Att 7 - Fort Harrison EHRM - Narrative.pdf

PDF 610 KB Posted

Attached to
Y1DZ--EHRM Infrastructure Upgrades Construction Fort Harrison 436-21-700
Solicitation number
36C77623B0001
Issued by

About this file

This solicitation is for construction services to complete infrastructure upgrades at the Montana VA Health Care System Fort Harrison VA Medical Center in support of the Electronic Health Record Modernization (EHRM) program. The scope of work includes architectural, structural, electrical, HVAC, plumbing, communication, and security system upgrades across multiple campus buildings. Services required are demolition, new construction, renovation of existing spaces, electrical panel upgrades and distribution work, HVAC modifications and controls, plumbing system changes, data communication cabling replacement and fiber infrastructure upgrades, physical security improvements, fire suppression system installation, asbestos and lead paint abatement, and associated site work. The work is covered under contract number 36C77623B0001 with the Department of Veterans Affairs Technology Acquisition Center Austin as the contracting agency.

View the file

Other files

File Type Posted
DBA Wage Rates - Lewis and Clark County - 01-20-23.pdf PDF
Tech Questions Tracker - Fort Harrison - Responses 1-23-23.pdf PDF
36C77623B0001 0006.pdf PDF
36C77623B0001 0005.pdf PDF
DBA Wage Rates - Lewis and Clark County - 01-13-23.pdf PDF
DBA Wage Rates - Lewis and Clark County - 01-06-23.pdf PDF
36C77623B0001 0004.pdf PDF
Tech Questions Tracker - Fort Harrison - Responses 1-10-23.pdf PDF
Limitations on Subcontracting - 852.219-75.docx DOCX document
DBA Wage Rates - Lewis and Clark County - 12-09-22.pdf PDF
Site Visit Sign-In Sheet - Fort Harrison EHRM - 12-12-2022.pdf PDF
36C77623B0001 0003.pdf PDF
36C77623B0001 0002.pdf PDF
36C77623B0001 0001.pdf PDF
Site Visit Sign-In Sheet - Fort Harrison EHRM - 11-30-2022.pdf PDF
Att 1.3 - Fort Harrison EHRM - Drawings Vol 1 Part 3 of 5.pdf PDF
Att 5 - Fort Harrison EHRM - Specification Appendix A.pdf PDF
Att 6 - Fort Harrison EHRM - Specification Appendix B.pdf PDF
Contractor Safety and Environmental Record.docx DOCX document
Limitations on Subcontracting.docx DOCX document
Att 1.1 - Fort Harrison EHRM - Drawings Vol 1 Part 1 of 5.pdf PDF
Att 1.5 - Fort Harrison EHRM - Drawings Vol 1 Part 5 of 5.pdf PDF
Att 2.1 - Fort Harrison EHRM - Drawings Vol 2 Part 1 of 2.pdf PDF
Fort Harrison - IFB 36C77623B0001 - 11-16-22.pdf PDF
Att 8 - Fort Harrison EHRM - Submittal Register.xlsx XLSX spreadsheet
Att 1.4 - Fort Harrison EHRM - Drawings Vol 1 Part 4 of 5.pdf PDF
DBA Wage Rates - Lewis and Clark County - 09-09-22.pdf PDF
Att 3 - Fort Harrison EHRM - Specification Vol 1.pdf PDF
Brand Name Justification - Fort Harrison.pdf PDF
Att 2.2 - Fort Harrison EHRM - Drawings Vol 2 Part 2 of 2.pdf PDF
Att 4 - Fort Harrison EHRM - Specification Vol 2.pdf PDF
VHA Supp Contract Reqs COVID-19 - 12-14-21.pdf PDF
Att 1.2 - Fort Harrison EHRM - Drawings Vol 1 Part 2 of 5.pdf PDF
Att 9 - Infrastructure Standard for Telecom Spaces v3.1.pdf PDF
436-21-700 - Ft Harrison EHRM - Scope of Work 9-21-2022.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100 % Construction Documents Submittal:

Basis of Design Narrative

May 20, 2022

Department of Veterans Health Administration

Electronic Health Record Modernization (EHRM) Infrastructure

Upgrades – Fort Harrison, MT

Contract No. 36C77621C0112

Montana VA Health Care System

Fort Harrison

3687 Veterans Drive

Fort Harrison, Montana 59636

US Department of Veterans Affairs

Program Contracting Activity Central (PCAC)

6150 Oak Tree Blvd., Suite 300

Independence, OH 44131

Prepared by:

GDM of Oregon

1401 W 34th Ave Suite 200

Anchorage, Alaska 99503

Note: This Basis of Design will be updated with each forthcoming milestone deliverable.

MVAHCS BASIS OF DESIGN 100%

Fort Harrison, MT 05/20/2022

MONTANA VA HEALTH CARE SYSTEM MEDICAL CENTER

ELECTRONIC HEALTH RECORDS MODERNIZATION (EHRM)

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

DESIGN NARRATIVE

100% CONSTRUCTION DOCUMENTS DESIGN NARRATIVE

Fort Harrison Executive Summary

This construction project upgrades the facilities electric and IT cabling to allow for the new Electronic

Health Records Modernization (EHRM) system. The scope of this project includes but is not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency), bonding UPS, building management system interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing spaces (demo, new construction, finishes), communication infrastructure (new data outlets, patch panels, upgrades to CAT 6A cable) in all buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings. Project scope locations include Buildings 16, 17, 20, 47, 115, 141, 150, 154A, 154B, 168, 169, 170, 171 and new underground power and cabling connections between buildings. We have included as part of the drawings deliverables the scope of work in each of the buildings.

REFERENCED DOCUMENTS

VA Office of Electronic Health Record Modernization OEHRM Site Infrastructure and End User Device

(EUD) Requirements April 15, 2021 (Version 2.0 for Concurrence) Paragraph 2.9 Physical Security Design

Requirements states:

New TR rooms and existing rooms undergoing modifications and upgrades shall comply with the following design manuals:

BLDG.

