This document outlines the scope of work for Project No. 436-21-700 EHRM Infrastructure Upgrades at the Fort Harrison VA Medical Center. The project includes infrastructure improvements at various buildings across the campus, such as architectural demolition and construction, electrical system upgrades, HVAC modifications, data communication cabling replacement, fiber infrastructure upgrades, civil site work, asbestos and lead paint abatement, fire suppression and alarm upgrades, and physical security system improvements. The scope of work involves architectural, structural, electrical, HVAC, plumbing, telecommunications, fire protection, and security aspects. The solicitation number is 36C77623B0001 and is open to all SDVOSB contractors. The contractor shall provide all labor, materials, equipment and qualified supervision to complete the upgrades in accordance with specifications and drawings.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL QUESTIONS AND SOLICITATION #: 36C77623B0001
RESPONSES TRACKING SHEET PROJECT TITLE: Fort Harrison EHRM Infrastructure Upgrades Construction Project
# RECEIVED
DATE
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
1 11/30/22 01/10/23 Can you please confirm the contractor will be hiring a Commissioning Agent (CxA) for commissioning services for this project?
Confirmed. The contractor shall hire an individual, company, or firm to act as the Commissioning Agent as required by Specification Section 01 91 00.
2 12/06/22 01/10/23 The telecom equipment schedule doesn't have horizontal cabling called out for building 170 but it does show cabling on the prints. Which is accurate?
The drawings for new work show the actual quantity of data required.
3 12/06/22 01/10/23 The telecom equipment schedule doesn't call out building 171 at all but the local building prints show new network cables. Please provide the required cable counts and fiber type and strand count.
Telecommunications cabling is routed back to Building 154 per drawing notes.
4 12/06/22 01/10/23 There are discrepancies between the cabling counts shown on print and the cabling called out in the telecom equipment schedule. Which is accurate and should be bid on?
Specifically if you could clarify comm room A148 rack 2 and the cable counts to that room. The schedule calls for 960 cables, the patch panel schedule calls for 384 and I have counted on the prints 336 cables. That’s a big difference in cable counts.
See answer to question #3.
960 indicated in the schedule is a typo. Should read 96.
336 is the correct number of cables. The additional patch panel is for future provision.
5 12/13/22 01/10/23 Please share us the Planholder List/Bidders List. We do not have a bidders list. This solicitation is open to all SDVOSB GCs under NAICS 236220. The sign-in sheet from the 11/30 site visit was posted to SAM.gov in an amendment on 12/1 and the sign-in sheet from the 12/12 site visit was posted on 12/27.
6 12/20/22 01/10/23 Will conduit in the walls need to be replaced to accommodate Cat6A?
Conduit in the walls is not required to be replaced in locations that the existing box and conduit are no longer used.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
7 12/20/22 01/10/23 Coming out of the sleeves into the hallways and office spaces, what is being used for cable management in the pathways? Cable tray?
It is the intent for the contractor to provide J-Hooks for cable pathways and field locate routing.
8 12/20/22 01/10/23 Should we bid a backboard for the fiber housing in unnamed building across from firehall
There shall be a backboard installed for mounting of new enclosure in RM 108.
9 12/20/22 01/10/23 Will the existing fiber in the fire hall be long enough to reach the new IDF
There shall only be A-side fiber taken to the Fire Hall as shown on Fiber Riser Diagram on sheet TK-033. Existing fiber is not to be re-used and shall be demolished after cutover to new fiber.
10 12/20/22 01/10/23 Pathway for the cables in the boiler room need to be identified considering space limitations
Contractor shall field verify routing and coordinate with VA COR and A/E for confirmation during construction.
11 12/20/22 01/10/23 Please confirm required OSHA certification and any special safety equipment for the crawlspace from boiler room to Madison Clinic
The contractor shall provide an OSHA “Competent Person” (CP). One who is capable of identifying existing and predictable hazards in the surroundings and working conditions which are unsanitary, hazardous or dangerous to employees, and who has the authorization to take prompt corrective measures to eliminate them (see 29 CFR 1926.32(f)). For this situation, the Competent person shall identify the hazards associated with working in the crawlspace. All confined space entry shall comply with 29
CFR 1926.
12 12/20/22 01/10/23 Please identify the pathway and access over the hard deck areas in the behavioral health building.
Contractor to field verify routing and access in the field.
Provide conduit sleeves through hard lid areas to accessible ceiling spaces and/or access hatches as required for installation of required sleeving.
13 12/20/22 01/10/23 Drawing TK-033 Fiber Riser Drawing has SM OS1 SM fiber to TRs, or are we allowed to substitute the OS1 with OS2 SM fiber and eliminate all OS1 fiber.
It is acceptable to substitute OS2 SM fiber for the OS1 SM fiber.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
14 12/20/22 01/10/23 During the site visit the VA mentioned there is a break in the fiber line underground, but unsure of where it is located. Will we be responsible for repairing this break? If so, how do you want it estimated to fix it?
Prior to reuse of any existing duct banks, the construction contractor must visually scope the duct bank conduit prior to pulling new fiber optic cabling. If a broken duct bank conduit is discovered, notify the COR and Contracting Officer.
15 12/20/22 01/10/23 Will the VA be supplying the new switches for the Racks? This is not anticipated. The contractor will assist the VA with relocation of existing switches to new locations during cutover.
16 12/20/22 01/10/23 Have there been any temperature or humidity control issues in the server rooms or TRs? If so, to what extent?
Some of the TRs have been intermittently noncompliant with the HVAC standards for OIT spaces in the past.
17 12/20/22 01/10/23 Can the VA please provide ICRA assessment level and class for each impacted area on this project?
The table in SECTION 01 35 26 SAFETY REQUIREMENTS, 1.12 INFECTION CONTROL, Section K provides this information.
18 12/20/22 01/10/23 Please advise if new plenum grade cabling can be run exposed in the ceiling or wall cavities in lieu of full conduits systems.
