Att 1.1 - Fort Harrison EHRM - Drawings Vol 1 Part 1 of 5.pdf
PDF 13 MB Posted
- Solicitation number
- 36C77623B0001
About this file
This solicitation is for infrastructure upgrades construction services at the Fort Harrison VA Medical Center in Montana. The scope of work includes architectural, structural, electrical, HVAC, plumbing, data communication, and site construction services across multiple buildings. Specific upgrades involve demolition, space reconfigurations, building additions, door and flooring replacements, structural alterations, electrical panel and distribution upgrades, BAS installation, HVAC modifications and controls work, plumbing modifications, data cabling replacements, fiber infrastructure upgrades, civil site work including duct banks and manholes, asbestos and lead abatement, fire suppression and alarm upgrades, firestopping, and physical security improvements. Offerors are to provide all labor, materials, equipment and supervision to complete the upgrades in accordance with specifications and drawings. The Department of Veterans Affairs Technology Acquisition Center is the contracting agency.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE SCOPE OF THIS PROJECT INCLUDES BUT NOT LIMITED TO THE FOLLOWING INFRASTRUCTURE IMPROVEMENTS: ELECTRICAL (ELECTRICAL PANEL UPGRADE, POWER (NORMAL, EMERGENCY)), BONDING, UPS, BUILDING MANAGEMENT SYSTEM INTERFACES, ASSESS FOR NEW AND UPGRADES TO EXISTING HVAC, RECONFIGURATION, EXPANSION AND RENOVATION OF EXISTING SPACE (DEMO, NEW CONSTRUCTION, FINISHES), COMMUNICATION INFRASTRUCTURE (NEW DATA OUTLETS, PATCH PANELS, UPGRADE TO CAT 6A CABLE) IN BUILDINGS AS NECESSARY, PHYSICAL SECURITY UPGRADES, ASSESS AND UPGRADE FIBER INFRASTRUCTURE BACKBONE CAMPUS WIDE WITHIN BUILDINGS AND BETWEEN BUILDINGS, HAZARDOUS MATERIAL ABATEMENT. PROJECT BUILDING LOCATIONS INCLUDE: BUILDINGS 141, SADIE, 154A, MADISON, 115, 169, 154, 170, 171, 16, 20 AND SITE.
PROJECT DESCRIPTIONGENERAL PROJECT NOTES
1. THE CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATION AND RELATED CONTRACT DOCUMENTS, VISIT SITE OF WORK, AND FULLY INFORM THEMSELVES AS ALL EXISTING CONDITIONS, FACILITIES, RESTRICTIONS AND OTHER MATTERS WHICH CAN AFFECT THE WORK, IN TIMELINE, QUALITY OR COST THEREOF; FAILURE OR OMISSION OF ANY CONTRACTOR TO VISIT THE SITE AND ACQUAINT THEMSELVES WITH THE EXISTING CONDITIONS, SHALL IN NO WAY RELIEVE THEM FROM ANY OBLIGATION WITH RESPECT TO THEIR CONTRACT AND NO EXTRA TIME OR COMPENSATION WILL BE ALLOWED BY REASON OF ANY THING OR MATTER CONCERNING WHICH THE CONTRACTOR COULD HAVE FULLY INFORMED THEMSELVES PRIOR TO BIDDING. GENERAL CONTRACTOR SHALL COORDINATE ALL ASPECTS
OF THE BUILDING CONSTRUCTION.
2. THE CONTRACTOR SHALL NOT CONSIDER CONSTRUCTION NOTES TO BE ALL-INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS EACH AREA AND TO FULFILL THE INTENT OF THE CONTRACT DOCUMENTS. CONTRACTOR SHALL COORDINATE ARCHITECTURAL CONSTRUCTION DRAWING AND NOTES WITH
CIVIL, STRUCTURAL AND MECHANICAL, ELECTRICAL & PLUMBING NOTES AND DRAWINGS.
3. THE DRAWINGS SHALL BE WORKED IN CONJUNCTION WITH THE TECHNICAL SPECIFICATIONS AND CONDITIONS OF THE PROJECT INCLUDED IN THE PROJECT MANUAL WHICH FORM A PART OF THE CONTRACT DOCUMENTS AND CONTAINS ADDITIONAL INFORMATION REQUIRED TO CONSTRUCT THE WORK OF THIS CONTRACT. IN THE EVENT OF A CONFLICT BETWEEN THE DRAWINGS AND THE SPECIFICATION NOTIFY THE COR FOR CLARIFICATION SEVEN DAYS BEFORE BEGINNING WORK ON THE
AFFECTED ACTIVITIES.
4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START OF THE WORK. NOTIFY THE COR OF ANY SIGNIFICANT CHANGES IN
DIMENSIONS OR CONDITIONS.
5. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, TOOLS, EQUIPMENT AND NECESSARY FACILITIES, AND PERFORM ALL LABOR AND SERVICES OF EVERY DESCRIPTION AS REQUIRED TO COMPLETE THE SCOPE OF WORK DEFINED ON THE DRAWINGS AND SPECIFICATIONS WITHIN THE AGREED TIMELINES.
6. THE CONTRACTOR SHALL ARRANGE FOR AND OBTAIN ALL VA ISSUED PERMITS (HOTWORK, ICRA, WEEKENDS, HOLIDAYS, SHUTDOWN, ETC), CERTIFICATES, INSPECTIONS, DEPARTMENT APPROVAL, ETC. FOR WORK PERFORMED UNDER THIS CONTRACT. PROVIDE COPIES OF ALL REQUIRED PERMITS, CERTIFICATES, INSPECTIONS AND AGENCY APPROVALS TO THE COR PRIOR TO THE COMMENCEMENT OF THE SCOPE.
7. FABRICATE AND INSTALL ALL WORK IN STRICT ACCORDANCE WITH THE SPECIFICATIONS, ALL APPLICABLE STATE AND LOCAL CODES, AND THE GENERAL AND
SUPPLEMENTARY CONDITIONS OF THE CONTRACT.
8. U.L. ASSEMBLIES DESCRIBED ARE FOR REFERENCE ONLY. THE GENERAL CONTRACTOR SHALL COORDINATE AND VERIFY THE INSTALLATION OF THE DESCRIBED
SYSTEM(S) .
9. ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE SOLELY RESPONSIBLE FOR THE PROPER PERFORMANCE OF THEIR WORK, COORDINATING WITH OTHER TRADES, MEANS AND METHODS OF CONSTRUCTION, SAFETY AND SECURITY ON SITE.
10. CUTTING AND PATCHING SHALL BE PERFORMED BY EACH TRADE AS NECESSARY FOR THE PERFORMANCE AND INSTALLATION OF THE WORK. CUTTING AND PATCHING SHALL BE PERFORMED IN A WORKMANLIKE MANNER CONSISTENT WITH INDUSTRY STANDARDS FOR FINISHES AND SUBSTRATES AFFECTED.
11. THE CONTRACTOR SHALL PROTECT THE FACILITY FROM WEATHER AND MAINTAIN SECURITY DURING ALL CONSTRUCTION WORK.
12. PROTECT EXISTING PROPERTY DURING CONSTRUCTION. REPAIR OR REPLACE, AT THE DISCRETION AND TO THE SATISFACTION OF THE COR, WITHOUT ADDITIONAL CHARGE TO THE OWNER, ANY EXISTING WORK DAMAGED DURING THE COURSE OF CONSTRUCTION.
13. THE WORK SHALL BE COORDINATED IN GOOD FAITH WITH THE COR AND ALL GOVERNMENT EMPLOYEES 14 DAYS IN ADVANCE OF BEGINNING EACH CONSTRUCTION
ACTIVITY.
14. UNLESS ITEMS OF MATERIAL, EQUIPMENT OR WORK ARE SPECIFICALLY NOTED TO BE PROVIDED OR FURNISHED BY OTHERS, THEY SHALL BE PROVIDED UNDER THIS
CONTRACT BY THE CONTRACTOR.
15. ALL WORK SHALL BE PERFORMED BY SKILLED WORKERS IN A WORKMANLIKE AND PROFESSIONAL MANNER CONSISTENT WITH INDUSTRY STANDARDS AND OR AS
DIRECTED BY THE COR.
16. THE CONTRACTOR SHALL LEAVE THE SITE AND ALL BUILDINGS AND STRUCTURES IN PROPER WORKING ORDER AND SHALL, WITHOUT ADDITIONAL CHARGE, REPLACE ANY WORK, MATERIALS, OR EQUIPMENT FURNISHED AND INSTALLED UNDER THE CONTRACT WHICH DEVELOPS DEFECTS, DUE TO A POSSIBLE WORKMANSHIP ISSUE, WITHIN ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER. THIS IS NOT TO LIMIT OR EXCLUDE ANY OTHER WARRANTY OR WARRANTY PERIOD
OTHERWISE DESCRIBED.
17. CONTRACTOR SHALL SCHEDULE, COORDINATE, AND FACILITATE ALL POWER, WATER, OR TELECOMMUNICATION OUTAGES AND SHUTDOWNS. ALL OUTAGES AND
SHUTDOWNS MUST BE SCHEDULED WITH THE COR ONE (1) WEEK PRIOR TO OUTAGE.
18. FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO REGULATED MATERIALS ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, EQUIPMENT, AND ALL OTHER EXISTING SYSTEMS. MAKE NECESSARY PROVISIONS TO MAINTAIN THE INTEGRITY OF SAID SYSTEMS PRIOR TO THE COMMENCEMENT OF DEMOLITION, IF ANY. SEE MECHANICAL, ELECTRICAL, TELECOMMUNICATIONS, AND ARCHITECTURAL DRAWINGS FOR ANY SYSTEM OR PORTIONS
THEREOF TO BE REMOVED, RELOCATED, REVISED OR ABANDONED.
