This solicitation is for infrastructure upgrades construction services at the Fort Harrison VA Medical Center in Montana. The contractor shall provide all labor, materials, equipment and services to complete projects including architectural demolition and construction, structural alterations, electrical system upgrades, HVAC modifications and installations, plumbing system modifications and installations, data communication infrastructure upgrades, civil site work, asbestos and lead paint abatement, fire suppression and alarm upgrades, physical security upgrades, and related work. The scope involves buildings 141, 154A, 154B, 169, 154, 170, 171, 16, 20 and associated site work.
Key project elements are architectural, structural, electrical, HVAC, plumbing, data communication and IT, civil, hazardous material abatement, fire protection, and physical security upgrades and installations. Offerors should follow submission instructions and deadlines provided in the solicitation issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J J JJ
J
DDD
J J
J D
D D
J J JJ
JOS
J
D D
D
J J
OS
J
J
J
D D
DJ
SCALE: 1/8" = 1'-0"
8' 6' 4' 2' 8' 16'0'
NORTH
FIRE RISER
OFFICE
OFFICE
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
Room
317B
ELEV.
STAIRS
141-AD-203
Room
Room
Room
Room
Room
Room
Room
Room
303A
Room
303B
Room
303C
Room
306A
Room
300A
Room
323 Room
Room
Room
Room
328A
Room
Room
330A
CORRIDOR
3C-1
Room
CORRIDOR
3C-2
Room
Room
Room
13-02
141-AD-203
13PHASING
PLAN
02-08
02-58
13-03
02-57
02-08
02-57
SEE MECHANICAL
DRAWINGS FOR
SCOPE OF WORK
02-58
09-21
OFFICE
OFFICE
FIRE RISER
CORRIDOR
OFFICE
13-06
13-07
02-11
02-04
02-26
EXISTING HVAC
SHAFT TO REMAIN
02-30
ELEVATOR
02-03
02-03
02-0602-43
02-44
SEE REFLECTED
CEILING PLAN FOR
EXTENT OF WORK
02-45
02-44
02-44
02-46
02-46
02-17
02-47
02-03
02-09
SCALE: 1/4" = 1'-0"
4' 3' 2' 1' 4' 8'0'
NORTH
02-56
13-09
OFFICE
OFFICE
FIRE RISER
CORRIDOR
OFFICE
PHASE 1 (CROSS HATCH):
1. BUILD TR ENCLOSURE, FINISH SPACE
2. MIGRATE EQUIPMENT RACKS
3. FINISH OFFICE 315
4. RELOCATE DOOR IN OFFICE 321 TO THE NORTH
ICRA BARRIER,
PHASE 1
PHASE 3 (DIAGONAL LEFT):
1. INSTALL ICRA BARRIERS,
2. DEMO EXISTING WALL AND DOORS,
CONSTRUCT NEW FIRE RISER ENCLOSURE
3. INSTALL ICRA BARRIER FOR CORRIDOR
CEILING WORK; COMPLETE AT DURING
PHASE 3 WORK, COORDINATE WITH C.O.R.
PHASE 2:
1. DEMO EXISTING ADMIN ENTRANCE WALLS AND
STOREFRONT, FINISH SPACES AS SPECIFIED
2. INSTALL NEW ENTRANCE DOOR
3. COMPLETE CEILING INSTALLATION IN ADMIN
SUITE
4. COORDINATE WORK WITH C.O.R. FOR WEEK
END AND AFTER HOURS WORK.
ELEVATOR
ICRA BARRIER,
PHASE 3
ICRA BARRIER,
PHASE 1
NOTE:
PROVIDE ACCESS TO ADMINISTRATION OFFICES
THROUGHOUT CONSTRUCTION DURATION.
INSTALLATION OF NEW CEILING TILE AND
CEILING MOUNTED DEVICES TO OCCUR AFTER
INSTALLATION OF NEW ENTRANCE DOOR;
COORDINATE WITH C.O.R. FOR AREA
AVAILABILITY AND DURATION OF WORK
OFFICE
STAIRS
S-33
OFFICE
OFFICE
OFFICE
SCALE: 1/4" = 1'-0"
4' 3' 2' 1' 4' 8'0'
NORTH
DEMOLITION LEGEND
INDICATES BUILT ITEM TO BE REMOVED
INDICATES LIGHT FIXTURE TO BE REMOVED
INDICATES EXTENT OF ICRA CLASS SCOPE
1. REFER TO G SERIES FOR DEMOLITION NOTES & HAZARDOUS
MATERIAL NOTES
2. MAINTAIN FIRE SUPPRESSION SYSTEM OPERATIONAL DURING
CONSTRUCTION WORK. FIRE SUPPRESSION CONTRACTOR TO
REMOVE DOWNWARD HEADS AND TURN UPWARDS, PROVIDE
NEW FIRE SUPPRESSION HEAD IN TELECOMMUNICATION ROOMS
(TR). WORK TO BE CONDUCTED WITHIN ONE WORKING SHIFT.
SEE ADDITIONAL PROJECT NOTES ON COVER SHEET.
DEMOLITION GENERAL NOTES
CABLE INSTALLATION ROUTE, FIELD VERIFY
CONDITIONS PRIOR TO COMMENCEMENT OF
WORK, SEE TELECOM DRAWINGS FOR
EXTENT OF WORK
ROOM ALLOCATION LEGEND
PROPOSED NEW CABINET / TR / MCR LOCATION
EXISTING TR WITH POWER AND FIBER
UPGRADES, SEE TELECOM AND
ELECTRICAL DRAWINGS
ABANDONED ROOM
ROOM TO REMAIN, NO WORK
PROPOSED EXPANSION TO TR
REMODEL REQUIRED DUE TO EHRM IMPACT
PROJECT KEY PLAN
VA MEDICAL CENTER
FORT HARRISON, MT
NORTH
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n M
T /2
B ld g r2
.r v t
/2
/2
:4
:4
P
M
141-AD-203
141 -LEVEL 3 DEMOLITION PLANS
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
BLDG 141
Project Director
JPRTMP05/20/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
FULLY SPRINKLERED
1/8" = 1'-0"1
141 - LEVEL 3 DEMOLITION FLOOR PLAN
1/4" = 1'-0"11
LEVEL 3 ENLARGED DEMOLITION PLAN
1/4" = 1'-0"13
LEVEL 3 PHASING PLAN
02-03 CAREFULLY REMOVE EXISTING DOOR, FRAME AND HARDWARE, RETURN TO OWNER.
02-04 DEMO CARPET, BASE, AND ADHESIVES; PREPARE FLOOR FOR NEW STATIC DISSIPATIVE
RESILIENT FLOORING AND BASE
02-06 DEMO EXISTING WALL IN ITS ENTIRETY INCLUDING ANY WALL MOUNTED DEVICES,
TERMINATE CONDUITS AT NEAREST J-BOX, PREP FLOOR TO RECEIVE NEW FINISH
02-08 CAREFULLY REMOVE CEILING TILES AND OTHER CEILING MOUNTED DEVICES, CAREFULLY
STORE IN NON-TRAFFICKED AREA AND PREPARE FOR REINSTALLATION AT COMPLETION
OF WORK
02-09 DEMO WALL AS REQUIRED TO RECEIVE NEW DOOR AND FRAME
02-11 EXTENT OF DEMOLITION WORK SHOWN DASHED
02-17 PATCH/REPAIR ALL WALL DAMAGE AND PREPARE FOR NEW FINISHES, TYP. PRIME
LOCATIONS OVERHEAD
02-26 PATCH AND SEAL ALL EXISTING PENETRATIONS THROUGH PLASTER WALLS, TYP.
02-30 DEMO EXISTING CEILING TILE, LIGHT FIXTURES AND ANY CEILING MOUNTED DEVICES;
REMOVE EXISTING SPRINKLER HEADS AND TURN UP DISCHARGE PIPE, PROVIDE NEW
FIRE SUPPRESSION HEADS FOR EXPOSED CONDITIONS
02-43 SAW CUT OPENING IN EXISTING CONCRETE SHEAR WALL, SEE STRUCTURAL DRAWINGS;
PREPARE TO RECEIVE NEW DOOR
02-44 DEMO EXISTING CEILING TILE, LIGHT FIXTURES AND ANY CEILING MOUNTED DEVICES;
PREPARE TO RECEIVE NEW FINISHES AND ACCESSORIES, SEE MEP DRAWINGS
02-45 DEMO WALL BASE AND PREPARE WALLS TO RECEIVE NEW FINISHES
02-46 PROTECT EXISTING CARPET DURING CONSTRUCTION, REMOVED CARPET TILE IN TR AREA
TO BE SALVAGED AND REUSED WHERE NEEDED; RETURN TO OWNER FOR STORAGE
02-47 REMOVE UNUSED CONDUITS FROM FLOOR, PATCH AND FILL, APPLY FLOOR LEVELING AS
REQUIRED, PREPARE TO RECEIVE NEW FLOORING
02-56 CORE DRILL THROUGH CONCRETE SHEAR WALL TO INSTALL MECHANICAL DUCT WORK,
SEE STRUCTRUAL DRAWINGS
02-57 CONTRACTOR TO ROUTE CONDUIT IN LEAST DESTRUCTIVE MANNER TO LOCATIONS AS
INDICATED IN TELECOMMUNICATION DRAWINGS, CONTRACTOR TO BE RESPONSIBLE TO
VISIT SITE AND UNDERSTAND ROUTING AND MATERIAL TREATMENT; PATCH AND FINISH
TO MATCH EXISTING MATERIALS; TYPICAL AT ALL DATA DROP LOCATIONS
02-58 REMOVE CEILING TILES AS SPECIFIED IN ICRA GUIDELINES PER RISK CLASSIFICATION
NOTED FOR CABLING INSTALLATION. COORDINATE EXTENT OF WORK WITH
TELECOMMUNICATION DRAWINGS
09-21 REMOVE AND RE-INSTALL CEILING TILES AND OTHER CEILING MOUNTED DEVICES AS
NEEDED FOR INSTALLATION OF CABLES AND CONDUITS ABOVE CEILING AS PER TELECOM
DRAWINGS, REPLACE ALL DAMANGED TILES TO MATCH EXISTING AND REINSTALL ALL
DEVICES AS NEEDED. DO NOT LEAVE CEILING TILES UNINSTALLED AND UNATTENDED
PAST DURATION OF WORKING SHIFT. CONTINUOUSLY REINSTALL TILES TO PROVIDE
SEALED SMOKE ASSEMBLY. SEE COVER SHEET FOR ADDITIONAL NOTES UNDER
"TEMPORARY FIRE & SMOKE PROTECTION"
13-02 ICRA CLASS II, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND WORKING HOURS
RESTRICTIONS
13-03 ICRA CLASS III, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND WORKING HOURS
RESTRICTIONS
13-06 INFECTION PREVENTION, FIRE RATED, 6MM PLASTIC BARRIER SEALED TOP, BOTTOM, AND
SIDES. PROVIDE VESTIBULE AREA FOR GOWNING AND UNGOWNING AND NEGATIVE
PRESSURE WITHIN CONSTRUCTION AREA IN ICRA CLASS IV. SEE SPECS FOR OTHER ICRA
CONSTRUCTION REQUIREMENTS; COORDINATE LOCATION OF TEMPORARY INFECTION
PREVENTION BARRIER ITHE C.O.R. AND INFECTION PREVENTION REPRESENTATIVE.
