Att 4 - Fort Harrison EHRM - Specification Vol 2.pdf
PDF 4 MB Posted
- Solicitation number
- 36C77623B0001
About this file
This solicitation is for a construction contract to complete infrastructure upgrades at the Montana VA Health Care System Fort Harrison VA Medical Center. The scope of work includes architectural, structural, electrical, HVAC, plumbing, data communication, and fire protection system upgrades and renovations across multiple buildings. Site work such as concrete duct banks, manholes, and landscaping are also required. Asbestos abatement, lead paint abatement, and physical security upgrades are to be provided. The contract will be awarded by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas. Responses are due based on the solicitation schedule.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
100 % Construction Documents:
Technical Specifications
May 20, 2022
Department of Veterans Health Administration
Electronic Health Record Modernization (EHRM) Infrastructure
Upgrades – Fort Harrison, MT
Contract No. 36C77621C0112
Montana VA Health Care
Fort Harrison Campus
3687 Veterans Dr.
Fort Harrison, MT 59636
US Department of Veterans Affairs
Program Contracting Activity Central (PCAC)
6150 Oak Tree Blvd., Suite 300
Independence, OH 44131
Prepared by:
GDM of Oregon
1000 W Steuben Street, Unit 3
Bingen, WA 98605
Volume 2 Divisions 21 - 32
Montana VA Health Care System (MVAHCS) Fort Harrison, MT
100% Construction Documents 05/20/2022
Electronic Health Records Modernization
(EHRM) Infrastructure Upgrades
Fort Harrison, MT VA Project No. 436-21-700
00 01 10 - 1 of 6
TABLE OF CONTENTS
SECTION 00 01 10
THE SPECIFICATIONS LISTED BELOW FORM A PART OF THE CONTRACT.
DIVISION 00 - SPECIAL SECTIONS # of Pages
00 01 10 Table of Contents……………………………………………………………………5
00 01 15 List of Drawing Sheets……………………………………………………
(See Index Included with Drawings)
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements…………………………………………………………29
01 32 16.15 VA Project Schedule………………………………………………………………9
01 33 00 Submittal Procedures……………………………………………………………8
01 33 23 Shop Drawings, Product Data, and Samples………8
01 35 26 Safety Requirements……………………………………………………………45
01 42 19 Reference Standards………………………………………………………………9
01 45 00 Quality Control………………………………………………………………………10
01 45 29 Testing Laboratory Services………………………………………13
01 57 19 Temporary Environmental Controls……………………………6
01 74 19 Construction Waste Management……………………………………6
01 81 11 Sustainable Construction Requirements………………8
01 91 00 General Commissioning Requirements……………………40
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Selective Demolition……………………………………………………………3
02 81 00 Transportation and Disposal of Hazardous
Materials………………………………………………………………………………………15
02 82 00 Asbestos Remediation…………………………………………………………90
02 83 00 Lead Remediation……………………………………………………………………47
DIVISION 03 – CONCRETE
03 30 00 Cast-In-Place Concrete………………………………………………………35
DIVISION 04 – MASONRY – NOT USED
DIVISION 05 – METALS
05 12 00 Structural Steel Framing…………………………………………………6
05 50 00 Metal Fabrications…………………………………………………………………7
Fort Harrison, MT VA Project No. 436-21-700
00 01 10 - 2 of 6
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry………………………………………………………………………10
06 20 00 Finish Carpentry………………………………………………………………………4
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 50 05 Roof Systems…………………………………………………………………………………6
07 51 13.13 Cold-Applied Built-Up Asphalt Roofing………………6
07 53 23 Ethylene-Propylene-Diene-Monomer Roof (EPDM)
System) Patching……………………………………………………………………18
07 71 00 Roof Specialties…………….…………………………………………………… 7
07 84 00 Firestopping…………………………………………………………………………………6
07 92 00 Joint Sealants……………………………………………………………………………8
DIVISION 08 – OPENINGS
08 11 10 Hollow Metal Doors and Frames………………………………… 7
08 14 16 Flush Wood Veneer Doors……………………………………………………5
08 31 13 Access Doors and Frames……………………………………………………5
08 34 00.10 Cold Aisle Containment System……………………………………4
08 34 53 Security Doors AND Frames………………………………………………8
08 71 00 Door Hardware……………………………………………………………………………19
08 90 00 Louvers and Vents……………………………………………………………………4
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes……3
09 06 00 Schedule for Finishes…………………………………………………………2
09 22 16 Non-Structural Metal Framing………………………………………6
09 29 00 Gypsum Board…………………………………………………………………………………5
09 51 13 Acoustical Panel Ceilings……………………………………………10
09 65 13 Resilient Base……………………………………………………………………………2
09 65 36 Static Dissipative Resilient Flooring…………… 6
09 91 00 Painting……………………………………………………………………………………………8
DIVISION 10 – SPECIALTIES
10 14 00 Signage………………………………………………………………………………………………5
10 28 00 Toilet, Bath, and Laundry Accessories………………7
Fort Harrison, MT VA Project No. 436-21-700
00 01 10 - 3 of 6
10 44 13 Fire Extinguisher Cabinets……………………………………………2
DIVISION 11 – EQUIPMENT (NOT USED)
DIVISION 12 – FURNISHINGS (NOT USED)
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-
Structural Components…………………………………………………………9
DIVISION 14– CONVEYING EQUIPMENT (NOT USED)
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression Systems……4
21 13 13 Wet-Pipe Sprinkler System Modifications…………6