19. ANY CONSTRUCTION INSTALLED IN CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO EXPENSE TO THE OWNER.
20. ALL REQUIRED EXITS FROM OCCUPIED PORTIONS OF THE BUILDING MUST BE MAINTAINED AT ALL TIMES. ESTABLISH PROCEDURES TO MINIMIZE CIRCULATION OF CONSTRUCTION PERSONNEL AND MATERIALS THROUGH OCCUPIED PORTIONS OF THE BUILDING. KEEP ALL AREAS ADJACENT TO THE WORK AREA CLEAN.
21. PRIOR TO DELIVERY OF MATERIALS TO THE CONSTRUCTION ZONE AND REMOVAL OF WASTE FROM THE SITE, VERIFY WITH THE COR FOR AN ACCEPTABLE ACCESS ROUTE AND TIME. UNDER NO CIRCUMSTANCES SHALL ANY AREA OUTSIDE THE CONSTRUCTION ZONE BE USED WITHOUT PRIOR WRITTEN APPROVAL FROM THE COR.
ALL BUILDING INTERIOR STAGING AREAS SHALL BE PROTECTED WITH FIRE RESISTANT PLYWOOD ENCLOSURES. ALL TRASH SHALL BE REMOVED FROM THE BUILDING DAILY. CONSTRUCTION MATERIALS SHALL NOT BE STORED IN CORRIDORS OR ANY OTHER UNAUTHORIZED LOCATION AT ANY TIME.
22. FIELD VERIFY ALL EXISTING DIMENSIONS, SERVICES, AND POINTS OF CONNECTION PRIOR TO START OF WORK.
23. THE DESIGN ADEQUACY, SAFETY, AND ERECTION OF BRACING, SHORING, SCAFFOLDING, AND TEMPORARY SUPPORTS AND RESTRAINS IS THE SOLE RESPONSIBILITY OF
THE CONTRACTOR.
24. NOTIFY THE FACILITY OF TIMES WHEN THE CONSTRUCTION NOISE WILL EXCEED 80 DECIBELS . RESCHEDULE SUCH WORK IF SO REQUIRED BY THE FACILITY.
25. NOTIFY THE COR OF ANY DISCREPANCIES DISCOVERED IN THE FIELD THAT REQUIRE CORRECTIVE ACTION PRIOR TO TAKING ANY ACTION.
26. FOR EXISTING FLOORS, CEILINGS, PARTITIONS, AND SERVICES TO REMAIN, PROTECT ALL FINISHES AND MATERIALS, AND REPAIR OR REPLACE ALL ITEMS THAT ARE DAMAGED OR SOILED DURING THE COURSE OF CONSTRUCTION. ALL FINISHES AND MATERIALS SHALL BE PROPERLY INTEGRATED TO CONSTITUTE A UNIFORM
APPEARANCE AND SEAMLESS TRANSITION.
27. ALL ITEMS TO BE REMOVED AND REPLACED SHALL BE HANDLED WITH PROPER CARE AND STORED IN SUCH A MANNER AS TO PREVENT DAMAGE; WHEN DAMAGED, REPLACE AT NO EXPENSE TO THE OWNER.
28. ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED OR BRACED IN ACCORDANCE WITH PROVISIONS OF THE TECHNICAL SPECIFICATIONS.
29. ALL DRAWINGS, THOUGH NOTED TO SCALE, ARE FOR ILLUSTRATION ONLY. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS. ITEMS WRONGLY LOCATED
BY DRAWINGS SCALING SHALL BE CORRECTED.
30. SIGNAGE CONSTRUCTION, FONT AND SIZE SHALL BE CONSISTENT WITH THE FACILITY'S EXISTING SIGNAGE SYSTEMS. REFER TO SPECIFICATIONS FOR CODE REQUIRED SIGNAGE. PROVIDE ADDITIONAL SIGNAGE AS MAY BE REQUIRED BY REQUEST OF THE FIRE MARSHAL AND/OR BUILDING CODE OFFICIAL OR COR.
31. EXERCISE CARE DURING CONSTRUCTION TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER ROUTINE, COORDINATE SEQUENCE OF WORK AND PHASING WITH THE COR TO MINIMIZE DISRUPTION OF THE MEDICAL CENTER. MANY OF THE WORK ITEMS REQUIRE THE WORK TO BE PERFORMED ONLY AT NIGHT, WEEKENDS, OR
HOLIDAYS WITH PRIOR APPROVAL OF THE COR AT NO ADDITIONAL COST TO THE GOVERNMENT.
32. PRIOR TO DRILLING OR CORING EXISTING CONCRETE, CONTRACTOR SHALL LOCATE EXISTING REINFORCEMENT TO MAINTAIN ADEQUATE CLEARANCES FROM AND AVOID DAMAGE TO EXISTING REINFORCEMENT. CONTRACTOR SHALL USE NON-DESTRUCTIVE TESTING (NDT) TO LOCATE REINFORCEMENT. WHENEVER FEASIBLE, CONTRACTOR SHALL USE GROUND PENETRATING RADAR (GPR) OR MEANS OTHER THAN X-RAY. WHERE X-RAY IS REQUIRED, CONTRACTOR SHALL PROVIDE WRITTEN REQUEST AT LEAST THREE (3) WEEKS PRIOR TO EVENT: WORK MAY BE REQUIRED TO BE PERFORMED OUTSIDE NORMAL WORK HOURS AND SHALL BE DOCUMENTED ON
THE THREE (3) WEEK LOOK-AHEAD SCHEDULE.
33. PROTECT EXISTING FIRE SUPPRESSION SYSTEMS DURING CONSTRUCTION.
34. IN THE EVENT THE CONTRACTOR DISCOVERS HAZARDOUS MATERIALS WHICH ARE NOT AVOIDABLE BY REROUTING THE WORK AND HAVE NOT BEEN DESCRIBED IN THE CONTRACT, THE CONTRACTOR IS TO NOTIFY THE COR AND THE A/E FOR DIFFERING SITE CONDITION ACKNOWLEDGEMENT. REMEDIATION WOULD BE COMPENSATED BY
ADDITIONAL MONEY AND ADDITIONAL TIME FOR CRITICAL PATH ACTIVITIES.
35. CONTRACTOR SHALL PROVIDE STAFF THAT WILL UNDERGO TRAINING AND CERTIFICATION TO ALLOW UN-ESCORTED ACCESS TO IT CLOSETS. THE CONTRACTOR SHALL CERTIFY SUFFICIENT NUMBER OF STAFF TO ACCOMMODATE PROPOSED SCHEDULE WITHOUT RELYING ON VA STAFF TO ACCOMPANY AS ESCORTS. THIS WILL REQUIRE PIV BADGING REQUIREMENT INCLUDING BACKGROUND INVESTIGATIONS. SEE "CONTRACTOR BACKGROUND INVESTIGATIONS REQUEST" FORM. COORDINATE WITH
CO/CS REGARDING SUBMITTING THE FORM.
36. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING ANY REQUIRED THIRD PARTY INSPECTORS.
OWNER
ARCHITECT
TELECOMMUNICATIONS
ENGINEER, PROJECT LEAD
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
A&E ARCHITECTS
608 NORTH 29th STREET
BILLINGS, MT 59101
406.248.2633
MONTANA VA HEALTHCARE SYSTEM
FORT HARRISON VAMC
RSA
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, ALASKA 99503
907.865.0564
PROJECT TEAM
RSA
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, ALASKA 99503
907.865.0564
STRUCTURAL
KREMER, GHELEN, AND ASSOCIATES
400 COLUMBIA STREET, SUITE 240
VANCOUVER, WA 98660-3413
503.289.2661
GDM - ARCTIC DISTRICT OFFICE
1401 W 34TH AVE, SUITE 200
ANCHORAGE, ALASKA 99503
907.917.2957
CIVIL ENGINEER
GDM - COLUMBIA GORGE DISTRICT OFFICE
1000 W STEUBEN ST, UNIT THREE
BINGEN, WA 98605
541.436.4723
INDUSTRIAL HYGIENEFIRE PROTECTION ENGINEER
TERP CONSULTING
14241 E 4TH AVAENUE, SUITE 5-230
AURORA, CO 80011
720.779.0797
GDM - ARCTIC DISTRICT OFFICE
1401 W 34TH AVE, SUITE 200
ANCHORAGE, ALASKA 99503
907.917.2957
RSA
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, ALASKA 99503
907.276.0521
"OWNER": THE OWNER IS UNITED STATES GOVERNMENT - DEPT. OF VETERANS AFFAIRS AND IS REFERRED TO THROUGHOUT THE CONTRACT DOCUMENTS AS IF SINGULAR IN NUMBER. THE TERM "OWNER"
MEANS THE OWNER OR THE OWNER'S CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE.
"CONTRACTING OFFICER" OR "C.O.": THE OWNER'S AUTHORIZED REPRESENTATIVE RESPONSIBLE FOR ADMINISTRATING THE CONTRACT BETWEEN THE GENERAL CONTRACTOR AND OWNER. THE TERM INCLUDES CERTAIN AUTHORIZED REPRESENTATIVES OF THE CONTRACTING OFFICER ACTING WITHIN THE
LIMITS OF THEIR AUTHORITY AS DELEGATED BY THE CONTRACTING OFFICER.
"CONTRACTING OFFICER'S REPRESENTATIVE", (COR): MEANS THE CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVE, IN PART, RESPONSIBLE FOR MONITORING THE CONTRACTOR'S (PLURAL) PERFORMANCE.
"WORK": THE TERM "WORK" MEANS THE CONSTRUCTION AND SERVICES REQUIRED BY THE CONTRACT DOCUMENTS, WHETHER COMPLETED OR PARTIALLY COMPLETED, AND INCLUDES ALL OTHER LABOR, MATERIALS, EQUIPMENT AND SERVICES PROVIDED BY THE CONTRACTOR TO FULFILL THE CONTRACTOR'S
OBLIGATIONS. THE WORK MAY CONSTITUTE THE WHOLE OR A PART OF THE PROJECT.
