Att 1.5 - Fort Harrison EHRM - Drawings Vol 1 Part 5 of 5.pdf
PDF 6 MB Posted
- Solicitation number
- 36C77623B0001
About this file
This solicitation is for infrastructure upgrades at the Fort Harrison VA Medical Center in Montana. The contractor will demolish existing structures, renovate building spaces, upgrade mechanical, electrical and HVAC systems, install new plumbing and data infrastructure, conduct asbestos abatement, and perform other site work. Buildings to be upgraded include 141, 154A, 154B, 169, 154, 170, 171, 16, 20. Scope includes architectural, structural, electrical, HVAC, plumbing and data communication work. The contractor must provide all labor, materials and equipment to complete the project in accordance with specifications and drawings.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFICE
ADA TOILET
CORRIDOR
2C-1
CORRIDOR
2C-4
SHARED OFFICE
SHARED OFFICE
HSKP
OFFICE
OFFICE
220-B
OFFICE
220-A
14"Ø S/A
26/14" R/A
3/4" HWR/S
12/6 E/A
W UP/DN
V UP
R/A
S9
14X26 R/A DN
HW
V
CW
FSD
CGS/R UP
11 11 11
OFFICE
OFFICE
OFFICE
OFFICE
ELEVATOR
124B
CORRIDOR
3C-1
CORRIDOR
12"Ø S/A
3/4" HWS/R
W UP/DN
V UP
S9
R/A
R/A DN
FSD
FIRE SPRINKLER
RISER AND VALVES
OFFICE
11 11
CGS/R DN
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:1
A
M
141-MD-301
MECHANICAL DEMOLITION
ENLARGED PLANS - BUILDING 141RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/4" = 1'-0"1
MECHANICAL DEMOLITION PLAN - BUILDING 141 FLOOR 2 ENLARGED
1/4" = 1'-0"2
MECHANICAL DEMOLITION PLAN - BUILDING 141 FLOOR 3 ENLARGED
PLAN
NORTH
PLAN
NORTH
SHEET NOTES
APPROXIMATE OUTLINE OF NEW TR AREA. SEE REMODEL SHEETS FOR ALL
DISCIPLINES FOR ADDITIONAL INFORMATION.
DEMOLISH DUCTWORK AND DIFFUSERS AS INDICATED. COORDINATE WITH
REMODEL WORK.
RELOCATE VAV. SEE REMODEL SHEETS FOR LOCATION.
DEMOLISH HEATING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.
DEMOLISH AIR CONDITIONING UNIT AND ALL ASSOCIATED PIPING.
DEMOLISH AIR CONDITIONING UNIT CONTROLLER AND ALL ASSOCIATED WIRING.
DEMOLISH 3/4" CONDENSATE PIPING TO DRAIN.
DEMOLISH 2" CGS/R PIPING. PATCH AND SEAL WALL PENETRATIONS.
DEMOLISH VAV SENSOR AND ALL ASSOCIATED WIRING.
DEMOLISH E/A DUCT BACK TO MAIN AND CAP.
SUPPLY AIR DUCTWORK AND VAVS IN THIS AREA NOT SHOWN FOR CLARITY.
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
KEYPLAN - BUILDING 141 FLOOR 2
KEYPLAN - BUILDING 141 FLOOR 3
AREA OF WORK
AREA OF WORK
PLAN
NORTH
PLAN
NORTH
Revisions: Date:
FOR ENLARGED PLAN SEE -
154-MD-300
CRAWL SPACE
BSMT
MECHANICAL
B-100
CRAWL SPACE
B-11C
Room
B-022
PHARMACY
CACHE
B04
MED ADMIN
STORAGE
BSMT
Room
BSMT
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:1
A
M
154-MD-0B1
MECHANICAL DEMOLITION PLAN -
BUILDING 154 - BASEMENTRSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/16" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 BASEMENT
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
PLAN
NORTH
115-5
CORRIDOR
C101
CORRIDOR
OFFICE
115-3A
COPIER
114A
CORRIDOR
C102
OFFICE
114B
OFFICE
EXAM
MECHANICAL
MECHANICAL
CORRIDOR
C
CLEAN
FOR ENLARGED PLAN SEE -
154-MD-301
154-MD-301
FOR ENLARGED PLAN SEE -
154-MD-302
154-MD-302
FOR ENLARGED PLAN SEE -
154-MD-301
TREATMENT
102G
TREATMENT
102F
SOILED
STORAGE
CORR.