ROOM

NUMBER

ROOM

AREA (sf) DEPARTMENT ROOM TYPE CABINET TYPE SITE VISIT NOTES/PROPOSED SOLUTION COMMENTS

16 106 29 Fire Department TE Cabinet only Wall mount

Telecom Enclosure cabinet in condtioned room

17 --- No Work

20 100B 27 Wood Shop TE Cabinet only Wall mount

Telecom Enclosure cabinet in condtioned room

47 --- No Work

B-20A

218A

315A

Mail room

Human Resources

Mental Health

Administration

TR

TR

TR

TR

2 racks

2 racks

2 racks

2 racks

New doors will need to cut through existing concrete shear walls.

150 --- To be served from Building 154A

B-09

239A

Data Center

Clinic (Madison)

(Sadie)

Patient Floor

Patient Floor

MCR

TR

TR

TR

TR

TR

MCR

2 Racks

3 racks

3 racks

3 racks

2 racks

154A A148 190 TR 3 racks

168 --- No Work

169 224 130

Mental Health TR

3 racks

170 103 78 Warehouse TE Cabinet only Wall mount

Telecom Enclosure cabinet in condtioned room Existing room

171 --- To be served from Building 154; limited work Demo existing closet

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

A. U.S. Department of Veterans Affairs Office of Information & Technology (OIT) Infrastructure

Standards for Telecommunications Spaces Version 3. 1 July 1, 2021.

B. VA Physical Security and Resiliency Design Manual, Rev April 1, 2021.

ANSI/TIA-942-B Telecommunications Infrastructure Standard for Data Centers (See Page 16 paragraph

4.1 Architectural Standards and Space Design of VA Office and Information and Technology Infrastructure

Standard for Telecommunication Spaces. Rev3).

ACCESSIBILITY CODE (ALL DISCIPLINES)

A. Federal Architectural Barriers Act Accessibility Standards (ABASS), Rev 2015

B. PG-18-13 VA Fire Barrier (A Supplement to Federal Barriers Act

Accessibility Standards) Fire Design Guide, Dec 2011.

BUILDING CODES (ALL DISCIPLINES)

International Code Council (ICC)

1. IBC—International Building Code, 2021

2. IFC—International Fire Code, 2021

3. IFGC—International Fuel Gas Code, 2021

4. IMC—International Mechanical Code, 2021

5. IPC—International Plumbing Code, 2021

National Fire Protection Association (NFPA)

1. NFPA Life Safety Code-101, 2021

2. NFPA 13 Standard for Installation of Sprinkler Systems-2022

3. NFPA 10 Standard for Portable Fire Extinguishers-2018

4. NFPA 70 National Electrical Code, 2020

5. NFPA 70E Standard for Electrical Safety in the Workplace, 2021

6. NFPA 72 National Fire Alarm and Signaling Code, 2019

7. NFPA 75 Standard for the Protection of Information Technology Equipment 2020

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

8. NFPA 76 Standard for the Fire Protection of Telecommunications Facilities, 2020

9. NFPA 99 Health Care Facilities Code, 2021

10. NFPA 101 Life Safety Code, 2021

11. NFPA 110 Standard for Emergency and Standby Power Systems, 2022

12. NFPA 241 Standard for Safeguarding Construction, Alteration and Demolition Operations

VA ARCHITECTURAL DESIGN MANUALS

VA Office of Construction and Facility Management Design Manual August 1, 2014

1. PG-18-1 Master Construction Specifications

(http://www.cfm.va.gov/til/spec.asp2)

2. PG-18-3 Design and Construction Procedures—April 15, 2019 http://www.cfm.va.gov/til/cpro.asp

3. PG-18-14 Room Finishes, Door and Hardware Schedule – March 2010

4. PG-18-15 VOL C A/E submissions instruction of Minor and NRM

Construction Program Nov 2008.

VA FIRE PROTECTION DESIGN MANUAL

1. VA Fire Protection Design Manual—Eight Edition, June 1, 2021

VA HVAC AND PLUMBING DESIGN MANUALS

1. HVAC Design Manual—November 1, 2017, Rev 1 May 1, 2019, rev 2 March 1, 2020 http://www.cfm.va.gov/til/dManual/dmlHVAC.pdf

2. Plumbing Design Manual PG-18-10—May 1, 2021

American Society of Heating, Refrigeration, and Air-Conditioning Engineers (ASHRAE)

1. Standard 62.1 – Ventilation for Acceptable Indoor Air Quality, 2017

2. Standard 90.1 - Energy Standard for Buildings Except Low-Rise Residential Buildings, 201

3. Standard 170 - Ventilation of Health Care Facilities, 2013

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

Sheet Metal and Air Conditioning Contractors National Association

1. HVAC Duct Construction Standards - Metal and Flexible

2. HVAC Systems Commissioning Manual, 2nd Edition, 2013

3. Seismic Restraint Manual Guidelines for Mechanical Systems, 3rd Edition, 2008

VA INTERIOR DESIGN

1. Interior Design Manual for New Construction and Renovations of Hospitals and Clinics—

November 1, 2020 http://www/cfm.va.gov/til/dManual/dmlDhonh.pdf

VA ELECTRICAL DESIGN

1. VA Electrical Design Manual – December 1,2019

VA LIGHTING DESIGN

1. Lighting Design Manual — December 2015 http://www.cfm.va.gov/til/dManual/dmLighting.pdf

VA SITE

1. Parking Design Manual and Demand Model – April 1, 2013, rev 11/1/2016 https://www.cfm.va.gov/til/dManual/dmParking.pdf

2. Site Development Design Manual – February 1, 2013 https://www.cfm.va.gov/til/dManual/dmSITE.pdf

3. Site Development Design Manual Appendix – February 1, 2013 https://www.cfm.va.gov/til/dManual/dmSITEAppendix.pdf

VA STRUCTURAL

1. VA Seismic Codes and Standards, H-18-8 http://www.cfm.va.gov/til/seismic.asp

VA SUSTAINABILITY

1. Sustainable Design Manual – Rev 1 August 18, 2017 https://www.cfm.va.gov/til/sustain/dmSustain.pdf

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

VA ASBESTOS ABATEMENT

1. Asbestos Abatement Design Manual for New Hospitals, Replacement Hospitals, Ambulatory Care, Clinical Additions, Energy Centers, Outpatient Clinics, Animal Research Facilities, Laboratory

Buildings – July 2011

2. Lead Based Paint Removal and Disposal

3. See specification Section 02 83 33.13 for list of Code of Federal Regulations (CFR) that apply to this work.

VA PHYSICAL SECURITY AND RESILIENCY

1. Physical Security and Resiliency Design Manual – October 1, 2020, rev 4/1/2021

Appendix A1 – VA Standard Security Door Types – October 1, 2020

Appendix A2 – Security Door Opening Schedule – October 1, 2020

Appendix A3 – Security Door Opening Matrix – October 1, 2020

Appendix 4 – Security System Application Matrix – October 1, 2020, rev 4/1/2021

VA DIRECTIVES

1. 0055 Energy and Water Management Program—December 10,

2. 055 VA Sustainable Building Program—October 11.

EHRM PROGRAM DESIGN ALERTS

SOCAMES 6 DESIGN ALERTS

#1 HEFP 10NA5G 29 April 2020-Unshielded Twisted Pair Cable Length Limitations

#2 HEFP 10NA5G 16 March 2021 VA OEHRM Help Desk Relocation

#3 HEFP 10NA5G 20 April 2021 Find User Training Requirements

#4 HEFP 10NA5G 07 June 2021-Telecomm Room Space Requirements in Existing Buildings

#5 HEFP 19HEFG 17 August 2021 – Fire Suppression in Data Centers

#7 HEFP 10NA5G 10 December 2021 – Standard TE Fan-Cooled Criteria

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

#8 HEFP 10NA5G 18 April 2022 – Temp and Humidity Conflict Resolution

COMPONENTS AND FINISHES

1. https://www.cfm.va.gov.til/dManual/dmTelecomm.pdf

2. U.S. Department of Veterans Affairs Office of Information & Technology (OIT) Infrastructure

Standards for Telecommunications Spaces Version 3.1 July 1, 2021

3. ANSI/NECK/BICSI 568 Standard for Installing Commercial Building Telecommunications Cabling

4. ANSI/TIA-1179, ANSI/TIA1179-A Healthcare Facility Telecommunications Infrastructure

5. TIA TBS-162-A, Telecommunications Cabling Guidelines for Wireless Access Points

6. ANSI/NECA/BICSI 607-D, Generic Telecommunications Bonding and Grounding (Earthing) for

Customer Premises July 2019

7. 802.3at-2009 - IEEE Standard for Information Technology—Local and metropolitan area networks—Amendment 3: Data Terminal Equipment (DTE) Power via the Media Dependent

Interface (MDI) Enhancements

8. 802.11ac-2013 – IEEE Standard for Information technology –Telecommunications and information exchange between systems – Amendment 4: Enhancements for Very High

Throughput for Operation in Bands below 6 GHz.

9. Wireless LAN (WLAN) Standard and WLAN Controller – Secure Configuration Baseline https://vaww.vashare.oit.va.gov/sites/itops/svcs/sma/BCM/Approved_Baseline/Wireless%20LA

N%20(WLAN)%20Standard%20and%20WLAN%20Controller%20-

%20Secure%20Configuration%20Baseline.pdf

12. https://vaww.vashare.oit.va.gov/sites/itops/svcs/sma/BCM/Approved_Baseline/Wireless%20L

13. The U.S. Department of Veterans Affairs, Physical Security Design Manual for Mission Critical

Facilities, January 2015 hrrp:www.cfm.va.gov/til/PhysicalSecurity/dmPhySecMC.pdf

14. U.S. Department of Veterans Affairs Enterprise Infrastructure Standard: Quality of Services (QoS) https://vaww.vashare.oit.va.gov/sites/itops/svcs/sma/BCM/Approved_Baseline/VA%20Enterpris e%20OIT%20Infrastructure%20(QoS)_1-14pdf

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

15. U.S. Department of Veterans Affairs Office of Construction & Facilities Management HVAC Design

Manual dated Revised May 1, 2019 https://www.cfm.va.gov/til/dManual/dmHVAC.pdf

16. U.S. Department of Veterans Affairs Enterprise Local Area Network (LAN) Technical Architecture

Standard, Version 2.1, February 13, 2019 https://vaww.vashare.oit.va.gov/sites/itops/svcs/sma/BCM/supporting_Documents/Enterprise%

20Local%20Area%Network%20 (LAN)%20Technical%20Architecture%20Standard_v2.1pdf

17. VHA Directive 1028 FACILITY ELECTRICAL POWER SYSTEMS, dated February 24, 2020

18. https://www.va.gov/vhapublications/ViewPublication.asp?pub_ ID8723

19. OEHRM Joint Security Architecture (JSA) Requirements Specifications Document (RSD) – Draft, not yet publicly available.

20. https://dvagov.sharepoint.com/sites/VACO.OEHRMoffice/Misc/SitePages/Construction_Admin.a spx

21. U.S. Department of Veterans Affairs Electronic Health Record Modernization Cabling

Infrastructure (VIEWS 01426385) Executive Decision Memorandum, date September 23, 2019

22. VA Systems Engineering Solution, Cerner EHRM Forward Deployed Server, dated April 20, 2019

23. VA DIRECTIVE 6500 VA CYBERSECURITY PROGRAM Reissue 4 dated January 29, 2019

24. VA DIRECTIVE 6512 SECURE WIRELESS TECHNOLOGY dated October 12, 2017

25. U.S. Department of Veterans Affairs Office of Information & Technology (OIT) Printer and

Multifunction Device Secure Configuration Baseline Version 1.4 August 5, 2019

26. https://vaww.vashare.oit.va.gov/sites/itops/svcs/sma/BCM/Approved_Baseline/Printer%20and%

20Multifunction%20Devices%20Secure%20Configuration%20Baseline.pdf

27. OEHRM Infrastructure Readiness Playbook v2.0

28. https://dvagov.sharepoint.com/sites/VACO.OEHRMoffice/Misc/Construction_ANCMTS/OEHRM%

20Infrastructure%20Readiness%20Playbook%20v2.0%20_Signed.pdf

29. Veterans Affairs OCFM H-18-8 Seismic Design Requirements, November 1, 2019

30. https:www.cfm.va.gov/til/etc/seismic.pdf https://www.cfm.va.gov/til/etc/seismic.pdf

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

Telecommunications Room Architectural Provisions

• Room width and depth – Varies per location in buildings and number of data drops the room supports.

• Design Standard call for an additional 12” deducted space at wall mounted backboards for mounted equipment

• Egress – Follows applicable NFPA 101 Life Safety requirements

• Door Width 3 ft.

• Door Height 8 ft. Varies pending existing building accessibility path.

• Floor to ceiling Varies per location in building(s)

Height

Wall area above the backboard surfaces shall be painted 5/8” Type X gyp bd to bottom of floor or roof framing above.

• Floor Surface Electronic Discharge (ESD) floor tile

• Walls Type X gyp bd and metal studs or CMU faced with

Continuous 4ft x 8ft AC ¾” fire treated plywood backboards coated with 2 coats of high gloss fire retardant paint.

Wall area above the backerboard surfaces shall be painted 5/8” Type X gyp bd bottom of floor or roof

• Water Barrier Any walls of a TR contiguous with an existing wall that has plumbing fixtures or supply lines running in it will have a roll on or sprayed elastomeric water barrier membrane under a new layer of 5/8” gyp bd.

• All door frames will be heavy duty hollow metal welded frames

• Doors exposed to public view will be 1-3/4” solid core, material species, grade and cut to be determined

• Doors in “back of the house” areas will be 16 gauge, rated painted hollow metal

• New doors in existing rated corridor walls will have a 45-minute fire rating

Montana HCS – Fort Harrison VAMC Architectural Design Standards

In addition to complying with VA National Design Standards and the HRM program requirements the design and materials will follow campus wide standards.

Door hardware

• Lockset Manufacture and model – to be provided by VA locksmith

• Removable keycores; Manufacturer / Supplier – to be provided by VA locksmith

• Three heavy duty hinges per door

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

Electronic Access Control Standards

• JCI is the access control vendor

• Information for the access control panels, card readers, scramble prox sensors, RTE sensors, etc. to be sent to GDM Team once the data is available.

Interior Walls

• 5/8”” Type X smooth finish gypsum board with ¾” fire rated plywood 8ft high back board panels on all walls.

• Gypsum board and plywood panels will be coated with high gloss white fire retardant paint.

Floor Covering

• Grounded static dissipative resilient floor and rubber base tile

• Manufacturer quality and color to comply with VA Design Standards

Fire Stopping of Wall Penetrations

Fire stopping for all new penetrations shall be provided. Locations for hour rating of existing rated firewalls, smoke walls, and smoke barriers are shown on the Statement of conditions Drawings

Hilti products will be specified as the Basis of Design. Each new rated penetration will be red in color and marked with its UL label certification number.

LIFE SAFETY AND FIRE CODE COMPLIANCE

TR spaces are unoccupied accessory use spaces and do not change or affect the occupancy or hazard classification of the buildings or the building area in which they are located. All new work for the EHRM modernization will meet existing code; however, there are known compliance issues with existing conditions. In accordance with NFPA 101 Section 43.4.1.4, no modifications will make the existing buildings less conforming with the code.

The Veterans Health Administration Office of Occupational Safety Health (19 HEF) has issued the eighth edition of the VA Fire Protection Design manual, date June 1, 2021. The requirements in this updated manual were incorporated into this project. A portion of manual concerning telecommunication rooms reads as follows:

Per this manual telecommunication rooms (TR) that are provided with wet pipe sprinkler protection as part of the existing building sprinkler system are not required to be provided with any additional fire protection such as fire rated walls, smoke detection, or a gaseous suppression system.

General Storage in Telecommunications Spaces. Paper stock, equipment packed in cardboard boxes, and other combustibles within telecommunications spaces must be restricted to the absolute minimum

INFRASTRUCTURE UPGRADES

Project No. 436-21-700 necessary for efficient operation. Any such materials in these spaces must be kept in totally enclosed metal file cases or cabinets.

For telecommunications rooms (TR) clean agent fire portable extinguishers are being provided no greater than 75 feet away from the IT space on the corridor wall in fire extinguisher cabinets.

Telecommunications rooms are typically locked and are only accessible to IT personnel. Technicians responsible for inspecting fire extinguishers will have more available access if the extinguishers are located outside the locked space.

Per the requirements of NFPA Chapter 19 Existing Healthcare Occupancies, Chapter 39 Existing Business

Occupancies any hazardous area shall be safeguarded by a fire barrier having a 1-hour fire resistance rating or shall be provided with an automatic sprinkler system in accordance with NFPA 101-8.7.1.

Per NFPA 101—2021 39.2.1.4 Means of Egress Requirements:

‘Floor levels that are below the street floor, are used only for storage, heating, and other service equipment; and are not subject to business occupancy shall have means in accordance with Chapter 42.’

Per NFPA 101 Table 42.2.5 Arrangement of Means of Egress:

An ordinary hazard storage occupancy in a non-sprinklered building is limited to 100 ft. for common path of travel, 50 ft. for dead end corridor and 200 ft. travel distance with two means of egress.

By applying the same provisions of NFPA 19 Existing Healthcare Occupancies for Fire Barrier around the new TR with a 1-hour fire resistance rating it is GDM’s opinion and that of our fire protection engineer consultant the TRs meet the intent of NFPA 101 and that of VA’s past interpretations on similar equivalency evaluations.

The design, installation, connection, and testing of a complete condensed aerosol fire suppression system for any unsprinklered TRs shall include, but not be limited to, condensed aerosol generators, fire alarm releasing control panels, automatic alarm initiating devices, audible and visual alarm notification appliances, abort button(s) and manual pull station(s) for suppression release, and any other required devices and connections, including wire and hardware.

The condensed aerosol fire extinguishing system will comply with all requirements of NFPA 2010 and

NFPA 72, except as modified and supplemented by the specification. The system shall be electrically supervised and monitor the integrity of all conductors and connections.

Basis of Design is Hochiki America FirePro Xtinguish or equivalent.

Fire Protection Engineer Reviews

GDM Team FRE Review will be conducted by James P. Begley, PE, FSFPE, CFM, Principal Fire Protection

Engineer.

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

ACCESS DOOR HARDWARE FOR THE TELECOMMUNICATION ROOMS AND THE UPDATED MAIN

COMPUTER ROOM

VA Physical Security and Resiliency Design Manual Oct 1, 2020, rev 1 April 1, 2021 describes in Appendix

A3 security door opening matrix what hardware is required for telecommunications main distribution frame room and telecommunication rooms accessible from interior corridors.

Continuous hinge(s)

Flush bolts (on double doors)

Mortise lock

- Operation at all times:

• Outside level always ridged

• Latchbolt released by key from corridor side and by lockset level inside

GDM to verify with maintenance staff the use of tamper resistant heavy duty leaf hinges in lieu of continuous piano hinges.

Middle hinge will be electrified to support the door access control system and the Schlage L909x series electrified mortise locks. Separate secondary key operated deadbolts are no longer required.

Specification section 08 71 00 will include detailed door hardware schedules for all doors.

MECHANICAL SYSTEMS

1. Design Codes and Standards

A. American Society of Heating, Refrigeration, and Air-Conditioning Engineers (ASHRAE)

1. Standard 62.1 – Ventilation for Acceptable Indoor Air Quality, 2017

2. Standard 90.1 - Energy Standard for Buildings Except Low-Rise Residential Buildings, 2013

3. Standard 170 - Ventilation of Health Care Facilities, 2013

B. International Code Council (ICC)

1. IBC – International Building Code, 2021

2. IFC – International Fire Code, 2021

3. IFGC – International Fuel Gas Code, 2021

4. IMC – International Mechanical Code, 2021

5. IPC – International Plumbing Code, 2021

C. Sheet Metal and Air Conditioning Contractors National Association

1. HVAC Duct Construction Standards - Metal and Flexible

2. HVAC Systems Commissioning Manual, 2nd Edition, 2013

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

3. Seismic Restraint Manual Guidelines for Mechanical Systems, 3rd Edition, 2008

D. US Department of Veteran’s Affairs (VA)

1. HVAC Design Manual (Revision 1), PG18-10, 1 May 2019

2. Sustainable Design Manual (Revision 1), 18 August 2017

a. Requirements for VA Minor New Construction and Renovation Projects (i.e., Under

$20,000,000)

3. Whole Building Commissioning Manual (Revision 1), November 2013

2. HVAC Systems

A. Description

1. General HVAC

a. Duct

1. Ductwork will be steel sheet metal, fabricated rectangular or premanufactured oval or spiral wound round ductwork, all constructed per SMACNA guidelines.

b. Refrigerant Piping

1. Refrigerant piping will be ASTM B280, Type ACR hard drawn or annealed copper with

Brazed joints.

c. Cooling Piping

1. Chilled water or glycol piping will be copper type K if 2” and smaller or welded/flanged steel if 2-½" and larger.

d. Filtration

1. Replaceable filters will be provided at each indoor CRAC unit, minimum rating of MERV

8.

e. Air inlets/outlets

1. Air inlets and outlets will be provided in each space as required to distribute ventilation airflow in the larger data room spaces.

2. Air inlets and outlets will be constructed of aluminum or steel. They will be painted/coated to match surrounding architectural finishes.

f. Insulation

1. Ductwork will be externally insulated to meet IECC requirements.

2. Refrigerant piping insulation will be closed-cell elastomeric type.

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

3. Aluminum jacketing will be provided over insulated refrigerant piping located at exterior of buildings.

a. Where required, jacketing will be painted to blend in with adjacent building construction.

g. Lining

1. No duct lining is intended to be utilized on this project.

h. Control Dampers

1. Control dampers with electronic actuators will be provided at all OSA inlet and exhaust outlet locations.

2. Shutoff dampers at OSA inlets and exhaust outlet locations will meet IECC leakage requirements.

i. Fire/Smoke Dampers

1. Fire and smoke dampers (or combination fire/smoke dampers) will be provided at all locations required by code.

2. Smoke dampers will be provided with integral duct smoke detectors or separately mounted duct smoke detectors. All duct smoke detectors will be addressable type and will be connected to the building fire alarm system.

j. Firestopping

1. All firestopping installation locations will be provided with UL listing sticker.

2. All firestopping shall be red in color

k. Main Computer Room (MCR) Cooling

1. The existing CRAC units (with associated outdoor units) will be reused for cooling and humidity control. The existing units are Liebert Upflow Indoor units with a nominal cooling capacity of 85 kW. The calculated cooling load of the MCR is 80 kW. This meets the VA requirement for N+1 redundancy as either unit can provide the required cooling capacity.

2. The existing CRAC units (with humidification/dehumidification capabilities) will provide cooling & conditioning for the data cabinets in this room in conjunction with a new cold-aisle containment system and updated data cabinet arrangement. The units will be relocated to a room separated from the MCR. New duct work will

INFRASTRUCTURE UPGRADES

Project No. 436-21-700 provide conditioned air to the cold aisle containment system and remove warm air from the hot side of server racks. The units will be linked together using the manufacturer’s controllers and will be configured to operate together in a lead/lag configuration that will also allow concurrent operation at low capacities to maximize energy savings, as well as managing redundancy in the system.

3. Design Criteria:

a. Space conditions will be designed to meet VA HVAC Design Manual & OIT

OEHRM Program requirements (72-81°F temperature range, 30-60% relative humidity, non-condensing).

l. IT/Data Closets (Small Rooms)

1. A dedicated CRAC unit (with humidification/dehumidification capabilities) will provide cooling for these rooms. Use of an independent unit will allow temperature control at all times without requiring the main building conditioning systems

(hydronic loop, VRF units, etc.) to be activated.

2. CRAC units will be provided as single units without any redundancy.

3. In buildings with a single data room, the CRAC unit will have a dedicated outdoor condensing unit. In buildings with multiply data rooms, CRAC units will have indoor water cooled condensers with a single outdoor dry cooler unit to serve all CRAC units.

4. Design Criteria:

a. Space conditions will be designed to meet VA HVAC Design Manual & OIT

OEHRM Program requirements (41-95°F temperature range, 8-80% relative humidity, non-condensing).

2. Ventilation

a. The existing ventilation systems for the building are intended to be re-used and will be re-routed as necessary to accommodate the new room configurations.

3. Hydronic Heating Systems

a. Hydronic heating water system piping will be re-routed as necessary to accommodate the new room configurations.

4. Plumbing Systems

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

a. Existing domestic CW system connections will be provided for CRAC units to enable humidification functions.

1. These connections will be made from the domestic water system.

2. Each water connection to a CRAC unit will be provided with a strainer and isolation valving located outboard of the CRAC unit for ease of maintenance access.

b. Sanitary drain connections will be provided for CRAC units to allow condensate drainage and drainage for dehumidification functionality.

5. Controls

a. The existing Schneider Electric direct digital control (DDC) system that serves the facility will be updated to integrate the new systems and devices provided under this project, as well as mechanical systems that are removed or modified.

b. Each data/IT space will be provided with new space temperature and humidity sensors to enable monitoring of those spaces.

c. The DDC system operates on the VA network with a dedicated subnet.

6. Alternative Systems Considered

a. Mini-split systems

1. Refrigerant-based mini split systems may be an option to provide conditioning for small IT/data spaces, however they would not provide control of humidity levels in the spaces. Due to the environmental conditions in the area, we feel that small CRAC units are a better solution for this reason as they provide specific control of humidity

(including humidification & dehumidification).

b. Underfloor air distribution

1. The existing raised floor system is configured at 6” above the base floor level. Per

CRAC unit manufacturer guidelines, the minimum height of a raised floor system for use as a supply air plenum is 12”. This is intended to allow airflow within the supply plenum without undue obstruction due to cabling and other items that are also routed within the raised floor system. The existing raised floor system will be removed as it does not meet minimum requirements for raised floor air distribution.

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

2. Raising the existing raised floor system in order to achieve the required floor height for underfloor air supply was evaluated. It was determined that raising the existing system was not viable. The limiting factors related to this are as follows:

a. The overall room height (8’-0” between current raised floor surface and existing dropped ceiling, with approximately 12” clear above existing racks).

b. The room location and area is changing, re-use of of the existing raised floor would be limited to a small area of the new MCR.

B. Space Coordination

1. Where existing mechanical systems (HVAC duct, VAV units, mechanical piping, plumbing, etc.) are located in data spaces, these items will be relocated to the extent possible to be out of the data room space.

2. Any liquid-carrying piping will be relocated to be outside of data room spaces (wherever possible).

3. Pipe Routing

a. Where possible, to minimize impact to interior spaces, refrigerant/cooling piping will be routed from the IT spaces, through ceiling spaces, to the building exterior and run exposed down exterior walls. Locations of exposed exterior piping will be selected to be in areas that are concealed or that already have other piping & exposed.

1. Exposed pipe routes will be preferably located in corners or adjacent to other exposed piping.

b. Where required to comply with SHPBO requirements (and where an exterior exposed route is not possible/practical per above notes), refrigerant piping may be routed vertically within the building footprint. In such cases, it is intended that piping will be routing either within existing chases, or new chases will be provided to enclose the piping.

3. Studies & Calculations

A. HVAC load calculations will be provided for each space.

ELECTRICAL SYSTEMS

1. Electrical Systems

a. Wiring Methods

i. General wiring methods are to be in conduit. Minimum conduit size shall be 3/4".

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

Electrical Metallic Tubing will be used in indoor locations. Underground conduit will be

PVC schedule 40 with Galvanized Rigid Steel bends. Exposed exterior conduit will be

Galvanized Rigid Steel.

ii. The minimum size for branch circuit conductors will be #12 AWG.

iii. The minimum size conductors for control wiring will be #14 AWG.

iv. The minimum size conductors for signal wiring will be #18 AWG.

v. Conductor Insulation type will be THHN/THWN-2 indoors, and XHHW-2 outdoors.

vi. Conductors for Underground installation will have type THW, USE, or RHW insulation.

vii. Neutral conductors will be full size throughout the system as a minimum. Provide oversized neutrals for telecom distribution. No shared neutrals will be provided.

viii. Wire for power and lighting will be solid and stranded copper conductor with thermoplastic THHN/THWN, 75°C insulation.

b. Wiring Devices

i. Specification grade 20-ampere switches and receptacles will be installed. Special ampere and voltage outlets are provided for specific equipment as programmed.

ii. Receptacles for telecommunications racks shall be NEMA L21-20R or L21-30R, 3-phase, 4-wire with ground, 20A or 30A locking type. Dual receptacles will be provided at each rack location, fed from separate sources, per the OIT standards.

iii. Receptacles for maintenance and special equipment will be provided as required by code. Receptacles will be provided per equipment layouts and equipment requirements.

iv. Receptacles will be provided in each space per program requirements.

v. Receptacle and faceplate color shall be red for devices served from the UPS system, and white for all others.

vi. All receptacles in exterior locations will be in-use extra duty weatherproof with weather resistant GFCI type receptacles.

c. Panels

i. Panels shall be factory-assembled with molded case circuit breakers and integral accessories as shown on the drawings. This includes TVSS and/or power metering equipment.

ii. Panel bussing shall be copper, and all breakers shall be the bolt-on type. Bussing shall be braced for the available short circuit current as shown on the drawings, but not less than

10kAIC for 120/208V panels.

iii. Enclosures shall be galvanized steel, NEMA 1 rated for indoor locations. Include removable inner dead front cover independent of the panel. Cover trim shall be the door in door type with hand-operated latch.

d. Grounding

i. Grounding for the building will be in compliance with Article 250 of the National Electrical

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

Code. All electrical power and communication systems shall be bonded to the equipment grounding system for both safety and ground potential differences. All branch circuit conduits will contain an equipment ground conductor from panel ground bus to the devices and equipment served.

ii. All communication rooms will be provided with a ground bar and a minimum of a #6 copper ground conductor connected to the building grounding electrode system. A new telecommunications grounding system will be installed in all new spaces.

iii. Telecom bonding backbone will be installed in all buildings if not present, and connected to the building grounding system.

e. Raceways:

i. General

1. A complete raceway system will be provided for all power conductors.

2. Rigid metal conduit, intermediate metal conduit and/or electrical metallic tubing will be used within the building. Rigid metal conduit be used where conduit is installed both exposed and in location that is susceptible to damage.

3. Empty conduit raceway systems will be provided for any communication cables located in areas with non-accessible ceilings or exposed structure and coordinated with IT.

4. Surface raceway or EMT will be used for new wiring in locations where it cannot be concealed in walls.

f. Lighting System

i. General

1. Design of lighting and electrical power distribution systems shall comply with the applicable VA design manuals.

2. Lighting will be served at 120 or 277V (depending on availability), single-phase, 60 hertz.

3. All lighting will be energy star rated. ASHRAE 90.1 – will be used for lighting power density and voltage drop calculations.

4. Emergency/egress and exit lighting will have emergency LED drivers or be connected to emergency circuits

5. Illumination levels will be provided to meet the requirements of the Illuminating

Engineering Society Standards and VA requirements in PG 18-12. All stated illumination levels will be at average-maintained levels, calculated at the work surface using an 80% maintenance factor.

6. Spaces with exposed ceilings will be illuminated with direct/indirect, pendant mount

LED fixtures.

7. LED lighting will be provided throughout new spaces.

8. Exit identification will be provided to identify egress pathways in accordance with building codes.

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

g. Security System

i. Card readers will be provided at interior doors of new IT spaces and tied into existing or new access control panels.

h. Fire Alarm System

i. Fire alarm systems will be in compliance with VA Fire Protection Design Manual.

ii. The existing buildings are provided with a fire alarm system. As part of this expansion/addition project, the new fire alarm devices will be integrated into the existing fire alarm system.

iii. Visual alarms will be provided throughout the new telecom rooms. While not required by the VA Fire Protection Design Manual for telecom rooms, the presence of ambient noise, full height walls, and potential for focused, extended work leads us to include them as a best practice.

iv. Smoke detectors in telecommunications spaces will be provided only where required to meet NFPA and VA requirements.

i. Communications

i. Fiber Optic OS1, OS2, and OM4 cabling:

1. The new Telecommunication Rooms (TR) will provide a central termination point for fiber optic backbone cables and data outlet wiring. This room will provide space for required communications electronic equipment.

2. Intrabuilding OS1 and OM4 fiber optic backbone cabling will be provided from the MCR to TR’s in Building 141, 154, 154A, and 169, including the demarc room B1A, where OIT uses a second core switch. B-side fiber distribution will be provided from B1A to the

TR’s, while A-side will originate in the MCR. New LIU’s and fiber optic patch panels will be provided within the new and existing communication spaces as required.

3. Interbuilding OS2 fiber optic backbone cabling will be derived from the MCR to each TR in outbuildings away from the central hospital complex. OS2 will be routed along existing paths to each room. New LIU’s and fiber optic patch panels will be provided within the new and existing communication spaces as required.

4. New underground conduit and a manhole will be installed serving Buildings 16, 17, 43, and 47, from the existing vault central to these buildings.

5. All fiber optic cables shall be routed in innerduct.

a. For exterior routing of fiber three Maxcell 3” 3-Cell has been designed into the project within each 4” conduit.

b. For interior routing of fiber optic cabling orange corrugated innerduct shall be used.

6. New TR spaces will be provided as shown in contract documents to provide compliance with OIT Infrastructure Standards.

7. Clinical TR’s will receive a minimum of (2) telecom racks, non-clinical will have (1)

INFRASTRUCTURE UPGRADES

Project No. 436-21-700 unless cable density dictates otherwise.

8. New recessed workstation outlet locations will be provided:

a. Single gang or two gang Stainless steel faceplate as required for quantity of jacks at location.

b. Non-populated faceplate positions shall be covered by blank covers.

c. Cables and faceplate shall be labeled in accordance with details in drawings.

d. Single Gang or Dual Gang MPLS straps as required

9. New surface mount workstation outlet locations shall be housed in Wiremold aluminum surface mount raceway.

10. New above ceiling and camera device cables shall be terminated using field termination plugs.

11. Pathways

a. Copper communications cable shall be supported at appropriate distances by J-hooks sized along pathways for a maximum of 40% fill at any given location.

b. Fiber Optic communications cable shall be run in orange corrugated innerduct, EMT, or underground PVC conduit as shown on drawings.

c. Penetrations though walls or fire barriers shall pass through via Hilti

SpeedSleeves or equivalent and/or EMT as called out on drawings.

d. All penetrations shall be appropriately fire stopped and labeled.

12. Spaces, pathways, outlet boxes, and Category 6A cable to meet OEHRM requirements.

Workstation jacks, patch panels and mounting racks will be provided to serve as infrastructure for the VA’s communication system.

13. Racks will be channel racks or server cabinets per OIT requirements. Overhead cable tray will be installed in each TR and throughout the MCR to allow for routing of structured cabling.

14. New telecom outlets and cabling will be provided prior to demolition of any active outlets to allow for parallel build out prior to network migration.

15. Existing cable tray will be re-used to the extent possible. New j-hooks will be installed above accessible ceilings for new cabling pathways. Cable tray will be replaced/upsized if cable counts exceed capacity and there is space to modify it.

16. MCR cabling will be provided to interconnect main distribution area to server cabinets.

j. Power Distribution Systems

i. Building 154, 154A

1. New TR’s will be served with new branch panels from the generator distribution system. A common feeder will be provided with taps in each room if rooms are stacked or in close proximity, and a main circuit breaker branch panelboard installed. A

INFRASTRUCTURE UPGRADES

Project No. 436-21-700 second feeder with the same distribution method will be provided from the Normal branch. Both feeders will originate in existing main distribution panels located in the building. These feeds will be from the buildings main switchboard as space allows.

Additional feeds may be fed from other distribution panels if additional space is required.

2. All TR’s will have a rack-mounted UPS.

3. MCR: New UPS’s and panels in parallel redundancy will be provided for the new MCR under separate contract. Circuits will be provided from those panels to the racks under this project. Power will be routed overhead to all cabinets via busway A/B systems.

ii. Outbuildings

1. New circuits from two different branch panels will be provided in each new TR or

Cabinet, with one circuit powering a rack-mounted UPS.

2. All TR’s or Cabinets will have a rack-mounted UPS.

STRUCTURAL DESIGN

All new facilities, new additions, and existing buildings requiring major renovations and/or seismic strengthening will be designed in accordance with VA and local Standards for Fort Harrison, MT.

Where applicable, we will verify the load-bearing capacity of the existing structural elements to support the new design loads including all previous renovations. We will review as-built conditions of lateral load resisting systems with respect to ductility and post elastic energy dissipation and deflections.

Where alterations have to be made to the structural elements in existing buildings, these elements individually and the buildings as units, must maintain adequate strength to safely resist both gravity and lateral loads. Any resulting deficiencies will be reinforced accordingly. All structurally modified components will be brought into accordance with current code. Renovations that serve to increase the gravity load on any structural element by more than 5% will be brought into compliance with current code. Renovations that serve to increase the seismic force in any structural element by more than 10% will be brought into compliance with current code. We will evaluate and identify whether or not a full or partial seismic renovation is recommended per codes or VA Design Guides.

The structural concepts and considerations as noted in this 10% BOD shall be evaluated, reviewed, discussed, and confirmed with the COR during the early stages of the project. Concepts shall be developed in sufficient detail to adequately identify the effect on the project program, cost, and schedule with respect to various options.

1. Design Codes

A. International Building Code (IBC 2021)

B. American Concrete Institute (ACI 2019)

C. American Institute of Steel Construction (AISC 15TH Edition)

D. American Society of Civil Engineers (ASCE 7-16)

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

2. Design Loading Criteria:

A. Minimum uniform basic design live loads will conform to current code. Increase live load above code limits where current and future program flexibility is required as discussed with the COR.

B. We will provide a 20 psf allowance for partitions on floors where specified live load is less than 100 psf.

C. Provisions shall be made in designing floors for a concentrated load of 2000 lb, placed upon any space 2.5ft square, wherever this load upon and otherwise unloaded floor would produce stresses greater than those caused by the uniform load.

D. All building modifications and building components will be designed in accordance with a minimum IBC and ASCE Occupancy Category III per code regardless of building program. New work in essential Facilities will be classified as Occupancy Category IV per VA Design Guide.

3. Systems

A. Foundation

1. Any new foundations swill be designed based on available geotechnical reports for the site. Team Engineers and QC Manager will review appropriateness and costs as applicable for options including footings, mat foundations, deep foundations (drilled piers, piles and caissons), including the potential for soil-ground remediation measures as is required by contract.

B. Schematic Design

1. We will provide Design Criteria including Governing Codes and Reference Standards, Deign Live and Dead Loads, Seismic and Wind Load and Factors, and Special Loads such as Exterior Finish, and Vibration; Material Strengths and Types of Concrete and Concrete

Materials, Reinforcing Steel, Post Tensioning, and Pre-Stressing, masonry, Structural Steel including Metal Deck, Welding, and Bolts, Miscellaneous Steel, Glue Laminated Wood, and wood. We will identify target drift limits for primary structural and non-structural architectural components.

C. Schematic Design Phase Structural Framing Options

1. Compare and contrast structural framing options including reinforced concrete, structural steel, precast, masonry and timber as appropriate with respect to floor and roof bay spans, cost efficiency, and floor and building heights and program requirements.

Identify advantages and disadvantages for the various structural options with respect to the vertical gravity system, lateral load resisting systems, construction schedule impacts, campus construction activity impacts, and cost effectiveness. Consideration of systems’ ability to be retrofitted or renovated should also be addressed. Preview structural system and coordinate interface with MEP systems and routing.

2. Structural systems will utilize sustainable and low VOC materials and building practices where practical in accordance with sustainability and LEED requirements as required by

VA Design Guides.

3. We will consider and account for adjacent structures and identify interaction issues during system development. Issues to consider and evaluate include method of excavation including temporary shoring concepts, proximity to existing basements, impact of new basements, deflection monitoring of existing structures during

INFRASTRUCTURE UPGRADES

Project No. 436-21-700 construction, building separation requirements as is required near renovations or excavations.

4. We will identify anticipated primary structure vertical and lateral deflections. Coordinate and evaluate deflection magnitudes with respect to the exterior façade joints, movement of façade between level and façade support details. Coordinate and confirm with design team and COR regarding acceptable levels of façade performance relative to building function after extreme seismic events, and up front construction cost relative to repair cost.

D. Lateral System

1. Lateral load resisting system will be appropriate for building requiring building modification or new additions. Lateral load resisting systems shall be code compliant and detailed for post elastic ductility and energy dissipation with limited damage.

E. Vibration

1. We will consider, evaluate, and accommodate vibrational and acoustical issues that may be caused by the new EHRM system components.

CIVIL ENGINEERING

Design Narrative

Project Description

The proposed primary and secondary fiber optic lines will be constructed under existing ground areas.

Fiber optic lines will be buried typically 3 feet below existing grounds using a conduit and manholes at junction points.

Site Preparation

Site preparation for the new fiber optic lines will consist of demolishing and removing existing landscaping, hard surfaces such as asphalt and concrete.

Site Grading

It is expected that the project may include limited site grading to construct pavement and landscaped areas. Site grading will be restored to match existing condition and will be performed in accordance with

Appendix J of the International Building Code (IBC).

Asphalt and Concrete Pavement Section

It is anticipated that the fiber optic lines will disturb existing asphalt and concrete surfaces. Disturbed asphalt and concrete surfaces will be restored from its existing condition.

Landscaping

The new fiber optic lines will avoid existing trees. Areas disturbed by the new fiber optic lines excavation will be restored from its existing condition. Trees and other vegetation close to excavation will be mark and protected using fencing.

Existing Utilities

INFRASTRUCTURE UPGRADES

Project No. 436-21-700

It is anticipated that the new fiber optic lines might conflict with existing utilities. The new fiber optic lines will avoid conflict with existing utilities such as storm water, steam, gas, and sewer systems.

REGULATED MATERIALS ABATEMENT

Asbestos

GDM will be responsible for verifying all routs of work during the schematic design phase where Asbestos

Containing Materials (ACM) will be disturbed by the new work. If any ACM is found along the route of construction GDM will complete a full survey that will be compliant with the sampling protocols of the

Asbestos Hazard Emergency Response Act (AHERA) by inspecting the materials for damage, measuring the amount of material and obtaining sample(S) for laboratory analysis. GDM will also provide a Certified

Asbestos Inspector to complete a walk through and survey if any ACM is found along the construction route.

ACM suspect material may be found in Building 154A, TR

Lead Paint and Flashings

GDM will be responsible for verifying all routes of work where Lead-Based Paint will be disrupted by completing a walk through. The objective of completing a walk through is to compare routes with Fort

Harrison Lead-Based Paint Program to determine if more testing for inspections are needed before construction phase. GDM will also provide a Certified Lead Inspector to perform inspection and testing if needed for the project. GDM will follow the guidelines, rules and regulations of federal and state agencies pertaining to lead programs on inspecting and testing measures.

PHYSICAL SECURITY SURVEY

GDM will provide an experience Physical Security Specialist to perform a physical security assessment for the EHRM upgrades to the Fort Harrison VAMC buildings. The physical security and resiliency assessment will meet the standards and practice of the U.S. Department of Veteran Affairs Physical Security and

Resiliency Design Manual. The objective of this assessment will be to provide the appropriate level of physical security and resiliency to the EHRM systems and facilities by providing a detailed report of areas of risk and focus on potential physical security gaps.