"PROJECT": THE TOTAL CONSTRUCTION OF WHICH THE WORK PERFORMED UNDER THE CONTRACT
DOCUMENTS
"DRAWINGS", "SHOP DRAWINGS" OR "PLANS": THE GRAPHIC AND PICTORIAL PORTIONS OF CONTRACT DOCUMENTS, WHENEVER LOCATED AND WHENEVER ISSUED, SHOWING DESIGN, LOCATION AND DIMENSIONS OF THE WORK, GENERALLY INCLUDING PLANS, ELEVATIONS, SECTIONS, DETAILS, SCHEDULES AND DIAGRAMS.
"PROJECT SUPERVISOR" OR "SUPERVISOR": MEANS THE ON-SITE SUPERVISION REPRESENTATIVE OF THE
PROJECT.
"ARCHITECT" OR "ENGINEER": MEANS THE VA'S ARCHITECTS, ENGINEERS AND OTHER DESIGN AND ENGINEERS PROFESSIONALS FOR THIS PROJECT, AND REFERRED THROUGHOUT THE DRAWINGS AS IF
SINGULAR IN NUMBER.
"TRADE CONTRACTOR" OR "CONTRACTORS": MEANS THE ENTITY UNDER CONTRACT AGREEMENT WITH THE GENERAL CONTRACTOR TO PROVIDE THE SPECIFIED GENERAL AND OR SPECIALTY WORK IN CONNECTION
WITH THIS PROJECT.
"FURNISH" OR "FURNISHED": MEANS PROVIDING ALL MATERIALS, SHOP DRAWINGS, TRANSPORTATION, INSURANCE, FIELD MEASUREMENTS, EXPEDITING, SHIPPING, HANDLING, PACKAGING, STORAGE, TOUCH-UP MATERIALS, OWNER'S MANUALS, TRAINING AND ANY OTHER ACCESSORIES REQUIRED FOR A COMPLETE
INSTALLATION.
"INSTALL" OR "INSTALLED": MEANS COMPLETING ALL WORK AND COSTS ASSOCIATED WITH UNLOADING, UNPACKING, HOISTING, STORAGE, HANGERS, SUPPORTS,SLEEVES, SCAFFOLDING, COORDINATION, LAYOUT, SHOP DRAWINGS, EXCAVATION, BACKFILL, DEWATERING, INSTALLATION, CUTTING AND PATCHING, FIRESTOPPING, CLEAN-UP, INSPECTION, DOCUMENTATION, PROTECTION OF SCOPE OF WORK AND ALL
ACCESSORIES, SERVICE AND FACILITIES REQUIRED FOR A COMPLETE INSTALLATION.
"PROVIDE" OR "PROVIDED": MEANS TO FURNISH AND INSTALL AND SHALL INCLUDE, WITHOUT
LIMITATION, ALL LABOR, MATERIALS, EQUIPMENTS, TRANSPORTATION SERVICES, AND OTHER ITEMS REQUIRED
TO COMPLETE THE REFERENCED TASK.
"BY OWNER"; "BY VAMC" OR "BY VA": MEANS ITEMS WILL BE ORDERED, PAID FOR, SHIPPED TO THE JOB
SITE AND INSTALLED BY THE OWNER.
"NOT IN CONTRACT" OR "N.I.C.": MEANS MATERIALS OR EQUIPMENT NOT IN THE CONTRACT, BUT MAY REQUIRE PROVISIONS IN THE CONSTRUCTION FOR FUTURE INSTALLATION AS SPECIFIED OR SHOWN.
OTHER DEFINITIONS OF WORDS AND TERMS USED IN THE DRAWINGS AND SPECIFICATIONS CAN BE FOUND IN THE LEGENDS AND SYMBOLS DRAWINGS FOR EACH DISCIPLINE AND IN DIVISION 0 AND 1 OF THE PROJECT
MANUAL.
BASIC DEFINITIONS
TEMPORARY FIRE & SMOKE PROTECTION
IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE
TO ANY INCOMPLETE WORK, PROVIDE TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL
SATISFYING FIRE RATING REQUIREMENTS AT PENETRATIONS
IF MULTIPLE CEILING TILES MUST BE REMOVED AND CANNOT BE REPLACED AT THE END OF THE WORK SHIFT, A 1-HOUR FIRE BARRIER WILL NEED TO BE CONSTRUCTED. IF CONTRACTOR IDENTIFIES UPCOMING WORK RESULTING IN A LONG-TERM CEILING REMOVAL, NOTIFY THE COR IMMEDIATELY WHETHER A RATED ENCLOSURE MUST BE CONSTRUCTION OR TEMPORARY UPRIGHT SPRINKLER HEADS INSTALLED. THIS
WORK IS TO BE PART OF THE SUBMITTED SCOPE OF WORK.
IF FLOOR OR RATED WALL PENETRATIONS CANNOT BE FIRESTOPPED AT THE END OF THE WORK SHIFT DUE TO THE NEED TO PULL ADDITIONAL CABLES, TEMPORARY FIRESTOPPING COMPOSED OF MINERAL WOOL SHOULD BE INSTALLED IN THE PENETRATION TO PROVIDE PROTECTION AGAINST FIRE/SMOKE SPREAD
THROUGH THE UNSEALED PENETRATION.
PROJECT KEY PLAN
MONTANA VA HEALTHCARE SYSTEM
ROCKY MOUNTAIN NETWORK 19
3687 VETERANS DRIVE | FORT HARRISON, MT 59636
PROJECT
NORTH
NORTH
MONTANA VA HEALTHCARE SYSTEM
ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM)
INFRASTRUCTURE UPGRADES - FORT HARRISON, MT
PROJECT NO. 436-21-700
CONTRACT NO. 36C77621C0112
100% CONSTRUCTION DOCUMENTS (CD) SUBMITTAL
MONTANA VA HEALTHCARE SYSTEM
ROCKY MOUNTAIN NETWORK 19
3687 VETERANS DRIVE | FORT HARRISON, MT 59636
ARCHITECTURAL ABBREVIATIONS
AB ANCHOR BOLT
ABV ABOVE
A/C AIR CONDITIONING
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ARCH ARCHITECT(URAL)
AWN AWNING
B/ BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM OR BENCHMARK
BRG BEARING
BTWN BETWEEN
BUR BUILT-UP ROOF
CAB CABINET
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CONST CONSTRUCTION
CG CORNER GUARD
CPT CARPET
CSMT CASEMENT
CT CERAMIC TILE
D DEEP
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIM(S) DIMENSIONS
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
E EAST
EA EACH
EC EXISTING COLUMN
EJ EXPANSION JOINT
ELEC ELECTRICAL
EL ELEVATION
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR
FACP FIRE ALARM CONTROL PANEL
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
F.F. FINISH FLOOR
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FND FOUNDATION
FP FIRE PROTECTION
FR FRAME
FRMG FRAMING
FT FEET/FOOT OR FIRE TREATED
FTG FOOTING
FTNG FOOTING
FRP FIBERGLASS REINFORCED PANEL
FRT FIRE RETARDANT TREATED
GA GAUGE
GALV GALVANIZED
GB GYPSUM BOARD
GC GENERAL CONTRACTOR
GL GLASS, GLAZING
GWB GYPSUM WALL BOARD
GYP GYPSUM
HC HANDICAP
HDR HEADER
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HTD HEATED
HVAC HEATING/VENTILATION & AIR
CONDITIONING
ID INSIDE DIAMETER
INFO INFORMATION
ISO ISOCYANURATE
INSUL INSULATE / INSULATED / INSULATION
INT INTERIOR
INV INVERT
JT JOINT
J-BOX JUNCTION BOX
KIT KITCHEN
L LONG / LENGTH
LAM LAMINATE(D)
LAV LAVATORY
LF LINEAR FEET
LT LIGHT
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MECH MECHANIC(AL)
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER OR
OVERFLOW DRAIN
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
OVHD OVERHEAD
PL PLATE
PLAM PLASTIC LAMINATE
PLUMB PLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
POLY POLYESTER OR POLYOLEFIN
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED OR POINT
PVMT PAVEMENT
QT QUARRY TILE
QTR QUARTER
QTY QUANTITY
R RADIUS
RA RETURN AIR
RB RUBBER BASE
RD ROOF DRAIN
RECY RECYCLE(D)
REF REFERENCE
REFRIG REFRIGERATOR OR
REFRIGERATION
REINF REINFORCE
REQD REQUIRED
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
S SOUTH
SC SOLID CORE
SCH SCHEDULE
SCHED SCHEDULED
SECT SECTION
SF SQUARE FEET
SFRM SPRAY APPLIED FIRE RESISTIVE
MATERIAL
SGL SINGLE
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SPECS SPECIFICATIONS
SOD SLAB ON DECK
SOG SLAB ON GRADE
SOH SAME OPPOSITE HAND
SS STAINLESS STEEL
ST STONE TILE
STD STANDARD
STND STANDARD
STL STEEL
STRUCT STRUCTURAL
TEMP TEMPERED
THK THICK
THRESH THRESHOLD
T.O. TOP OF
TOBM TOP OF BEAM
T.O.BM. TOP OF BEAM
T.O.P. TOP OF PLATE
T.O.S. TOP OF STEEL
T/ TOP OF
T&G TONGUE AND GROOVE
TEL TELEPHONE
THK THICK
TRANS TRANSOM
TV TELEVISION
TYP TYPICAL
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VP VENEER PLASTER
VR VAPOR RETARDER
VT VINYL TILE
VWC VINYL WALL COVERING
W WIDE OR WEST
W/ WITH
WC WATER CLOSET
WD WOOD
WDW WINDOW
WG WALL GUARD
WH WATER HEATER
W/IN WITHIN
W/O WITHOUT
WP WATERPROOF
WR WATER RESISTANT
WT WEIGHT
WWF WELDED WIRE FABRIC
# NUMBER OR POUND
@ AT
WINDOW TAGROOM TAG
DOOR TAG KEYNOTE TAG
ASSEMBLY TAG
MATERIAL TAG
REVISION TAGREVISION CLOUD XXX
X
XX-XX
X
CEILING TAG VIEW REFERENCE
BUILDING
SECTION
WALL
SECTION
ELEVATION
GRID LINE
DETAIL
CALL OUT
INTERIOR
ELEVATION
EXTERIOR
ELEVATION
DETAIL
SECTION
#1
#2
#3
#4
POSITION OF VIEW ON SHEET
VIEW NAME
1 1/2" = 1'-0"
VIEW SCALE
VIEW NAME
A6.#
A3.#
A3.#
A3.#
A4.#
A3.#
ROOM NAME
101.1
X
X'-X"
XXX-X
XXX
W D
HT
CASEWORK TAG
CABINET DESIGN SERIES NO.