21 13 45 Sprinkler Guards………………………………………………………………………2
21 22 00 Clean Agent Fire Suppression System…………………18
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing…………………………27
22 05 23 General-Duty Valves for Plumbing Piping…………7
22 07 11 Plumbing Insulation………………………………………………………………9
22 08 00 Commissioning of Plumbing Systems…………………………3
22 11 00 Facility Water Distribution…………………………………………8
22 13 00 Facility Sanitary and Vent Piping………………………12
22 14 29 Sump Pumps………………………………………………………………………………………5
22 62 00 Vacuum Systems for Laboratory and Healthcare
Facilities……………………………………………………………………………………15
22 63 00 Gas Systems for Laboratory and Healthcare
Facilities……………………………………………………………………………………12
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC……………………………………30
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment………………………………………………………………………………………9
23 05 93 Testing, Adjusting, and Balancing for
HVAC……………………………………………………………………………………………………10
23 07 11 HVAC and Boiler Plant Insulation…………………………12
23 08 00 Commissioning of HVAC Systems……………………………………4
23 09 23 Direct-Digital Control System for HVAC…………82
Fort Harrison, MT VA Project No. 436-21-700
00 01 10 - 4 of 6
23 21 13 Hydronic Piping………………………………………………………………………21
23 23 00 Refrigerant Piping…………………………………………………………………9
23 31 00 HVAC Ducts and Casings………………………………………………………9
23 36 00 Air Terminal Units…………………………………………………………………4
23 37 00 Air Outlets and Inlets………………………………………………………4
23 81 23 Computer-Room Air-Conditioners………………………………15
DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations…12
26 05 19 Low-Voltage Electrical Power Conductors and
Cables…………………………………………………………………………………………………9
26 05 26 Grounding and Bonding for Electrical
Systems………………………………………………………………………………………………8
26 05 33 Raceway and Boxes for Electrical Systems……16
26 05 41 Underground Electrical Construction…………………10
26 05 73 Overcurrent Protective Device Coordination
Study……………………………………………………………………………………………………5
26 24 16 Panelboards……………….…………………………………………………………………7
26 27 26 Wiring Devices……………………………………………………………………………9
26 29 21 Enclosed Switches and Circuit Breakers……………6
26 33 53 Static Uninterruptible Power Supply…………………26
26 43 13 Surge Protective Devices…………………………………………………3
26 51 00 Interior Lighting…………………………………………………………………10
DIVISION 27 – COMMUNICATIONS
27 05 26 Grounding and Bonding for Communication
Systems………………………………………………………………………………………………6
27 05 33 Conduits and Backboxes for Communications
Systems……………………………………………………………………………………………12
27 05 36 Cable Trays for Communication Systems………………3
27 05 53 Identification for Communications Systems……2
27 10 00 Structured Cabling…………………………………………………………………5
27 11 16 Communications Cabinets, Racks, Frames, and
Enclosures………………………………………………………………………………………5
Fort Harrison, MT VA Project No. 436-21-700
00 01 10 - 5 of 6
27 11 19 Communications Termination Blocks and Patch
Panels…………………………………………………………………………………………………4
27 11 26 Communications Rack Mounted Power Protection and Power Strips………………………………………………………………………4
27 13 13 Communications Copper Backbone Cabling……………2
27 13 13.13 Communications Copper Cable Splicing and
Terminations…………………………………………………………………………………2
27 13 23 Communications Optical Fiber Backbone
Cabling………………………………………………………………………………………………3
27 15 13 Communications Copper Horizontal Cabling………2
27 15 13.13 Communications Optical Fiber Cable Splicing and
Terminations…………………………………………………………………………………1
27 16 19 Communications Patch Cords, Station Cords, and
Cross Connect Wire…………………………………………………………………2
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (NOT USED)
DIVISION 31 – EARTHWORK
31 20 11 Earthwork………………………………………………………………………………………18
31 23 19 Dewatering…………………………………………………………………………………….6
31 23 23.33 Flowable Fill………………………………………………………………………………8
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior
Improvements.………………………………………………………………………………19
32 12 16 Asphalt Paving……………………………………………………………………………7
32 17 23 Pavement Markings …………………………………………………………………7
32 90 05 Turfgrass Sodding……………………………………………………………………4
DIVISION 33 – UTILITIES (NOT USED)
DIVISION 34 – TRANSPORTATION (NOT USED)
DIVISION 48 – ELECTRICAL POWER GENERATION (NOT USED)
APPENDIX A – HAZARDOUS MATERIALS SURVEY……………………………………………………………………………………132
APPENDIX B – VA EQUIPMENT NAMING CONVENTION………………………………………………………………………………6
- - - E N D - - -
Fort Harrison, MT VA Project No. 436-21-700
00 01 10 - 6 of 6
- - - THIS PAGE LEFT INTENTIONALLY BLANK - - -
Montana VA Health Care System (MVAHCS) FINAL BID DOCUMENTS Fort Harrison, MT 5/20/2022
Fort Harrison, MT VA Project No. 436-21-700
21 08 00 - 1 of 4
COMMISSIOINING OF FIRE SUPPRESSION
SYSTEMS
SECTION 21 08 00
COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section apply to all sections of Division 21.
B. This project will have selected building systems commissioned. The complete list of equipment and systems to be commissioned is specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00 GENERAL COMMISSIONING REQUIRMENTS. A
Commissioning Agent (CxA) provided by the GC will manage the commissioning process.
1.2 RELATED WORK
A. Section 01 00 00 GENERAL REQUIREMENTS.
B. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.
C. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
D. Section 21 13 13 WET-PIPE SPRINKLER SYSTEM.
E. Section 21 22 00 CLEAN AGENT FIRE SUPPRESSION SYSTEM.
F. Section 28 31 00 FIRE DETECTION AND ALARM.
1.3 SUMMARY
A. This Section includes requirements for commissioning the Fire
Suppression systems, subsystems and equipment. This Section supplements the general requirements specified in Section 01 91 00
General Commissioning Requirements.
B. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members.
1.4 DEFINITIONS
A. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for definitions.
1.5 COMMISSIONED SYSTEMS
A. Commissioning of a system or systems specified in Division 21 is part of the construction process. Documentation and testing of these systems, as well as training of the VA’s Operation and Maintenance
Fort Harrison, MT VA Project No. 436-21-700
21 08 00 - 2 of 4 personnel in accordance with the requirements of Section 01 91 00 and of Division 21, is required in cooperation with the VA and the CxA.
B. The fire suppression systems commissioning will include the systems listed in Section 01 91 00 General Commissioning Requirements.
1.6 SUBMITTALS
A. The commissioning process requires review of selected Submittals. The
CxA will provide a list of submittals that will be reviewed by the CxA.
This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23 SHOP DRAWINGS, PRODUCT
DATA, and SAMPLES for further details.
B. The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL
COMMISSIONING REQUIREMENTS.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 CONSTRUCTION INSPECTIONS
A. Commissioning of the building fire suppression systems will require inspection of individual elements of the fire suppression construction throughout the construction period. The Contractor shall coordinate with the CxA in accordance with Section 01 91 00 and the commissioning plan to schedule inspections as required to support the commissioning process.
3.2 PRE-FUNCTIONAL CHECKLISTS
A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional Performance Testing. The CxA will prepare Pre-Functional Checklists to be used to document equipment installation. The Contractor shall complete the checklists. Completed checklists shall be submitted to the VA and to the Commissioning Agent for review. The CxA may spot check a sample of completed checklists.
If the CxA determines that the information provided on the checklist is not accurate, the CxA will return the marked-up checklist to the
Contractor for correction and resubmission. If the CxA determines that a significant number of completed checklists for similar equipment are not accurate, the CxA will select a broader sample of checklists for review. If the CxA determines that a significant number of the broader
Fort Harrison, MT VA Project No. 436-21-700
21 08 00 - 3 of 4 sample of checklists is also inaccurate, all the checklists for the type of equipment will be returned to the Contractor for correction and resubmission. Refer to SECTION 01 91 00 GENERAL COMMISSIONING
REQUIREMENTS for submittal requirements for Pre-Functional Checklists, Equipment Startup Reports, and other commissioning documents.
3.3 CONTRACTORS TESTS
A. Contractor tests as required by other sections of Division 21 shall be scheduled and documented in accordance with Section 01 00 00 GENERAL
REQUIREMENTS. All testing shall be incorporated into the project schedule. Contractor shall provide no less than 7 calendar days’ notice of testing. The CxA will witness selected Contractor tests at the sole discretion of the CxA. Contractor tests shall be completed prior to scheduling Systems Functional Performance Testing.
3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING
A. The Commissioning Process includes Systems Functional Performance
Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency conditions. The CxA will prepare detailed Systems Functional
Performance Test procedures for review and approval by the Contracting
Officers Representative (COR). The Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required labor, materials, and test equipment identified in the test procedure to perform the tests. The CxA will witness and document the testing. The Contractor shall sign the test reports to verify tests were performed. See Section 01 91 00 GENERAL COMMISSIONING
REQUIREMENTS, for additional details.
3.5 TRAINING OF VA PERSONNEL
A. Training of the VA operation and maintenance personnel is required in cooperation with the COR and CxA. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the requirements of Section 01 91 00. The instruction shall be scheduled in coordination with the COR after submission and approval of formal training plans. Refer to Section 01 91 00 GENERAL COMMISSIONING
Fort Harrison, MT VA Project No. 436-21-700
21 08 00 - 4 of 4
REQUIREMENTS and Division 21 Sections for additional Contractor training requirements.
----- END -----
100% Construction Documents 05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Hot Springs VA Medical Center Project No. 436-21-700
21 13 13 - 1 of 6
WET-PIPE SPRINKLER SYSTEM
MODIFICATIONS
SECTION 21 13 13
WET-PIPE SPRINKLER SYSTEM MODIFICATIONS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Existing sprinklers requiring relocation due to changes in some wall and ceiling locations at some of the telecommunication rooms (TR) are shown on the reflected ceiling drawings.
B. Contractor shall shut off the appropriate sprinkler system zone valve, drain the water in the piping in that zone, relocate the indicated heads, flush the piping in the affected zone, and recharge the zone.
C. New sprinklers shall be quick response unless quick response sprinklers are specifically prohibited for the location and hazard.
D. It is not permissible to mix quick response and standard response sprinklers. Sprinklers within the same compartment shall have the same response characteristics.
E. Sprinkler systems protecting Telecommunication Spaces (TS) in Building
154, Rooms B-09A and B-09 will be valved separately from other sprinkler systems.
1.2 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Section 07 84 00, FIRESTOPPING.
C. Section 09 91 00, PAINTING.
1.3 DESIGN CRITERIA
A. Design Basis Information: Provide materials, equipment, installation, and inspection in accordance with the requirements of NFPA 13.
B. Sprinkler hazard classifications shall be as follows:
1. In Telecommunication Spaces (TS) - Ordinary Hazard Group I
2. In Telecommunication Rooms (TR) - Light Hazard
3. In spaces that are being abandoned and converted to other uses, hazard classification shall be in accordance with NFPA 13.