13-07 SEAL PERIMETER OF DOOR TO MAINTAIN NEGATIVE PRESSURE WITHIN CONSTRUCTION
AREA; PROTECT FINISH DURING CONSTRUCTION
13-09 ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH 4MM MIN.
PLASTIC SHEET; ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED ROUTE IN
ENCLOSED DUMPSTER CART DESIGN FOR SUCH PRUPOSED WITH A LID.
KEY NOTES
Revisions: Date:
UP
UP
SCALE: 1/16" = 1'-0"
16' 12' 8' 4' 16' 32'0'
PLAN
NORTH
729 SF
OIT IMAGING
B-13
MECHANICAL
B-11
154-AD-300
13-03
PROSTHETICS
BSMT
SAFETY
BSMT
Room
BSMT
PHARMACY CACHE
B04 Room
BSMT
Room
BSMT
MED ADMIN
STORAGE
BSMT
Room
BSMTELEV
STAIR
EDUCATION
BSMT
Room
BSMT
SPS SUPPLIES
BSMT
Room
BSMT
SLEEP
BSMT
Room
BSMT
Room
BSMT
BUILDING 150BUILDING 154A
OPTIONAL CONTRACTOR ACCESS
CONTRACTOR ACCESS
02-57
INDICATES BUILT ITEM TO BE REMOVED
INDICATES LIGHT FIXTURE TO BE REMOVED
DEMOLITION LEGEND
INDICATES EXTENT OF ICRA CLASS SCOPE
1. SEE G SERIES SHEETS FOR ALL DEMOLITION NOTES & HAZARDOUS
MATERIAL NOTES
2. IN HOSPITAL OCCUPANCY, CONTRACTOR ARE TO USE A
CONSTRUCTION CONTAINMENT CUBE WITH HEPA VACUUM TO
MAINTAIN NEGATIVE PRESSURE AS A MEANS TO ACCESS AREAS
ABOVE CEILING TILES. THIS INCLUDES ALL PATIENT CORRIDORS
AND ALL ACUTE CARE PATIENT AREAS. THIS IS IN CONJUNCTION
WITH THE HOSPITALS INFECTION PREVENTION MEASURES AND
ICRA PROTOCOLS.
3. MAINTAIN FIRE SUPPRESSION SYSTEM OPERATIONAL DURING
CONSTRUCTION WORK. FIRE SUPPRESSION CONTRACTOR TO
REMOVE DOWNWARD HEADS AND TURN UPWARS, PROVIDE NEW
FIRE SUPPRESSION HEAD IN TELECOMMUNICATION ROOMS (TR).
WORK TO BE CONDUCTED WITHIN ONE WORKING SHIFT. SEE
ADDITIONAL PROJECT NOTES ON COVER SHEET.
DEMOLITION GENERAL NOTES
CABLE INSTALLATION ROUTE, FIELD VERIFY
CONDITIONS PRIOR TO COMMENCEMENT OF
WORK, SEE TELECOM DRAWINGS FOR
EXTENT OF WORK
INDICATES AREA EXISTING TR CLOSET.
EXISTING EQUIPMENT TO BE REMOVED PER
TELECOMMUNICATION DRAWINGS. PATCH
WALLS, REMOVE BASE AND FLOORING.
PREPARE TO RECEIVE NEW FINISHES.
PROJECT KEY PLAN
VA MEDICAL CENTER
FORT HARRISON, MT
PLAN
NORTH
TRUE
NORTH
ROOM ALLOCATION LEGEND
PROPOSED NEW CABINET / TR / MCR LOCATION
EXISTING TR WITH POWER AND FIBER
UPGRADES, SEE TELECOM AND
ELECTRICAL DRAWINGS
ABANDONED ROOM
ROOM TO REMAIN, NO WORK
PROPOSED EXPANSION TO TR
REMODEL REQUIRED DUE TO EHRM IMPACT
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n M
T /2
B ld g r2
.r v t
/2
/2
:4
:0
P
M
154-AD-200
154-BASEMENT LEVEL
DEMOLITION PLANGDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
BLDG 154
Project Director
JPRTMP05/20/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
FULLY SPRINKLERED
1/16" = 1'-0"1
BASEMENT FLOOR PLAN
02-57 CONTRACTOR TO ROUTE CONDUIT IN LEAST DESTRUCTIVE MANNER TO LOCATIONS AS
INDICATED IN TELECOMMUNICATION DRAWINGS, CONTRACTOR TO BE RESPONSIBLE TO
VISIT SITE AND UNDERSTAND ROUTING AND MATERIAL TREATMENT; PATCH AND FINISH
TO MATCH EXISTING MATERIALS; TYPICAL AT ALL DATA DROP LOCATIONS
13-03 ICRA CLASS III, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND WORKING HOURS
RESTRICTIONS
KEYNOTES
UP
UP
OS
X O S
O S
SCALE: 1/16" = 1'-0"
16' 12' 8' 4' 16' 32'0'
PLAN
NORTH
TR
115-3
EXAM
154-AD-201
154-AD-201
OFFICE
115-5
OFFICE
115-3A
COPIER
114A
CORRIDOR
TR
PROCEDURE
VITALS
MECHANICAL
TELE/DATA
115-28B
ELEC
115-28A
STRG
115-51
STRG
115-29
OFFICE
115-48
OFFICE
115-32
COMMON
(MEETING)
115-44
COMMON
(MEETING)
115-46
COMMON
(MEETING)
115-33
COMMON
(MEETING)
115-34
MECHANICAL
UTILITY
144A
STORAGE
OFFICE
115-14
TOILET
133B
GENERATOR ROOM
144B
STORAGE
133A
OFFICE
STRG
OFFICE
114B
TREATMENT
102F
TREATMENT
102G
WAITING
OFFICE
102E
STAFF DENTIST
102T
OFFICE
127A
TOILET
101C
OFFICE
OFFICE
TOILET
101B
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
CLOSET
TOILET
SOIL
IT
STORAGE
CLEAN
EXAM
EXAM
EXAM
EXAM
CLOSET
LOBBY
TOILET
UTILITY
TOILET
EXAM
EXAM
EXAM
LAUNDRY
COMMON AREA
139B
OFFICE
OFFICE
139A
COMMON AREA
141D
OFFICE
141B
BATHROOM
141C
STORAGE
141E
LINEN SERVICE
CLEAN LINEN
SERVICE
STORAGE
MECHANICAL
UTILITY
OFFICE
S109
OFFICE
S102
CORRIDOR
C101
TRAINING CENTER
S110
OFFICE
S108
OFFICE
S103
OFFICE
S104
COMMON AREA
171 HAC
ELEC
OFFICE
OFFICE
BATHROOM
OFFICE
LAB
PHARMACY
WAITING ROOM
LAB
STORAGE
164E
CANTEEN
HAC
OFFICE
STRG
MECHANICAL
UTILITY
COMMON AREA
150STRG
TOILET
147A
VEST.
TOILET
148A
VEST.
HSKPG
131B
STORAGE
128A
STRG
Room
CORRIDOR
C105
COMMON AREA
UTIL.
118TOILET
117A
TOILET
117B
CL.
Room
LAB
CORR.
116A
X-RAY LAB
116OFFICE
115-2
OFFICE
115-4
COMMON AREA
COMMON AREA
(WAITING)
115-7
OFFICE
102U
OFFICE
102V
ECHOCARDIO
-GRAPHY
102W
X-RAY LAB
102P
X-RAY LAB
102Q
MECH.
127C
OFFICE
127B
STRG
112A
OFFICE
OFFICE
115-58
COMMON ROOM
(KITCHEN)
115-56
SOILED STORAGE
CLEAN STORAGE
102I
STORAGE
102H
STRG
102Y
DENTAL HYGIENE
102M
STAIR
102J
TOILET
115-9
CORRIDOR
115-10
TOILET
115-8
CORRIDOR
115A
OFFICE
115-17
OFFICE
115-19
OFFICE
115-23
OFFICE
115-21TOILET
115-26
STRG
115-27HALLWAY
115-35
MECHANICAL
UTILITY
115-30
OFFICE
115-36
OFFICE
115-37
OFFICE
115-38
OFFICE
115-40
CORRIDOR
115-50
OFFICE
115-20
OFFICE
115-22
OFFICE
115-18
OFFICE
115-16
OFFICE
115-54
OFFICE
115-42
OFFICE
115-43
OFFICE
115-45
OFFICE
115-47
OFFICE
115-49
OFFICE
115-53
N2 STORAGE
OFFICE
115-55
OFFICE
115-52
TOILET
115-59
HSKP
115-60
HAC
OFFICE
154OFFICE
OFFICE
POLICE
ELEV
ELEV
ELEV
CORRIDOR
C108
OFFICE
102D
OFFICE
STRG
CANTEEN
OFFICE
S107
OFFICE
S105
OFFICE
S106
CANTEEN
X-RAY LAB
102U
OR
102K
PATIENT ROOM
104A
TOILET
STRG
OFFICE
TOILET
OFFICE
115-15
LAB
CORR.
C106
X-RAY LAB
OFFICE
115-41
OFFICE
115-57
OFFICE
115-13
OFFICE
115-11
ROOM
CANTEEN
162A
WAITING
LOBBY
C107
STRG
102S
STRG
102R
OR
102L
PATIENT ROOM
MOTHER'S ROOM
ULTRASOUND
120A
REC HALL KITCHEN
111B
OFFICE
VEST
C104
STAIR
A
STAIR
C
VEST
Room
Room
FIRE
ELEC
CORRIDOR
C105
ELEC
FIRE
HAC
CORRIDOR
C
CORR.