Plenum rated copper cabling may be run exposed in all accessible ceiling spaces and run open in walls as necessary. Copper cabling through hard lid areas must be run in conduit within non-accessible ceilings. Fiber optic cabling shall be routed in innerduct within accessible/open ceiling areas but must be routed through conduit within inaccessible ceiling spaces.
19 12/20/22 01/10/23 Will Liebert Verfiv UPS's be acceptable to the VA? Liebert Vertiv UPSs is an acceptable product. Equipment will be evaluated for "as equal" during the submittal process.
20 12/20/22 01/10/23 For the building electrical load calculations page EK-004 through EK-014: Was each existing load center / panel subject to the standard 30 day load test, or calculated from size and number of breakers in each load center / panel?
Sizing is based on existing information and field observations.
21 12/20/22 01/10/23 If there was load center testing completed is a copy of that report available?
No report available.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
22 12/20/22 01/10/23 Can the VA please share its current, Fire Suppression contractors for the site?
IT&M Division, Inc. of Helena MT.
SprinkMT of Helena MT.
23 12/20/22 01/10/23 Can the VA please share its current, access control contractors / integrator for the site?
Access Control Contractor
FICO
Dan Morris, EIT | Project Manager Facility Improvement Corp. (FICO) Office: (406)-452-0009 Cell: (406)-750-3033
VA HVAC Controls Tally Armstrong HVAC Mechanic 406-447-7403
Physical Access Controls | Intrusion Detection | Security Cameras Charles (Marcus) White Security Officer/Chief 406-447-7660 Or Dale Wagner Deputy Chief of Police 406-447-7661 Or Dayne Roberts Physical Security Specialist 406-447-7586
24 12/20/22 01/10/23 Where new "Proximity Card Reader's" are shown, is GC to provide the actual PIV readers for Access control, or just the conduit to their new locations?
General Contractor’s sub-contractor is to supply all new access control hardware as shown in plans and specifications.
25 12/20/22 01/10/23 On Page EK-001, are the J boxes shown above the racks for the 208V, 20A 3 Phase with L21-20R locking receptacle mounted on the racks or on the wall?
The L21-20R receptacles can be mounted on the wall for single rack system. Do not mount directly on rack.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
26 12/20/22 01/10/23 On Page EK-001, are the 208V, 20A 3 Phase needed 2 per rack or 2 per Elevation? If its only 2 per elevation, then rooms with 3 racks would need at least 1 more receptacle top plug the UPS's into.
When there are 3 racks, there are (2) 60A hard wired connections that connected to a Zone PDU. Refer to detail 4 on Sheet EK-001.
27 12/20/22 01/10/23 In the scope of work document it mentions asbestos and lead abatement, but don’t see any hazardous material reports.
Can the VA please share the report used for this solicit?
The document “Att 5 - Fort Harrison EHRM - Specification Appendix A” that was posted with the solicitation is the Hazardous Material Survey.
28 12/20/22 01/10/23 In the scope of work document it mentions Fire Alarm upgrades, Intrusion Detection and Cameras, but don’t find any specs or Drawings from Division 28. Can the VA provide the DIV 28 specs / dwgs?
All new Fire Alarm devices, Intrusion Detection, and Camera Systems shall integrate with the existing systems.
Contractor to submit product data for review.
29 12/20/22 01/10/23 In scope of work document it mentions upgrading (BAS) equipment. Can the VA please share current BAS contractor / vendor for the site?
FICO is the vendor, Schneider Electric is the BAS supplier.
30 12/20/22 01/10/23 Sheet 00-GI-000.1, General Note #35 refers to a “Contractor Background Investigations Request” Form necessary to complete PIV Badging Requirements.
a. Please provide a copy of the Contractor Background
Investigations Request Form.
b. What will be the duration for the required “Training and
Certification” be, to allow un-escorted access to IT Closets?
c. Will there be any costs associated with the background investigation?
d. Will the VA train and certify subcontractors for PIV Badging?
Site superintendents will be expected to go through the PIV Badging process. Typical laborers (sub-contractors) are not expected to undergo this process.
a. All associated paperwork will be provided at the time of award.
b. There is no training associated. The application consists of approximately 4 documents.
c. No.
d. No. Only the prime contractor will be eligible for PIV badging.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
31 12/20/22 01/10/23 KN #13-06 on the demolition plans specifies the construction of the ICRA barriers to be “6mm Plastic Barrier Sealed Top, Bottom, And Sides”.
a. Please confirm the VA will approve 6mm Plastic ICRA
Barriers at the locations specified on the drawings.
b. Please confirm these ICRA Barriers will require a
“Vestibule Area” at each location.
c. Please confirm these ICRA Barriers will be able to remain in place for the duration of required construction.
a. Plastic critical barriers are acceptable at all locations, as long as they are effectively affixed to the ground and ceiling and secure from movement or damage.
Sheet plastic shall be Fire retardant polystyrene, 6-mil thickness.
b. As required by Specification Section 01 35 26, a vestibule is only required when working in areas designated as Class IV & V. For these spaces, provide an anteroom or double entrance openings that allow workers to remove protective clothing or vacuum off existing clothing in these areas. Construct the anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave work site. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
c. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may not be removed until a work area cleaning has been performed. When work is started in an area, the contractor is expected to continue working diligently until that area's completion. If there will be extended periods of non-productivity in an area, the VA may request the contractor remove the critical barrier and reinstall prior to restarting construction activities.
32 12/20/22 01/10/23 Sheet CJ-00001 includes a Detail for “Outdoor Concrete Housekeeping Pad”. Please provide locations this pad detail is required.
Pad is located at Building 20. Refer to Sheets 20-MH-011 and 20-AE-201 for location of housekeeping pad.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
33 12/20/22 01/10/23 Sheet 154-AD-300 has a sheet note that states “Area Of Exterior Excavation Adjacent To New MCR, See Civil Drawings…” No work is indicated in this area on the Civil Drawings or Architectural Details.
a. Please provide updated Civil Drawings that specify
“Exterior Excavation” required.
b. Please provide “Architectural Details” of all required work adjacent to new MCR.
c. Please provide specifications for any required
“Waterproofing System”.