EXPLANATION OF SYMBOLS
TYPICAL SHEET VIEW NUMBERING LAYOUT
NUMBERING STARTS IN BOTTOM LEFT CORNER, MOVING
UPWARDS, SKIPPING NONE
ARCH E1 (30"x42")
PROJECT SITE
VA MEDICAL CENTER
FORT HARRISON, MT
PROJECT LOCATION MAP
HELENA, MT
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/2
G e n e ra l In fo r2
.r v t
/2
/2
:2
:3
P
M
00-GI-000.1
COVER AND PROJECT GENERAL
INFORMATION VOLUME 1GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
GEN INFO
Project Director
JPRTMP05/20/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
VOLUME 1
CIVIL STRUCTURAL ARCHITECTURAL MECHANICAL
Revisions: Date:
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/2
G e n e ra l In fo r2
.r v t
/2
/2
:2
:4
P
M
00-GI-001
INDEX OF DRAWINGS
GDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
GEN INFO
Project Director
JPRTMP05/20/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
DRAWING INDEX
GENERAL
ARCHITECTURAL - DEMOLITION
ARCHITECTURAL REMODEL
VOLUME 1
SHEET NO. SHEET NAME
16-AE-201 16-FLOOR PLANS
20-AE-201 20-FLOOR PLAN
141-AE-200 141-BASEMENT FLOOR PLAN
141-AE-201 141-LEVEL 1 FLOOR PLAN
141-AE-202 141-LEVEL 2 FLOOR PLAN
141-AE-203 141-LEVEL 3 FLOOR PLAN
141-AE-300 141-ENLARGED BASEMENT TR FLOOR PLANS
141-AE-301 141-ENLARGED LEVEL 1 TR FLOOR PLAN
141-AE-302 141-ENLARGED LEVEL 2 TR FLOOR PLANS
141-AE-303 141-ENLARGED LEVEL 3 TR FLOOR PLAN
154-AE-200 154-BASEMENT FLOOR PLAN
154-AE-201 154-LEVEL 1 FLOOR PLAN
154-AE-202 154-LEVEL 2 FLOOR PLAN
154-AE-203 154-LEVEL 3 AND LEVEL 4 FLOOR PLAN
154-AE-204 154-ROOF PLAN
154-AE-300 154-ENLARGED BASEMENT FLOOR PLANS
154-AE-301 154-ENLARGED LEVEL 1 FLOOR PLANS AND
ELEVATIONS
154-AE-302 154-ENLARGED LEVEL 1 FLOOR PLAN AND ELEVATIONS
154-AE-303 154-ENLARGED LEVEL 2 FLOOR PLAN AND ELEVATIONS
154-AE-304 154-ENLARGED LEVEL 3 FLOOR PLANS AND
ELEVATIONS
154-AE-305 154-ENLARGED LEVEL 4 FLOOR PLANS AND
ELEVATIONS
154-AE-601 154-MCR ELEVATIONS AND CASEWORK
154A-AE-200 154A-BASEMENT FLOOR PLAN
154A-AE-201 154A-LEVEL 1 FLOOR PLAN
154A-AE-202 154A-ROOF PLAN
154A-AE-301 154A-ENLARGED PLANS
169-AE-201 169-FLOOR AND ROOF PLAN
169-AE-301 169-ENLARGED PLANS
170-AE-201 170-FLOOR PLANS AND ELEVATIONS
171-AE-201 171-FLOOR PLANS
SHEET NO. SHEET NAME
20-AD-201 20-DEMOLITION FLOOR PLAN
141-AD-200 141 -BASEMENT DEMOLITION PLANS
141-AD-201 141-LEVEL 1 DEMOLITION PLAN
141-AD-202 141-LEVEL 2 DEMOLITION PLANS
141-AD-203 141 -LEVEL 3 DEMOLITION PLANS
154-AD-200 154-BASEMENT LEVEL DEMOLITION PLAN
154-AD-201 154-LEVEL 1 DEMOLITION PLAN
154-AD-202 154-LEVEL 2 DEMOLITION PLAN
154-AD-203 154-LEVEL 3 DEMOLITION PLAN
154-AD-204 154-LEVEL 4 DEMOLITION PLAN
154-AD-300 154-BASEMENT ENLARGED DEMOLITION FLOOR PLAN
154A-AD-201 154A - DEMOLITION PLANS
169-AD-201 169-DEMOLITION FLOOR PLANS
SHEET NO. SHEET NAME
00-GI-000.1 COVER AND PROJECT GENERAL INFORMATION VOLUME 1
00-GI-001 INDEX OF DRAWINGS
00-GI-002 PROJECT CODE SUMMARY / PROJECT GENERAL NOTES
00-GI-003 ICRA CLASSIFICATION PROCESS
00-GI-004 PROJECT LOCATION MAPS & CAMPUS PLAN
00-GI-005 PROJECT ASSEMBLY TYPES AND TYPICAL ROOF DETAILS
00-GI-005.1 UL ASSEMBLIES
00-GI-005.2 UL ASSEMBLIES
00-GI-005.3 UL ASSEMBLIES
00-GI-006 DOOR SCHEDULE, TYPICAL CEILING AND DOOR DETAILS
00-GI-007 PARTITION DETAILS
00-GI-008 FIRE PROTECTION GENERAL NOTES
SHEET NO. SHEET NAME
CI0001 CIVIL - GENERAL NOTES
RC0001 CIVIL - EXISTING CONDITIONS PLAN
CS0001 CIVIL - FIBER OPTICS SITE PLAN
CS0002 CIVIL - ENLARGED FIBER OPTICS SITE PLAN
CU0101 CIVIL - SECONDRARY FIBER OPTICS PLAN AND PROFILE
CJ00001 CIVIL - DETAILS
CIVIL
SHEET NO. SHEET NAME
16-ED-011 ELECTRICAL DEMOLITION PLAN - BLDG 16 FIRST FLOOR
020-ED-011 ELECTIRCAL DEMOLITION PLAN - BLDG 20
141-ED-0B1 ELECTRICAL DEMOLITION PLAN - BLDG 141 BASEMENT
141-ED-011 ELECTRICAL DEMOLITION PLAN - BLDG 141 FIRST FLOOR
141-ED-021 ELECTRICAL DEMOLITION PLAN - BLDG 141 SECOND FLOOR
141-ED-031 ELECTRICAL DEMOLITION PLAN - BLDG 141 THRID FLOOR
154-ED-0B1 ELECTRICAL DEMOLITION PLAN - BLDG 154 BASEMENT
154-ED-0B1.1 ENLARGED LIGHTING DEMOLITION PLAN - MCR BASEMENT
154-ED-0B1.2 ENLARGED ELECTRICAL DEMO PLAN - MCR BASEMENT
154-ED-011 ELECTRICAL DEMOLITION PLAN - BLDG 154 FIRST FLOOR
154-ED-021 ELECTRICAL DEMOLITION PLAN - BLDG 154 SECOND FLOOR
154-ED-031 ELECTRICAL DEMOLITION PLAN - BLDG 154 THIRD FLOOR
154-ED-041 ELECTRICAL DEMOLITION PLAN - BLDG 154 FOURTH FLOOR
154A-ED-0B1 ELECTRICAL DEMOLITION PLAN - BLDG 154A BASEMENT
154A-ED-0B1.1 ENLARGED ELECTRICAL DEMO PLAN - BLDG 154A BASEMENT
154A-ED-011 ELECTRICAL DEMOLITION PLAN - BLDG 154A FIRST FLOOR
169-ED-011 ELECTRICAL DEMOLITION PLAN - BLDG 169
170-ED-011 ELECTRICAL DEMOLITION PLAN - BLDG 170
171-ED-011 ELECTRICAL DEMOLITION PLAN - BLDG 171 FIRST FLOOR
ELECTRICAL DEMOLITIONMECHANICAL DEMOLITION
VOLUME 2
TELECOMMUNICATIONS DEMOLITION
SHEET NO. SHEET NAME
EK-001 POWER AND ELEVATIONS AND DETAILS
EK-002 POWER ONE-LINE DIAGRAMS
EK-003 ELECTRICAL LEGEND AND FIXTURE SCHEDULE
EK-004 ELECTRICAL DETAILS
EK-005 ELECTRICAL LOAD CALCULATIONS
EK-006 BUILDINGS 16 & 20 - PANEL SCHEDULES
EK-007 BUILDING 141 - PANEL SCHEDULES
EK-008 BUILDING 141 - PANEL SCHEDULES
EK-009 BUILDING 154 - PANEL SCHEDULES
EK-010 BUILDING 154 - PANEL SCHEDULES
EK-011 BUILDING 154 - PANEL SCHEDULES
EK-012 BUILDING 154 - PANEL SCHEDULES
EK-013 BUILDINGS 154A - PANEL SCHEDULES
EK-014 BUILDINGS 169 & 170 - PANEL SCHEDULES
16-EP-011 ELECTRICAL REMODEL PLAN - BLDG 16 FIRST FLOOR
020-EP-011 ELECTRICAL REMODEL PLAN - BLDG 20
141-EP-0B1 ELECTRICAL REMODEL PLAN - BLDG 141 BASEMENT
141-EP-011 ELECTRICAL REMODEL PLAN - BLDG 141 FIRST FLOOR
141-EP-021 ELECTRICAL REMODEL PLAN - BLDG 141 SECOND FLOOR
141-EP-031 ELECTRICAL REMODEL PLAN - BLDG 141 THIRD FLOOR
154-EP-0B1 ELECTRICAL REMODEL PLAN - BLDG 154 BASEMENT
154-EP-0B1.1 ENLARGED LIGHTING REMODEL PLAN - MCR BASEMENT
154-EP-0B1.2 ENLARGED ELECTRICAL REMODEL PLAN - MCR BASEMENT
154-EP-0B1.3 VA EQUIPMENT POWER DETAILS
