SWMP) and the CGP requires a Storm Water Pollution Prevention Plan (SWPPP).
Preliminary Meeting: Review SWMP and/ or SWPPP and permit, along with Grading and Drainage plan at site.
Entrance: The CGP requires SWPPP, permit, and contact information be openly displayed at the main entrance of the site.
Field Report: A qualified inspector must inspect the site regularly. City inspectors may inspect the site, and documentation is required for the CGP.
BMPs: They must be installed and maintained per site plan and SWMP/SWPPP.
Control Measures: Ensure construction of control measures per approved plan (e.g.
diversion dikes, drainage swales, silt fences, sediment traps, gravel filter berms, storm drain inlet protection, etc.).
Final: After completion of construction and final stabilization of exposed soil, a Notice of Termination (NOT) is required for CGP.
WHAT’S WRONG
WITH A LITTLE DIRT?
Sediment is the most common pollutant from construction activities.
Soil can clog inlets and pipes, causing flooding, or increase turbidity (clarity) or impede flow of streams.
Water clarity is vital to the health of streams. Plants and aquatic life need sunlight!
When it rains, dirt tracked onto roadways flows into inlets.
The more vegetative cover, the better chances of keeping soil on your site! So minimize disturbed areas and phase construction activities.
PROTECTING STORM DRAINS
NEAR CONSTRUCTION SITES
IS THE LAW!