C
STRG
VEST
CORRIDOR
115-25
CORRIDOR
C101
CORRIDOR
C
CORRIDOR
C102
CORRIDOR
115-24
CORRIDOR
115-39
CORRIDOR
115-31
CORRIDOR
C103
CORRIDOR
C
RECEPTION
CORRIDOR
C
CORRIDOR
C
CORRIDOR
C
STRG
MECHANICAL
13-03
154-AD-201
02-08
02-58
09-21
SEE BUILDING 154A SHEETS
09-13
13-03
13-02
13-03
13-03
13-02
02-06
02-03
02-03
02-11
02-03
02-04OFFICE
115-5
CORRIDOR
OFFICE
115-3A
COPIER
114A
TR
115-3
02-3002-30
02-2602-17
13-06
13-06
02-54
02-54
02-54
02-09
13-06
13-09
TR
MECHANICAL
02-11
13-06
02-04
02-30
02-54
02-54
02-54
02-16
02-21
13-09
INDICATES BUILT ITEM TO BE REMOVED
INDICATES LIGHT FIXTURE TO BE REMOVED
DEMOLITION LEGEND
INDICATES EXTENT OF ICRA CLASS SCOPE
1. SEE G SERIES SHEETS FOR ALL DEMOLITION NOTES & HAZARDOUS
MATERIAL NOTES
2. IN HOSPITAL OCCUPANCY, CONTRACTOR ARE TO USE A
CONSTRUCTION CONTAINMENT CUBE WITH HEPA VACUUM TO
MAINTAIN NEGATIVE PRESSURE AS A MEANS TO ACCESS AREAS
ABOVE CEILING TILES. THIS INCLUDES ALL PATIENT CORRIDORS
AND ALL ACUTE CARE PATIENT AREAS. THIS IS IN CONJUNCTION
WITH THE HOSPITALS INFECTION PREVENTION MEASURES AND
ICRA PROTOCOLS.
3. MAINTAIN FIRE SUPPRESSION SYSTEM OPERATIONAL DURING
CONSTRUCTION WORK. FIRE SUPPRESSION CONTRACTOR TO
REMOVE DOWNWARD HEADS AND TURN UPWARS, PROVIDE NEW
FIRE SUPPRESSION HEAD IN TELECOMMUNICATION ROOMS (TR).
WORK TO BE CONDUCTED WITHIN ONE WORKING SHIFT. SEE
ADDITIONAL PROJECT NOTES ON COVER SHEET.
DEMOLITION GENERAL NOTES
CABLE INSTALLATION ROUTE, FIELD VERIFY
CONDITIONS PRIOR TO COMMENCEMENT OF
WORK, SEE TELECOM DRAWINGS FOR
EXTENT OF WORK
INDICATES AREA EXISTING TR CLOSET.
EXISTING EQUIPMENT TO BE REMOVED PER
TELECOMMUNICATION DRAWINGS. PATCH
WALLS, REMOVE BASE AND FLOORING.
PREPARE TO RECEIVE NEW FINISHES.
PROJECT KEY PLAN
VA MEDICAL CENTER
FORT HARRISON, MT
PLAN
NORTH
TRUE
NORTH
ROOM ALLOCATION LEGEND
PROPOSED NEW CABINET / TR / MCR LOCATION
EXISTING TR WITH POWER AND FIBER
UPGRADES, SEE TELECOM AND
ELECTRICAL DRAWINGS
ABANDONED ROOM
ROOM TO REMAIN, NO WORK
PROPOSED EXPANSION TO TR
REMODEL REQUIRED DUE TO EHRM IMPACT
STORAGE
102H
TREATMENT
102G
CORR.
C
CLEAN STORAGE
102I
02-17
02-20 02-55
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n M
T /2
B ld g r2
.r v t
/2
/2
:4
:0
P
M
154-AD-201
154-LEVEL 1 DEMOLITION PLAN
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
BLDG 154
Project Director
JPRTMP05/20/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
FULLY SPRINKLERED
1/16" = 1'-0"1
LEVEL 1 FLOOR PLAN
1/4" = 1'-0"2
LEVEL 1 TR 115-3 DEMOLITION PLAN
1/4" = 1'-0"3
LEVEL 1 TR 121 DEMOLITION PLAN
02-03 CAREFULLY REMOVE EXISTING DOOR, FRAME AND HARDWARE, RETURN TO
OWNER.
02-04 DEMO CARPET, BASE, AND ADHESIVES; PREPARE FLOOR FOR NEW STATIC
DISSIPATIVE RESILIENT FLOORING AND BASE
02-06 DEMO EXISTING WALL IN ITS ENTIRETY INCLUDING ANY WALL MOUNTED DEVICES,
TERMINATE CONDUITS AT NEAREST J-BOX, PREP FLOOR TO RECEIVE NEW FINISH
02-08 CAREFULLY REMOVE CEILING TILES AND OTHER CEILING MOUNTED DEVICES,
CAREFULLY STORE IN NON-TRAFFICKED AREA AND PREPARE FOR
REINSTALLATION AT COMPLETION OF WORK
02-09 DEMO WALL AS REQUIRED TO RECEIVE NEW DOOR AND FRAME
02-11 EXTENT OF DEMOLITION WORK SHOWN DASHED
02-16 DEMO PLUMBING HOOKUPS AND TERMINATE BEHIND WALL AS PER PLUMBING
DRAWINGS
02-17 PATCH/REPAIR ALL WALL DAMAGE AND PREPARE FOR NEW FINISHES, TYP. PRIME
LOCATIONS OVERHEAD
02-20 DEMO FLOOR & FLOOR BASE, PATCH WALLS, PREPARE FOR NEW FINISHES
02-21 DEMO EXISTING PLUMBING FIXTURES, WALL TILE IF ANY, AND PLUMBING
ACCESSORIES. CAP AND TERMINATE PER PLUMBING DRAWINGS.
02-26 PATCH AND SEAL ALL EXISTING PENETRATIONS THROUGH PLASTER WALLS, TYP.
02-30 DEMO EXISTING CEILING TILE, LIGHT FIXTURES AND ANY CEILING MOUNTED
DEVICES; REMOVE EXISTING SPRINKLER HEADS AND TURN UP DISCHARGE PIPE,
PROVIDE NEW FIRE SUPPRESSION HEADS FOR EXPOSED CONDITIONS
02-54 EXTEND GYPSUM BOARD TO UNDERSIDE OF DECK AND SEAL, BOTH SIDES OF
WALL; PATCH AND SEAL TIGHT AROUND ALL PENETRATIONS
02-55 REMOVE CARD READER FROM WALL, PATCH, AND PAINT TO MATCH EXISTING
WALL COLOR
02-58 REMOVE CEILING TILES AS SPECIFIED IN ICRA GUIDELINES PER RISK
CLASSIFICATION NOTED FOR CABLING INSTALLATION. COORDINATE EXTENT OF
WORK WITH TELECOMMUNICATION DRAWINGS
09-13 FOLLOW EXISTING CABLE ROUTING FOR REMOVAL OF EXISTING CABLE AND
INSTALLATION OF NEW CABLES AT LOCATIONS AS NOTED IN TELECOM DRAWINGS.
09-21 REMOVE AND RE-INSTALL CEILING TILES AND OTHER CEILING MOUNTED DEVICES
AS NEEDED FOR INSTALLATION OF CABLES AND CONDUITS ABOVE CEILING AS PER
TELECOM DRAWINGS, REPLACE ALL DAMANGED TILES TO MATCH EXISTING AND
REINSTALL ALL DEVICES AS NEEDED. DO NOT LEAVE CEILING TILES UNINSTALLED
AND UNATTENDED PAST DURATION OF WORKING SHIFT. CONTINUOUSLY
REINSTALL TILES TO PROVIDE SEALED SMOKE ASSEMBLY. SEE COVER SHEET FOR
ADDITIONAL NOTES UNDER "TEMPORARY FIRE & SMOKE PROTECTION"
13-02 ICRA CLASS II, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND WORKING
HOURS RESTRICTIONS
13-03 ICRA CLASS III, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND WORKING
HOURS RESTRICTIONS
13-06 INFECTION PREVENTION, FIRE RATED, 6MM PLASTIC BARRIER SEALED TOP,
BOTTOM, AND SIDES. PROVIDE VESTIBULE AREA FOR GOWNING AND UNGOWNING
AND NEGATIVE PRESSURE WITHIN CONSTRUCTION AREA IN ICRA CLASS IV. SEE
SPECS FOR OTHER ICRA CONSTRUCTION REQUIREMENTS; COORDINATE
LOCATION OF TEMPORARY INFECTION PREVENTION BARRIER ITHE C.O.R. AND
INFECTION PREVENTION REPRESENTATIVE.
13-09 ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH
4MM MIN. PLASTIC SHEET; ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM
THE PROJECT BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA
APPROVED ROUTE IN ENCLOSED DUMPSTER CART DESIGN FOR SUCH PRUPOSED
WITH A LID.
SCALE: 1/4" = 1'-0"
4' 3' 2' 1' 4' 8'0'
PLAN
NORTH
1/4" = 1'-0"4
(E) TR 102H DEMOLTION PLAN
SCALE: 1/16" = 1'-0"
16' 12' 8' 4' 16' 32'0'
NORTH
TR
239A
ROOM
OFFICE
239B
CORRIDOR
C243
154-AD-202
ELEV
ELEV
ELEV
STORAGE
218B
COPY
TOILET
234A
TOILET
MOVE OFFICE
239C
CORRIDOR
C237
EXAM
204L
HSK
EQUIPMENT
STORAGE
218A
EXAM
203L
MECHANICAL
UTILITY
EXAM
205L
EXAM
EXAM
ANESTHESIA
OFFICE
PATHOLOGY
OFFICE
206L
PATHOLOGY
OFFICE
208L
PATHOLOGY
OFFICE
207L
4-STATION WORK
SPACE
238L
PPE
234L
SHOWER
235L
EXAM
242L
CLEAN
240L
TLT
EXAM
238F
MORGUE
232L
MORGUE
231L
OFFICE (FUTURE
EXAM)
238E
ELEC
239L
OFFICE
238B
OFFICE
238C
STAFF LOUNGE
224L
OFFICE
238D
WOMENS LOCKER
225L
SHOWER
226L
STAFF TOILET
FIRE
HSK
ELEC
OFFICE
263A
OFFICE
CORRIDOR
C233
PROCEDURE
271A
OFFICE
PROCEDURE
FUTURE
MECHANICAL
273MENS LOCKER
227L
MICROBIOLOGY
LAB
210L
PAD OFFICE
269C
PAD STORAGE
ENDOSCOPY
PROCEDURE
273B
ENDOSCOPY
PROCEDURE
TOILET
210A
CHANGE
CHANGE
CHANGE
MECHANICAL
UTILITY
CYSTOSCOPY
WORKROOM
214A
CYSTOSCOPY
PROCEDURE
EQUIP.