154-EP-011 ELECTRICAL REMODEL PLAN - BLDG 154 FIRST FLOOR
154-EP-021 ELECTRICAL REMODEL PLAN - BLDG 154 SECOND FLOOR
154-EP-031 ELECTRICAL REMODEL PLAN - BLDG 154 THIRD FLOOR
154-EP-041 ELECTRICAL REMODEL PLAN - BLDG 154 FOURTH FLOOR
154A-EP-0B1 ELECTRICAL REMODEL PLAN - BLDG 154A BASEMENT
154A-EP-0B1.1 ENLARGED ELECTRICAL REMODEL PLAN - BLDG 154A BASEMENT
154A-EP-011 ELECTRICAL REMODEL PLAN - BLDG 154A FIRST FLOOR
169-EP-011 ELECTRICAL REMODEL PLAN - BLDG 169
170-EP-011 ELECTRICAL REMODEL PLAN - BLDG 170
171-EP-011 ELECTRICAL REMODEL PLAN - BLDG 171 FIRST FLOOR
ELECTRICAL REMODEL
SHEET NO. SHEET NAME
16-TD-011 TELECOM DEMOLITION PLAN - BLDG 16 FIRST FLOOR
020-TD-011 TELECOM DEMOLITION PLAN - BLDG 20
141-TD-0B1 TELECOM DEMOLITION PLAN - BLDG 141 BASEMENT
141-TD-011 TELECOM DEMOLITION PLAN - BLDG 141 FIRST FLOOR
141-TD-021 TELECOM DEMOLITION PLAN - BLDG 141 SECOND FLOOR
141-TD-031 TELECOM DEMOLITION PLAN - BLDG 141 THIRD FLOOR
154-TD-0B1 TELECOM DEMOLITION PLAN - BLDG 154 BASEMENT
154-TD-0B1.1 ENLARGED TELECOM DEMOLITION PLAN - MCR BASEMENT
154-TD-011 TELECOM DEMOLITION PLAN - BLDG 154 FIRST FLOOR
154-TD-021 TELECOM DEMOLITION PLAN - BLDG 154 SECOND FLOOR
154-TD-031 TELECOM DEMOLITION PLAN - BLDG 154 THIRD FLOOR
154-TD-041 TELECOM DEMOLITION PLAN - BLDG 154 FOURTH FLOOR
154A-TD-0B1 TELECOM DEMOLITION PLAN - BLDG 154A BASEMENT
154A-TD-0B1.1 ENLARGED TELECOM DEMOLITION PLAN - BLDG 154A BASEMENT
154A-TD-011 TELECOM DEMOLITION PLAN - BLDG 154A FIRST FLOOR
169-TD-011 TELECOM DEMOLITION PLAN - BLDG 169
170-TD-011 TELECOM DEMOLITION PLAN - BLDG 170
171-TD-011 TELECOM DEMOLITION PLAN - BLDG 171 FIRST FLOOR
SHEET NO. SHEET NAME
TJ-001 GENERAL TELECOM NOTES
TK-001 ELECOM BONDING DETAILS
TK-002 TELECOM BONDING AND TELECOM DETAILS
TK-003 TYPICAL RACK AND CABINET DETAILS
TK-004 PATCH PANEL SCHEDULES - BUILDING 141
TK-005 PATCH PANEL SCHEDULES - BUILDING 141
TK-006 PATCH PANEL SCHEDULES - BUILDING 141
TK-007 PATCH PANEL SCHEDULES - BUILDING 141 & 150
TK-008 PATCH PANEL SCHEDULES - BUILDING 154
TK-009 PATCH PANEL SCHEDULES - BUILDING 154
TK-010 PATCH PANEL SCHEDULES - BUILDING 154
TK-011 PATCH PANEL SCHEDULES - BUILDING 154
TK-012 PATCH PANEL SCHEDULES - BUILDING 154
TK-013 PATCH PANEL SCHEDULES - BUILDING 154
TK-014 PATCH PANEL SCHEDULES - BUILDING 154
TK-015 PATCH PANEL SCHEDULES - BUILDING 154
TK-016 PATCH PANEL SCHEDULES - BUILDING 154
TK-017 PATCH PANEL SCHEDULES - BUILDING 154
TK-018 PATCH PANEL SCHEDULES - BUILDING 154
TK-019 PATCH PANEL SCHEDULES - BUILDING 154
TK-020 PATCH PANEL SCHEDULES - BUILDING 154
TK-021 PATCH PANEL SCHEDULES - BUILDING 154A
TK-022 PATCH PANEL SCHEDULES - BUILDING 154A
TK-023 PATCH PANEL SCHEDULES - BUILDING 154A
TK-024 PATCH PANEL SCHEDULES - BUILDING 154A
TK-025 PATCH PANEL SCHEDULES - BUILDING 154A
TK-026 PATCH PANEL SCHEDULES - BUILDING 154A
TK-027 PATCH PANEL SCHEDULES - BUILDING 154A
TK-028 PATCH PANEL SCHEDULES - BUILDING 154B
TK-029 PATCH PANEL SCHEDULES - BUILDING 169
TK-030 PATCH PANEL SCHEDULES - BUILDING 169
TK-031 PATCH PANEL SCHEDULES - BUILDING 169
TK-032 PATCH PANEL SCHEDULES - BUILDING 170 & 171
TK-033 FIBER RISER DIAGRAM
TK-034 ANALOG BACKBONE RISER DIAGRAM
TK-035 TELECOM ROOM DETAILS
TK-036 NEW PATCH PANEL SCHEDULES
TK-037 NEW PATCH PANEL SCHEDULES
TK-038 NEW PATCH PANEL SCHEDULES
TK-039 NEW PATCH PANEL SCHEDULES
TK-040 NEW PATCH PANEL SCHEDULES
TK-041 NEW PATCH PANEL SCHEDULES
TK-042 NEW PATCH PANEL SCHEDULES
TK-043 NEW PATCH PANEL SCHEDULES
TK-044 NEW PATCH PANEL SCHEDULES
TK-045 NEW PATCH PANEL SCHEDULES
TK-046 NEW PATCH PANEL SCHEDULES
TK-047 NEW RACK ELEVATIONS
TK-048 NEW RACK ELEVATIONS
TK-049 NEW RACK ELEVATIONS
TS-001 FIBER SITE PLAN
TELECOMMUNICATIONS REMODEL
16-TN-011 TELECOM REMODEL PLAN - BLDG 16 FIRST FLOOR
16-TN-011.1 TELECOM DISTANCE ASSESSMENT - BLDG 16
020-TN-011 TELECOM REMODEL PLAN - BLDG 20
020-TN-011.1 TELECOM DISTANCE ASSESSMENT - BLDG 20
141-TN-0B1 TELECOM REMODEL PLAN - BLDG 141 BASEMENT
141-TN-0B1.1 ELE DISTANCE ASSESSMENT - BLDG 141 BASEMENT
141-TN-011 TELECOM REMODEL PLAN - BLDG 141 FIRST FLOOR
141-TN-011.1 TELE DISTANCE ASSESSMENT - BLDG 141 FIRST FLOOR
141-TN-021 ELECOM REMODEL PLAN - BLDG 141 SECOND FLOOR
141-TN-021.1 TELE DISTANCE ASSESSMENT - BLDG 141 SECOND FLOOR
141-TN-031 TELECOM REMODEL PLAN - BLDG 141 THIRD FLOOR
141-TN-031.1 TELE DISTANCE ASSESSMENT - BLDG 141 THIRD FLOOR
154-TN-0B1 TELECOM REMODEL PLAN - BLDG 154 BASEMENT
154-TN-0B1.1 TELECOM DISTANCE ASSESSMENT - BLDG 154 BASEMENT
154-TN-0B1.11 ENLARGED TELECOM REMODEL PLAN - MCR BASEMENT
154-TN-0B1.12 VA MCR DETAILS
154-TN-0B1.13 VA MCR DETAILS
154-TN-0B1.14 VA MCR DETAILS
154-TN-011 TELECOM REMODEL PLAN - BLDG 154 FIRST FLOOR
154-TN-011.1 TELECOM DISTANCE ASSESSMENT - BLDG 154 FIRST FLOOR
154-TN-012 TELECOM REMODEL PLAN - BLDG 154 FIRST FLOOR SECTION 1
154-TN-013 TELECOM REMODEL PLAN - BLDG 154 FIRST FLOOR SECTION 2 & 3
154-TN-021 TELECOM REMODEL PLAN - BLDG 154 SECOND FLOOR
154-TN-021.1 TELECOM DISTANCE ASSESSMENT - BLDG 154 SECOND FLOOR
154-TN-031 TELECOM REMODEL PLAN - BLDG 154 THIRD FLOOR
154-TN-031.1 TELECOM DISTANCE ASSESSMENT - BLDG 154 THIRD FLOOR
154-TN-041 TELECOM REMODEL PLAN - BLDG 154 FOURTH FLOOR
154-TN-041.1 TELECOM DISTANCE ASSESSMENT - BLDG 154 FOURTH FLOOR
154A-TN-0B1 TELECOM REMODEL PLAN - BLDG 154A BASEMENT
154A-TN-0B1.1 TELECOM DIST ASSESSMENT - BLDG 154A BASEMENT
154A-TN-0B1.11 ENLARGED TELECOM REMODEL PLAN - BLDG 154A BASEMENT
154A-TN-011 TELECOM REMODEL PLAN - BLDG 154A FIRST FLOOR
154A-TN-011.1 TELECOM DIST ASSESSMENT - BLDG 154A FIRST FLOOR
169-TN-011 TELECOM REMODEL PLAN - BLDG 169
169-TN-011.1 TELECOM DISTANCE ASSESSMENT - BLDG 169
170-TN-011 TELECOM REMODEL PLAN - BLDG 170
170-TN-011.1 TELECOM DISTANCE ASSESSMENT - BLDG 170
171-TN-011 TELECOM REMODEL PLAN - BLDG 171 FIRST FLOOR
SHEET NO. SHEET NAME
16-MD-011 MECHANICAL DEMOLITION PLAN - BUILDING 16