C
STAIR
102J
CLEAN
STORAGE
102I
CANTEEN
LAB
LOBBY
C107
LOBBY
C107
TRAINING
CENTER
S110
MECHANICAL
UTILITY
STORAGE
COMMON AREA
PATIENT ROOM
OFFICE
COMMON AREA
(WAITING)
115-7
VEST
CORRIDOR
C105
LINEN SERVICE
LOBBY
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:1
A
M
154-MD-011
MECHANICAL DEMOLITION PLAN -
BUILDING 154 - FLOOR 1RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/16" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
PLAN
12 12
239B
EXAM
203L
MOVE OFFICE
239C
FOR ENLARGED PLAN SEE - 1
154-MD-303
FOR ENLARGED PLAN SEE -
154-MD-303
FOR ENLARGED PLAN SEE -
154-MD-303
154-MD-303
EXAM
204L
CORRIDOR
C237
ORTHO
OPERATING
ROOM
217A
MECHANICAL
UTILITY
CYSTOSCOPY
PROCEDURE
CORRIDOR
C201
ENDOSCOPY
PROCEDURE
CORE LAB
211L
MICROBIOLOGY
LAB
210L
ANATOMIC
PATHOLOGY
209L
STAFF LOUNGE
224L
MORGUE
232L
PAD STORAGE
STERILE
ASSEMBLY
ROOM
OPERATING
ROOM
217B
EQUIPMENT
STORAGE
218A
ANAESTHESIA
WORKROOM
PROCEDURE
271A
STRG
273A
FUTURE
MECHANICAL
CORRIDOR
C210
EQUIP.
CORR
C204D
CORR
C204B
CORRIDOR
C201
OFFICE
154-CUAC-1
154-CUAC-2
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:1
A
M
154-MD-021
MECHANICAL DEMOLITION PLAN -
BUILDING 154 - FLOOR 2RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/16" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 2
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
SHEET NOTES
OUTDOOR CONDENSER FOR BASEMENT CRAC UNIT TO REMAIN.
DEMOLISH OUTDOOR CONDENSER FOR BASEMENT CRAC UNIT.
PIPING FOR CRAC UNITS TO REMAIN. EACH CONDENSER IS CONNECTED TO TWO
SETS OF REFRIGERANT SUPPLY AND RETURN PIPING. SHOWN AS SINGLE LINE FOR
CLARITY.
DEMOLISH PIPING BACK TO CHASE. PIPING IN CHASE TO BE CAPPED, LABELED, AND
ABANDONED IN PLACE.
PLAN
TRAINING
PATIENT ROOM
SUPPLY
FOR ENLARGED PLAN SEE -
154-MD-304
154-MD-304
FOR ENLARGED PLAN SEE -
154-MD-305
FOR ENLARGED PLAN SEE -
154-MD-305
OFFICE
CORRIDOR
C
OFFICE
OFFICE
EXISTING
WAITING
TOILET
NURSE'S
STATION
SAME DAY
SURGERY
NURSE
315J
MECHANICAL
ROOM
OFFICE
PATIENT ROOM
PATIENT ROOM
PATIENT ROOM
CORRIDOR
INTENSIVE CARE
UNIT
CHEMO
CONSULT/OFFICE
307D
CORRIDOR
C
CORRIDOR
C
MED ROOM
SDS INTAKE
AREA
OFFICE
MEN TOILET
CORRIDOR
C
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:2
A
M
154-MD-031
MECHANICAL DEMOLITION PLAN -
BUILDING 154 - FLOOR 3RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/16" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 3
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
PLAN
PATIENT ROOM
BATH
421A
PATIENT ROOM
STORAGE
422B CORRIDOR
C403
DAY ROOM
FOR ENLARGED PLAN SEE -
154-MD-304
154-MD-304
CORRIDOR
C402
OFFICE
OFFICE
438B
OFFICE
443C
FOR ENLARGED PLAN SEE -
154-MD-305
NURSE'S
STATION
OFFICE
CORRIDOR
C402A
PATIENT ROOM
PATIENT ROOM
BREAK ROOM
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:2
A
M
154-MD-041
MECHANICAL DEMOLITION PLAN -
BUILDING 154 - FLOOR 4RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/16" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 4
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
PLAN
3 3
CORRIDOR
B-09C
CORRIDOR
B-09C
OIT IMAGING
B-13
CRAWL SPACE
B-11C
CRAWL SPACE
BSMT
CRAWL SPACE
B-11C
CORRIDOR
B-12
3/4" HW
1-1/2" CW
1-1/2" CW
3/4" HW
1/2" HWC
2" W DRAIN
11 MECHANICAL
B-11
STAIR
30X12 44X16 38X16 30X12
154-ECO-1 154-ECO-2
AREA OF WORK
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:2
A
M
154-MD-300
MECHANICAL DEMOLITION
ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/4" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 BASEMENT ENLARGED
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
SHEET NOTES
DEMOLISH DOWNFLOW CRAC UNITS AND ASSOCIATED REFRIGERATION PIPING.
DEMOLISH CW AND CD PIPING BACK TO MAIN AND CAP.
RELOCATE UPFLOW CRAC UNITS, SEE REMODEL PLAN FOR LOCATION. DEMOLISH
ASSOCIATED DUCTWORK, REFRIGERATION PIPING, AND CW AND CD PIPING.
PRE-ECONOMIZER PUMP BOXES AND PIPING TO ROOF TO REMAIN.
DEMOLISH REFRIGERANT PIPING SERVING CRAC UNITS TO BE RELOCATED. EACH UNIT
HAS TWO SETS OF SUPPLY AND RETURN PIPING, ONLY ONE SET SHOWN FOR CLARITY.
REFRIGERANT PIPING FROM ROOF CONDENSING UNIT TO PUMPED ECONOMIZERS TO
REMAIN. EACH UNIT HAS TWO SETS OF SUPPLY AND RETURN PIPING, ONLY ONE SET
SHOWN FOR CLARITY.
DEMOLISH ALL SUPPLY AND RETURN DUCT, GRILLES, AND DIFFUSERS.
DEMOLISH PRE-ECONOMIZER PUMP BOXES AND ASSOCIATED REFRIGERATION PIPING.
DEMOLISH REFRIGERANT PIPING TO CHASE. CAP PIPING AT CHASE, LABEL, AND
ABANDON IN PLACE.
DEMOLISH CW FOR HUMIDIFIER BACK TO BACKFLOW PREVENTER. BACKFLOW
PREVENTER AND UPSTREAM PIPING TO REMAIN.
DEMOLISH CD BACK TO 2" DRAIN IN WALL. RETAIN 2" DRAIN IN PLACE FOR USE IN
REMODEL WORK.
DEMOLISH WALL CONTROLLER FOR CRAC UNITS.
PLAN
NORTH
EXAM
MECHANICAL
CORRIDOR
C
S
12"Ø R/A
10"Ø S/A
7"Ø S/A
12" LPS
1" LPS
8"Ø E/A
7"Ø E/A
9"Ø E/A UP
TO ROOF
VAV
3/4" HGS/R3/4" HGS/R
FLOOR SINK
EXAM
MECHANICAL
CORRIDOR
C
2" V
1" HW
1" CW
1" HW
1" HW
CORRIDOR
C
FLOOR SINK
2" V
ROOM 109 AREA OF WORK
ROOM 102H AREA OF WORK
TREATMENT
102G
CORR.
C
SOILED
STORAGE
CLEAN
STORAGE
102I
E/A
E/A
S/A
S/A
S/A
VAV
S/A
E/A UP
TO ROOF
EXHAUST FAN
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:2
A
M
154-MD-301
MECHANICAL DEMOLITION
ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/2" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1
ROOM 109 ENLARGED HVAC
1/2" = 1'-0"3
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1
ROOM 109 ENLARGED PLUMBING
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
SHEET NOTES
DEMOLISH DUCTWORK AND DIFFUSERS BACK TO MAIN AND CAP. COORDINATE
WITH REMODEL WORK.
DEMOLISH HEATING PIPING BACK TO MAIN AND CAP.
DEMOLISH HEATING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.
DEMOLISH SINK AND ALL PIPING BACK TO MAIN AND CAP.
DEMOLISH PLUMBING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.
DEMOLISH SENSOR FOR VAV.
DEMOLISH DIFFUSER AND FLEX DUCT.
DEMOLISH EXHAUST GRILLE.
PLAN
NORTH
PLAN
NORTH
1/2" = 1'-0"2
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1
ROOM 102H ENLARGED
PLAN
NORTH
COPIER
114A
OFFICE
115-3A
CORRIDOR
C102
OFFICE
115-5
CORRIDOR
CORRIDOR
C101
HWS/R
S/A
S/A
S/A
S/A
E/A E/A
S4
S/A S/A
E/A UP
30 X 8 R/A DN
30 X 8 R/A DN
S4
OFFICE
115-5
OFFICE
115-3A
COPIER
114A
CORRIDOR
C102
2-1/2" CW
1-1/2" HW
3/4" CW W
CW
AREA OF WORK
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:2
A
M
154-MD-302
MECHANICAL DEMOLITION
ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/2" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1 ROOM 115-3 HVAC ENLARGED.
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
PLAN
NORTH
SHEET NOTES
DEMOLISH DUCTWORK AND DIFFUSERS BACK TO MAIN AND CAP. COORDINATE
WITH REMODEL WORK.
DEMOLISH PLUMBING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.
DEMOLISH VAV AND DUCTWORK BACK TO MAIN AND CAP. COORDINATE WITH
REMODEL WORK
DEMOLISH SENSOR FOR VAV.
DEMOLISH VAV BOX.
1/2" = 1'-0"2
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1 ROOM 115-3 PLUMBING ENLARGED
PLAN
NORTH
STORAGE
218B
E/A
E/A
S/A
TR
239A
OFFICE
239B
CORRIDOR
C243
E/A
E/A
E/A S/AS/A
S/A
ROOM
E/A
S/A
TR
239A
CORRIDOR
C243
OFFICE
239B
CW
HW
W
CW
CW
HW
CW
HW
V W
CW
W W V H C
FOR WORK IN
THIS AREA, SEE -
154-MD-303
154-MD-303
FOR WORK IN THIS AREA,
SEE - 2
154-MD-303
FOR WORK IN THIS AREA,
SEE - 1
154-MD-303
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:2
A
M
154-MD-303
MECHANICAL DEMOLITION
ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/2" = 1'-0"2
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 2
ROOM 218B ENLARGED
1/2" = 1'-0"3
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 2
ROOM 239 ENLARGED VENTILATION
1/2" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 2
ROOM 272 ENLARGED
1/2" = 1'-0"4
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 2
ROOM 239 ENLARGED PIPING
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
SHEET NOTES
DEMOLISH DUCTWORK AND DIFFUSERS AS INDICATED. COORDINATE WITH
REMODEL WORK.
DEMOLISH DUCTWORK AND DIFFUSERS BACK TO MAIN AND CAP.
DEMOLISH DIFFUSER AND FLEX DUCT.
DEMOLISH EXHAUST GRILLE.
DEMOLISH PLUMBING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.
APPROXIMATE OUTLINE OF NEW TR AREA. SEE REMODEL SHEETS FOR ALL
DISCIPLINES FOR ADDITIONAL INFORMATION.
TRAINING
CORRIDOR
C
E/A
E/A
S/A
R/A
PATIENT ROOM
S/A DIFFUSER
CORRIDOR
C403
S/A DIFFUSER
VAV
E/A GRILLE E/A UP TO EF
SOIL
422A
S/A
E/A
CORRIDOR
C
3" V UP/DN
4" W UP/DN
3" V UP/DN
TO BE RELOCATED.