UROLOGY
PROCEDURE
WOMEN TOILET
MEN'S TOILET
VESTIBULE
CHANGE
SURGICAL SCRUB
WOMENS
CHANGING ROOM
ANAESTHESIA
WORKROOM
TOILET
209B
ENDOSCOPE
CLEANING
CORRIDOR
C204A
SHOWER
209A
MENS CHANGING
ROOM
Room
217E Room
217C SURGICAL SCRUB
217D
ORTHO OPERATING
ROOM
217A
OR NURSE MGR
OFFICE
OR NURSE OFFICE
STERILE STRG
MOVE OFFICE
228A
STERILE CORE
MOVE OFFICE
228B
STAFF
BREAKROOM
219CORRIDOR
C126
OPERATING ROOM
217B
SPS EQUIPMENT
CORRIDOR
C201
BREAKROOM
WOMENS LOCKER
MENS LOCKER
SPS OFFICE
225 SPS OFFICE
CART WASH
RECEPTION
STRG.
223L
CORRIDOR
C202
UROLOGY EXAM
HOUSEKEEPING
ELEC
?FIRE
SHOWER
210B
CORE LAB
211L
LEAD TECH OFFICE
212L
LAB MANAGER
OFFICE
213L
POC OFFICE
214L
STORAGE
217L
CORRIDOR
C218
ANATOMIC
PATHOLOGY
209L
XYLENESTRG
222L
ELEC.
221L
GAS TANKS
220L
MECH.
219L
CORRIDOR
C
CORRIDOR
C230
CORRIDOR
C210
WAITING
HSK
236L
CORR
C204B
CORR
C204D
UTIL STRG
C204E
GROSS DECON
STERILE PREP
RESTROOM
227A
TOILET
226A
STORAGE
224A
BATHROOM
273C
ENDOSCOPY
OFFICE
274STRG
273A
PAD BREAKDOWN
TRANSCRIPTION
OMNICELL
STORAGE
230A
PRE-STERILE
222A
STERILE
ASSEMBLY ROOM
ELEC
STORAGE
HALLWAY
213A
STAIR
A
STAIR
C
154-AD-202
154-AD-202
02-08
13-05
13-03
13-04
02-57
02-58
09-13
09-21
13-02
02-59
OFFICE
239B
TR
239A 02-03
02-11
02-30
02-26
02-04
13-05
13-05
EXAM
203L
WAITING
CORRIDOR
C243
02-42
02-02
02-06
02-06
02-30
02-30
13-06
13-09
PROCEDURE
271A
ROOM
CORRIDOR
C210 STRG
273A
CORRIDOR
C201
02-17
02-20
02-55
13-06
13-11
STORAGE
218B
EQUIP.
MECHANICAL
UTILITY
CORR
C204D
EQUIPMENT
STORAGE
218A
02-2013-06
13-11
INDICATES BUILT ITEM TO BE REMOVED
INDICATES LIGHT FIXTURE TO BE REMOVED
DEMOLITION LEGEND
INDICATES EXTENT OF ICRA CLASS SCOPE
1. SEE G SERIES SHEETS FOR ALL DEMOLITION NOTES & HAZARDOUS
MATERIAL NOTES
2. IN HOSPITAL OCCUPANCY, CONTRACTOR ARE TO USE A
CONSTRUCTION CONTAINMENT CUBE WITH HEPA VACUUM TO
MAINTAIN NEGATIVE PRESSURE AS A MEANS TO ACCESS AREAS
ABOVE CEILING TILES. THIS INCLUDES ALL PATIENT CORRIDORS
AND ALL ACUTE CARE PATIENT AREAS. THIS IS IN CONJUNCTION
WITH THE HOSPITALS INFECTION PREVENTION MEASURES AND
ICRA PROTOCOLS.
3. MAINTAIN FIRE SUPPRESSION SYSTEM OPERATIONAL DURING
CONSTRUCTION WORK. FIRE SUPPRESSION CONTRACTOR TO
REMOVE DOWNWARD HEADS AND TURN UPWARS, PROVIDE NEW
FIRE SUPPRESSION HEAD IN TELECOMMUNICATION ROOMS (TR).
WORK TO BE CONDUCTED WITHIN ONE WORKING SHIFT. SEE
ADDITIONAL PROJECT NOTES ON COVER SHEET.
DEMOLITION GENERAL NOTES
CABLE INSTALLATION ROUTE, FIELD VERIFY
CONDITIONS PRIOR TO COMMENCEMENT OF
WORK, SEE TELECOM DRAWINGS FOR
EXTENT OF WORK
INDICATES AREA EXISTING TR CLOSET.
EXISTING EQUIPMENT TO BE REMOVED PER
TELECOMMUNICATION DRAWINGS. PATCH
WALLS, REMOVE BASE AND FLOORING.
PREPARE TO RECEIVE NEW FINISHES.
PROJECT KEY PLAN
VA MEDICAL CENTER
FORT HARRISON, MT
PLAN
NORTH
TRUE
NORTH
ROOM ALLOCATION LEGEND
PROPOSED NEW CABINET / TR / MCR LOCATION
EXISTING TR WITH POWER AND FIBER
UPGRADES, SEE TELECOM AND
ELECTRICAL DRAWINGS
ABANDONED ROOM
ROOM TO REMAIN, NO WORK
PROPOSED EXPANSION TO TR
REMODEL REQUIRED DUE TO EHRM IMPACT
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n M
T /2
B ld g r2
.r v t
/2
/2
:4
:0
P
M
154-AD-202
154-LEVEL 2 DEMOLITION PLAN
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
BLDG 154
Project Director
JPRTMP05/20/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
FULLY SPRINKLERED
1/16" = 1'-0"1
LEVEL 2 FLOOR DEMOLITION PLAN
1/4" = 1'-0"2
LEVEL 2 TR 239A DEMOLITION PLAN
PLAN
NORTH
SCALE: 1/4" = 1'-0"
4' 3' 2' 1' 4' 8'0'
1/4" = 1'-0"3
(E) TR 272 DEMOLITION PLAN
1/4" = 1'-0"4
(E) TR 218B DEMOLTION PLAN
02-02 CAREFULLY REMOVE EXISTING DOOR, FRAME, AND HARDWARE, STORE IN
NON-TRAFFICKED AREA AND PREPARE FOR REINSTALLATION
02-03 CAREFULLY REMOVE EXISTING DOOR, FRAME AND HARDWARE, RETURN TO OWNER.
02-04 DEMO CARPET, BASE, AND ADHESIVES; PREPARE FLOOR FOR NEW STATIC DISSIPATIVE
RESILIENT FLOORING AND BASE
02-06 DEMO EXISTING WALL IN ITS ENTIRETY INCLUDING ANY WALL MOUNTED DEVICES,
TERMINATE CONDUITS AT NEAREST J-BOX, PREP FLOOR TO RECEIVE NEW FINISH
02-08 CAREFULLY REMOVE CEILING TILES AND OTHER CEILING MOUNTED DEVICES,
CAREFULLY STORE IN NON-TRAFFICKED AREA AND PREPARE FOR REINSTALLATION AT
COMPLETION OF WORK
02-11 EXTENT OF DEMOLITION WORK SHOWN DASHED
02-17 PATCH/REPAIR ALL WALL DAMAGE AND PREPARE FOR NEW FINISHES, TYP. PRIME
LOCATIONS OVERHEAD
02-20 DEMO FLOOR & FLOOR BASE, PATCH WALLS, PREPARE FOR NEW FINISHES
02-26 PATCH AND SEAL ALL EXISTING PENETRATIONS THROUGH PLASTER WALLS, TYP.
02-30 DEMO EXISTING CEILING TILE, LIGHT FIXTURES AND ANY CEILING MOUNTED DEVICES;
REMOVE EXISTING SPRINKLER HEADS AND TURN UP DISCHARGE PIPE, PROVIDE NEW
FIRE SUPPRESSION HEADS FOR EXPOSED CONDITIONS
02-42 DEMO EXISTING WINDOW AND PERIMETER TRIM, INFIL WITH METAL STUDS AND 5/8"
TYPE 'X' GYSPUM AS REQUIRED TO MATCH EXISTING WALL THICKNESS; PREPARE TO
RECEIVE NEW FINISHES.
02-55 REMOVE CARD READER FROM WALL, PATCH, AND PAINT TO MATCH EXISTING WALL
COLOR
02-57 CONTRACTOR TO ROUTE CONDUIT IN LEAST DESTRUCTIVE MANNER TO LOCATIONS AS
INDICATED IN TELECOMMUNICATION DRAWINGS, CONTRACTOR TO BE RESPONSIBLE TO
VISIT SITE AND UNDERSTAND ROUTING AND MATERIAL TREATMENT; PATCH AND FINISH
TO MATCH EXISTING MATERIALS; TYPICAL AT ALL DATA DROP LOCATIONS
02-58 REMOVE CEILING TILES AS SPECIFIED IN ICRA GUIDELINES PER RISK CLASSIFICATION
NOTED FOR CABLING INSTALLATION. COORDINATE EXTENT OF WORK WITH
TELECOMMUNICATION DRAWINGS
02-59 CORE DRILL PENETRATIONS THROUGH ROOF FOR PLUMBING LINES; APPLY
APPROPRIATE UL HILTI 1-HOUR FIRE RATED SEAL FOR TYPE OF PENETRATION SYSTEM
SELECTED, SEE SPEC SECTION 07 84 00 FOR SUBMITTAL REQUIREMENTS
09-13 FOLLOW EXISTING CABLE ROUTING FOR REMOVAL OF EXISTING CABLE AND
INSTALLATION OF NEW CABLES AT LOCATIONS AS NOTED IN TELECOM DRAWINGS.