20-MD-011 MECHANICAL DEMOLITION PLAN - BUILDING 20
141-MD-0B1 MECHANICAL DEMOLITION PLAN - BUILDING 141 BASEMENT
141-MD-011 MECHANICAL DEMOLITION PLAN - BUILDING 141 FLOOR 1
141-MD-021 MECHANICAL DEMOLITION PLAN - BUILDING 141 FLOOR 2
141-MD-031 MECHANICAL DEMOLITION PLAN - BUILDING 141 FLOOR 3
141-MD-300 MECHANICAL DEMOLITION ENLARGED PLANS - BUILDING 141
141-MD-301 MECHANICAL DEMOLITION ENLARGED PLANS - BUILDING 141
154-MD-0B1 MECHANICAL DEMOLITION PLAN - BUILDING 154 - BASEMENT
154-MD-011 MECHANICAL DEMOLITION PLAN - BUILDING 154 - FLOOR 1
154-MD-021 MECHANICAL DEMOLITION PLAN - BUILDING 154 - FLOOR 2
154-MD-031 MECHANICAL DEMOLTION PLAN - BUILDING 154 - FLOOR 3
154-MD-041 MECHANICAL DEMOLTION PLAN - BUILDING 154 - FLOOR 4
154-MD-300 MECHANICAL DEMOLITION ENLARGED PLANS - BUILDING 154
154-MD-301 MECHANICAL DEMOLITION ENLARGED PLANS - BUILDING 154
154-MD-302 MECHANICAL DEMOLITION ENLARGED PLANS - BUILDING 154
154-MD-303 MECHANICAL DEMOLITION ENLARGED PLANS - BUILDING 154
154-MD-304 MECHANICAL DEMOLITION ENLARGED PLANS - BUILDING 154
154-MD-305 MECHANICAL DEMOLITION ENLARGED PLANS - BUILDING 154
154A-MD-0B1 MECHANICAL DEMOLITION PLAN - BUILDING 154A -BASEMENT
154A-MD-011 MECHANICAL DEMOLITION PLAN - BUILDING 154A - FLOOR 1
154A-MD-021 MECHANICAL DEMOLITION PLAN - BUILDING 154A - ROOF
154A-MD-300 MECHANICAL DEMOLITION ENLARGED PLANS - BUILDING 154A
154A-MD-301 MECHANICAL DEMOLITION ENLARGED PLANS - BUILDING 154A
169-MD-011 MECHANICAL DEMOLITION PLAN - BUILDING 169 - FLOOR 1
169-MD-021 MECHANICAL DEMOLITION PLAN - BUILDING 169 - ROOF
169-MD-300 MECHANICAL DEMOLITION ENLARGED PLANS - BUILDING 169
170-MD-011 MECHANICAL DEMOLITION PLAN - BUILDING 170
MECHANICAL REMODEL
SHEET NO. SHEET NAME
MG - 001 MECHANICAL LEGEND AND ABBREVIATIONS
MG - 002 MECHANICAL SCHEDULES
MG - 003 MECHANICAL SCHEDULES
MG - 004 MECHANICAL SEQUENCE OF OPERATIONS AND CONTROLS
MG - 005 MECHANICAL DETAILS
MG - 006 MECHANICAL DETAILS
MG - 007 MECHANICAL DETAILS
MG - 008 MECHANICAL SITE PLAN
16-MH-011 MECHANICAL REMODEL PLAN - BUILDING 16
020-MH-011 MECHANICAL REMODEL PLAN - BUILDING 20
141-MH-0B1 MECHANICAL REMODEL PLAN - BUILDING 141 BASEMENT
141-MH-011 MECHANICAL REMODEL PLAN - BUILDING 141 FLOOR 1
141-MH-021 MECHANICAL REMODEL PLAN - BUILDING 141 FLOOR 2
141-MH-031 MECHANICAL REMODEL PLAN - BUILDING 141 FLOOR 3
141-MH-100 MECHANICAL REMODEL ENLARGED PLANS - BUILDING 141
141-MH-101 MECHANICAL REMODEL ENLARGED PLANS - BUILDING 141
154-MH-0B1 MECHANICAL REMODEL PLAN - BUILDING 154 - BASEMENT
154-MH-011 MECHANICAL REMODEL PLAN - BUILDING 154 - FLOOR 1
154-MH-021 MECHANICAL REMODEL PLAN - BUILDING 154 - FLOOR 2
154-MH-031 MECHANICAL REMODEL PLAN - BUILDING 154 - FLOOR 3
154-MH-041 MECHANICAL REMODEL PLAN - BUILDING 154 - FLOOR 4
154-MH-100 MECHANICAL REMODEL ENLARGED PLANS - BUILDING 154
154-MH-101 MECHANICAL REMODEL ENLARGED PLANS - BUILDING 154
154-MH-102 MECHANICAL REMODEL ENLARGED PLANS - BUILDING 154
154-MH-103 MECHANICAL REMODEL ENLARGED PLANS - BUILDING 154
154-MH-104 MECHANICAL REMODEL ENLARGED PLANS - BUILDING 154
154-MH-105 MECHANICAL REMODEL ENLARGED PLANS - BUILDING 154
154-MH-400 BUILDING 154 DATA ROOM VENTILATION SECTIONS
154A-MH-0B1 MECHANICAL REMODEL PLAN - BUILDING 154A - BASEMENT
154A-MH-011 MECHANICAL REMODEL PLAN - BUILDING 154A - FLOOR 1
154A-MH-021 MECHANICAL REMODEL PLAN - BUILDING 154A - ROOF
154A-MH-100 MECHANICAL REMODEL ENLARGED PLAN - BUILDING 154A
169-MH-011 MECHANICAL REMODEL PLAN - BUILDING 169 - FLOOR 1
169-MH-021 MECHANICAL REMODEL PLAN - BUILDING 169 - ROOF
169-MH-100 MECHANICAL REMODEL ENLARGED PLANS - BUILDING 169
170-MH-011 MECHANICAL REMODEL PLAN - BUILDING 170
SHEET NO. SHEET NAME
00-GI-000.2 COVER AND PROJECT GENERAL INFORMATION VOLUME 2
00-GI-001 INDEX OF DRAWINGS
GENERAL
SHEET NO. SHEET NAME
141-SF-100 BUILDING 141 STRUCTURAL FRAMING
154-SF-100 BUILDING 154 STRUCTURAL FRAMING
154A-SF-100 BUIILDING 154A STRUCTURAL FRAMING
STRUCTURAL
APPLICABLE CODES AND ORDINANCES ENERGY CODE - BUILDING ENVELOPE
2021 NFPA 101, LIFE SAFETY CODE
2022 NFPA 13, STANDARD FOR THE INSTALL ACTION OF SPRINKLER SYSTEMS
2020 NFPA 25, STANDARD FOR THE INSPECTION, TESTING, AND MAINTENANCE OF WATER-BASED FIRE PROTECTION SYSTEMS
2020 NFPA 70, NATIONAL ELECTRICAL CODE
2022 NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE
2020 NFPA 75, STANDARD FOR THE FIRE PROTECTION OF INFORMATION TECHNOLOGY EQUIPMENT
2021 INTERNATIONAL BUILDING CODE (IBC) WHERE NFPA 101 AND ASSOCIATED DOCUMENTS ARE SILENT
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL FIRE CODE (IFC), WHERE NFPA STANDARDS AND CODES ARE SILENT
2021 INTERNATIONAL MECHANICAL CODE (IMC)
2021 INTERNATIONAL FUEL GAS CODE (IFGC)
2021 UNIFORM PLUMBING CODE
2009 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES (ICC/ANSI 117.1)
PER 2018 IECC TABLE C402.2:
INSULATION ENTIRELY ABOVE DECKROOFS
METAL FRAMEDWALLS, ABOVE GRADE
BELOW- GRADE WALLWALLS, BELOW GRADE
UNHEATED SLABSSLAB- ON- GRADE FLOORS
SWINGING
OPAQUE DOORS
REQUIRED PROVIDED
ROLL- UP OR SLIDING
MONTANA- CLIMATE ZONE XX
R-30ci
R-13 + R-7.5ci
R-7.5ci
R-10 FOR 24" BELOW
U-0.37
R-4.75
R-30ci (MIN.)
R-22 + R-7.5ci
R-7.5ci
R-15 TO T.O. FOUNDATION
U-0.37
R-4.75
BUILDING ELEMENT
FIXED FENESTRATION
OPERABLE FENESTRATION
ENTRANCE DOORS
U-0.36; SHGC-0.40
U-0.43; SHGC-0.40
U-0.77; SHGC-0.40
U-0.33 MIN; GLAZING SHGC 0.27 MIN
N/A
U-0.33 MIN;GLAZING SHGC 0.27 MIN
2018 INTERNATIONAL ENERGY CODE SUMMARIES AND REFERENCE SECTIONS BELOW ARE PROVIDED FOR CONVENIENCE ONLY . IT IS THE CONTRACTORS RESPONSIBILITY TO UNDERSTAND AND MEET THE REQUIREMENTS OF THE 2018 INTERNATIONAL ENERGY CODE
C402.4 AIR LEAKAGE (MANDATORY)
THE THERMAL ENVELOPE OF BUILDINGS SHALL COMPLY WITH SECTIONS C402.4.1 THROUGH C402.4.8
C402.4.1 AIR BARRIERS
A CONTINUOUS AIR BARRIER SHALL BE PROVIDED THROUGHOUT THE BUILDING THERMAL ENVELOPE.
C402.4.1.1 AIR BARRIER CONSTRUCTION
1. THE AIR BARRIER SHALL BE CONTINUOUS FOR ALL ASSEMBLIES THAT ARE THE THERMAL ENVELOP OF THE BUILDING AND
ACROSS THE JOINTS AND ASSEMBLIES.
2.AIR BARRIER JOINTS AND SEAMS SHALL BE SEALED, INCLUDING SEALING TRANSITIONS IN PLACES AND CHANGES IN
MATERIALS.
3. RECESSED LIGHTING FIXTURES AND OTHER SIMILAR INSTALLED OBJECTS WHICH PENETRATE THE AIR BARRIER SHALL
COMPLY WITH SECTION C402.4.8
EXCEPTION: BUILDINGS THAT COMPLY WITH SECTION C402.4.1.2.3 ARE NOT REQUIRED TO COMPLY WITH ITEMS 1 AND 3
C402.4.1.2.3 BUILDING TEST
THE COMPLETED BUILDING SHALL BE TESTED AND THE AIR LEAKAGE RATE OF THE BUILDING ENVELOPE SHALL NOT EXCEED 0.40 cfm/ft² AT A PRESSURE DIFFERENTIAL OF 0.3 INCHES WATER GAUGE (2.0l/s*m² AT 75 Pa) IN ACCORDANCE WITH ASTM E779 OR AN
EQUIVALENT METHOD APPROVED BY THE CODE OFFICIAL.
C402.4.2 AIR BARRIER PENETRATIONS
A CONTINUOUS AIR BARRIER SHALL BE PROVIDED THROUGHOUT THE BUILDING THERMAL ENVELOPE.
ACCESSIBILITY
VA BARRIER FREE DESIGN STANDARD, PAGE 18-13
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)
SECTION 1103 SCOPING REQUIREMENTS - 1103.1 WHERE REQUIRED.
SITES, BUILDINGS, STRUCTURES, FACILITIES, ELEMENTS AND SPACES, TEMPORARY OR PERMANENT, SHALL BE
ACCESSIBLE TO PERSONS WITH PHYSICAL DISABILITIES.
EXCEPTIONS:
1103.2.3 EMPLOYEE WORK AREAS. SPACES AND ELEMENTS WITHIN EMPLOYEE WORK AREAS SHALL ONLY BE
REQUIRED TO
COMPLY WITH SECTION 907.5.2.3.2, 1007, AND 1104.3.1 AND SHALL BE DESIGNED AND CONSTRUCTION SO THAT
INDIVIDUALS
WITH DISABILITIES CAN APPROACH, ENTER, AND EXIT THE WORK AREAS.
1103.2.8 LIMITED ACCESS SPACES. NONOCCUPIABLE SPACES ACCESSED ONLY BY LADDERS, CATWALKS, CRAWLSPACES, FREIGHT ELEVATORS OR VERY NARROW PASSAGEWAYS ARE NOT REQUIRED TO BE ACCESSIBLE.
1103.2.9 EQUIPMENT SPACES. SPACES FREQUENTED ONLY BY PERSONNEL FOR MAINTENANCE, REPAIR OR
MONITORING OF
EQUIPMENT ARE NOT REQUIRED TO BE ACCESSIBLE.
2203.2.15 WALK IN COOLERS AND FREEZERS. WALK IN COOLERS AND FREEZERS INTENDED FOR EMPLOYEE USE
ONLY ARE NOT REQUIRED TO BE ACCESSIBLE.
SECTION 1104 ACCESSIBLE ROUTES - 1104.5 LOCATION.
ACCESSIBLE ROUTES SHALL COINCIDE WITH OR BE LOCATED IN THE SAME AREA AS A GENERAL CIRCULATION PATH.
WHERE
THE CIRCULATION PATH IS INTERIOR, THE ACCESSIBLE ROUTE SHALL ALSO BE INTERIOR. WHERE ONLY ONE
ACCESSIBLE
ROUTE IS PROVIDED, THE ACCESSIBLE ROUTE SHALL NOT PASS THROUGH KITCHENS, STORAGE ROOMS, RESTROOMS, CLOSETS, OR SIMILAR SPACES.
1105.1 PUBLIC ENTRANCES.
IN ADDITION TO ACCESSIBLE ENTRANCES REQUIRED BY SECTION 1105.1.1 THROUGH 1105.1.6, AT LEAST 60 PERCENT
OF ALL
PUBLIC ENTRANCES SHALL BE ACCESSIBLE.
EXCEPTIONS: LOADING AND SERVICE ENTRANCES THAT ARE NOT THE ONLY ENTRANCE TO A TENANT SPACE.
1105.1.6 TENANT SPACES.
AT LEAST ONE ACCESSIBLE ENTRANCE SHALL BE PROVIDED TO EACH TENANT.
SECTION 1106 PARKING AND PASSENGER LOADING FACILITIES - 1106.1 REQUIRED.
WHERE PARKING IS PROVIDED, ACCESSIBLE PARKING SPACES SHALL BE PROVIDED IN COMPLIANCE WITH TABLE
1106.1, EXCEPT AS REQUIRED BY SECTION 1106.2 THROUGH 1106.4.
1106.6 LOCATION.
ACCESSIBLE PARKING SPACES SHALL BE LOCATED ON THE SHORTEST ACCESSIBLE ROUTE OF TRAVEL FROM
ADJACENT
PARKING TO AN ACCESSIBLE BUILDING ENTRANCE.
SECTION 1108 SPECIAL OCCUPANCIES - 1108.2 ASSEMBLY AREA SEATING.
A BUILDING, ROOM OR SPACE USED FOR ASSEMBLY PURPOSED WITH FIXED SEATING SHALL COMPLY WITH SECTION 1108.2.1 THROUGH 1108.2.5. PER 1108.2.2.1 GENERAL SEATING. WHEELCHAIR SPACES SHALL BE PROVIDED IN ACCORDANCE
WITH TABLE 1108.2.2.1.
SECTION 1110 SIGNAGE - 1110.1 SIGNS.
REQUIRED ACCESSIBLE ELEMENTS SHALL BE IDENTIFIED BY THE INTERNATIONAL SYMBOL OF ACCESSIBILITY AT THE FOLLOWING LOCATIONS: ACCESSIBLE PARKING SPACES, PASSENGER LOADING ZONES, ROOMS, ENTRANCES, CHECK-OUT AISLES, FAMILY OR ASSISTED-USE TOILET AND BATHING ROOMS, AREAS OF REFUGE, AND EXTERIOR AREAS. IN ADDITIONAL 1110.2 DIRECTIONAL SIGNAGE. DIRECTIONAL SIGNAGE INDICATING THE ROUTE TO THE NEAREST LIKE ACCESSIBLE ELEMENT SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS STATED IN 1110.2 AND
INCLUDE THE INTERNATIONAL SYMBOL OF ACCESSIBILITY.
1110.4 VARIABLE MESSAGE SIGNS - TRANSPORTATION FACILITIES.
WHERE PROVIDED IN TRANSPORTATION FACILITIES, VARIABLE MESSAGE SIGNS CONVEYING TRANSPORTATION-
RELATED INFORMATION SHALL COMPLY WITH SECTION 1110.4
1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE HIMSELF/ HERSELF WITH THE
SCOPE OF WORK.
2. THE DEMOLITION NOTES PROVIDE A GENERAL DESCRIPTION OF THE ITEMS AND AREAS
REQUIRING REMOVAL. THE CONTRACTOR SHALL FIELD VERIFY ACTUAL QUANTITIES AND
LOCATIONS OF ALL INDICATED ITEMS AS NECESSARY TO COMPLETE THE SCOPE OF WORK
IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
3. COORDINATE WITH OWNER FOR ANY EQUIPMENT TO BE SALVAGED. UNLESS SPECIFICALLY
SCHEDULED FOR REUSE, DEMOLISHED MATERIALS SHALL BECOME THE POSSESSION OF
THE CONTRACTOR AND SHALL BE IMMEDIATELY REMOVED FROM THE SITE.
4. REMOVE MATERIALS FROM SITE AND DISPOSE OF IN A LEGAL AND ENVIRONMENT
FRIENDLY MANNER PER VA GUIDELINES AT NO ADDITIONAL EXPENSE TO OWNER
5. DEBRIS FROM THE DEMOLITION SHALL NOT BE ALLOWED TO ACCUMULATE WITHIN THE
BUILDING OR ON THE SITE. ALL DEBRIS IS TO BE REMOVED, AT MINIMUM ONCE PER SHIFT
DURING THE DESIGNATED TIMES.
6. REMOVE FROM SITE ANY CONTAMINATED, VERMIN INFESTED, OR DANGEROUS MATERIALS
ENCOUNTERED AND DISPOSE OF BY SAFE MEANS SO AS NOT TO ENDANGER HEALTH OF
WORKERS AND PUBLIC.
7. BURNING OF MATERIALS ON SITE IS NOT PERMITTED.
8. CLEAN-UP: MUST MEET GOVERNING DUST CONTROL CODES AND STANDARDS.
9. NOTIFY AFFECTED UTILITY COMPANIES BEFORE STARTING WORK AND COMPLY WITH THEIR
REQUIREMENTS.
10. PREVENT MOVEMENT OR SETTLEMENT OF ADJACENT STRUCTURES. PROVIDE BRACING
AND SHORING.
11. CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE INCONVENIENCE TO ANY ADJACENT
OCCUPIED BUILDING OR SITE AS POSSIBLE AND WITH MINIMUM INTERFERENCE TO PUBLIC
OR PRIVATE ACCESSES. MAINTAIN PROTECTED EGRESS AND ACCESS AT ALL TIMES.
12. CONTRACTOR SHALL PROVIDE TEMPORARY DUST AND CONSTRUCTION SEPARATION
WALLS AS REQUIRED TO SHIELD THE PUBLIC FROM NOISE, DUST, WEATHER, AND OTHER
HAZARDS THAT MAY BE EXPOSED AS A RESULT OF THE DEMOLITION WORK.
SEE SPECIFICATION SECTION 01 35 26 FOR DETAILS AND DEMOLITION DRAWINGS FOR
LOCATIONS.
13. PERFORM CUTTING OF EXISTING CONCRETE AND MASONRY WITH SAWS AND CORE DRILLS.
DO NOT USE JACK-HAMMERS EXCEPT WHERE PERMITTED AND APPROVED BY COR.
14. BREAK CONCRETE AND MASONRY INTO SECTIONS LESS THAN 3 FEET IN ANY DIMENSION.
15. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO INSURE EXISTING
STRUCTURAL ELEMENTS REMAIN UNDAMAGED THROUGHOUT CONSTRUCTION, UNLESS
SPECIFICALLY NOTED ON DEMOLITION PLAN. IT IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR TO IDENTIFY AND PROVIDE ANY SHORING, BRACING, OR TEMPORARY
STRUCTURE, AND TO COORDINATE WITH STRUCTURAL ENGINEER AS REQUIRED.
16. ALL PUBLIC UTILITIES ARE TO REMAIN IN OPERATION THROUGHOUT CONSTRUCTION.
CONTRACTOR TO COORDINATE ANY TEMPORARY SERVICES REQUIRED TO MAINTAIN
BUSINESS OPERATIONS WITH THE COR.
17. SEE ENGINEERING DRAWINGS FOR DUCTWORK, DIFFUSER, PLENUM BOX, ETC. DEMOLITION
AND/OR PROTECTION. COORDINATE WITH MECHANICAL ENGINEER. ANY EARTHWORK
REQUIRES A THIRD PARTY LOCATE.
18. FIRE SAFETY MUST BE MAINTAINED FOR ALL PERSONNEL WORKING ON THE FLOOR. ALL
FIRE STAIRS, ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND OPERABLE AT ALL
TIMES. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT THIS
EQUIPMENT. IMMEDIATELY NOTIFY COR, BUILDING SECURITY AND BUILDING MANAGER OF
DAMAGED OR DISABLED SYSTEMS AND REPAIR OR REPLACE DAMAGED SYSTEMS
IMMEDIATELY AS DIRECTED AND TO THE SATISFACTION OF THE COR. RELOCATION OF
SMOKE DETECTORS, PUBLIC ADDRESS SPEAKERS AND FIRE ALARM EQUIPMENT,
NECESSITATED BY NEW CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST PRIORITY,
AND PER THE PLANS.
19. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE POINT IN
QUESTION WITH THE COR BEFORE PROCEEDING. IMMEDIATELY STOP WORK IF
HAZARDOUS MATERIALS ARE FOUND AND CONTACT THE COR.
20. SEE TELECOMMUNICATION DRAWINGS FOR REMOVAL OF ANY EQUIPMENT, CABLING
SWITCHES, AND CONDUIT PERTAINING TO DATA/COMMUNICATIONS AND TELEPHONE.
VERIFY WITH TELEPHONE COMPANIES, SERVICE OWNER OR TENANT
DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO PREVENT NEW
CONSTRUCTION DELAYS.
21. PROVIDE FOR FIRE PROOFING REPAIR AS REQUIRED, TO THE ORIGINAL RATING WHERE
CONSTRUCTION TRADES REMOVE EXISTING FIRE PROOFING. REPAIR ANY DAMAGE OR
PENETRATIONS IN RATED ASSEMBLIES TO CONFORM TO THEIR ORIGINAL LISTING
REQUIREMENTS AND TO MAINTAIN FIRE PROTECTION AND SEPARATION AS ORIGINALLY
DESIGNED.
22. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE LEFT IN
CLEAN, ORDERLY CONDITION. ALL DEBRIS AND MISCELLANEOUS MATERIAL SHALL BE
REMOVED.
23. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY AND ALL
DAMAGE CAUSED BY OR IN CONJUNCTION WITH THE "WORK". REFINISH TO MATCH
EXISTING ADJACENT FINISH, OR AS NOTED HEREIN.
24. FOR AREAS NOT IN DEMOLITION SCOPE OF WORK, PROTECT AS REQUIRED, ALL SURFACES, EQUIPMENT, FIXTURES AND HARDWARE DURING DEMOLITION AND/OR CONSTRUCTION.
25. PRIOR TO DEMOLITION, INVESTIGATE WALLS FOR CONCEALED PIPING AND/OR OTHER
UTILITIES OR SERVICES AND INFORM COR OF ANY CONDITION NOT DOCUMENTED IN
CONTRACT DRAWINGS. DEMO DESIGNATED WALL BASES, WALL FRAMING, BATT
INSULATION AND GYPSUM BOARD. DEMO CONDUITS AND RECEPTACLES, REFERENCE
ELECTRICAL DEMO PLAN FOR ADDITIONAL INFORMATION.
26. ALL EXISTING DIRECTIONAL SIGNAGE TO BE REMOVED UNLESS NOTED OTHERWISE.
27. WHERE NOTED, REMOVE FLOORING DOWN TO TOP OF CONC. SLAB, INCLUDING
ADHESIVES, TRANSITION STRIPS, AND OTHER ASSOCIATED ELEMENTS, TYP., UNLESS
NOTED OTHERWISE. PREPARE REMAINING SURFACES TO RECEIVE NEW FINISHES.
DEMOLITION NOTES
HAZARDOUS MATERIALS NOTES
1. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION. ALL INFORMATION REGARDING EXISTING CONDITIONS IS BASED UPON
OWNER-SUPPLIED DOCUMENTS AND MAY NOT PRECISELY REFLECT FIELD CONDITIONS.
2. PROVIDE ALL BACKING FOR MILLWORK, GRAB BARS, AND ANY AND ALL WALL MOUNTED
EQUIPMENT OR ACCESSORIES; COORDINATE LOCATIONS.
3. ALL DIMENSIONS ARE FROM STRUCTURAL OR UNFINISHED FACE OF STUD, UNLESS
OTHERWISE NOTED.
4. PROVIDE A SMOOTH AND LEVEL FINISH FLOOR, TYP. PATCH AND REPAIR ALL
INCONSISTENCIES IN FLOOR ELEVATIONS.
5. PATCH AND REPAIR ANY / ALL WALL SURFACES AS REQUIRED TO PROVIDE SUITABLE
SUBSTRATE FOR FINISHES.
6. REFER TO DOOR AND FRAME SCHEDULE FOR DOORS REQUIRING ADA ACCESS CONTROL.
7. PROVIDE ACOUSTICAL SEALANT AROUND WALL EDGES, TOP AND BOTTOM, AND
PENETRATIONS, AND INSTALL PUTTY PADS AROUND ELECTRICAL BOXES WHERE
PARTITION CONTAINS ACOUSTICAL INSULATION.
8. ALL TELECOMMUNICATION ROOMS ARE TO HAVE EXPOSED STRUCTURE UNLESS NOTED
OTHERWISE, NO CEILINGS SPECIFIED.
FLOOR PLAN NOTES
REFLECTED CEILING PLAN NOTES
1. REFER TO ELECTRICAL SHEETS FOR FIXTURE TYPES, SWITCHING, AND SPECIAL SYSTEMS.
2. REFER TO MECHANICAL SHEETS FOR DIFFUSER AND DUCTING LAYOUTS.
3. REFERENCE EXTERIOR FINISH LEGEND FOR EXTERIOR PAINT COLORS; REFERENCE FINISH
SCHEDULE FOR INTERIOR PAINT COLORS AND FINISH.
1. THE CONTRACTOR SHALL REMOVE ALL HAZARDOUS MATERIALS AS NECESSARY TO
FULFILL THE DEMOLITION AND CONSTRUCTION REQUIREMENTS OF THIS PROJECT.
2. THE CONTRACTOR SHALL PREPARE AN ABATEMENT PLAN IN ACCORDANCE WITH THE
REQUIREMENTS OF THE MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY. THIS
PLAN MUST BE COORDINATED WITH THE FINDINGS IN THE HAZARDOUS MATERIALS
SURVEY.
1. PRESSURE INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE PRESSURE (VERIFY
TWICE A DAY IN WRITING AND SUBMIT TO COR) - IF NOT, VERIFY ALL OPENINGS (SUCH
AS DOORS) ARE CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-FILTER. METER
MUST READ CONTINUOUSLY.
2. CONTRACTOR SHALL DEVELOP A DAILY CHECK LIST FOR CONSTRUCTION
OVERSIGHT TUNED TO THE QUALITY ASSURANCE PLAN WHICH CAPTURED MOST
ERRORS. THIS MAY EVOLVE TO A LIVING DOCUMENT PENDING ISSUES
ENCOUNTERED.
3. REFER TO SPEC SECTION 01 35 26 AND DEMOLITION DRAWINGS FOR ICRA
REQUIREMENTS BASED ON DURATION / EXTENT OF WORK AND RISK FACTOR
INFECTION CONTROL NOTES
U.S. Department of Veterans Affairs
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/2
G e n e ra l In fo r2
.r v t
/2
/2
:2
:4
P
M
00-GI-002
PROJECT CODE SUMMARY /
PROJECT GENERAL NOTESGDM
1000 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GODDIN, PE
A&E DESIGN
124 NORTH 29TH STREET, #100
BILLINGS, MONTANA 59101
406.248.2633
T. MARCELLO PIERROTTET, AIA
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
GEN INFO
Project Director
JPRTMP05/20/2022
100% CONSTRUCTION
DOCUMENTS
ARCHITECTA/E:
NOTE:
1. ALL WORK TO BE CONDUCTED IN DESIGNATED CLASS IV AND V AREAS AS INDICATED IN DRAWINGS, IS TO BE…