4. In spaces changing from a higher to lower hazard classification, existing hazard classification may remain unchanged.
100% Construction Documents 05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Hot Springs VA Medical Center Project No. 436-21-700
21 13 13 - 2 of 6
WET-PIPE SPRINKLER SYSTEM
MODIFICATIONS
1.4 SUBMITTALS
A. Submit as one package in accordance with Section 01 33 23, SHOP
DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detailed working drawings that are signed by a NICET Level III or Level IV Sprinkler Technician or stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering. As the Government review is for technical adequacy only, the installer remains responsible for correcting any conflicts with other trades and building construction that arise during installation. Partial submittals will not be accepted. Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in notebooks or binders and provide an index referencing the appropriate specification section. In addition to the hard copies, provide submittal items in
Paragraphs 1.4(A)1 through 1.4(A)5 electronically in pdf format on a compact disc or as directed by the COR. Submittals shall include, but not be limited to, the following:
1. Qualifications:
a. Provide a copy of the installing contractors fire sprinkler and state contractor’s license.
b. Provide a copy of the NICET certification for the NICET Level III or Level IV Sprinkler Technician who prepared and signed the detailed working drawings unless the drawings are stamped by a
Registered Professional Engineer licensed in the field of Fire
Protection Engineering.
c. Provide documentation showing that the installer has been actively and successfully engaged in the installation of commercial automatic sprinkler systems repairs and modifications for the past ten years.
2. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to the Plans and Calculations chapter of NFPA
13. Drawings shall include graphical scales that allow the user to determine lengths when the drawings are reduced in size.
3. Manufacturer’s Data Sheets: Provide data sheets for all materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets. Where data
100% Construction Documents 05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Hot Springs VA Medical Center Project No. 436-21-700
21 13 13 - 3 of 6
WET-PIPE SPRINKLER SYSTEM
MODIFICATIONS
sheets describe items in addition to those proposed to be used for the system, clearly identify the proposed items on the sheet.
4. Valve Charts: Provide a valve chart that identifies the location of each control valve of the zones affected by the work in this specification section. Coordinate nomenclature and identification of control valves with COR.
5. Final Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requirements in
Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. In addition, submittals shall include, but not be limited to, the following:
a. Material and Recharging Certificate: Upon completion of the sprinkler system installation modifications and flushing, provide a copy of a completed Material and Activation Certificate as indicated in NFPA 13. Certificates shall be provided to document all parts of the new work.
1.5 QUALITY ASSURANCE
A. Installer Reliability: The installer shall possess a valid State of
Montana fire sprinkler contractor's license.
B. Materials and Equipment: All equipment and devices shall be of a make and type listed by UL or approved by FM, or other nationally recognized testing laboratory for the specific purpose for which it is used. All materials, devices, and equipment shall be approved by MVAHCS Fire
Chief and GDM’s Fire Protection Engineer. All materials and equipment shall be free from defect. All materials and equipment shall be new unless specifically indicated otherwise on the contract drawings.
1.6 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. National Fire Protection Association (NFPA):
13-22 ..................Installation of Sprinkler Systems
25-20 ..................Inspection, Testing, and Maintenance of Water-
Based Fire Protection Systems
101-21 .................Life Safety Code
100% Construction Documents 05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Hot Springs VA Medical Center Project No. 436-21-700
21 13 13 - 4 of 6
WET-PIPE SPRINKLER SYSTEM
MODIFICATIONS
170-21 .................Fire Safety and Emergency Symbols
C. Underwriters Laboratories, Inc. (UL):
Fire Protection Equipment Directory (2011)
D. Factory Mutual Engineering Corporation (FM):
Approval Guide
PART 2 - PRODUCTS
2.1 PIPING & FITTINGS
A. Piping and fittings for sprinkler systems shall be in accordance with
NFPA 13 and match the existing system’s materials.
B. Flexible sprinkler hose shall be FM Approved and limited to hose with threaded end fittings with a minimum inside diameter or 1-inch and a maximum length of 6-feet.
2.2 VALVES
A. General:
1. Valves shall be in accordance with NFPA 13.
2. Do not use quarter turn ball valves for 50 mm (2 inch) or larger drain valves.
B. Control Valve: The control valves shall be a listed indicating type.
Control valves shall be UL Listed or FM Approved for fire protection installations. System control valve shall be rated for normal system pressure but in no case less than 175 PSI.
C. Check Valve: Shall be of the swing type with a flanged cast iron body and flanged inspection plate.
D. Automatic Ball Drips: Cast brass 20 mm (3/4 inch) in-line automatic ball drip with both ends threaded with iron pipe threads.
2.3 SPRINKLERS
A. All sprinklers shall be FM approved.
B. Provide standard response sprinklers with fusible link heads in telecommunication spaces (TS) and quick response sprinklers in all other areas unless specifically prohibited.
100% Construction Documents 05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Hot Springs VA Medical Center Project No. 436-21-700
21 13 13 - 5 of 6
WET-PIPE SPRINKLER SYSTEM
MODIFICATIONS
C. Provide sprinkler guards in telecommunication spaces (TS). Provide sprinkler guards in accordance with NFPA 13 in all other areas. The sprinkler guard shall be UL listed or FM approved for use with the corresponding sprinkler.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Installation shall be accomplished by the licensed contractor. Provide a qualified technician, experienced in the installation and operation of the type of system being installed, to supervise the installation and testing of the system.
B. Installation of Piping: Accurately cut pipe to measurements established by the installer and work into place without springing or forcing. In any situation where bending of the pipe is required, use a standard pipe-bending template.