09-21 REMOVE AND RE-INSTALL CEILING TILES AND OTHER CEILING MOUNTED DEVICES AS
NEEDED FOR INSTALLATION OF CABLES AND CONDUITS ABOVE CEILING AS PER
TELECOM DRAWINGS, REPLACE ALL DAMANGED TILES TO MATCH EXISTING AND
REINSTALL ALL DEVICES AS NEEDED. DO NOT LEAVE CEILING TILES UNINSTALLED AND
UNATTENDED PAST DURATION OF WORKING SHIFT. CONTINUOUSLY REINSTALL TILES
TO PROVIDE SEALED SMOKE ASSEMBLY. SEE COVER SHEET FOR ADDITIONAL NOTES
UNDER "TEMPORARY FIRE & SMOKE PROTECTION"
13-02 ICRA CLASS II, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND WORKING HOURS
RESTRICTIONS
13-03 ICRA CLASS III, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND WORKING HOURS
RESTRICTIONS
13-04 ICRA CLASS IV, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND WORKING HOURS
RESTRICTIONS
13-05 ICRA CLASS V, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND WORKING HOURS
RESTRICTIONS
13-06 INFECTION PREVENTION, FIRE RATED, 6MM PLASTIC BARRIER SEALED TOP, BOTTOM,
AND SIDES. PROVIDE VESTIBULE AREA FOR GOWNING AND UNGOWNING AND NEGATIVE
PRESSURE WITHIN CONSTRUCTION AREA IN ICRA CLASS IV. SEE SPECS FOR OTHER
ICRA CONSTRUCTION REQUIREMENTS; COORDINATE LOCATION OF TEMPORARY
INFECTION PREVENTION BARRIER ITHE C.O.R. AND INFECTION PREVENTION
REPRESENTATIVE.
13-09 ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH 4MM MIN.
PLASTIC SHEET; ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED ROUTE IN
ENCLOSED DUMPSTER CART DESIGN FOR SUCH PRUPOSED WITH A LID.
13-11 INFECTION PREVENTION VESTIBULE WITH 24" X 36" TACK-MATTS AT EACH SIDE OF
BARRIER AND HAND SANITIZER AT EACH CONSTRUCTION ACCESS LOCATION.
X
X
SCALE: 1/16" = 1'-0"
16' 12' 8' 4' 16' 32'0'
PLAN
NORTH
143 SF
TR
154-AD-203
PROPOSED LOCATION FOR
RELOCATED CLEAN LINEN ROOM
ELEV
ELEV
ELEV
MED ROOM
314C.R.
STORE
301A
ELEC
313A
STRG
STRG
OFFICE
OFFICE
MEN TOILET
TOILET
C.R.
EAM/CONSULT
LINEN STORAGE
370D
BATH
370A
STORE
BATH
356A
BATH
357A
BATH
355A
BATH
324A
BATH
325A
BATH
326A
WAITING
CLOSET
Room
OFFICE
Room
Room
Room
FIRE
EQUIPMENT
314A
NURSE MGR
315H
ISOLATION
EMPLOYEE
LOUNGE
NOURISHMENT
TOILET
315E
SOIL
SOIL
315K
SOIL
318DCONSULT
TOILET
318A
TOILET
318B
CONSULT/OFFICE
307D LINEN
307E
TOILET
307C
TOILET
307B
LINEN
SOIL
307A
ELEC
HSKP
321B
TOILET
322A
Room
CLOSET
PATIENT CLOTHING
STORAGE
ICU
315B
ICU
315C
ICU
315D
ICU
315A
OMNI CELLS
315I
ICU
315FINTENSIVE CARE
UNIT
ICU
315G
BATH
371A
BATH
372A
PATIENT ROOM
Room
370B
CHAPEL
ELEC
361A
FIRE
361B
STORE
362J
WORK STATION
362K
SCOPE
362D
BATH
362C
TOILET
366A
VITALS
361C
CORRIDOR
SUPPLY
RECEPTION
KITCHEN
BATH
CORRIDOR
C
PATIENT ROOM
BATH
OFFICE
PATIENT ROOM
PATIENT ROOM
OFFICE
Room
TRANSFER
COORDINATOR
OFFICE
SOILED LINEN
PATIENT ROOM
NURSE'S STATION
MED ROOM
PATIENT ROOM
Room
BATH
327A
PATIENT ROOM
BREAKROOM
STRG
ISO ROOM
PATIENT ROOM
TRAINING
SOIL
EXAM
319 CHEMO
ANTE
PATIENT ROOM
WAITING
STAFF LOCKER
EXAM/CONSULTATION
OFFICE
SPECIAL
PROCEDURE #2
363A
CORRIDOR
C
PROCEDURE SUITE
VESTIBULE
362B
SOILED
TRANSITION
DROPOFF
362F
SPECIAL
PROCEDURE #1
362E
EXISTING
SAME DAY
SURGERY
CLEAN SUPPLY
OFFICE
TOILET
341A
CORRIDOR
C
Room
STORE
302A
MECHANICAL
ROOM
CORRIDOR
C
CORRIDOR
305A
CORRIDOR
C
CORRIDOR
C
CORRIDOR
NURSE
315J
CORRIDOR
C
STORE
318C
SDS INTAKE AREA
STAIR
A
STAIR
C
154-AD-203
13-02
09-13
09-21
13-04
13-04
02-57
02-57
02-58
13-02
13-05
TR
02-03
02-04
02-06
02-09
02-02
02-17
02-50
02-48
02-49
02-51
13-06
CORRIDOR
C
CORRIDOR
C
TRAINING
TOILET
322A
SOIL
PATIENT ROOM
13-06
CAREFULLY REMOVE EXISTING
PATIENT LIFT SYSTEM, STORE IN
NON-TRAFFICKED AREA AND
PREPARE FOR REINSTALLATION
SCALE: 1/4" = 1'-0"
4' 3' 2' 1' 4' 8'0'
PLAN
NORTH
02-61
02-06DEMO EXISTING DUCT, SEE
MECHANICAL DRAWINGS, INFIL
OPENING WITH NEW CONCRETE
154-AD-203
13-09
CLEAN SUPPLY
OFFICE
OFFICE
TOILET
CORRIDOR
C
02-17
02-20
02-44
13-06
INDICATES BUILT ITEM TO BE REMOVED
INDICATES LIGHT FIXTURE TO BE REMOVED
DEMOLITION LEGEND
INDICATES EXTENT OF ICRA CLASS SCOPE
1. SEE G SERIES SHEETS FOR ALL DEMOLITION NOTES & HAZARDOUS
MATERIAL NOTES
2. IN HOSPITAL OCCUPANCY, CONTRACTOR ARE TO USE A
CONSTRUCTION CONTAINMENT CUBE WITH HEPA VACUUM TO
MAINTAIN NEGATIVE PRESSURE AS A MEANS TO ACCESS AREAS
ABOVE CEILING TILES. THIS INCLUDES ALL PATIENT CORRIDORS
AND ALL ACUTE CARE PATIENT AREAS. THIS IS IN CONJUNCTION
WITH THE HOSPITALS INFECTION PREVENTION MEASURES AND
ICRA PROTOCOLS.
3. MAINTAIN FIRE SUPPRESSION SYSTEM OPERATIONAL DURING
CONSTRUCTION WORK. FIRE SUPPRESSION CONTRACTOR TO
REMOVE DOWNWARD HEADS AND TURN UPWARS, PROVIDE NEW
FIRE SUPPRESSION HEAD IN TELECOMMUNICATION ROOMS (TR).
WORK TO BE CONDUCTED WITHIN ONE WORKING SHIFT. SEE
ADDITIONAL PROJECT NOTES ON COVER SHEET.
DEMOLITION GENERAL NOTES
CABLE INSTALLATION ROUTE, FIELD VERIFY
CONDITIONS PRIOR TO COMMENCEMENT OF
WORK, SEE TELECOM DRAWINGS FOR
EXTENT OF WORK
INDICATES AREA EXISTING TR CLOSET.
EXISTING EQUIPMENT TO BE REMOVED PER
TELECOMMUNICATION DRAWINGS. PATCH
WALLS, REMOVE BASE AND FLOORING.
PREPARE TO RECEIVE NEW FINISHES.
PROJECT KEY PLAN
VA MEDICAL CENTER
FORT HARRISON, MT
PLAN
NORTH
TRUE
NORTH
ROOM ALLOCATION LEGEND
PROPOSED NEW CABINET / TR / MCR LOCATION
EXISTING TR WITH POWER AND FIBER
UPGRADES, SEE TELECOM AND
ELECTRICAL DRAWINGS
ABANDONED ROOM
ROOM TO REMAIN, NO WORK
PROPOSED EXPANSION TO TR
REMODEL REQUIRED DUE TO EHRM IMPACT
6"
NEW CONCRETE INFIL IN EXISTING
DUCT OPENING; PROVIDE 6"
MINIMUM THICKNESS TO MAINTAIN 2-
HOUR FIRE FLOOR RATING
1/2" STEEL PLATE FULL
WIDTH OF OPENING
4" x 4" x 1/4" STEEL ANGLE AT
PERIMETER OF OPENING
FIELD VERIFY OPENING
1/2" EXPANSION BOLT @ 8" O.C.
INTO EXISTING CONCRETE FLOOR
WITH 3 1/2" MINIMUM EMBEDMENT
DEMOLISHED EXISTING DUCT
EXISTING CONCRETE
FLOOR
#4 BARS AT 8" O.C. EACH WAY
CENTERED IN CONCRETE
3/16"
SCARIFY EDGES OF EXISTING CONCRETE
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n M
T /2
B ld g r2
.r v t
/2
/2
:4
:1
P
M
154-AD-203
154-LEVEL 3 DEMOLITION PLAN
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
BLDG 154
Project Director
JPRTMP05/20/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
FULLY SPRINKLERED
1/16" = 1'-0"1
LEVEL 3 FLOOR PLAN
1/4" = 1'-0"2
LEVEL 3 TR 323 DEMOLITION PLAN
1/4" = 1'-0"3
(E) OFFICE 340 DEMOLITION PLAN
02-02 CAREFULLY REMOVE EXISTING DOOR, FRAME, AND HARDWARE, STORE IN
NON-TRAFFICKED AREA AND PREPARE FOR REINSTALLATION
02-03 CAREFULLY REMOVE EXISTING DOOR, FRAME AND HARDWARE, RETURN TO OWNER.
02-04 DEMO CARPET, BASE, AND ADHESIVES; PREPARE FLOOR FOR NEW STATIC DISSIPATIVE
RESILIENT FLOORING AND BASE
02-06 DEMO EXISTING WALL IN ITS ENTIRETY INCLUDING ANY WALL MOUNTED DEVICES,
TERMINATE CONDUITS AT NEAREST J-BOX, PREP FLOOR TO RECEIVE NEW FINISH
02-09 DEMO WALL AS REQUIRED TO RECEIVE NEW DOOR AND FRAME
02-17 PATCH/REPAIR ALL WALL DAMAGE AND PREPARE FOR NEW FINISHES, TYP. PRIME
LOCATIONS OVERHEAD
02-20 DEMO FLOOR & FLOOR BASE, PATCH WALLS, PREPARE FOR NEW FINISHES
02-44 DEMO EXISTING CEILING TILE, LIGHT FIXTURES AND ANY CEILING MOUNTED DEVICES;
PREPARE TO RECEIVE NEW FINISHES AND ACCESSORIES, SEE MEP DRAWINGS
02-48 CAREFULLY REMOVE EXISTING WALL MOUNTED P.LAM HEAD WALL, CAREFULLY
REMOVE MED GASES, NURSE CALL AND ELECTRICAL OUTLETS AND PREPARE FOR
REINSTALLATION AT NEW HEAD WALL LOCATION, SEE PLUMBING AND ELECTRICAL
DRAWINGS; CAREFULLY REMOVE BUMBER WALL RAILS AND BED PLUG-IN AND PREPARE
FOR REINSTALATION.
02-49 CAREFULLY REMOVE EXISTING PATIENT LIFT TRACKS, STORE IN NON-TRAFFICKED AREA
DN PREPARE FOR REINSTALLATION; REMOVE LIGHT FIXTURES AND OTHER CEILING
MOUNTED DEVICES.
02-50 DEMO EXISTING GYPSUM BOARD CEILING, LIGHT FIXTURES AND ANY CEILING MOUNTED
DEVICES; REMOVE EXISTING SPRINKLER HEADS AND TURN UP DISCHARGE PIPE,
PROVIDE NEW FIRE SUPPRESSION HEADS FOR EXPOSED CONDITIONS
02-51 DEMO EXISTING BASE AND WALL CABINETS, COUNTERTOP AND TILE FROM WALLS AND
FLOOR. PREPARE TO RECEIVE NEW FINISHES
02-57 CONTRACTOR TO ROUTE CONDUIT IN LEAST DESTRUCTIVE MANNER TO LOCATIONS AS
INDICATED IN TELECOMMUNICATION DRAWINGS, CONTRACTOR TO BE RESPONSIBLE TO
VISIT SITE AND UNDERSTAND ROUTING AND MATERIAL TREATMENT; PATCH AND FINISH
TO MATCH EXISTING MATERIALS; TYPICAL AT ALL DATA DROP LOCATIONS
02-58 REMOVE CEILING TILES AS SPECIFIED IN ICRA GUIDELINES PER RISK CLASSIFICATION
NOTED FOR CABLING INSTALLATION. COORDINATE EXTENT OF WORK WITH
TELECOMMUNICATION DRAWINGS
02-61 CAREFULLY REMOVE ACCESS DOOR AND DIALISYS CONNECTION, REMOVE AND STORE
ALL THESE ITEMS IN NON-TRAFFICKED AREA AND PREPARE FOR REINSTALLATION, SEE
PLUMBING DRAWINGS.
09-13 FOLLOW EXISTING CABLE ROUTING FOR REMOVAL OF EXISTING CABLE AND
INSTALLATION OF NEW CABLES AT LOCATIONS AS NOTED IN TELECOM DRAWINGS.
09-21 REMOVE AND RE-INSTALL CEILING TILES AND OTHER CEILING MOUNTED DEVICES AS
NEEDED FOR INSTALLATION OF CABLES AND CONDUITS ABOVE CEILING AS PER
TELECOM DRAWINGS, REPLACE ALL DAMANGED TILES TO MATCH EXISTING AND
REINSTALL ALL DEVICES AS NEEDED. DO NOT LEAVE CEILING TILES UNINSTALLED AND
UNATTENDED PAST DURATION OF WORKING SHIFT. CONTINUOUSLY REINSTALL TILES
TO PROVIDE SEALED SMOKE ASSEMBLY. SEE COVER SHEET FOR ADDITIONAL NOTES
UNDER "TEMPORARY FIRE & SMOKE PROTECTION"
13-02 ICRA CLASS II, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND WORKING HOURS
RESTRICTIONS
13-04 ICRA CLASS IV, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND WORKING HOURS
RESTRICTIONS
13-05 ICRA CLASS V, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND WORKING HOURS
RESTRICTIONS
13-06 INFECTION PREVENTION, FIRE RATED, 6MM PLASTIC BARRIER SEALED TOP, BOTTOM,
AND SIDES. PROVIDE VESTIBULE AREA FOR GOWNING AND UNGOWNING AND NEGATIVE
PRESSURE WITHIN CONSTRUCTION AREA IN ICRA CLASS IV. SEE SPECS FOR OTHER
ICRA CONSTRUCTION REQUIREMENTS; COORDINATE LOCATION OF TEMPORARY
INFECTION PREVENTION BARRIER ITHE C.O.R. AND INFECTION PREVENTION
REPRESENTATIVE.
13-09 ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH 4MM MIN.
PLASTIC SHEET; ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED ROUTE IN
ENCLOSED DUMPSTER CART DESIGN FOR SUCH PRUPOSED WITH A LID.
KEYNOTES
1 1/2" = 1'-0"4
CONCRETE FLOOR INFIL DETAIL
O S
X
X
SCALE: 1/16" = 1'-0"
16' 12' 8' 4' 16' 32'0'
PLAN
NORTH
TR
154-AD-204
PROPOSED LOCATION FOR
RELOCATED CLEAN LINEN ROOM
ELEV
ELEV
ELEV
CORRIDOR
C409
STRG
SOIL
422A
STRG
CORRIDOR
C402
Room
TOILET
Room
TOILET
STRG
OFFICE
STORAGE
OFFICE
BATHROOM
442A
OFFICE
TR
KITCHEN
DAY ROOM
466B
CONSULT.
PATIENT ROOM
ELEC.
STRG
466A
ISOLATION
PATIENT ROOM
STRG
463B
TOILET
463A
STRG
462B
STRG
461B
NEGATIVE
PRESSURE
PATIENT ROOM
Room
470B
Room
470ATOILET
459A
CLEAN
TOILET
454A
TOILET
455A
TOILET
453A
SHOWER
414A
SHOWER
415A
TOILET
423A
TOILET
424A
TOILET
425A
HSKP
STRG
STRG
FIT TEST ROOM
STUDENT ROOM
PATIENT ROOM
I.V. PUMP STRG
OFFICE
438B
STRESS LAB
OFFICE
OFFICE
STRG
SOIL
457A
PATIENT ROOM
MED ROOM
SECLUSION
SECLUSION
NURSE'S STATION
SHOWER
PATIENT ROOM
OFFICE
STORAGE
PATIENT ROOM
PATIENT ROOM
CORRIDOR
C403
TOILET
416A
PATIENT ROOM
STRG
460A
CORRIDOR
C408
PATIENT ROOM
PATIENT ROOM
OFFICE
443B
CLEAN SUPPLY
438C
OFFICE
443C
KITCHEN
SHOWER
Room
CORRIDOR
C401
Room
402A
CORRIDOR
C407
CORRIDOR
C404
TOILET
SOIL
412A
DAY ROOM
413STORAGE
422B
BATH
421A
BARIATRIC
PATIENT ROOM
Room
?Room
? ISOLATION
PATIENT ROOM
TOLET
417A
TOILET
418A
TOILET
419A
PATIENT ROOM
STRG
419B
STRG
418B
STRG
417B
PATIENT ROOM
PATIENT ROOM
PATIENT ROOM
OFFICE
BREAK ROOM
OFFICE
406A
OFFICE
TOILET
LINEN STRG
TOILET
410A
PATIENT ROOM
TOILET
461A
TOILET
462A
TOILET
464A
Room
TOILET
465A
CORRIDOR
C406
CORRIDOR
C402A
Room
STAIR
A
STAIR
C
154-AD-204
09-13
09-21
13-02
02-58
02-57
13-04 13-04
TR
02-03
02-06
02-06
02-11
02-17
02-30
02-05
02-05
02-27
02-21
13-06
EXISTING DOOR AND
HARDWARE TO REMAIN
02-20
DEMO EXISTING DUCT, SEE
MECHANICAL DRAWINGS, INFIL
OPENING WITH NEW CONCRETE
154-AD-203
13-09
OFFICE
438B
CLEAN SUPPLY
438C
OFFICE
443C
BATHROOM
442A
OFFICE
443B
OFFICE
CORRIDOR
C402
02-17
02-44
02-20
13-06
13-09
INDICATES BUILT ITEM TO BE REMOVED
INDICATES LIGHT FIXTURE TO BE REMOVED
DEMOLITION LEGEND
INDICATES EXTENT OF ICRA CLASS SCOPE
1. SEE G SERIES SHEETS FOR ALL DEMOLITION NOTES & HAZARDOUS
MATERIAL NOTES
2. IN HOSPITAL OCCUPANCY, CONTRACTOR ARE TO USE A
CONSTRUCTION CONTAINMENT CUBE WITH HEPA VACUUM TO
MAINTAIN NEGATIVE PRESSURE AS A MEANS TO ACCESS AREAS
ABOVE CEILING TILES. THIS INCLUDES ALL PATIENT CORRIDORS
AND ALL ACUTE CARE PATIENT AREAS. THIS IS IN CONJUNCTION
WITH THE HOSPITALS INFECTION PREVENTION MEASURES AND
ICRA PROTOCOLS.
3. MAINTAIN FIRE SUPPRESSION SYSTEM OPERATIONAL DURING
CONSTRUCTION WORK. FIRE SUPPRESSION CONTRACTOR TO
REMOVE DOWNWARD HEADS AND TURN UPWARS, PROVIDE NEW
FIRE SUPPRESSION HEAD IN TELECOMMUNICATION ROOMS (TR).
WORK TO BE CONDUCTED WITHIN ONE WORKING SHIFT. SEE
ADDITIONAL PROJECT NOTES ON COVER SHEET.
DEMOLITION GENERAL NOTES
CABLE INSTALLATION ROUTE, FIELD VERIFY
CONDITIONS PRIOR TO COMMENCEMENT OF
WORK, SEE TELECOM DRAWINGS FOR
EXTENT OF WORK
INDICATES AREA EXISTING TR CLOSET.
EXISTING EQUIPMENT TO BE REMOVED PER
TELECOMMUNICATION DRAWINGS. PATCH
WALLS, REMOVE BASE AND FLOORING.
PREPARE TO RECEIVE NEW FINISHES.
PROJECT KEY PLAN
VA MEDICAL CENTER
FORT HARRISON, MT
PLAN
NORTH
TRUE
NORTH
ROOM ALLOCATION LEGEND
PROPOSED NEW CABINET / TR / MCR LOCATION
EXISTING TR WITH POWER AND FIBER
UPGRADES, SEE TELECOM AND
ELECTRICAL DRAWINGS
ABANDONED ROOM
ROOM TO REMAIN, NO WORK
PROPOSED EXPANSION TO TR
REMODEL REQUIRED DUE TO EHRM IMPACT
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n M
T /2
B ld g r2
.r v t
/2
/2
:4
:1
P
M
154-AD-204
154-LEVEL 4 DEMOLITION PLAN
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
BLDG 154
Project Director
JPRTMP05/20/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
FULLY SPRINKLERED
1/16" = 1'-0"1
LEVEL 4 FLOOR PLAN
1/4" = 1'-0"2
LEVEL 4 TR 422 DEMOLITION PLAN
PLAN
NORTH
SCALE: 1/4" = 1'-0"
4' 3' 2' 1' 4' 8'0'
1/4" = 1'-0"3
(E) OFFICE 438C DEMOLITION PLAN
02-03 CAREFULLY REMOVE EXISTING DOOR, FRAME AND HARDWARE, RETURN TO
OWNER.
02-05 DEMO CABINETRY, COUNTER, PLUMBING FIXTURE, WALL MOUNTED ACCESSORIES,
AND DIVIDING WALL
02-06 DEMO EXISTING WALL IN ITS ENTIRETY INCLUDING ANY WALL MOUNTED DEVICES,
TERMINATE CONDUITS AT NEAREST J-BOX, PREP FLOOR TO RECEIVE NEW FINISH
02-11 EXTENT OF DEMOLITION WORK SHOWN DASHED
02-17 PATCH/REPAIR ALL WALL DAMAGE AND PREPARE FOR NEW FINISHES, TYP. PRIME
LOCATIONS OVERHEAD
02-20 DEMO FLOOR & FLOOR BASE, PATCH WALLS, PREPARE FOR NEW FINISHES
02-21 DEMO EXISTING PLUMBING FIXTURES, WALL TILE IF ANY, AND PLUMBING
ACCESSORIES. CAP AND TERMINATE PER PLUMBING DRAWINGS.
02-27 DEMO EXISTING TILE FLOOR, APPLY SELF LEVELING COMPOUND AND PREPARE TO
RECEIVE NEW FLOORING.
02-30 DEMO EXISTING CEILING TILE, LIGHT FIXTURES AND ANY CEILING MOUNTED
DEVICES; REMOVE EXISTING SPRINKLER HEADS AND TURN UP DISCHARGE PIPE,
PROVIDE NEW FIRE SUPPRESSION HEADS FOR EXPOSED CONDITIONS
02-44 DEMO EXISTING CEILING TILE, LIGHT FIXTURES AND ANY CEILING MOUNTED
DEVICES; PREPARE TO RECEIVE NEW FINISHES AND ACCESSORIES, SEE MEP
DRAWINGS
02-57 CONTRACTOR TO ROUTE CONDUIT IN LEAST DESTRUCTIVE MANNER TO LOCATIONS
AS INDICATED IN TELECOMMUNICATION DRAWINGS, CONTRACTOR TO BE
RESPONSIBLE TO VISIT SITE AND UNDERSTAND ROUTING AND MATERIAL
TREATMENT; PATCH AND FINISH TO MATCH EXISTING MATERIALS; TYPICAL AT ALL
DATA DROP LOCATIONS
02-58 REMOVE CEILING TILES AS SPECIFIED IN ICRA GUIDELINES PER RISK
CLASSIFICATION NOTED FOR CABLING INSTALLATION. COORDINATE EXTENT OF
WORK WITH TELECOMMUNICATION DRAWINGS
09-13 FOLLOW EXISTING CABLE ROUTING FOR REMOVAL OF EXISTING CABLE AND
INSTALLATION OF NEW CABLES AT LOCATIONS AS NOTED IN TELECOM DRAWINGS.
09-21 REMOVE AND RE-INSTALL CEILING TILES AND OTHER CEILING MOUNTED DEVICES
AS NEEDED FOR INSTALLATION OF CABLES AND CONDUITS ABOVE CEILING AS PER
TELECOM DRAWINGS, REPLACE ALL DAMANGED TILES TO MATCH EXISTING AND
REINSTALL ALL DEVICES AS NEEDED. DO NOT LEAVE CEILING TILES UNINSTALLED
AND UNATTENDED PAST DURATION OF WORKING SHIFT. CONTINUOUSLY REINSTALL
TILES TO PROVIDE SEALED SMOKE ASSEMBLY. SEE COVER SHEET FOR ADDITIONAL
NOTES UNDER "TEMPORARY FIRE & SMOKE PROTECTION"
13-02 ICRA CLASS II, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND WORKING
HOURS RESTRICTIONS
13-04 ICRA CLASS IV, SEE SPEC SECTION 01 35 26 FOR REQUIREMENTS AND WORKING
HOURS RESTRICTIONS
13-06 INFECTION PREVENTION, FIRE RATED, 6MM PLASTIC BARRIER SEALED TOP,
BOTTOM, AND SIDES. PROVIDE VESTIBULE AREA FOR GOWNING AND UNGOWNING
AND NEGATIVE PRESSURE WITHIN CONSTRUCTION AREA IN ICRA CLASS IV. SEE
SPECS FOR OTHER ICRA CONSTRUCTION REQUIREMENTS; COORDINATE LOCATION
OF TEMPORARY INFECTION PREVENTION BARRIER ITHE C.O.R. AND INFECTION
PREVENTION REPRESENTATIVE.
13-09 ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH 4MM
MIN. PLASTIC SHEET; ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE
PROJECT BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGN FOR SUCH PRUPOSED WITH A LID.
J
J J
JJ
JJ
J J
J
JJ
J
J
JJ
J
J
J
J
J J J J
EXISTING ACCESS LADDER TO REMAIN
EXISTING CONCRETE PAD
EXISTING CONCRETE PADGRAVEL CRAWL SPACE
EXISTING CONCRETE
FOOTINGS AND GRADE BEAM
NOTES:
1. EXISTING CONCRETE BEAMS AND DECK TO BE EXPOSED, REMOVE ALL CONDUITS AND CLEAN SURFACES.
2. ABOVE CEILING CONDUITS, DUCTS, AND OTHER MISCELLANEOUS ITEMS TO BE DEMOLISHED AND REORGANIZED
IN A CLEAN MANNER.
OIT IMAGING
B-13
MECHANICAL
B-11
02-03
02-03
02-03
02-06
02-06
02-03
02-22
02-09
02-35 02-35
NORTHSCALE: 1/4" = 1'-0"
4' 3' 2' 1' 4' 8'0'
154-AE-601
154-AE-601
DEMO EXISTING CRAC UNITS,
SEE MECHANICAL DRAWINGS
DEMO EXISTING CRAC UNITS,
SEE MECHANICAL DRAWINGS
WALL TO REMAIN
5' - 4 3/4"
FIELD VERIFY LENGTH OF WALL TO
REMAIN WITH NEW CONSTRUCTION
02-35
CORE THROUGH EXISTING FOOTING
TO INSTALL NEW PLUMBING PIPE
AREA OF EXTERIOR EXCAVATION ADJACENT TO NEW MCR, SEE
CIVIL DRAINGS FOR EXTENT OF WORK AND ARCHITECTURAL
DETAILS AND SPECS FOR INSTALLATION OF WATER PROOFING
SYSTEM
02-09
02-03
APPROXIMATE LOCATION OF CHILLED WATER LINE
WALL PENETRATION
13-06
13-06
13-07
NOTE:
SEAL MECHANICAL ROOM TO
PREVENT DUST
CONTAMINATION TO AIR
HANDLER
EXISTING AIR HANDLING UNTS TO BE BROUGHT OFF-LINE DURING
CONSTRUCTION ACTIVITIES. CONTRACTOR TO PROVIDE NEGATIVE
PRESSURE EXHAUST SYSTEM FOR DURATION OF WORK
13-09
OIT IMAGING
B-13
MECHANICAL
B-11
CORRIDOR
B-08A
CORRIDOR
B-12
CORRIDOR
B-09C
CLEAN AGENT
AREA
B-09B
PHASE 1: DATA CENTER B-09
1. CONTRACTOR TO IMPLEMENT ICRA MEASURES AND BEGIN
CONSTRUCTION OF B-09, B-09A,B-09C, AND DEMISING WALL
FROM CORRIDOR B08A AND B-09C TO EXISTING CRAWL
SPACE. NOTE TO PROTECT EXISTING UPS AREA.
2. AT COMPLETION OF WORK, OIT TO MIGRATE SERVERS AND
REQUIRED EQUIPMENT TO FUNCTIONAL DATA CENTER.
3. COORDINATE WITH C.O.R. TIMELINE OF EXPECTED SERVER
MIGRATION.
PHASE 2: STORAGE B-13
1. CONTRACTOR TO COORDINATE EQUIPMENT FOR SALVAGE
WITH C.O.R.
2. CONTRACTOR TO IMPLEMENT ICRA MEASURES AND
REMODEL WORK AS NOTED IN DOCUMENTS.
SCALE: 1/8" = 1'-0"
8' 6' 4' 2' 8' 16'0'
NORTH
MCR
B-09
RELOCATED CRAC
UNITS
PROTECT EXISTING UPS
AND OTHER EQUIPMENT
TO REMAIN
ICRA CONTAINMENT,
PHASE 1
ICRA CONTAINMENT,
PHASE 2
INDICATES BUILT ITEM TO BE REMOVED
INDICATES LIGHT FIXTURE TO BE REMOVED
DEMOLITION LEGEND
INDICATES EXTENT OF ICRA CLASS SCOPE
1. SEE G SERIES SHEETS FOR ALL DEMOLITION NOTES & HAZARDOUS
MATERIAL NOTES
2. IN HOSPITAL OCCUPANCY, CONTRACTOR ARE TO USE A
CONSTRUCTION CONTAINMENT CUBE WITH HEPA VACUUM TO
MAINTAIN NEGATIVE PRESSURE AS A MEANS TO ACCESS AREAS
ABOVE CEILING TILES. THIS INCLUDES ALL PATIENT CORRIDORS
AND ALL ACUTE CARE PATIENT AREAS. THIS IS IN CONJUNCTION
WITH THE HOSPITALS INFECTION PREVENTION MEASURES AND
ICRA PROTOCOLS.
3. MAINTAIN FIRE SUPPRESSION SYSTEM OPERATIONAL DURING
CONSTRUCTION WORK. FIRE SUPPRESSION CONTRACTOR TO
REMOVE DOWNWARD HEADS AND TURN UPWARS, PROVIDE NEW
FIRE SUPPRESSION HEAD IN TELECOMMUNICATION ROOMS (TR).
WORK TO BE CONDUCTED WITHIN ONE WORKING SHIFT. SEE
ADDITIONAL PROJECT NOTES ON COVER SHEET.
DEMOLITION GENERAL NOTES
CABLE INSTALLATION ROUTE, FIELD VERIFY
CONDITIONS PRIOR TO COMMENCEMENT OF
WORK, SEE TELECOM DRAWINGS FOR
EXTENT OF WORK
INDICATES AREA EXISTING TR CLOSET.
EXISTING EQUIPMENT TO BE REMOVED PER
TELECOMMUNICATION DRAWINGS. PATCH
WALLS, REMOVE BASE AND FLOORING.
PREPARE TO RECEIVE NEW FINISHES.
PROJECT KEY PLAN
VA MEDICAL CENTER
FORT HARRISON, MT
PLAN
NORTH
TRUE
NORTH
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n M
T /2
B ld g r2
.r v t
/2
/2
:4
:1
P
M
154-AD-300
154-BASEMENT ENLARGED
DEMOLITION FLOOR PLANGDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
BLDG 154
Project Director
JPRTMP05/20/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
FULLY SPRINKLERED
1/4" = 1'-0"1
ENLARGED BASEMENT DEMOLITION PLAN
1/8" = 1'-0"2
154 - DATA CENTER PHASING PLAN
02-03 CAREFULLY REMOVE EXISTING DOOR, FRAME AND HARDWARE, RETURN TO OWNER.
02-06 DEMO EXISTING WALL IN ITS ENTIRETY INCLUDING ANY WALL MOUNTED DEVICES,
TERMINATE CONDUITS AT NEAREST J-BOX, PREP FLOOR TO RECEIVE NEW FINISH
02-09 DEMO WALL AS REQUIRED TO RECEIVE NEW DOOR AND FRAME
02-22 COMPLETELY DEMO EXISTING RAISED FLOORING SYSTEM, STAIRS, RAMPS, PEDESTALS,
RAILINGS, AND ASSOCIATED ACCESSORIES. CLEAN EXPOSED CONCRETE AND
PREPARE TO RECEIVE NEW SEAL FINISH
02-35 SAW CUT CONCRETE AND EXCAVATE AS REQUIRED TO INSTALL FLOOR DRAIN SYSTEM
AND SUMP PUMP
13-06 INFECTION PREVENTION, FIRE RATED, 6MM PLASTIC BARRIER SEALED TOP, BOTTOM,
AND SIDES. PROVIDE VESTIBULE AREA FOR GOWNING AND UNGOWNING AND NEGATIVE
PRESSURE WITHIN CONSTRUCTION AREA IN ICRA CLASS IV. SEE SPECS FOR OTHER
ICRA CONSTRUCTION REQUIREMENTS; COORDINATE LOCATION OF TEMPORARY
INFECTION PREVENTION BARRIER ITHE C.O.R. AND INFECTION PREVENTION
REPRESENTATIVE.
13-07 SEAL PERIMETER OF DOOR TO MAINTAIN NEGATIVE PRESSURE WITHIN CONSTRUCTION
AREA; PROTECT FINISH DURING CONSTRUCTION
13-09 ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH 4MM MIN.
PLASTIC SHEET; ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED ROUTE IN
ENCLOSED DUMPSTER CART DESIGN FOR SUCH PRUPOSED WITH A LID.
UP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
WAP
SCALE: 1/8" = 1'-0"
8' 6' 4' 2' 8' 16'0'
PROJECT
NORTH
190 SF
TR
A148
SURGICAL OUTP.
STORAGE
A164
SURGICAL OUTP.
EXAM
A180
SURGICAL OUTP.
EXAM
A181
SURGICAL OUTP.
EXAM
A179
SURGICAL OUTP.
STAFF LOUNGE
A163
SURGICAL OUTP.
EXAM
A162
SURGICAL OUTP.
EXAM
A161
SURGICAL OUTP.
EXAM
A160
SURGICAL OUTP.
EXAM
SURGICAL OUTP.
EXAM
A158
SURGICAL OUTP.
EXAM
A157
SURGICAL OUTP.
BREAK ROOM
SURGICAL OUTP.
OFFICE/EXAM
SURGICAL OUTP.
PROCEDURE
SURGICAL OUTP.
CLOSET
A153
COMMON
MECHANICAL
A152
COMMON STAFF RR
A171
SURGICAL OUTP.
EXAM
A170
SURGICAL OUTP.
EXAM
A169
Room
A168
Room
A169
PR TLT
A167
SUGICAL OUTP.
STORAGE
A166
Room
A172
SURGICAL OUTP.
EXAM
A178
SURGICAL OUTP.
EXAM
A177
SURGICAL OUTP.
EXAM
A176
SURGICAL OUTP.
EXAM
A175
SURG OUTP.
CLEAN
A174
COMMON CORR.
C-113
COMMON
CORRIDOR
C-111 COMMON STAF RR
A172
117 SF
COMMON
CORRIDOR
C-116
65 SF
COMMON
CORRIDOR
C-114
729 SF
COMMON
CORRIDOR
C-112
376 SF
COMMON
CORRIDOR
C-115
SURG OUTP
SOILED
A173
EMS
A144
SURGICAL OUTP.
EXAM
A143
OPTH. EXAM
A145
OFFICE
A186
OFFICE/EXAM
A185
OFFICE/EXAM
A184
OFFICE/EXAM
A183
EXAM
A182
OFFICE
A142
SURGICAL OUTP.
CHEAK-IN
A141
COMMON
BATHROOM
A138
STORAGE
A139
EMS OFFICE
130G
OFFICE
A137
COMMON
CORRIDOR
C-117
EXAM
A187
EXAM
A188
EXAM
A191
STORAGE
A192
HSKP
A147A
COMMON
CORRIDOR
C-115
BLOOD DRAW
A149B
PT LTL
A49A
CHASE
149AB
WAITING
A197
OFFICE
151C
OFFICE
151B
OFFICE
OFFICE
OFFICE
151D
OFFICE
151A
HALLWAY
A149
RESROOM
A136
RESTROOM
A135
OFFICE
A133
OFFICE
A129A
OFFICE/EXAM
A129
CPAC/MCCR
OFFICE
A128
COMMON
HALLWAY
A127
UNASSIGNED
OFFICE
A126
OPTHAL EXAM
A125
LOGISTICS
STORAGE
A120
OPTHAL
OFFICE/EXAM
A121
OPTHAL
OFFICE/EXAM
A122
OPTHAL OFFICE
A124
OPTHAL OFFICE
A123
COMMON
CORRIDOR
AC105
CORRIDOR
C-106
OPTHAL OFFICE
A119
OPTHAL OFFICE
A120
OPTHAL EXAM
A104
ST TLT
A99
ST TLT
A98
EMS HSKP
A103
OPTHAL OFFICE
A102
OPTHAL CLST
A101
COMMON
CORRIDOR
A100
CLOSET
SP100
COMMON ELEC
A146
COMMON STAIR
A83
STORAGE
A97
OPTHAL
OFFICE/EXAM
A96
OPTHAL EXAM
A95
OPTHAL EXAM
A94
OPTHAL EXAM
A93
ED EXAM
A92
ED BH EXAM
A31
ED EXAM
ED ON - CALL
ED CLOSET
EMS HSKP
A82
PHARMACY FUME
HOOD
A106
ED NEURO EXAM
A107
ED EXAM
ED NEURO EXAM
A108
ED EXAM
A109
ED EXAM
A90
ED CLEAN/MED
A87
ED PAT TOILET
A89
ED EXAM
A86
ED EXAM
A79
HAS CENTRAL
CHEAK-IN
A111
ED EXAM
A116
ED OFF. / CLST
A114
ED EXAM
A117 OPTHAL OPEN
OFFICE
A117A
ED OBSERV &
TRTMT
A88
COMMON
CORRIDOR
AC94
ED OFFICE
A102
ED OFFICE
A103
ED EXAM NEG AIR
A78
ED BREAK ROOM
A100
OPTHAL STORAGE
A118
ED OFFICE
A113
ED OFFICE
A115
COMMON
CORRIDOR
C-102
CORRIDOR
AC103
COMMON
CORRIDOR
C-104
COMMON
CORRIDOR
AC101
LOBBY
COMMON
CORRIDOR
C-095
ED WAITING
A199
SECURITY OFFICE
A130E
HALLWAY
A198A
154A-AD-201
02-08
09-13
02-58
13-03
13-04
09-21
02-57
DEMO EXISTING CARPET AND BASE
AS NEEDED TO INSTALLED NEW
CHASE WALL
SEE MECHANICAL DRAWINGS
FOR PIPING CORE
02-25
13-06
TR
A148
HALLWAY
A149
PROJECT
NORTH
SCALE: 1/4" = 1'-0"
4' 3' 2' 1' 4' 8'0'
02-04
02-17
02-30
02-40
13-06 13-11
13-09
INDICATES BUILT ITEM TO BE REMOVED
INDICATES LIGHT FIXTURE TO BE REMOVED
DEMOLITION LEGEND
INDICATES EXTENT OF ICRA CLASS SCOPE
1. SEE G SERIES SHEETS FOR ALL DEMOLITION NOTES & HAZARDOUS
MATERIAL NOTES
2. IN HOSPITAL OCCUPANCY, CONTRACTOR ARE TO USE A
CONSTRUCTION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .