Att_8_-_CLIN Pricing Chart Draft RFP.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
7 Meter Rigid Hull Inflatable Boats
Solicitation number
N00024-20-R-2210
Issued by

About this file

This document contains a pricing template and draft request for proposal for a five-year indefinite delivery/indefinite quantity contract to procure 248 seven-meter rigid hull inflatable boats. The Naval Sea Systems Command intends to issue a small business set-aside competitive RFP in the third quarter of fiscal year 2020 to North American Industry Classification System code 336612 for expeditionary seven-meter rigid inflatable boats to replace current equipment over the next five years. The boats are to be built to commercial standards using government-specified requirements focused on key hoisting weight and ship compatibility constraints. Offerors are limited to small business builders. The draft includes boat specifications, drawings, and general arrangements available upon signed non-disclosure agreement. Pricing is to be provided using the template including firm fixed pricing for engineering, production, and materials over five ordering periods.

View the file

Other files

File Type Posted
Draft 7M Use and Nondisclosure (NDA).docx DOCX document
betaSAM Draft 7M RFP 27 FEB 2020.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total Contract N0002420R2210 Attachment #9 CLIN Pricing Sheet (DRAFT)

COLOR CODING KEY
To Be Filled in by Contractor
Auto-fill calculation
No Data Required
CLINSExtended DescriptionNotional QtyCLIN PriceTotal per CLIN
CONTRACT YEAR ONE PRICING
CLIN10017M RIB (Initial Production Boat)1$ - 0$ - 0
CLIN10027M RIB72$ - 0
CLIN10037M RIB LPD17 Variant (Initial Prod Boat)1$ - 0
CLIN10047M RIB LPD17 Variant10$ - 0
CLIN10057M RIB SOLAS Variant (Initial Prod Boat)1$ - 0
CLIN10067M SOLAS Variant7$ - 0
CLIN1007Batteries84$ - 0
CLIN1008Batteries SOLAS Variant8$ - 0
CLIN1009Hull & Deck Mold Inspection1$ - 0
CLIN1010Pre-Delivery Inspection and Trials9$ - 0
CLIN10117M RIB Shipping- Cheatham Annex92$ - 0
CLIN10127M RIB Shipping- DDDC92$ - 0
CLIN1013Short Slings92$ - 0
CLIN1014Long Slings92$ - 0
CLIN1015Long Term Preservation92$ - 0
CLIN1016TDP NRE1$ - 0
CLIN1017Provisioned Itemd Ordered (PIO) Spares$ - 0
CLIN1018Engineering & Industrial Services$100,000.00
CLIN1019Dispay Models2$ - 0
Total$ 100,000.00
CONTRACT YEAR TWO PRICING
CLIN20017M RIB34$ - 0
CLIN20027M RIB LPD17 Variant2$ - 0
CLIN20037M SOLAS Variant4$ - 0
CLIN2004Batteries36$ - 0
CLIN2005Batteries SOLAS Variant4$ - 0
CLIN2006Pre-Delivery Inspection and Trials6$ - 0
CLIN20077M RIB Shipping- Cheatham Annex40$ - 0
CLIN20087M RIB Shipping- DDDC40$ - 0
CLIN2009Short Slings40$ - 0
CLIN2010Long Slings40$ - 0
CLIN2011Long Term Preservation40$ - 0
Total$ - 0
CONTRACT YEAR THREE PRICING
CLIN30017M RIB39$ - 0
CLIN30027M RIB LPD17 Variant2$ - 0
CLIN30037M SOLAS Variant5$ - 0
CLIN3004Batteries41$ - 0
CLIN3005Batteries SOLAS Variant5$ - 0
CLIN3006Pre-Delivery Inspection and Trials6$ - 0
CLIN30077M RIB Shipping- Cheatham Annex46$ - 0
CLIN30087M RIB Shipping- DDDC46$ - 0
CLIN3009Short Slings46$ - 0
CLIN3010Long Slings46$ - 0
CLIN3011Long Term Preservation46$ - 0
Total$ - 0
CONTRACT YEAR FOUR PRICING
CLIN40017M RIB49$ - 0
CLIN40027M RIB LPD17 Variant2$ - 0
CLIN40037M SOLAS Variant4$ - 0
CLIN4004Batteries51$ - 0
CLIN4005Batteries SOLAS Variant4$ - 0
CLIN4006Pre-Delivery Inspection and Trials6$ - 0
CLIN40077M RIB Shipping- Cheatham Annex55$ - 0
CLIN40087M RIB Shipping- DDDC55$ - 0
CLIN4009Short Slings55$ - 0
CLIN4010Long Slings55$ - 0
CLIN4011Long Term Preservation55$ - 0
Total$ - 0
CONTRACT YEAR FIVE PRICING
CLIN50017M RIB39$ - 0
CLIN50027M RIB LPD17 Variant2$ - 0
CLIN50037M SOLAS Variant4$ - 0
CLIN5004Batteries41$ - 0
CLIN5005Batteries SOLAS Variant4$ - 0
CLIN5006Pre-Delivery Inspection and Trials6$ - 0
CLIN50077M RIB Shipping- Cheatham Annex45$ - 0
CLIN50087M RIB Shipping- DDDC45$ - 0
CLIN5009Short Slings45$ - 0
CLIN5010Long Slings45$ - 0
CLIN5011Long Term Preservation45$ - 0
Total$ - 0
Total Evauated Price$ 100,000.00

Boat CLIN Price Breakout

COLOR CODING KEY
To Be Filled in by Contractor
Auto-fill calculation
No Data Required
CLIN 1001 - 7M RIB (Initial Production Boat)CLIN 1002 - 7M RIBCLIN 1003 - 7M RIB LPD17 Variant (Initial Prod Boat)CLIN 1004 - 7M RIB LPD17 VariantCLIN 1005 - 7M RIB SOLAS Variant (Initial Prod Boat)CLIN 1006 - 7M RIB SOLAS Variant
DescriptionPriceDescriptionPriceDescriptionPriceDescriptionPriceDescriptionPriceDescriptionPrice
Hull and Structure (Material)Hull and Structure (Material)Hull and Structure (Material)Hull and Structure (Material)Hull and Structure (Material)Hull and Structure (Material)
Hull and Structure (Labor)Hull and Structure (Labor)Hull and Structure (Labor)Hull and Structure (Labor)Hull and Structure (Labor)Hull and Structure (Labor)
Deck (Material)Deck (Material)Deck (Material)Deck (Material)Deck (Material)Deck (Material)
Deck (Labor)Deck (Labor)Deck (Labor)Deck (Labor)Deck (Labor)Deck (Labor)
Console (Material)Console (Material)Console (Material)Console (Material)Console (Material)Console (Material)
Console (Labor)Console (Labor)Console (Labor)Console (Labor)Console (Labor)Console (Labor)
Independent Lab Construction oversite for Prototype SOLAS variantIndependent Lab Construction oversite for Prototype SOLAS variantIndependent Lab Construction oversite for Prototype SOLAS variantIndependent Lab Construction oversite for Prototype SOLAS variantIndependent Lab Construction oversite for Prototype SOLAS variantIndependent Lab Construction oversite for Prototype SOLAS variant
Independent Lab Construction oversite for Production SOLAS variantIndependent Lab Construction oversite for Production SOLAS variantIndependent Lab Construction oversite for Production SOLAS variantIndependent Lab Construction oversite for Production SOLAS variantIndependent Lab Construction oversite for Production SOLAS variantIndependent Lab Construction oversite for Production SOLAS variant
Collar w/ MBCSCollar w/ MBCSCollar w/ MBCSCollar w/ MBCSCollar w/ MBCSCollar w/ MBCS
LPD17 Single Point Lift FrameLPD17 Single Point Lift FrameLPD17 Single Point Lift FrameLPD17 Single Point Lift FrameLPD17 Single Point Lift FrameLPD17 Single Point Lift Frame
Forward and Aft Hoisting FittingsForward and Aft Hoisting FittingsForward and Aft Hoisting FittingsForward and Aft Hoisting FittingsForward and Aft Hoisting FittingsForward and Aft Hoisting Fittings
Transom Cap / Aft Tow BittTransom Cap / Aft Tow BittTransom Cap / Aft Tow BittTransom Cap / Aft Tow BittTransom Cap / Aft Tow BittTransom Cap / Aft Tow Bitt
Bow Bitt with Gun FoundationBow Bitt with Gun FoundationBow Bitt with Gun FoundationBow Bitt with Gun FoundationBow Bitt with Gun FoundationBow Bitt with Gun Foundation
Aft Arch (SOLAS Variant only)Aft Arch (SOLAS Variant only)Aft Arch (SOLAS Variant only)Aft Arch (SOLAS Variant only)Aft Arch (SOLAS Variant only)Aft Arch (SOLAS Variant only)
Propeller Guard (SOLAS Variant only)Propeller Guard (SOLAS Variant only)Propeller Guard (SOLAS Variant only)Propeller Guard (SOLAS Variant only)Propeller Guard (SOLAS Variant only)Propeller Guard (SOLAS Variant only)
SOLAS Righting Bag and Co2 Bottle SystemSOLAS Righting Bag and Co2 Bottle SystemSOLAS Righting Bag and Co2 Bottle SystemSOLAS Righting Bag and Co2 Bottle SystemSOLAS Righting Bag and Co2 Bottle SystemSOLAS Righting Bag and Co2 Bottle System
SparesSparesSparesSparesSpares
Total$ - 0Total$ - 0Total$ - 0Total$ - 0Total$ - 0Total$ - 0
CLIN 2001 - 7M RIBCLIN 2002 - 7M RIB LPD17 VariantCLIN 2003 - 7M RIB SOLAS Variant
DescriptionPriceDescriptionPriceDescriptionPrice
Hull and Structure (Material)Hull and Structure (Material)Hull and Structure (Material)
Hull and Structure (Labor)Hull and Structure (Labor)Hull and Structure (Labor)
Deck (Material)Deck (Material)Deck (Material)
Deck (Labor)Deck (Labor)Deck (Labor)
Console (Material)Console (Material)Console (Material)
Console (Labor)Console (Labor)Console (Labor)
Independent Lab Construction oversite for Prototype SOLAS variantIndependent Lab Construction oversite for Prototype SOLAS variantIndependent Lab Construction oversite for Prototype SOLAS variant
Independent Lab Construction oversite for Production SOLAS variantIndependent Lab Construction oversite for Production SOLAS variantIndependent Lab Construction oversite for Production SOLAS variant
Collar w/ MBCSCollar w/ MBCSCollar w/ MBCS
LPD17 Single Point Lift FrameLPD17 Single Point Lift FrameLPD17 Single Point Lift Frame
Forward and Aft Hoisting FittingsForward and Aft Hoisting FittingsForward and Aft Hoisting Fittings
Transom Cap / Aft Tow BittTransom Cap / Aft Tow BittTransom Cap / Aft Tow Bitt
Bow Bitt with Gun FoundationBow Bitt with Gun FoundationBow Bitt with Gun Foundation
Aft Arch (SOLAS Variant only)Aft Arch (SOLAS Variant only)Aft Arch (SOLAS Variant only)
Propeller Guard (SOLAS Variant only)Propeller Guard (SOLAS Variant only)Propeller Guard (SOLAS Variant only)
SOLAS Righting Bag and Co2 Bottle SystemSOLAS Righting Bag and Co2 Bottle SystemSOLAS Righting Bag and Co2 Bottle System
SparesSparesSpares
Total$ - 0Total$ - 0Total$ - 0
CLIN 3001 - 7M RIBCLIN 3002 - 7M RIB LPD17 VariantCLIN 3003 - 7M RIB SOLAS Variant
DescriptionPriceDescriptionPriceDescriptionPrice
Hull and Structure (Material)Hull and Structure (Material)Hull and Structure (Material)
Hull and Structure (Labor)Hull and Structure (Labor)Hull and Structure (Labor)
Deck (Material)Deck (Material)Deck (Material)
Deck (Labor)Deck (Labor)Deck (Labor)
Console (Material)Console (Material)Console (Material)
Console (Labor)Console (Labor)Console (Labor)
Independent Lab Construction oversite for Prototype SOLAS variantIndependent Lab Construction oversite for Prototype SOLAS variantIndependent Lab Construction oversite for Prototype SOLAS variant
Independent Lab Construction oversite for Production SOLAS variantIndependent Lab Construction oversite for Production SOLAS variantIndependent Lab Construction oversite for Production SOLAS variant
Collar w/ MBCSCollar w/ MBCSCollar w/ MBCS
LPD17 Single Point Lift FrameLPD17 Single Point Lift FrameLPD17 Single Point Lift Frame
Forward and Aft Hoisting FittingsForward and Aft Hoisting FittingsForward and Aft Hoisting Fittings
Transom Cap / Aft Tow BittTransom Cap / Aft Tow BittTransom Cap / Aft Tow Bitt
Bow Bitt with Gun FoundationBow Bitt with Gun FoundationBow Bitt with Gun Foundation
Aft Arch (SOLAS Variant only)Aft Arch (SOLAS Variant only)Aft Arch (SOLAS Variant only)
Propeller Guard (SOLAS Variant only)Propeller Guard (SOLAS Variant only)Propeller Guard (SOLAS Variant only)
SOLAS Righting Bag and Co2 Bottle SystemSOLAS Righting Bag and Co2 Bottle SystemSOLAS Righting Bag and Co2 Bottle System
SparesSparesSpares
Total$ - 0Total$ - 0Total$ - 0
CLIN 4001 - 7M RIBCLIN 4002 - 7M RIB LPD17 VariantCLIN 4003 - 7M RIB SOLAS Variant
DescriptionPriceDescriptionPriceDescriptionPrice
Hull and Structure (Material)Hull and Structure (Material)Hull and Structure (Material)
Hull and Structure (Labor)Hull and Structure (Labor)Hull and Structure (Labor)
Deck (Material)Deck (Material)Deck (Material)
Deck (Labor)Deck (Labor)Deck (Labor)
Console (Material)Console (Material)Console (Material)
Console (Labor)Console (Labor)Console (Labor)
Independent Lab Construction oversite for Prototype SOLAS variantIndependent Lab Construction oversite for Prototype SOLAS variantIndependent Lab Construction oversite for Prototype SOLAS variant
Independent Lab Construction oversite for Production SOLAS variantIndependent Lab Construction oversite for Production SOLAS variantIndependent Lab Construction oversite for Production SOLAS variant
Collar w/ MBCSCollar w/ MBCSCollar w/ MBCS
LPD17 Single Point Lift FrameLPD17 Single Point Lift FrameLPD17 Single Point Lift Frame
Forward and Aft Hoisting FittingsForward and Aft Hoisting FittingsForward and Aft Hoisting Fittings
Transom Cap / Aft Tow BittTransom Cap / Aft Tow BittTransom Cap / Aft Tow Bitt
Bow Bitt with Gun FoundationBow Bitt with Gun FoundationBow Bitt with Gun Foundation
Aft Arch (SOLAS Variant only)Aft Arch (SOLAS Variant only)Aft Arch (SOLAS Variant only)
Propeller Guard (SOLAS Variant only)Propeller Guard (SOLAS Variant only)Propeller Guard (SOLAS Variant only)
SOLAS Righting Bag and Co2 Bottle SystemSOLAS Righting Bag and Co2 Bottle SystemSOLAS Righting Bag and Co2 Bottle System
SparesSparesSpares
Total$ - 0Total$ - 0Total$ - 0
CLIN 5001 - 7M RIBCLIN 5002 - 7M RIB LPD17 VariantCLIN 5003 - 7M RIB SOLAS Variant
DescriptionPriceDescriptionPriceDescriptionPrice
Hull and Structure (Material)Hull and Structure (Material)Hull and Structure (Material)
Hull and Structure (Labor)Hull and Structure (Labor)Hull and Structure (Labor)
Deck (Material)Deck (Material)Deck (Material)
Deck (Labor)Deck (Labor)Deck (Labor)
Console (Material)Console (Material)Console (Material)
Console (Labor)Console (Labor)Console (Labor)
Independent Lab Construction oversite for Prototype SOLAS variantIndependent Lab Construction oversite for Prototype SOLAS variantIndependent Lab Construction oversite for Prototype SOLAS variant
Independent Lab Construction oversite for Production SOLAS variantIndependent Lab Construction oversite for Production SOLAS variantIndependent Lab Construction oversite for Production SOLAS variant
Collar w/ MBCSCollar w/ MBCSCollar w/ MBCS
LPD17 Single Point Lift FrameLPD17 Single Point Lift FrameLPD17 Single Point Lift Frame
Forward and Aft Hoisting FittingsForward and Aft Hoisting FittingsForward and Aft Hoisting Fittings
Transom Cap / Aft Tow BittTransom Cap / Aft Tow BittTransom Cap / Aft Tow Bitt
Bow Bitt with Gun FoundationBow Bitt with Gun FoundationBow Bitt with Gun Foundation
Aft Arch (SOLAS Variant only)Aft Arch (SOLAS Variant only)Aft Arch (SOLAS Variant only)
Propeller Guard (SOLAS Variant only)Propeller Guard (SOLAS Variant only)Propeller Guard (SOLAS Variant only)
SOLAS Righting Bag and Co2 Bottle SystemSOLAS Righting Bag and Co2 Bottle SystemSOLAS Righting Bag and Co2 Bottle System
SparesSparesSpares
Total$ - 0Total$ - 0Total$ - 0

CLIN 1018 EIS

N0002420R2210
COLOR CODING KEY
To Be Filled in by Contractor
Auto-fill calculation
No Data Required
Note: Fully Loaded rates should include all overheads and profit
25%75%
TotalEngineeringProduction
Estimated Labor Hours1000250750
Ordering
PeriodPercentageEngineeringProduction
Ordering Period 145%113338
Ordering Period 235%88263
Ordering Period 35%1338
Ordering Period 45%1237
Ordering Period 510%2575
100%250750
OFFEROR PROPOSED RATES CLIN 1018
Ordering
PeriodFully Loaded Engineering Rate (per hour)Fully Loaded Production Rate
(per hour)**Material Handling Rate (percentage)
Ordering Period 1
Ordering Period 2
Ordering Period 3
Ordering Period 4
Ordering Period 5
*Material Handling Rate MUST be a percentage (i.e. 5%, 10%, 15%)

Estimated Material $100,000 $ 100,000.00

Ordering
PeriodPercentageMaterial
Ordering Period 145%$ 45,000.00
Ordering Period 235%$ 35,000.00
Ordering Period 35%$ 5,000.00
Ordering Period 45%$ 5,000.00
Ordering Period 510%$ 10,000.00
100%$ 100,000.00
TOTAL EVALUATED PRICE FOR CLIN 1018
Ordering
PeriodEngineeringProductionMaterialsTotal
Ordering Period 1$0.00$0.00$45,000.00$45,000.00
Ordering Period 2$0.00$0.00$35,000.00$35,000.00
Ordering Period 3$0.00$0.00$5,000.00$5,000.00
Ordering Period 4$0.00$0.00$5,000.00$5,000.00
Ordering Period 5$0.00$0.00$10,000.00$10,000.00
Total$100,000.00

File details come from the government source that posted it. Updated .