C. Provide escutcheon plates for exposed piping passing through walls, floors or ceilings.
D. Clearances: For systems requiring seismic protection, piping that passes through floors or walls shall have penetrations sized 50 mm (2 inches) nominally larger than the penetrating pipe for pipe sizes 25 mm
(1 inch) to 90 mm (3 ½ inches) and 100 mm (4 inches) nominally larger for penetrating pipe sizes 100 mm (4 inches) and larger.
E. Sleeves: Provide for pipes passing through masonry or concrete. Provide space between the pipe and the sleeve in accordance with NFPA 13. Seal this space with a UL Listed through penetration fire stop material in accordance with Section 07 84 00, FIRESTOPPING. Where core drilling is used in lieu of sleeves, also seal space. Seal penetrations of walls, floors and ceilings of other types of construction, in accordance with
Section 07 84 00, FIRESTOPPING.
F. Firestopping shall be provided for all penetrations of fire resistance rated construction. Firestopping shall comply with Section 07 84 00, FIRESTOPPING.
G. Painting of Pipe: In finished areas where walls and ceilings have been painted, paint primed surfaces with two coats of paint to match adjacent surfaces, except paint valves and operating accessories with two coats of gloss red enamel. Exercise care to avoid painting
100% Construction Documents 05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Hot Springs VA Medical Center Project No. 436-21-700
21 13 13 - 6 of 6
WET-PIPE SPRINKLER SYSTEM
MODIFICATIONS
sprinklers. Painting of sprinkler systems above suspended ceilings and in crawl spaces is not required. Painting shall comply with Section 09
91 00, PAINTING. Any painted sprinkler shall be replaced with a new sprinkler.
H. Interruption of Service: There shall be no interruption of the existing sprinkler protection, water, electric, or fire alarm services without prior permission of the Contracting Officer. Contractor shall develop an interim fire protection program where interruptions involve occupied spaces. Request in writing at least one week prior to the planned interruption.
100% Construction Documents 05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Hot Springs VA Medical Center Project No. 436-21-700
21 13 45 - 1 of 2
SPRINKLER GUARDS
SECTION 21 13 45
SPRINKLER GUARDS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Supply and installation of sprinkler guards for existing wet-pipe system sprinklers in all Telecommunication Spaces(TS).
1.2 RELATED WORK
A. Section 02 41 00, DEMOLITION OF EXISTING CEILING SYSTEMS.
1.3 DESIGN CRITERIA
A. Hard-wire cage designed to incase the sprinkler and protect it from mechanical damage. Guards shall be approved by the manufacture for use with upright or pendent style sprinklers.
1.4 SUBMITTALS
A. Submit as one package in accordance with Section 01 33 23, SHOP
DRAWINGS, PRODUCT DATA, AND SAMPLES.
1. Manufacturers technical data
2. Two samples of each proposed type
1.5 QUALITY ASSURANCE
A. Listings and Approvals
1. UL listed
2. FM approved class 2901
1.6 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. National Fire Protection Association (NFPA):
13-22 ..................Installation of Sprinkler Systems
C. Underwriters Laboratories, Inc. (UL):
Fire Protection Equipment Directory (2011)
D. Factory Mutual Engineering Corporation (FM):
Approval Guide
100% Construction Documents 05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Hot Springs VA Medical Center Project No. 436-21-700
21 13 45 - 2 of 2
SPRINKLER GUARDS
PART 2 - PRODUCTS
2.1 PIPING & FITTINGS
A. Basis of Design
1. The sprinkler guard shall be listed for use with the make and model of the sprinkler being protected.
2. Viking model D-1 Sprinkler guard
The Viking Corporation, 2010 N Industrial Park Drive, Hastings, MI
49058. Telephone: 269-945-9501 Technical Services: 877-384-5494
Fax:269-818-1680 Email:techsvcs@vikingcorp.com www.vikinggroupinc.com
3. Or approved equal.
2.2 SPARES
A. Provide four(4) spare guards of each type
PART 3 - EXECUTION
3.1 INSTALLATION
A. Installation shall be accomplished by a qualified technician, experienced in the installation of sprinkler guards.
B. Repairs: Repair damage to the building or equipment resulting from the installation of the sprinkler guards by the installer at no additional expense to the Government.
% Construction Documents
05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Fort Harrison, MT VA Project No. 436-21-700
21 22 00 - 1 of 19
CLEAN AGENT FIRE SUPPRESSION SYSTEM
SECTION 21 22 00
CLEAN AGENT FIRE SUPPRESSION SYSTEM
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements in this specification section include the design, installation and testing of a calculated automatic and manual fixed total flooding clean agent fire extinguishing system and releasing system in accordance with VHA Office of Occupational Safety Health
(19HEF) Fire Protection Design Manual Eighth Edition – June 1, 2021, NFPA 2001, NFPA 72, NFPA 70, and NFPA 75 and proposed clean agent manufacturer’s written instructions for the telecommunication space on the contract drawings. The installation shall include all mechanical, controls and electrical components necessary for a complete and operating clean agent fire suppression system.
1.2 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
B. Section 07 84 00, FIRESTOPPING
C. Section 09 91 00, PAINTING
D. Section 28 05 13, CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND
SECURITY
E. Section 28 05 28.33, CONDUIT AND BACKBOXES FOR ELECTRONIC SAFETY AND
SECURITY
F. Section 28 31 00, FIRE DETECTION AND ALARM
1.3 DESIGN CRITERIA
A. The clean agent fire extinguishing system shall be a fixed total flooding type utilizing clean agent designed to provide a uniform concentration throughout the protected spaces in accordance with NFPA
2001 for a Class C fire.
1. The system shall provide a minimum design concentration by volume, throughout the protected spaces at the minimum anticipated temperature within the protected space.
2. The design concentration within any protected space shall not exceed by volume the no observable adverse effects level (NOAEL). Special
% Construction Documents
05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Fort Harrison, MT VA Project No. 436-21-700
21 22 00 - 2 of 19
CLEAN AGENT FIRE SUPPRESSION SYSTEM
means such as mechanical exhaust shall not be permitted to be used to achieve this criterion.
3. The clean agent shall have a global warming potential (GWP) of less than 4,000 and the clean agent shall be readily available throughout the continental United States.
4. Provide the quantity of clean agent as required by NFPA 2001 and agent’s manufacturer’s calculations and written instructions. Such factors as unenclosed openings (if any), “rundown” time of fans, time required for dampers to close, and any other feature of the facility that could affect concentration shall be addressed in clean agent quality to maintain an agent concentration of 85% for a 10 minute time duration per NFPA 2001.
5. Provide seismic bracing for the clean agent fire extinguishing system components per specification Section 13 05 41.
1.4 SUBMITTALS
A. Submit as one package in accordance with Section 01 33 23, SHOP
DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detailed working drawings that are signed by a NICET Level IV Special Hazards Suppression Systems
Technician. As the Government review is for technical adequacy only, the installer remains responsible for correcting any conflicts with other trades and building construction that arise during installation.
Partial submittals will not be accepted. Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in notebooks or binders and provide an index referencing the appropriate specification section. In addition to the hard copies, provide submittal items in Paragraphs 1.4(A)1 through
1.4(A)5 electronically in PDF format on a compact disc or as directed by the Contracting Officers Representative (COR). Submittals shall include, but not be limited to, the following:
1. Qualifications:
a. Provide a copy of the installing contractor’s and state contractor’s license.
b. Provide a copy of the NICET certification for the NICET Level IV
Special Hazards Suppression System Technician who will prepare and sign the detailed working drawings.
% Construction Documents
05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Fort Harrison, MT VA Project No. 436-21-700
21 22 00 - 3 of 19
CLEAN AGENT FIRE SUPPRESSION SYSTEM
c. Provide documentation showing that the installer has been actively and successfully engaged in the installation of clean agent fire suppression systems for the past ten (10) years.
2. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working plans and drawings of the clean agent fire extinguishing system conforming to NFPA 2001. Submit detailed 1:100 (1/8 inch) scale
(minimum) working plans and drawings of the releasing system conforming to NFPA 72. Drawings shall include graphical scales that allow the user to determine lengths when the drawings are reduced in size.
3. Manufacturers Data Sheets:
a. Provide for all materials and equipment proposed for use on the clean agent fire extinguishing system, including the releasing system. Include listing information and installation instructions in data sheets. Where data sheet describes items in addition to that item being submitted, clearly identify proposed item on the sheet.
4. Calculation Sheets:
a. Submit flow calculation sheets in tabular form conforming to the requirements of NFPA 2001. Calculations shall include total storage capacity, flooding concentrations, enclosure leakage rates, discharge times, flow through distribution network, pipe sizes, and nozzle orifice sizes.
b. Submit battery calculations sheets in tabular form conforming to the requirements of NFPA 72.
c. Submit voltage drop calculations in tabular form. Calculations shall indicate circuit amperage draw, wire resistance, circuit length, and voltage drop. The voltage drop shall demonstrate that voltage provided at the each appliance is within its operating voltage range. Voltage drop calculations shall assume an initial voltage of 20.4 volts.
d. Submit calculations of loads for sizing of sway bracing.
5. Clean Agent Recharging Certification: Provide a letter to the COR certifying that the installer maintains or has access to a clean agent recharging station. The installer shall also provide proof of
% Construction Documents
05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Fort Harrison, MT VA Project No. 436-21-700
21 22 00 - 4 of 19
CLEAN AGENT FIRE SUPPRESSION SYSTEM
the ability to recharge the largest clean agent fire extinguishing system capacity within 48 hours.
6. Test Plan: Provide a test plan to the COR. The testing plan shall describe the procedures to be used to test the system. The testing plan shall include a step-by-step procedure of all tests to be performed, including indication of which tests will present a disruption to building occupants. No tests shall be conducted until the testing plan is approved by the COR or his designated representative.
7. Final Record Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requirements in
Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
Submittals shall include, but not be limited to, the following:
a. A complete set of as-built drawings showing the installed system with the specific interconnections between the system switches and the fire alarm equipment. Provide a complete set in the formats as follows. Submit Items 2 and 3 below on a compact disc or as directed by the COR.
1) One full size (or size as directed by the COR) printed copy.
2) One complete set in electronic PDF format.
3) One complete set in AutoCAD format or a format as directed by the COR.
b. System Certification: Upon completion of the clean agent fire extinguishing system installation, including testing, the authorized representative of the installing contractor and the
NICET IV designer shall certify that the installation complies with all requirements and that satisfactory total system operation has been achieved. Provide a copy of the Record of
Completion for the releasing system in accordance with NFPA 72.
c. Operating and Maintenance Manuals that include step-by-step procedures required for operation, shutdown, and routine maintenance and testing. The manuals shall include the manufacturer’s name, model number, parts list, the name of the local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization, % Construction Documents
05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Fort Harrison, MT VA Project No. 436-21-700
21 22 00 - 5 of 19
CLEAN AGENT FIRE SUPPRESSION SYSTEM
including address and telephone number, for each item of equipment.
d. One (1) paper copy of the System Certification and Record of
Completion and the Operating and Maintenance Manuals listed above shall be provided in a binder. In addition, these materials shall be provided in PDF format on a compact disc or as directed by the
COR.
e. Provide one (1) additional copy of the Operations and Maintenance
Manual for the system in a binder and mount in an accessible location adjacent to the storage cylinder(s).