Exterior excavation of the MCR was descoped from the project. Therefore, the architectural note regarding excavation and waterproofing is no longer relevant.
34 12/20/22 01/10/23 Sheet 20-AE-201, Key Notes 03-01 specifies “New Housekeeping Pad, Coordinate with Mechanical drawings for Size and Civil Drawings for Details.
a. Should this “New Housekeeping Pad” be constructed as shown on Sheet CJ-00001, “Outdoor Concrete Housekeeping Pad Detail”?
b. Mechanical Sheet 20-MH-011 does not specify a “Pad Size”, please provide the required “Pad Size” for 20-
CUAC-1.
Pad is located at Building 20. Refer to Sheets 20-MH-011 and 20-AE-201 for location of housekeeping pad.
a. The detail provided on sheet CJ-00001 should be followed when constructing the housekeeping pad.
b. Pad size is 52x30x6".
35 12/20/22 01/10/23 Sheet 154-AD-201, Detail 4 does not have a Key Note at the corridor wall opening shown. Is this opening a new door or an infill of an existing door?
Storage 102H existing door 154-102H.0 is to remain in place as shown in Detail 5/A154-AE-301 and Door Schedule. Hardware Schedule 15 for this door indicates replacement of lockset only.
36 12/20/22 01/10/23 Sheet 154-AD-201, Detail 3 appears to show demolition of the door into TR 109, however no Key Note is present specifying door demolition. Please provide a Key Note specifying the required work at this location.
Dashed line on door indicates this door is to be removed.
Key Note 02-03 applies to door. Replacement of door is indicated in detail 1/154-AE-301, Door Schedule, and Hardware Schedule.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
37 12/20/22 01/10/23 Sheet 154-AD-202, Storage #218B is in the OR Suite. Will construction workers be required to “Gown-Up” while working in this area?
As identified in Keynote 13-06 on Sheet 154-AD-202, The OR space, including Storage Room #218, is designated as ICRA CLASS V and subject to all applicable requirements of Specification Section 01 35 26. Personnel will be required to wear coveralls at all times during Class V work activities. Coveralls must be removed before leaving the anteroom.
38 12/20/22 01/10/23 Sheet 00-GI-002, Reflected Ceiling Plan Notes #3 Refers to the “Finish Schedule”. No Finish Schedule was provided with the Contract Documents. Please provide a complete Finish Schedule.
Finish Schedule is not provided as part of these documents. Finishes or direction of Finish concepts are indicated in specification of respective materials.
Contractor's responsibility is to provide compatible finishes as per Owner's and Architect's approval for final selection of Finishes.
39 12/20/22 01/10/23 Sheet 154-AE-303, KN #09-29 Install New Flooring To Match Existing Similar Use Room. Please provide/specify the “Match Existing Similar Use Room” flooring desired.
Selected contractor will need to submit a similar flooring for approval compatible to flooring installed in other rooms of same use.
40 12/20/22 01/10/23 Specification Section 10 14 00 Signage is included in the Specifications. Please provide a sign design and locations signs are desired.
Signage design is shown in Specification Section 10 14 00, Signage. Location of new signage is to occur at all doors receiving new materials or change of use of space.
Impacted rooms shown in plans.
41 12/20/22 01/10/23 Sheet 141-TD-0B1, General Note I, and Sheet Note 3 require us to demo existing telecom devices/cabling.
a. Does all of the existing 25 Pair telephone cabling need to be demolished?
b. If so, what will replace it, and how many pairs will be needed for POTS lines, and utility functions.
c. What would the new 25 pair be terminated to, 66 blocks, 110 blocks?
a. Existing telephone cabling shall be demolished only in areas where new is being provided as shown on sheet
TK-034.
b. See sheet TK-034.
c. New will be landed on patch panels.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
42 12/20/22 01/10/23 Sheet 141-TD-0B1, Sheet Note 1 states “leave other systems (DDC, Access Control, ETC).
a. If those systems are to be left alone, which all have a tie in to the data communications network, what will the requirement be to keep those systems connected?
b. Are they connected with copper or fiber?
c. Please confirm that VA will contract directly with the subsystem vendor on all systems that need be moved.
a. Where connections to the data network are required verify with patch panel schedules and drawings if the cabling is being replaced in the project scope.
b. Coordinate with VA staff for connections.
c. Contractor shall be responsible to relocate any system indicated in documents to be relocated.
43 12/20/22 01/10/23 Sheet 141-TD-0B1, Detail Notes 1 states “Demolish Equipment and All Cabling”, 2. “Equipment to Remain”, 3.
“Equipment to be salvaged/removed by VA.”
Please confirm the VA will complete this work for all “Other Systems” (DDC, Access Control, Nurse call, Fire Alarm, Etc.)
Contractor shall be responsible to relocate any system indicated in documents to be relocated. For any system indicated to be removed by VA, work will be performed by the VA.
44 12/20/22 01/10/23 Please confirm the VA will be working and scheduling with the subsystem vendors on scheduling network outages.
No interruption to the telecommunications infrastructure may occur until new is in place and cutover is being performed. Install the new infrastructure and keep the transitionary time to a minimum to mitigate interruption as much as possible during cutover. The contractor is required to coordinate with the COR and all vendors prior to cutover.
45 12/20/22 01/10/23 During the project walk through, the VA made mention that there would be no outages. Please confirm that there are no outages allowed?
No interruption to the telecommunications infrastructure may occur until new is in place and cutover is being performed.
46 12/20/22 01/10/23 Does the VA have extra network equipment (Switch gear, routers, UPS's) to keep the network connected during construction and cut over between the old network room and the new network room?
This is not anticipated. The contractor will assist the VA with relocation of existing switches to new locations during cutover.
47 12/20/22 01/10/23 Please confirm, that all existing conduit stubs for data communications are 3/4".
Contractor to field verify. Contractor also has the option to free cable pursuant to detail 5 on sheet TK-002.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
48 12/20/22 01/10/23 Please provide all existing locations where 1/2" conduits need to be replaced.
Contractor to field verify. There should be no 1/2" conduit existing as this is forbidden per VA requirements and standards. Contractor also has the option to free cable pursuant to detail 5 on sheet TK-002.
49 12/20/22 01/10/23 Please confirm the Site Superintendent and SSHO are to be on site full time and employees of the offeror.
The project superintendent must maintain a physical presence at the site at all times that construction is active.
The SSHO or an equally qualified Designated Representative/alternate will maintain a presence on the site during construction operations in accordance with FAR Clause 52.236-6: Superintendence by the Contractor.
The SSHO can have collateral duties as the contractor’s superintendent. The contractor may hire an individual, company, or firm to act as the as the Superintendent and
SSHO.
50 12/20/22 01/10/23 Please confirm all workers on site are to have OSHA 10 Certification.
All designated Competent Persons shall have completed the OSHA 30-hour Construction Safety course within the past 5 years. All other construction workers shall have the OSHA 10-hour Construction Safety Outreach course and any necessary safety training to be able to identify hazards within their work environment.
51 12/20/22 01/10/23 Please provide VA review time for RFI’s. 14 Calendar Days
52 12/20/22 01/10/23 01 45 00 – Refers to multiple people in QC organization to include Superintendent, Site Safety and Health Officer (SSHO) and the Quality Control Manager.
a. Please confirm (3) individuals need to be assigned to this project.
b. Please confirm these (3) individuals CANNOT have collateral duties and must be (3) unique individuals.
The Superintendent cannot have collateral duties. If qualified, the SSHO and QCM/CQC Systems Manager may be the same individual.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
53 12/20/22 01/10/23 Please confirm that the SSHO, Superintendent, and QCM must all be employees of the offeror.
The contractor may hire individuals, companies, or firms to act as the as the Superintendent or SSHO or
QCM/CQC.
54 12/20/22 01/10/23 Please confirm the CQC System Manager must be on site at all times and be an employee of the offeror.
The CQC will maintain a presence on the site during construction operations. The contractor may hire individuals, companies, or firms to act as the as the Superintendent or SSHO or QCM/CQC.
55 12/20/22 01/10/23 Please confirm the CQC System Manager is required to have a valid USACE CQM certificate per the VA TIL 01 45 00 requirements for CQC System Manager.
Confirmed. This is standard VA requirement.
56 12/20/22 01/10/23 PLEASE CONFIRM THE SUPERINTENDENT SHALL NOT
HAVE ANY SHARED DUTIES AS A QCM OR SSHO ON
THE PROJECT.
The Superintendent cannot have collateral duties. If qualified, the SSHO and QCM/CQC Systems Manager may be the same individual.
57 12/20/22 01/10/23 PLEASE CONFIRM THE SSHO SHALL NOT HAVE ANY
SHARED DUTIES AS A QCM OR SUPERINTENDENT ON
THE PROJECT.
The Superintendent cannot have collateral duties. If qualified, the SSHO and QCM/CQC Systems Manager may be the same individual.
58 12/20/22 01/10/23 PLEASE CONFIRM THE QCM SHALL NOT HAVE ANY
SHARED DUTIES AS A SSHO OR SUPERINTENDENT.
The Superintendent cannot have collateral duties. If qualified, the SSHO and QCM/CQC Systems Manager may be the same individual.
59 12/20/22 01/10/23 PLEASE CONFIRM THAT THE CONTRACTOR IS TO
SUPPLY ALL TESTING AND INSPECTION FOR THE
PROJECT.
Confirmed.
60 12/20/22 01/10/23 PLEASE CONFIRM THAT COMMISSIONING AGENT IS BY
THE CONTRACTOR TO BE INCLUDED IN THE BID
PROPOSAL.
Confirmed. The contractor shall hire an individual, company, or firm to act as the Commissioning Agent as required by Specification Section 01 91 00.
61 12/20/22 01/10/23 PLEASE CONFIRM REQUIREMENT FOR AN ADDITIONAL
20% CAPACITY OF COMMUNICATIONS CABLING TO BE
INCLUDED IN THE BID AMOUNT.
This is confirmed per documents.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
62 12/20/22 01/10/23 WILL WORK IN COMMON HALLWAYS REQUIRE USE OF
THE CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO WORK SITE
WITH HEPA VACUUM FOR VACUUMING PRIOR TO
EXIT)? OR WILL THE VA ALLOW THE WORK TO BE DONE
WITH PLASTIC SHEATING IF THE DUST DISTURBANCE
IS MINIMAL AND 4 OR LESS ACOUSTIC TILES ARE
REMOVED FOR THAT PARTICULAR WORK?
Work in hallways will require critical barriers such as sheetrock, plywood, plastic, to seal area from non-work area or the contractor may implement control cube method. Without implementing a critical barrier, the maximum number of acoustical ceiling tiles to be removed is four in ICRA Class 1 and 2 areas. A critical barrier will be required for working in any areas with a ICRA designation above Class 2.
63 12/20/22 01/10/23 PLEASE CONFIRM LEVEL 4 FINISH FOR ALL FINISHED
AREAS OPEN TO PUBLIC VIEW OF GYPSUM BOARD.
Confirmed. Level 4 finish for all exposed areas open to public, patient, and staff view.
64 12/20/22 01/10/23 PLEASE CONFIRM PAINTING UNLESS OTHERWISE
NOTED IS TO BE (3) COATS (PRIME, BODY, AND FINISH)
AND WILL BE FROM "SEAM TO SEAM" OR TO A CHANGE
OF MATERIALS WHERE WALLS HAVE BEEN PATCHED
AND REFINISHED.
Confirmed.
65 12/20/22 01/10/23 CAN THE DATA CABLES BE ALLOWED TO BE FISHED IN
WHERE PATHWAYS ARE NOT LARGE ENOUGH?
Yes. See detail 5 on sheet TK-002.
66 12/20/22 01/10/23 PLEASE CONFIRM THAT THE FIRESTOPPING
INSTALLER MUST BE EITHER A FM GLOBAL APPROVED
CONTRACTOR, UL QUALIFIED FIRESTOP CONTRACTOR
CERTIFIED, OR AN ACCREDITED FIRESTOP SPECIALY
CONTRACTOR BY A FIRESTOPPING PRODUCT
MANUFACTURER.
Firestopping Installer must conform with Specification section 07 84 00 as described in Part 1, Article 1.5 Quality Assurance, Paragraph B.
67 12/20/22 01/10/23 PLEASE CONFIRM THAT THE CONTRACTOR IS TO
INCLUDE THE SERVICES OF A THIRD PARTY
FIRESTOPPING INSPECTOR IN THEIR BID.
Confirmed.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
68 12/20/22 01/10/23 SHEET 141-TD-0B1, GENERAL NOTE I, AND SHEET NOTE
3: DOES ALL OF THE EXISTING 25 PAIR TELEPHONE
CABLING NEED TO BE DEMOLISHED? IF SO, WHAT WILL
REPLACE IT, AND HOW MANY PAIRS WILL BE NEEDED
FOR POTS LINES, AND UTILITY FUNCTIONS. WHAT
WOULD THE NEW 25 PAIR BE TERMINATED TO 66
BLOCKS, 110 BLOCKS?
Existing telephone cabling shall be demolished only in areas where new is being provided as shown on sheet TK-034. New shall be landed on patch panels
69 12/20/22 01/10/23 SHEET 141-TD-0B1 SHEET NOTE 1: ON THE THE DEMO
PAGES THERE IS A SHEET NOTE THAT STATES: LEAVE
OTHER SYSTEMS (DDC, ACCESS CONTROL, ETC). IF
THOSE SYSTEMS ARE TO BE LEFT ALONE, WHICH ALL
HAVE A TIE IN TO THE DATA COMMUNICATIONS
NETWORK, WHAT WILL THE REQUIREMENT BE TO
KEEP THOSE SYSTEMS CONNECTED WITH COPPER OR
FIBER? PLEASE CONFIRM THAT VA WILL CONTACT THE
SUBSYSTEM VENDOR ON SYSTEMS THAT NEED BE
MOVE UNLESS OTHERWISE NOTED.
Where connections to the data network are required, verify with patch panel schedules and drawings if the cabling is being replaced in the project scope. Coordinate cabling requirements with VA and existing conditions.
Contractor shall be responsible to relocate any system indicated in documents to be relocated.
70 12/20/22 01/10/23 CURRENT NURSE CALL SYSTEMS ARE MIXED WITH
CAT5E AND CAT6 CABLING. ARE THOSE NEEDING TO
BE MOVED, AND REWIRED TO THE CAT6A SPEC?
Any horizontal cabling indicated on plan to be replaced shall be. If it is not indicated on plan to be replaced, contractor to maintain existing cabling.
71 12/20/22 01/10/23 THE SPECIFICATION AND PRINTS CALL OUT TWO
TYPES OF FIBER. OS1, AND OM4. IS THE V.A. ASKING
FOR A HYBRID FIBER? OR IS UP TO THE CONTRACTOR
TO CHOOSE? IF HYBRID HOW MANY OF EACH STRAND
OF EACH FIBER TYPE?
Contractor may use hybrid cable at their discretion. For strand counts see Schedule on sheet TK-035.
72 12/20/22 01/10/23 WILL THERE BE ANY AREAS ON THE HOSPITAL
CAMPUS THAT ARE CURRENTLY NOT BEING USED
THAT ARE PART OF THIS UPGRADE?
Every area affected has some level of occupancy. The outbuildings are less busy but still regularly occupied.
There may be limited interior laydown space available and will need to be coordinated with the VA on a case-by-case basis.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
73 12/20/22 01/10/23 DOES THE VA HAVE EXTRA NETWORK EQUIPMENT
(SWITCH GEAR, ROUTERS, UPS'S) TO KEEP THE
NETWORK CONNECTED DURING CONSTRUCTION AND
CUT OVER BETWEEN THE OLD NETWORK ROOM AND
THE NEW NETWORK ROOM?
This is not anticipated. The contractor will assist the VA with relocation of existing switches to new locations during cutover.
74 12/20/22 01/10/23 DO THE 5KVA RACK MOUNTED UPS'S NEED TO BE 3
PHASE OR CAN THEY BE SINGLE PHASE?
UPS shall be 3 Phase.
75 12/20/22 01/10/23 ARE THE CHANNEL RACKS IN THE TR'S 2-POST OR 4-
POST? IF 4-POST, DO WE NEED TO PROVIDE THE
SECURITY DOOR AS SHOWN IN THE OIT GUIDELINES?
The security door is required, as shown in the OIT guidelines. This is to ensure systems within the TR's are secure should non-OIT personnel need access for maintenance, etc.
76 12/20/22 01/10/23 ARE WE TO SUPPLY CAT6A PATCH CORDS FOR THE
HEAD END AND STATION END?
Contractor shall supply patch cords for both workstation outlet location and patch panel locations. Contractor to supply (2) patch cords for each horizontal cabling connection with a total quantity of 50% of the project total horizontal connections.
77 12/20/22 01/10/23 TO CONFIRM MAXCELL REQUIREMENTS, EACH 4"
CONDUIT IS TO RECEIVE A TOTAL OF (3) 3" 3-CELL
PACKS FOR A TOTAL OF (9) CELLS?
That is correct.
78 12/20/22 01/10/23 SPECS MENTION THAT THE VA PREFERS COMPUTER
ROOM CABLING TO BE ALL PRE- TERMINATED COPPER
CABLING, ARE WE ALLOWED TO SWITCH THIS TO FIELD
TERMINATIONS INSTEAD SO THAT WE CAN CUSTOMIZE
LENGTHS AND MINIMIZE SERVICE LOOPS. WE BELIEVE
THIS MAY BE A QUICKER TURN-AROUND.
It is an ISTS requirement that all intrabuilding and computer room cabling be factory terminated.
79 12/20/22 01/10/23 SPECS CALL OUT TO USE OS1, CAN WE USE OS2
INSTEAD? TYPICALLY, OS1 HAS BEEN REPLACED BY
THE NEWER OS2 WHICH IS ALSO AVAILABLE FOR
INDOOR APPLICATIONS AND MAY HAVE SHORTER
LEAD-TIMES.
It is acceptable to substitute OS2 SM fiber for the OS1 SM fiber
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
80 12/20/22 01/10/23 IS THE EC RESPONSIBLE FOR REMOVING THE
EXISTING BASKET TRAY?
Where shown to be demolished in rooms, the contractor is responsible to remove.
81 12/20/22 01/10/23 AFTER REMOVING EXISTING WAP DEVICES, ARE WE TO
RE-INSTALL THE SAME DEVICES AS WELL?
That is correct.
82 12/20/22 01/10/23 PER PATCH PANEL SCHEDULE SHOWN ON PAGE TK-
007 AND TK-028, STATES CABLES WITHIN BUILDING 150
AND 154B. ARE WE TO REMOVE THESE CABLES AS
WELL? THERE ARE NO DEMO DRAWINGS REFLECTING
BUILDINGS 150 AND 154B
Demolition plans for 154B are captured within the Telecom Demolition Plan for Building 154B. See 154-TD- 011 for an example. Building 150 is captured on the Telecom Demolition Plan for Building 154 - Basement.
See drawing 154-TD-0B1.
83 12/20/22 01/10/23 ARE WE REQUIRED TO USE ALL PLENUM RATED
CABLING FOR ALL AREAS? OR CAN WE USE RISER
RATED CABLING?
Plenum rated copper cabling is required.
84 12/20/22 01/10/23 DO ALL WORKSTATION FACEPLATES NEED TO BE
STAINLESS STEEL AS SHOWN ON PAGE TK-002, DETAIL
#6?
Yes, all faceplates shall be stainless steel.
85 12/20/22 01/10/23 JUST TO CONFIRM, THE PATCH PANEL SCHEDULES ON
PAGES TK-004 THROUGH TK-032 REPRESENT THE
EXISTING PATCH PANELS THAT NEED TO BE DEMOED,
CORRECT?
They indicate existing conditions. Contractor to coordinate with all plans for exact quantities of cables to be demolished. Also reference TK-035 schedule.
86 12/20/22 01/10/23 FIBER BACKBONE "A AND B" PATHWAY IS BEING
SHOWN FROM BLDG. 169 TR 224 TO BLDG. 154 AND
ENDS ON PAGE 169-TN-011. NONE OF THE FLOOR
PLANS FOR BLDG. 154 REFLECT THE PATHWAY INTO
BLDG. 154 FROM BLDG. 169. HOW IS THIS FIBER
ROUTING COMPLETELY FROM BLDG. 169 TO BLDG. 154?
Contractor to utilize connecting corridor for routing of fiber.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
87 12/20/22 01/10/23 WHERE IS THE EXISTING TR ROOM LOCATED WITHIN
BLDG. 47? OS2 CABLING IS REQUIRED FROM MCR B-09
TO THE EXISTING TR AND WE'LL NEED TO KNOW HOW
MUCH CABLE IS REQUIRED WITHIN THE BLDG. AND
HOW IT'LL BE ROUTED TO GET ACCURATE CABLE
FOOTAGE.
Contractor to field verify lengths and location.
88 12/20/22 01/10/23 WHERE IS THE EXISTING TR ROOM LOCATED WITHIN
BLDG. 17? OS2 CABLING IS REQUIRED FROM MCR B-09
TO THE EXISTING TR AND WE'LL NEED TO KNOW HOW
MUCH CABLE IS REQUIRED WITHIN THE BLDG. AND
HOW IT'LL BE ROUTED TO GET ACCURATE CABLE
FOOTAGE.
Contractor to field verify lengths and location.
89 12/20/22 01/10/23 WHERE IS THE EXISTING TR ROOM LOCATED WITHIN
BLDG. 168? OS2 CABLING IS REQUIRED FROM MCR B-
09 TO THE EXISTING TR AND WE'LL NEED TO KNOW
HOW MUCH CABLE IS REQUIRED WITHIN THE BLDG.
AND HOW IT'LL BE ROUTED TO GET ACCURATE CABLE
FOOTAGE.
Contractor to field verify lengths and location.
90 12/20/22 01/10/23 PER THE FIBER RISER DIAGRAM ON PAGE TK-033, ALL
THE OS2 FIBER CABLING IS TAGGED AS "2A - A-SIDE
OS2 FIBER" BUT THE ONLY ROUTE SHOWN TO THE
FIRST MANHOLE FROM BLDG. 154A IS STATING IT’S
FOR THE "B-SIDE FIBER ROUTING". ARE WE TO USE
THE "B-SIDE FIBER ROUTING" LINE SHOWN FOR THE
PATHWAY TAKEN TO INSTALL ALL "2A - A-SIDE OS2
FIBER"? CAN YOU PROVIDE A SCALE FOR PAGE TS-001
FIBER SITE PLAN SO THAT WE CAN GET ACCURATE
FOOTAGE FOR ALL OSP FIBER REQUIRED?
Contractor to use existing pathways to route A-side fiber.
A-side and B-side fiber are not to share pathways per ISTS requirements.
91 12/20/22 01/10/23 ARE WE TO ASSUME THAT CONTAINMENT IS NOT
REQUIRED FOR INSTALLING CABLING WITHIN BLDG.
16?
Plan to follow the ICRA Class 1 requirements for Building 16.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
92 12/20/22 01/10/23 ON PAGE 16-TN-011, SHEET NOTES #4 AND #5 STATE
TO PULL A CABLE TO EACH LOCATION. ARE THESE
CAT6A CABLES REQUIRED FOR BOTH LOCATIONS? OR
ARE THESE SECURITY CABLES REQUIRED?
Verify cable type necessary with door hardware and existing access control system. This is for security access control.
93 12/20/22 01/10/23 ON PAGE 154-TN-0B1.12, DETAIL #01 VA MCR DIVERSE
PATHWAY DETAIL - NEW CABLING, YOU CAN’T TELL A
DIFFERENCE BETWEEN THE "24 DUPLEX LC OM4 - B-
SIDE" LINE VERSUS THE "48 CAT 6A - B-SIDE" LINE. CAN
YOU CLARIFY THE DIFFERENCE IN THE LINES?
Cabling is a mirror of A-Side requirements. Please reference this for cabling.
94 12/20/22 01/10/23 IS THERE ANY EXISTING FIBER / COPPER BACKBONE
CABLING THAT NEEDS TO BE REMOVED? IF SO, HOW
MANY CABLES ARE WE REMOVING? DO THEY ALL
ORIGINATE FROM THE EXISTING B1A DMARC? ALL
THAT IS SHOWN IS REMOVING COPPER PANELS AND
FIBER ENCLOSURES BUT NO ADDITIONAL
INFORMATION AS TO WHERE EACH FIBER / COPPER IS
RUNNING TO AND FROM. COULD YOU PROVIDE A
DEMOLITION ONE-LINE DIAGRAM?
Contractor to remove all existing fiber scheduled to be replaced. All existing copper backbone cabling shown to be new shall have existing removed after replacement.
Contractor to field verify.
95 12/20/22 01/10/23 CAN YOU PROVIDE A RACK ELEVATION PLAN FOR THE
EXISTING RACKS WITHIN B1A?
Existing rack elevations are not available. The selected construction contractor will need to as-built theses racks and submit them as part of the shop drawings.
96 12/20/22 01/10/23 WILL CONTRACTOR PARKING AVAILABLE ON SITE? Contractor parking is available onsite. Due to limited parking, campus size, and multiple ongoing construction projects, the contractor shall limit the number of contractor vehicles on site to an appropriate level. Parking to be coordinated with the COR.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
97 12/20/22 01/10/23 ON PAGE 154-TN-0B1, THE "A-SIDE FIBER ROUTING"
LINE FROM THE "4 INCH SLEEVE TO FLOOR ABOVE"
BACK TO THE MCR IS COMING INTO THE MCR TO THE
LEFT OF THE DOUBLE DOOR OPENING, BUT WHEN
YOU SWITCH PAGES TO THE MCR LAYOUT ON PAGE
154-TN-0B1.11, THERE’S ONLY ONE BASKET TRAY
ENTRY ABOVE THE DOUBLE DOOR FOR THE B-SIDE
FIBER ENTRY. SHOULD THERE BE ANOTHER ENTRY
POINT FOR THE A SIDE FIBER?
Provide basket tray from penetration location shown on 0B1 to Basket tray above MDAs.
98 12/20/22 01/10/23 WHAT IS THE PATHWAY FOR THE A-SIDE FIBER FROM
THE MCR TO TR 109 ON PAGE 154-TN- 011? THERE IS
NO A-SIDE LINE BEING SHOWN FROM THE CORE HOLE
TO TR109, ONLY TO TR 115-3.
Fiber for A-side comes up through floor in 154A rm A148 and then routes as shown to TR 109.
99 12/20/22 01/10/23 HOW AND WHERE IS THE A-SIDE FIBER CABLING
RUNNING INTO THE DMARC B1A ROOM? WHAT
EXISTING RACK IS IT TERMINATING INTO SO THAT WE
CAN ACCURATELY DETERMINE LENGTH?
A-Side fiber is not required in room B1A. All existing drops here are being relocated to B30.
100 12/20/22 01/10/23 THE SPECIFICATIONS DON’T TOUCH ON WHAT CABLING
MANUFACTURER IS ACCEPTABLE FOR THE VA, BUT ON
PAGE TK-002, DETAIL #6 SHOWS SPECIFICALLY AN
ORTRONICS FACEPLATE, ARE WE ALLOWED TO
INSTALL AN ALTERNATIVE SOLUTION TO ORTRONICS?
It is acceptable to use a different manufacturer and the product will be evaluated as an approved equal product during the submittal process.
101 12/20/22 01/10/23 ON PAGE 179 OF THE "ATT 9 - INFRASTRUCTURE
STANDARD FOR TELECOM SPACES V3.1", IT SHOWS
THE RECOMMENDED UTP MEDIA COPPER TRUNKS TO
BE BERK-TEK LEVITON, CAN THIS BE SWITCHED TO A
SIMILAR SOLUTION BY A DIFFERENT MANUFACTURER?
It is acceptable to use a different manufacturer and the product will be evaluated as an approved equal product during the submittal process.
102 12/20/22 01/10/23 IS IT SAFE TO ASSUME THAT ALL THE HEADEND OSP
CABLING WITHIN MCR B-09 WILL BE TERMINATING
WITHIN THE MDA A 3 CABINET?
See schedule on sheet TK-035.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
103 12/20/22 01/10/23 THE CURRENT DRAWING SETS DO NOT REPRESENT AN
ELEVATION PLAN FOR EACH BUILDING. PLEASE
PROVIDE CEILING HEIGHTS AND HEIGHTS TO DECK
FOR EACH BUILDING.
Ceiling heights are noted on applicable rooms in Reflected Ceiling Plan details. TR spaces are open to existing structure. Contractor is responsible to fully inform themselves of all existing conditions which will affect their work as per Item 1 under General Project Notes in Sheet
00-GI-000.1.
104 12/20/22 01/10/23 JUST TO CONFIRM, FRONT AND REAR DOORS ARE
NEEDED FOR ALL CHANNEL RACKS BEING INSTALLED?
THE DIVISION 27 SPECS CALL IT OUT, BUT ON PAGE
187 OF THE ATT 9 – INFRASTRUCTURE STANDARD FOR
TELECOM SPACES V3.1, DETAIL #1 STATES THAT IT’S
“OPTIONAL”.
Each of the TR's IT racks shall be required to be fully secured. This is to ensure systems within the TR's are secure should non-OIT personnel need access for maintenance, etc.
105 12/20/22 01/10/23 ON PAGE TK-047, DETAILS #1 AND #2 SHOW A 2RU
RACK MOUNT UPS DEVICE BEING INSTALLED. THE
DIV.27 SPECS AND THE ATT 9 – INFRASTRUCTURE
STANDARD FOR TELECOM SPACES V3.1 DO NOT HAVE
ANY DETAILS ON A 2RU RACK MOUNT UPS. CAN YOU
PROVIDE A SPEC ON WHAT TYPE OF 2RU RACK MOUNT
UPS YOU ARE WANTING?
See schedule on sheet TK-035.
106 12/20/22 01/10/23 ARE YOU LOOKING FOR AN END TO END
MANUFACTURER WARRANTY? CURRENTLY THE
DRAWINGS AND ATT-9 INFRASTRUCTURE STANDARD
ARE STATING TO USE BERK-TEK / LEVITON PATCH
PANELS WITH ORTRONICS JACKS AND FACEPLATES
FOR THE COPPER SIDE. SEE DETAIL #6 AND #9 ON
PAGE TK-002 FOR CLARIFICATION.
Yes, we are looking for an end-to-end solution. Patch panels should be unpopulated.
107 12/20/22 01/10/23 SHEET 141-TD-0B1: IN DETAIL NOTES 1. DEMOLISH
EQUIPMENT AND CABLING, 2. EQUIPMENT TO
REMAIN, 3. EQUIPMENT TO BE SALVAGED/REMOVED
BY VA. DOES THIS INCLUDE OTHER SYSTEMS AS
WELL?
This only includes systems as shown in the contract documents.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
108 12/20/22 01/10/23 PLEASE CONFIRM THE VA WILL BE WORKING AND
SCHEDULING WITH THE SUBSYSTEM VENDORS ON
SCHEDULING NETWORK OUTAGES.
No interruption to the telecommunications infrastructure may occur until new is in place and cutover is being performed. Install the new infrastructure and keep the transitionary time to a minimum to mitigate interruption as much as possible during cutover. The contractor is required to coordinate with the COR and all vendors prior to cutover.
109 12/20/22 01/10/23 DURING THE PROJECT WALK THROUGH, THE VA MADE
MENTION THAT THERE WOULD BE NO OUTAGES. CAN
WE CONFIRM THAT THERE ARE NO OUTAGES
ALLOWED?
No interruption to the telecommunications infrastructure may occur until new is in place and cutover is being performed. Install the new infrastructure and keep the transitionary time to a minimum to mitigate interruption as much as possible during cutover.
110 12/20/22 01/10/23 PLEASE CONFIRM, THAT ALL EXISTING CONDUIT STUBS
FOR DATA COMMUNICATIONS ARE 3/4".
Contractor to field verify. Contractor also has the option to free cable pursuant to detail 5 on sheet TK-002.
111 12/20/22 01/10/23 PLEASE CONFIRM EXISTING LOCATIONS WHERE 1/2"
CONDUITS NEED TO BE REPLACED.
Contractor to field verify. There should be no 1/2" conduit existing as this is forbidden per VA requirements and standards. Contractor also has the option to free cable pursuant to detail 5 on sheet TK-002.
112 12/20/22 01/10/23 PLEASE CONFIRM IF THIS PROJECT IS TAX EXEMPT. IF
SO, WILL THE VA PROVIDE ALL THE DOCUMENTATION
TO THE CONTRACTOR POST AWARD?
Contractor is responsible to include all applicable taxes in bid.
113 12/20/22 01/10/23 PLEASE CONFIRM THAT FIRE RATED 6MM PLASTIC
ICRA TEMPORARY BARRIER IS ACCEPTABLE FOR
CLASS IV AND V AREAS AND THAT A HARD BARRIER
WILL NOT BE REQUIRED BY THE VA. THERE IS A
DISCREPENCY BETWEEN THE PLANS AND
SPECIFICATIONS PROVIDED.
Plastic critical barriers are acceptable at all locations, as long as they are effectively affixed to the ground and ceiling and secure from movement or damage. Sheet plastic shall be Fire retardant polystyrene, 6-mil thickness.
If any plastic critical barrier fails inspections more than twice, the contractor may be required to install and maintain a hard barrier at their expense.
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
114 12/20/22 01/10/23 WILL FLEXIBLE METAL CONDUIT BE ALLOWED IN
AREAS WHERE THE PLANS NOTE “CONTRACTOR TO
ROUTE CONDUIT IN LEAST DESTRUCTIVE MANNER TO
LOCATIONS AS INDICATED IN TELECOMMUNICATION
DRAWINGS”?
FMC will be allowed on a case-by-case basis. Contractor to submit RFI detailing and clearly identifying locations where desired to be used.
115 12/20/22 01/10/23 PLEASE CONFIRM THERE ARE NO REQUIREMENTS FOR
THE CONTRACTOR TO UTILIZE OR SUBMIT ANY FILES
OR PLANS IN REVIT
No, the contractor will not be required to utilize Revit.
However, Specification Section 01 00 00 requires that the contractor maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications, and clarifications. The contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
116 12/20/22 01/10/23 The AISC requirement in the Structural Steel Framing Specification 05 12 00 will severely limit the available steel contractors in the area. The structural steel scope is limited to new door opening supports and mechanical supports which any qualified steel contractor can perform. Can the AISC requirement be waived for this project?
This requirement will not be enforced.
117 12/21/22 01/10/23 The Brand Name Justification document indicates Schneider Electric Building Management is to provide the HVAC controls. Schneider has requested existing system information – Product Type (Andover Continuum, TAC-IA, Invensys, etc.) and System Extent (are Schneider Controls used throughout the campus? Just for the buildings in this project? etc). Can you please provide this information?
You can contact the vendor for existing system information.
Dan Morris, EIT | Project Manager Facility Improvement Corp. (FICO) Office: (406)-452-0009 Cell: (406)-750-3033
ANSWERED
DATE CONTRACTOR QUESTIONS VA RESPONSES TO QUESTIONS
118 12/21/22 01/10/23 Can you provide the existing fire protection drawings for the project?
The construction contractor is required to modify the existing fire sprinkler systems according to the new TR wall layouts and ceiling heights. The construction contractor is required to submit shop drawings with the proposed fire sprinkler modifications to the VA for review and approval.
119 12/30/22 01/10/23 Are they allowing equals on lighting products for this project? It is acceptable to use a different manufacturer and the product will be evaluated as an approved equal product during the submittal process.