This federal solicitation calls for construction services to complete infrastructure upgrades at the Fort Harrison VA Medical Center campus in Montana. The contractor shall demolish existing structures, provide all labor, materials, and equipment to perform upgrades to multiple buildings and sites. Work includes architectural, structural, electrical, HVAC, plumbing, data communication, and site construction services. Specific scope involves building demolition and renovation, systems upgrades, fire protection improvements, security modifications, asbestos abatement, and landscaping. The Department of Veterans Affairs seeks these infrastructure upgrades through Buildings 141, 154A, 154B, 169, 154, 170, 171, 16, 20 and adjacent sites.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SITE
VA MEDICAL CENTER
FORT HARRISON, MT
MONTANA STATE MAP
MONTANA
PROJECT SITE
VA MEDICAL CENTER
FORT HARRISON, MT
PROJECT REGION MAP
PROJECT SITE
VA MEDICAL CENTER
FORT HARRISON, MT
PROJECT LOCATION MAP
HELENA, MT
PROJECT SITE
VA MEDICAL CENTER
FORT HARRISON, MT
PROJECT SITE MAP
VA MEDICAL CENTER
FORT HARRISON, MT
NORTH
154A
16A
154B
154-115
PROPOSED ALTERNATE LAYDOWN YARD.
SUBJECT TO CHANGE BY THE VA
PROPOSED LAYDOWN YARD,
SUBJECT TO CHANGE BY THE VA
PROJECT KEY PLAN
MONTANA VA HEALTHCARE SYSTEM
ROCKY MOUNTAIN NETWORK 19
3687 VETERANS DRIVE | FORT HARRISON, MT 59636
PROJECT
NORTH
NORTH
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/2
G e n e ra l In fo r2
.r v t
/2
/2
:2
:4
P
M
00-GI-004
PROJECT LOCATION MAPS &
CAMPUS PLANGDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
GEN INFO
Project Director
JPRTMP05/20/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
N.T.S.
PROJECT CAMPUS PLAN
Revisions: Date:
1 5/8" (1)
2 1/2" (2)
3 5/8" (3)
6" (6)
A SERIES PARTITION (GWB BOTH SIDES)
A
1 5/8" (1)
2 1/2" (2)
3 5/8" (3)
6" (6)
9 5/8" (10)
A-6
FIN. FLOOR, TYP
UNDERSIDE OF DECK
OR BEAM ABOVE, TYP
CONT SEALANT
BOTH SIDES, TYP
(FIRE RATED SEALANT AT
RATED WALLS)
SYMBOL:
CONT SEALANT
BOTH SIDES, TYP
STUD SIZE
(w/ INHERENT FIRE RATING, IF ANY)
WALL TYPE
METAL STUD w/
5/8" GWB EACH SIDE
SLIP TRACK
BATT INSULATION or SOUND
BATTS (WHERE REQ'D)
2A-6
FIN. FLOOR, TYP
UNDERSIDE OF DECK
OR BEAM ABOVE, TYP
FIRE RATED CONT SEALANT
BOTH SIDES, TYP
SYMBOL:
CONT SEALANT
BOTH SIDES, TYP
STUD SIZE
(w/ INHERENT FIRE
RATING)
WALL TYPE
METAL STUD w/
5/8" GWB EACH SIDE
SLIP TRACK
BATT INSULATION or SOUND
BATTS (WHERE REQ'D)
1A-6or
B SERIES PARTITION (GWB 1-SIDE)
B
C SERIES PARTITION (CONC)
C
M SERIES PARTITION (CMU)
M
NOT-RATED or 1-HOUR RATING UL DES U465 (MTL) 2-HOUR RATING UL DES U411 (MTL)
1 5/8" (1)
2 1/2" (2)
3 5/8" (3)
6" (6) B-6
FIN. FLOOR, TYP
UNDERSIDE OF DECK
OR BEAM ABOVE, TYP
CONT SEALANT,
TYP
SYMBOL:
CONT SEALANT,
TYP
STUD SIZE
WALL TYPE
METAL STUD w/
5/8" GWB 1-SIDE
SLIP TRACK
BATT INSULATION or SOUND
BATTS (WHERE REQ'D)
NOT-RATED (MTL)
TOP OF
WALL
CAST IN
PLACE
CONC
TOP OF
WALL
CONCRETE
MASONRY
UNITS (CMU)
12" (12)
7 5/8" (8)10" (10)
5 5/8" (6)8" (8)
3 5/8" (4)6" (6)
C-8
SYMBOL:
WALL TYPE
STUD SIZE
(w/ INHERENT FIRE RATING, IF ANY)
2A-6
SYMBOL:
STUD SIZE
(w/ INHERENT FIRE RATING, IF ANY)
WALL TYPE
VERTICAL ASSEMBLIES
1A-3CorA-3Cor
INDICATES WALL
BUILT ON TOP OF
CONCRETE STEM
CONCRETE SLAB ON GRADE,
REF STRUCTURAL
15 MIL. VAPOR PERMEABLE
AIR BARRIER
UNDERSLAB PER
GEO-TECHNICAL REPORT
FLOOR ASSEMBLY
F1
FLOOR ASSEMBLY
F2
FLOOR ASSEMBLY
F3
FLOOR ASSEMBLY
F4
METAL DECK,
REF STRUCTURAL
STEEL JOIST,
REF STRUCTURAL
CAST IN PLACE
CONCRETE
EPDM ROOFING SYSTEM
METAL DECK,
REF STRUCTURAL
1/2" SUBSTRATE BOARD
STEEL JOIST,
REF STRUCTURAL
(2) LAYERS POLYISOCYANURATE
INSULATION BOARD, STAGGER
JOINTS, 6" MIN
1/2" COVER BOARD
WOOD DECK,
REF STRUCTURAL
STEEL JOIST,
REF STRUCTURAL
CAST IN PLACE
CONCRETE
WOOD DECK,
REF STRUCTURAL
WOOD JOIST,
REF STRUCTURAL
CAST IN PLACE
CONCRETE
FLOOR ASSEMBLY
F5
WOOD SUB-FLOOR,
REF STRUCTURAL
WOOD JOIST,
REF STRUCTURAL
FINISH FLOOR
ROOF ASSEMBLY
R1
HORIZONTAL ASSEMBLIES
EXAMPLE: = 2-HOUR FIRE RATING (PER UL DESCRIPTION)
TYPE 'A' WALL
WITH 6" STUDS
TILE BACKER BOARD ( T )
ADDITIONAL WALL COMPONENTS:
L - LOW WALL
P - PARTIAL HEIGHT
S - SOUND BATTS
T - TILE BACKER BOARD
V - VAPOR PERMEABLE AIR BARRIER
W - WET WALL
C - WALL SITS ON CONC CURB
TYPE (A - Z)
STUD/MATERIAL
WIDTH
2 A - 6 T
FIRE RATING
2A-6T
WALL TYPE TAG LEGEND
NON-LIFTABLE
EPDM WASHERED FASTENER AS REQUIRED
GALVANIZED ANNULAR RING SHANK NAILS (3" O.C.)
ALUMINUM TERMINATION /
RESTRAINT BAR, FASTENED
WITH APPROVED
FASTENERS (8" O.C.)
WOOD CURB CONSTRUCTION
INSULATION ATTACHED
PER SPECIFICATION
REQUIREMENTS
MEMBRANE
HOT AIR WELD
ROOF TOP UNIT OR SKYLIGHT
8" MIN.
MEMBRANE FLASHING ADHERED IN FTR #
201 OR #190e ADHESIVE
PREMOLDED CORNER
FLASHING (FULLY
ADHERED)
METAL COUNTERFLASHING,
FASTEN W WASHERED FASTENERS
(12" O.C.)
MECHANICAL UNIT
SEALANT BEHIND TOP
OF FLASHING
STEEL CHANNEL AT
PERIMETER OF OPENING
SEALANT AS RECOMMENDED
BY ROOF MANUFACTURER
STAINLESS STEEL CLAMPING
RING
1-1/2" MIN. HOT AIR WELD
8" M
IN
1"
1" TO 12" DIA.
NOTES:
1. TEMPERATURE OF PIPE MUST NOT EXCEED 180°F.
2. NON-REINFORCED MEMBRANE FLASHING
WRAPPED AROUND PIPE SHALL HAVE 1 1/2" WIDE
MIN VERTICAL HOT AIR WELD.
ROOFING MEMBRANE
PER SPECIFICATION
2"
NON-REINFORCED FLASHING
MEMBRANE, APPLY HEAT TO
FLASHING AND HAND-FORM PRIOR
TO HOT AIR WELDING
ROOF SYSTEM
PER ROOF
TYPES
NOTES:
1. MEMBRANE SPLICE PROCEDURE IS FOR SPLICES BETWEEN CURED ROOF MEMBRANE SECTIONS
2. FOR TYPICAL MEMBRANE SPLICING PROCEDURES REFER TO THE APPLICABLE ROOFING SYSTEM
INSTALLATION SPECIFICATION IN PART 2.
3. APPLY SPLICING CEMENT OVER ENTIRE 1 1/2" MIN. SPLICE AREA PRIOR TO APPLICATION OF IN-
SEAM SEALANT.
4. IN-SEAM SEALANT SHALL BE CONTINUOUS ALONG THE LENGTH OF THE SPLICE
5. MAINTAIN A CONTINUOUS BEAD OF IN-SEAM SEALANT AT AL MEMBRANE SPLICES; ESPECIALLY AT
SPLICE INTERSECTIONS.
MIN. 1-1/2"W HOT AIR WELD
APPROX. 1/8" DIA. BEAD
OF EDGE SEALANT REQ'D
ON CUT EDGES OF
REINFORCED MEMBRANE
SEAM PLATE
6" T
Y P
ROOFING MEMBRANE
1/4" PROTECTION BOARD
1/2" MIN.
4 1/2" MIN.
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/2
G e n e ra l In fo r2
.r v t
/2
/2
:2
:4
P
M
00-GI-005
PROJECT ASSEMBLY TYPES AND
TYPICAL ROOF DETAILSGDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
GEN INFO
Project Director
JPRTMP05/20/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
6" = 1'-0"16
ROOF CURB DETAILS
1 1/2" = 1'-0"11
ROOF MEMBRANE AND LAP PENETRATION DETAILS
Revisions: Date:
| EHRM Ft Harrison Structural 100% CD |
| 141-SF-100 |
| 154-SF-100 |
154A-SF-100
21147.00 Fort Harrison VA - Civil 100% 5-20-2022
| CI0001 |
| RC0001 |
| CS0001 |
| CS0002 |
| CU0101 |
| CJ-00001 |
| 21147_AD Set |
| 21147_Bldg 20_AD |
| 20-AD-201 - 20-DEMOLITION FLOOR PLAN |
| 21147_Bldg 141_AD |
| 141-AD-200 - 141 -BASEMENT DEMOLITION PLANS |
| 141-AD-201 - 141-LEVEL 1 DEMOLITION PLAN |
| 141-AD-202 - 141-LEVEL 2 DEMOLITION PLANS |
| 141-AD-203 - 141 -LEVEL 3 DEMOLITION PLANS |
| 21147_Bldg 154_AD |
| 154-AD-200 - 154-BASEMENT LEVEL DEMOLITION PLAN |
| 154-AD-201 - 154-LEVEL 1 DEMOLITION PLAN |
| 154-AD-202 - 154-LEVEL 2 DEMOLITION PLAN |