1.5 QUALITY ASSURANCE
A. Installer Reliability: The installer shall possess a valid state of
South Dakota contractor's license. The installer shall have been actively and successfully engaged in the installation of five similar sized clean agent special suppression systems for the past ten years.
The installer shall maintain or have access to a clean agent recharging station. The installer shall provide proof of the ability to recharge the clean agent fire extinguishing system capacity within 48 hours.
B. Materials and Equipment: All equipment and devices shall be UL listed or approved by FM. All materials, devices, and equipment shall be approved by the VA. All materials and equipment shall be free from defect.
1.6 APPLICABLE PUIBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. National Fire Protection Association (NFPA):
70-2021 ................National Electric Code
72-2022 ................National Fire Alarm Code
75-2020 ................Fire Protection of Information Technology
Equipment
170-2021 ...............Fire Safety Symbols
2001-2022 ..............Installation of Clean Agent Fire Extinguishing
Systems
% Construction Documents
05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Fort Harrison, MT VA Project No. 436-21-700
21 22 00 - 6 of 19
CLEAN AGENT FIRE SUPPRESSION SYSTEM
C. Underwriters Laboratories, Inc. (UL): Fire Protection Equipment
As of Contract Award Date Directory
D. Factory Mutual Engineering Corporation (FM): Approval Guide
As of Contract Award Date
1.7 WARRANTY
All work performed and all material and equipment furnished under this contract shall be free from defects and shall remain so for a period of one year from the date of acceptance of the entire installation by the
COR.
PART 2 PRODUCTS
2.1 GENERAL
A. All equipment and components shall be new and the manufacturer’s current model. All equipment and components shall be UL listed or FM approved for its intended use. The authorized representative of the manufacturer of the major equipment shall certify that the installation complies with all manufacturer’s requirements and that satisfactory total system operation has been achieved.
B. Fire extinguishing agents approved by VA are limited to:
1. FK-5-1-12 (NOVEC 1230 Sapphire)
2. HFC-227ea (FM-200, MH 227, NAF 5227)
3. IG-541 (Inergen)
2.2 CLEAN AGENT FIRE EXTINGUISHING SYSTEM
A. General:
1. The clean agent fire extinguishing system shall be UL listed and shall be in accordance with NFPA 2001.
B. Piping and fittings:
1. All piping and fittings shall be in compliance with NFPA 2001.
2. Multi-outlet fittings, other than tees, shall not be permitted.
3. All piping shall be reamed, blown clear, and swabbed with appropriate solvent to remove mill varnish and cutting oils before assembly.
4. Ordinary cast iron steel and non-metallic piping and fittings and flexible hoses shall not be used unless specifically required by the manufacturer.
% Construction Documents
05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Fort Harrison, MT VA Project No. 436-21-700
21 22 00 - 7 of 19
CLEAN AGENT FIRE SUPPRESSION SYSTEM
C. Piping Support:
1. All piping shall be supported in accordance with the manufacturer’s written instructions.
2. Piping shall be supported within 12 inches (304 mm) of discharge nozzles. The supports shall prevent the upward movement of the nozzle.
D. Storage Cylinders:
1. Provide storage cylinders as required by the manufacturer’s written instructions and in accordance with NFPA 2001.
2. Cylinder assemblies shall be of steel construction designed to meet the requirements of the U.S. Department of Transportation.
3. Filling of the storage cylinders shall be by an authorized systems distributor in conjunction with a factory authorized agent filling station. Initial filling and recharge shall be performed in accordance with manufacturer’s written instructions and shall not require replacement components for normal service.
4. Cylinders shall be securely attached to the wall. Provide factory-or field-fabricated retaining brackets consisting of steel straps and channels; suitable for container support, maintenance, and tank refilling or replacement.
5. For halocarbon clean agents, storage cylinders shall be provided with a low agent pressure switch.
E. Valve Actuators:
1. Electric valve actuators shall be of brass construction and stackable design with swivel connections to allow removal of actuators for maintenance or testing.
2. Operation of actuators shall not require replacement of components.
No electro-explosive devices may be used to actuate the valve assembly. Actuators shall include an indication if they are set or actuated.
3. Electric valve actuators shall be magnetic latch, continuous duty type for 24 VDC operation.
4. Actuation devices shall be UL-listed or FM-approved for use with the system.
% Construction Documents
05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Fort Harrison, MT VA Project No. 436-21-700
21 22 00 - 8 of 19
CLEAN AGENT FIRE SUPPRESSION SYSTEM
5. Removal of the electric valve actuator shall cause a trouble on the clean agent control panel.
F. Discharge Nozzles:
1. Nozzles shall be permanently marked with the manufacturer’s part number. The nozzles shall be threaded directly to the discharge piping without the use of special adaptors.
2.3 RELEASING SYSTEM
A. General
1. The releasing system shall be an analog addressable intelligent reporting, microprocessor-controlled system, capable of remote sensitivity testing of the smoke detectors, and be installed in accordance with NFPA 70, 72, and 2001.
B. Clean Agent Control Panel:
1. General:
a. The clean agent control panel shall be UL-listed or FM-approved and include a UL-listed or FM-approved releasing module.
b. Each protected space shall be provided with its own clean agent control unit.
c. All circuits shall be monitored for integrity.
d. Visually and audibly annunciate all alarm, supervisory, and trouble signals including, but not limited to main power failure, open circuit, short circuit, ground faults, and system bypass activation.
e. The panel or releasing module shall include a 0-60 second programmable timer.
f. The clean agent control panel shall be provided with separate contacts to provide common supervisory, alarm, and trouble signals to the main building fire alarm system.
2. Enclosure:
a. The clean agent control unit shall be housed in a cabinet suitable for both recessed and surface mounting. The cabinet and front panel shall be corrosion protected, given a rust-resistant prime coat, and manufacturer's standard finish.
b. The cabinet shall contain all necessary relays, terminals, lamps, and legend plates to provide control for the system.
% Construction Documents
05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Fort Harrison, MT VA Project No. 436-21-700
21 22 00 - 9 of 19
CLEAN AGENT FIRE SUPPRESSION SYSTEM
3. Power Supply:
a. The clean agent control unit shall derive its normal power from a
120 volt, 60 Hz dedicated supply connected to the emergency power system. Standby power shall be provided by a 24 volt DC battery as hereinafter specified. The normal power shall be transformed, rectified, coordinated, and interfaced with the standby battery and charger.
b. The power supply for smoke detection systems shall be taken from the clean agent control unit.
4. Circuit Supervision: Each alarm initiating device circuit, signaling line circuit, and notification appliance circuit, shall be supervised against the occurrence of an open, short circuit, or ground fault condition in the field wiring. These conditions shall cause a trouble signal to sound in the control unit until manually silenced by an off switch.
a. Initiating device circuits (IDC) shall be wired Class B in accordance with NFPA 72.
b. Signaling line circuits (SLC) shall be wired Class B in accordance with NFPA 72.
c. Notification appliance circuits (NAC) shall be wired Class B in accordance with NFPA 72.
5. Supervisory Alarm Devices: The low agent pressure switch and maintenance lockout switch shall initiate a supervisory signal.
6. Trouble signals:
a. Arrange the trouble signals for automatic reset (non-latching).
b. System trouble switch off and on lamps shall be visible through the control unit door.
7. Function Switches: Provide the following switches in addition to any other switches required for the system:
a. Remote Alarm Transmission By-pass Switch: Shall prevent transmission of all signals to the building fire alarm control unit when in the "off" position. A clean agent control unit system trouble signal shall be energized when switch is in the off position.
% Construction Documents
05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Fort Harrison, MT VA Project No. 436-21-700
21 22 00 - 10 of 19
CLEAN AGENT FIRE SUPPRESSION SYSTEM
b. Alarm Off Switch: Shall disconnect power to notification appliance circuits on the clean agent control panel. A system trouble signal shall be activated when the switch is in the off position.
c. Trouble Silence Switch: Shall silence the trouble signal whenever the trouble silence switch is operated. This switch shall not reset the trouble signal.
d. Reset Switch: Shall reset the system after an alarm, provided the initiating device has been reset. The system shall lock in alarm until reset.
e. Lamp Test Switch: A test switch or other approved convenient means shall be provided to test the indicator lamps.
f. AHU Bypass: Provide a means to disable air handling unit shutdown and dampers from closing upon operation of an initiating device designed to interconnect with these devices. A system trouble signal shall be activated when switch is in the off position.
8. Reset2 Capability: Each clean agent control unit shall be installed and programmed so that each must be reset locally after an alarm, before the main fire alarm control unit can be reset.
C. Conduit, Boxes, and Wire
1. Conduit shall be in accordance with Section 28 05 28.33 CONDUIT AND
BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY and as follows:
a. All new conduits shall be installed in accordance with NFPA 70.
b. Conduit fill shall not exceed 40% of interior cross-sectional area.
c. All new conduits shall be 3/4 inch (19 mm) minimum.
2. Wire:
a. Wiring shall be installed in conduit.
b. Wiring shall be in accordance with NEC article 760, Section 28 05
13, CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY, and as recommended by the manufacturer of the fire alarm system. All wires shall be color coded. Number and size of conductors shall be as recommended by the fire alarm system manufacturer, but not less than 18 AWG for initiating device circuits and 14 AWG for notification appliance circuits.
% Construction Documents
05/20/2022
Electronic Health Records Modernization (EHRM) Infrastructure Upgrades Fort Harrison, MT VA Project No. 436-21-700
21 22 00 - 11 of 19
CLEAN AGENT FIRE SUPPRESSION SYSTEM
c. Signaling line circuits shall be twisted and shielded unless other wiring methods are specifically required by the fire alarm equipment manufacturer in writing.
3. Terminal Boxes, Junction Boxes, and Cabinets:
a. These shall be galvanized steel in accordance with UL requirements.
b. All boxes shall be sized and installed in accordance with NFPA
70.
c. Covers shall be repainted red in accordance with Section 09 91
00, PAINTING and shall be identified with white markings as "CA
FA" or as directed by the COR for junction boxes and as "CLEAN
AGENT FIRE ALARM SYSTEM" for cabinets and terminal boxes.
Lettering shall be a minimum of 3/4 inch (19 mm) high.
d. Terminal boxes and cabinets shall have a volume 50 percent greater than required by NFPA 70. Minimum sized wire shall be considered as 14 AWG for calculation purposes.
e. Terminal boxes and cabinets shall have identified screw type terminal strips and shall be located in an accessible location.
Terminal strips shall be labeled as to what circuit it is or as approved by the COR.
D. Standby Power Supply
1. Batteries:
a. The batteries shall be of the sealed,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .