Att_8_-_CLIN Pricing Chart Draft RFP.xlsx
XLSX spreadsheet 31 KB Posted
- Attached to
- 7 Meter Rigid Hull Inflatable Boats
- Solicitation number
- N00024-20-R-2210
About this file
This document contains a pricing template and draft request for proposal for a five-year indefinite delivery/indefinite quantity contract to procure 248 seven-meter rigid hull inflatable boats. The Naval Sea Systems Command intends to issue a small business set-aside competitive RFP in the third quarter of fiscal year 2020 to North American Industry Classification System code 336612 for expeditionary seven-meter rigid inflatable boats to replace current equipment over the next five years. The boats are to be built to commercial standards using government-specified requirements focused on key hoisting weight and ship compatibility constraints. Offerors are limited to small business builders. The draft includes boat specifications, drawings, and general arrangements available upon signed non-disclosure agreement. Pricing is to be provided using the template including firm fixed pricing for engineering, production, and materials over five ordering periods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft 7M Use and Nondisclosure (NDA).docx | DOCX document | |
| betaSAM Draft 7M RFP 27 FEB 2020.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Contract N0002420R2210 Attachment #9 CLIN Pricing Sheet (DRAFT)
| COLOR CODING KEY |
| To Be Filled in by Contractor |
| Auto-fill calculation |
| No Data Required |
| CLINS | Extended Description | Notional Qty | CLIN Price | Total per CLIN |
| CONTRACT YEAR ONE PRICING | ||||
| CLIN1001 | 7M RIB (Initial Production Boat) | 1 | $ - 0 | $ - 0 |
| CLIN1002 | 7M RIB | 72 | $ - 0 | |
| CLIN1003 | 7M RIB LPD17 Variant (Initial Prod Boat) | 1 | $ - 0 | |
| CLIN1004 | 7M RIB LPD17 Variant | 10 | $ - 0 | |
| CLIN1005 | 7M RIB SOLAS Variant (Initial Prod Boat) | 1 | $ - 0 | |
| CLIN1006 | 7M SOLAS Variant | 7 | $ - 0 | |
| CLIN1007 | Batteries | 84 | $ - 0 | |
| CLIN1008 | Batteries SOLAS Variant | 8 | $ - 0 | |
| CLIN1009 | Hull & Deck Mold Inspection | 1 | $ - 0 | |
| CLIN1010 | Pre-Delivery Inspection and Trials | 9 | $ - 0 | |
| CLIN1011 | 7M RIB Shipping- Cheatham Annex | 92 | $ - 0 | |
| CLIN1012 | 7M RIB Shipping- DDDC | 92 | $ - 0 | |
| CLIN1013 | Short Slings | 92 | $ - 0 | |
| CLIN1014 | Long Slings | 92 | $ - 0 | |
| CLIN1015 | Long Term Preservation | 92 | $ - 0 | |
| CLIN1016 | TDP NRE | 1 | $ - 0 | |
| CLIN1017 | Provisioned Itemd Ordered (PIO) Spares | $ - 0 | ||
| CLIN1018 | Engineering & Industrial Services | $100,000.00 | ||
| CLIN1019 | Dispay Models | 2 | $ - 0 | |
| Total | $ 100,000.00 | |||
| CONTRACT YEAR TWO PRICING | ||||
| CLIN2001 | 7M RIB | 34 | $ - 0 | |
| CLIN2002 | 7M RIB LPD17 Variant | 2 | $ - 0 | |
| CLIN2003 | 7M SOLAS Variant | 4 | $ - 0 | |
| CLIN2004 | Batteries | 36 | $ - 0 | |
| CLIN2005 | Batteries SOLAS Variant | 4 | $ - 0 | |
| CLIN2006 | Pre-Delivery Inspection and Trials | 6 | $ - 0 | |
| CLIN2007 | 7M RIB Shipping- Cheatham Annex | 40 | $ - 0 | |
| CLIN2008 | 7M RIB Shipping- DDDC | 40 | $ - 0 | |
| CLIN2009 | Short Slings | 40 | $ - 0 | |
| CLIN2010 | Long Slings | 40 | $ - 0 | |
| CLIN2011 | Long Term Preservation | 40 | $ - 0 | |
| Total | $ - 0 | |||
| CONTRACT YEAR THREE PRICING | ||||
| CLIN3001 | 7M RIB | 39 | $ - 0 | |
| CLIN3002 | 7M RIB LPD17 Variant | 2 | $ - 0 | |
| CLIN3003 | 7M SOLAS Variant | 5 | $ - 0 | |
| CLIN3004 | Batteries | 41 | $ - 0 | |
| CLIN3005 | Batteries SOLAS Variant | 5 | $ - 0 | |
| CLIN3006 | Pre-Delivery Inspection and Trials | 6 | $ - 0 | |
| CLIN3007 | 7M RIB Shipping- Cheatham Annex | 46 | $ - 0 | |
| CLIN3008 | 7M RIB Shipping- DDDC | 46 | $ - 0 | |
| CLIN3009 | Short Slings | 46 | $ - 0 | |
| CLIN3010 | Long Slings | 46 | $ - 0 | |
| CLIN3011 | Long Term Preservation | 46 | $ - 0 | |
| Total | $ - 0 | |||
| CONTRACT YEAR FOUR PRICING | ||||
| CLIN4001 | 7M RIB | 49 | $ - 0 | |
| CLIN4002 | 7M RIB LPD17 Variant | 2 | $ - 0 | |
| CLIN4003 | 7M SOLAS Variant | 4 | $ - 0 | |
| CLIN4004 | Batteries | 51 | $ - 0 | |
| CLIN4005 | Batteries SOLAS Variant | 4 | $ - 0 | |
| CLIN4006 | Pre-Delivery Inspection and Trials | 6 | $ - 0 | |
| CLIN4007 | 7M RIB Shipping- Cheatham Annex | 55 | $ - 0 | |
| CLIN4008 | 7M RIB Shipping- DDDC | 55 | $ - 0 | |
| CLIN4009 | Short Slings | 55 | $ - 0 | |
| CLIN4010 | Long Slings | 55 | $ - 0 | |
| CLIN4011 | Long Term Preservation | 55 | $ - 0 | |
| Total | $ - 0 | |||
| CONTRACT YEAR FIVE PRICING | ||||
| CLIN5001 | 7M RIB | 39 | $ - 0 | |
| CLIN5002 | 7M RIB LPD17 Variant | 2 | $ - 0 | |
| CLIN5003 | 7M SOLAS Variant | 4 | $ - 0 | |
| CLIN5004 | Batteries | 41 | $ - 0 | |
| CLIN5005 | Batteries SOLAS Variant | 4 | $ - 0 | |
| CLIN5006 | Pre-Delivery Inspection and Trials | 6 | $ - 0 | |
| CLIN5007 | 7M RIB Shipping- Cheatham Annex | 45 | $ - 0 | |
| CLIN5008 | 7M RIB Shipping- DDDC | 45 | $ - 0 | |
| CLIN5009 | Short Slings | 45 | $ - 0 | |
| CLIN5010 | Long Slings | 45 | $ - 0 | |
| CLIN5011 | Long Term Preservation | 45 | $ - 0 | |
| Total | $ - 0 | |||
| Total Evauated Price | $ 100,000.00 |
Boat CLIN Price Breakout
| COLOR CODING KEY |
| To Be Filled in by Contractor |
| Auto-fill calculation |
| No Data Required |
| CLIN 1001 - 7M RIB (Initial Production Boat) | CLIN 1002 - 7M RIB | CLIN 1003 - 7M RIB LPD17 Variant (Initial Prod Boat) | CLIN 1004 - 7M RIB LPD17 Variant | CLIN 1005 - 7M RIB SOLAS Variant (Initial Prod Boat) | CLIN 1006 - 7M RIB SOLAS Variant | ||||||
| Description | Price | Description | Price | Description | Price | Description | Price | Description | Price | Description | Price |
| Hull and Structure (Material) | Hull and Structure (Material) | Hull and Structure (Material) | Hull and Structure (Material) | Hull and Structure (Material) | Hull and Structure (Material) | ||||||
| Hull and Structure (Labor) | Hull and Structure (Labor) | Hull and Structure (Labor) | Hull and Structure (Labor) | Hull and Structure (Labor) | Hull and Structure (Labor) | ||||||
| Deck (Material) | Deck (Material) | Deck (Material) | Deck (Material) | Deck (Material) | Deck (Material) | ||||||
| Deck (Labor) | Deck (Labor) | Deck (Labor) | Deck (Labor) | Deck (Labor) | Deck (Labor) | ||||||
| Console (Material) | Console (Material) | Console (Material) | Console (Material) | Console (Material) | Console (Material) | ||||||
| Console (Labor) | Console (Labor) | Console (Labor) | Console (Labor) | Console (Labor) | Console (Labor) | ||||||
| Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | ||||||
| Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | ||||||
| Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | ||||||
| LPD17 Single Point Lift Frame | LPD17 Single Point Lift Frame | LPD17 Single Point Lift Frame | LPD17 Single Point Lift Frame | LPD17 Single Point Lift Frame | LPD17 Single Point Lift Frame | ||||||
| Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | ||||||
| Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | ||||||
| Bow Bitt with Gun Foundation | Bow Bitt with Gun Foundation | Bow Bitt with Gun Foundation | Bow Bitt with Gun Foundation | Bow Bitt with Gun Foundation | Bow Bitt with Gun Foundation | ||||||
| Aft Arch (SOLAS Variant only) | Aft Arch (SOLAS Variant only) | Aft Arch (SOLAS Variant only) | Aft Arch (SOLAS Variant only) | Aft Arch (SOLAS Variant only) | Aft Arch (SOLAS Variant only) | ||||||
| Propeller Guard (SOLAS Variant only) | Propeller Guard (SOLAS Variant only) | Propeller Guard (SOLAS Variant only) | Propeller Guard (SOLAS Variant only) | Propeller Guard (SOLAS Variant only) | Propeller Guard (SOLAS Variant only) | ||||||
| SOLAS Righting Bag and Co2 Bottle System | SOLAS Righting Bag and Co2 Bottle System | SOLAS Righting Bag and Co2 Bottle System | SOLAS Righting Bag and Co2 Bottle System | SOLAS Righting Bag and Co2 Bottle System | SOLAS Righting Bag and Co2 Bottle System | ||||||
| Spares | Spares | Spares | Spares | Spares | |||||||
| Total | $ - 0 | Total | $ - 0 | Total | $ - 0 | Total | $ - 0 | Total | $ - 0 | Total | $ - 0 |
| CLIN 2001 - 7M RIB | CLIN 2002 - 7M RIB LPD17 Variant | CLIN 2003 - 7M RIB SOLAS Variant | |||
| Description | Price | Description | Price | Description | Price |
| Hull and Structure (Material) | Hull and Structure (Material) | Hull and Structure (Material) | |||
| Hull and Structure (Labor) | Hull and Structure (Labor) | Hull and Structure (Labor) | |||
| Deck (Material) | Deck (Material) | Deck (Material) | |||
| Deck (Labor) | Deck (Labor) | Deck (Labor) | |||
| Console (Material) | Console (Material) | Console (Material) | |||
| Console (Labor) | Console (Labor) | Console (Labor) | |||
| Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | |||
| Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | |||
| Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | |||
| LPD17 Single Point Lift Frame | LPD17 Single Point Lift Frame | LPD17 Single Point Lift Frame | |||
| Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | |||
| Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | |||
| Bow Bitt with Gun Foundation | Bow Bitt with Gun Foundation | Bow Bitt with Gun Foundation | |||
| Aft Arch (SOLAS Variant only) | Aft Arch (SOLAS Variant only) | Aft Arch (SOLAS Variant only) | |||
| Propeller Guard (SOLAS Variant only) | Propeller Guard (SOLAS Variant only) | Propeller Guard (SOLAS Variant only) | |||
| SOLAS Righting Bag and Co2 Bottle System | SOLAS Righting Bag and Co2 Bottle System | SOLAS Righting Bag and Co2 Bottle System | |||
| Spares | Spares | Spares | |||
| Total | $ - 0 | Total | $ - 0 | Total | $ - 0 |
| CLIN 3001 - 7M RIB | CLIN 3002 - 7M RIB LPD17 Variant | CLIN 3003 - 7M RIB SOLAS Variant | |||
| Description | Price | Description | Price | Description | Price |
| Hull and Structure (Material) | Hull and Structure (Material) | Hull and Structure (Material) | |||
| Hull and Structure (Labor) | Hull and Structure (Labor) | Hull and Structure (Labor) | |||
| Deck (Material) | Deck (Material) | Deck (Material) | |||
| Deck (Labor) | Deck (Labor) | Deck (Labor) | |||
| Console (Material) | Console (Material) | Console (Material) | |||
| Console (Labor) | Console (Labor) | Console (Labor) | |||
| Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | |||
| Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | |||
| Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | |||
| LPD17 Single Point Lift Frame | LPD17 Single Point Lift Frame | LPD17 Single Point Lift Frame | |||
| Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | |||
| Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | |||
| Bow Bitt with Gun Foundation | Bow Bitt with Gun Foundation | Bow Bitt with Gun Foundation | |||
| Aft Arch (SOLAS Variant only) | Aft Arch (SOLAS Variant only) | Aft Arch (SOLAS Variant only) | |||
| Propeller Guard (SOLAS Variant only) | Propeller Guard (SOLAS Variant only) | Propeller Guard (SOLAS Variant only) | |||
| SOLAS Righting Bag and Co2 Bottle System | SOLAS Righting Bag and Co2 Bottle System | SOLAS Righting Bag and Co2 Bottle System | |||
| Spares | Spares | Spares | |||
| Total | $ - 0 | Total | $ - 0 | Total | $ - 0 |
| CLIN 4001 - 7M RIB | CLIN 4002 - 7M RIB LPD17 Variant | CLIN 4003 - 7M RIB SOLAS Variant | |||
| Description | Price | Description | Price | Description | Price |
| Hull and Structure (Material) | Hull and Structure (Material) | Hull and Structure (Material) | |||
| Hull and Structure (Labor) | Hull and Structure (Labor) | Hull and Structure (Labor) | |||
| Deck (Material) | Deck (Material) | Deck (Material) | |||
| Deck (Labor) | Deck (Labor) | Deck (Labor) | |||
| Console (Material) | Console (Material) | Console (Material) | |||
| Console (Labor) | Console (Labor) | Console (Labor) | |||
| Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | |||
| Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | |||
| Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | |||
| LPD17 Single Point Lift Frame | LPD17 Single Point Lift Frame | LPD17 Single Point Lift Frame | |||
| Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | |||
| Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | |||
| Bow Bitt with Gun Foundation | Bow Bitt with Gun Foundation | Bow Bitt with Gun Foundation | |||
| Aft Arch (SOLAS Variant only) | Aft Arch (SOLAS Variant only) | Aft Arch (SOLAS Variant only) | |||
| Propeller Guard (SOLAS Variant only) | Propeller Guard (SOLAS Variant only) | Propeller Guard (SOLAS Variant only) | |||
| SOLAS Righting Bag and Co2 Bottle System | SOLAS Righting Bag and Co2 Bottle System | SOLAS Righting Bag and Co2 Bottle System | |||
| Spares | Spares | Spares | |||
| Total | $ - 0 | Total | $ - 0 | Total | $ - 0 |
| CLIN 5001 - 7M RIB | CLIN 5002 - 7M RIB LPD17 Variant | CLIN 5003 - 7M RIB SOLAS Variant | |||
| Description | Price | Description | Price | Description | Price |
| Hull and Structure (Material) | Hull and Structure (Material) | Hull and Structure (Material) | |||
| Hull and Structure (Labor) | Hull and Structure (Labor) | Hull and Structure (Labor) | |||
| Deck (Material) | Deck (Material) | Deck (Material) | |||
| Deck (Labor) | Deck (Labor) | Deck (Labor) | |||
| Console (Material) | Console (Material) | Console (Material) | |||
| Console (Labor) | Console (Labor) | Console (Labor) | |||
| Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | |||
| Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | |||
| Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | |||
| LPD17 Single Point Lift Frame | LPD17 Single Point Lift Frame | LPD17 Single Point Lift Frame | |||
| Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | |||
| Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | |||
| Bow Bitt with Gun Foundation | Bow Bitt with Gun Foundation | Bow Bitt with Gun Foundation | |||
| Aft Arch (SOLAS Variant only) | Aft Arch (SOLAS Variant only) | Aft Arch (SOLAS Variant only) | |||
| Propeller Guard (SOLAS Variant only) | Propeller Guard (SOLAS Variant only) | Propeller Guard (SOLAS Variant only) | |||
| SOLAS Righting Bag and Co2 Bottle System | SOLAS Righting Bag and Co2 Bottle System | SOLAS Righting Bag and Co2 Bottle System | |||
| Spares | Spares | Spares | |||
| Total | $ - 0 | Total | $ - 0 | Total | $ - 0 |
CLIN 1018 EIS
| N0002420R2210 |
| COLOR CODING KEY |
| To Be Filled in by Contractor |
| Auto-fill calculation |
| No Data Required | |||
| Note: Fully Loaded rates should include all overheads and profit | |||
| 25% | 75% | ||
| Total | Engineering | Production | |
| Estimated Labor Hours | 1000 | 250 | 750 |
| Ordering | ||||
| Period | Percentage | Engineering | Production | |
| Ordering Period 1 | 45% | 113 | 338 | |
| Ordering Period 2 | 35% | 88 | 263 | |
| Ordering Period 3 | 5% | 13 | 38 | |
| Ordering Period 4 | 5% | 12 | 37 | |
| Ordering Period 5 | 10% | 25 | 75 | |
| 100% | 250 | 750 |
| OFFEROR PROPOSED RATES CLIN 1018 | ||
| Ordering | ||
| Period | Fully Loaded Engineering Rate (per hour) | Fully Loaded Production Rate |
| (per hour) | **Material Handling Rate (percentage) | |
| Ordering Period 1 | ||
| Ordering Period 2 | ||
| Ordering Period 3 | ||
| Ordering Period 4 | ||
| Ordering Period 5 | ||
| *Material Handling Rate MUST be a percentage (i.e. 5%, 10%, 15%) |
Estimated Material $100,000 $ 100,000.00
| Ordering | |||
| Period | Percentage | Material | |
| Ordering Period 1 | 45% | $ 45,000.00 | |
| Ordering Period 2 | 35% | $ 35,000.00 | |
| Ordering Period 3 | 5% | $ 5,000.00 | |
| Ordering Period 4 | 5% | $ 5,000.00 | |
| Ordering Period 5 | 10% | $ 10,000.00 | |
| 100% | $ 100,000.00 |
| TOTAL EVALUATED PRICE FOR CLIN 1018 | |||||
| Ordering | |||||
| Period | Engineering | Production | Materials | Total | |
| Ordering Period 1 | $0.00 | $0.00 | $45,000.00 | $45,000.00 | |
| Ordering Period 2 | $0.00 | $0.00 | $35,000.00 | $35,000.00 | |
| Ordering Period 3 | $0.00 | $0.00 | $5,000.00 | $5,000.00 | |
| Ordering Period 4 | $0.00 | $0.00 | $5,000.00 | $5,000.00 | |
| Ordering Period 5 | $0.00 | $0.00 | $10,000.00 | $10,000.00 | |
| Total | $100,000.00 |
File details come from the government source that posted it. Updated .