1-1/2" HW UP/DN
2-1/2" CW UP/DN
TO BE RELOCATED
PATIENT ROOM
TRAINING
CORRIDOR
C
O2
MA
MV
SOIL
422A
CORRIDOR
C403
V UP/DN
W UP/DN
V UP/DN
TO BE RELOCATED
VERIFY SIZE PRIOR
TO DEMOLITION.
HW DN
CW DN
TO BE RELOCATED
VERIFY SIZE PRIOR
TO DEMOLITION.
PATIENT ROOM
CORRIDOR
C404
FOR WORK IN
THIS AREA, SEE -
154-MD-304
154-MD-304
FOR WORK IN THIS AREA,
SEE -
154-MD-304
154-MD-304
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:3
A
M
154-MD-304
MECHANICAL DEMOLITION
ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/2" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 3
ROOM 323 HVAC ENLARGED
1/2" = 1'-0"2
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 4
ROOM 422 HVAC ENLARGED
1/2" = 1'-0"3
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 3
ROOM 323 PLUMBING ENLARGED
1/2" = 1'-0"4
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 4
ROOM 422 PLUMBING ENLARGED
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
SHEET NOTES
DEMOLISH DUCTWORK AND DIFFUSERS BACK TO MAIN AND CAP. COORDINATE
WITH REMODEL WORK.
DEMOLISH DUCTWORK AND FIRE DAMPER IN WALL. COORDINATE WITH REMODEL
WORK.
DEMOLISH HEATING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.
DEMOLISH PLUMBING PIPING BACK TO MAIN AND CAP. COORDINATE WITH
REMODEL WORK.
DEMOLISH PLUMBING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.
TWO SETS OF O2, MEDICAL AIR AND MEDICAL VACUUM PIPING AND OUTLETS IN
HEADWALL TO BE RELOCATED. VERIFY QUANTITY, LAYOUT, AND SIZE OF OUTLETS
AND PIPING PRIOR TO DEMOLITION.
DEMOLISH SENSOR FOR VAV.
DEMOLISH DUCTWORK AS INDICATED.
RELOCATE SINK. SEE REMODEL SHEETS FOR LOCATION.
APPROXIMATE OUTLINE OF NEW TR AREA. SEE REMODEL SHEETS FOR ALL
DISCIPLINES FOR ADDITIONAL INFORMATION.
KEYPLAN BUILDING 154 FLOOR 3
1/64" = 1'-0"6
KEYPLAN BUILDING 154 FLOOR 4
3 3
CONSULT/OFFICE
307D
C.R.
CORRIDOR
C
CORRIDOR
C
E/A
VAV
R/A
S/A
CLEAN SUPPLY
VAV
OFFICE
EXISTING
OFFICE
TOILET
CORRIDOR
C
R/A
E/A R/A
S/A
E/A
OFFICE
443C
OFFICE
438B
OFFICE
BATHROOM
442A
CORRIDOR
C402
FOR WORK IN
THIS AREA, SEE -
154-MD-305
FOR WORK IN
THIS AREA, SEE -
154-MD-305
FOR WORK IN THIS AREA,
SEE - 3
154-MD-305
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:3
A
M
154-MD-305
MECHANICAL DEMOLTION
ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/2" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 3
ROOM 313 ENLARGED
1/2" = 1'-0"2
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 3
ROOM 340 ENLARGED
1/2" = 1'-0"3
MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 4
ROOM 438 ENLARGED
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
SHEET NOTES
DEMOLISH AC UNIT AND ASSOCIATED REFRIGERATION PIPING.
DEMOLISH DIFFUSER AND FLEX DUCT.
DEMOLISH AC UNIT SENSOR AND CONTROLS.
DEMOLISH CONDENSATE DRAIN.
DEMOLISH EXHAUST GRILLE
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
KEY PLAN BUILDING 154 FLOOR 3
KEY PLAN BUILDING 154 FLOOR 4
154A-MD-300
154A-MD-300
Room
B31O
CORRIDOR
B3
OPERATOR'S
BOOTH
B1
MECHANICAL
B15
CORRIDOR
B3
Room
B17
STORAGE
B70
MECH
B13
OFFICE
B31G
DEMARC
B1A
FOR ENLARGED PLAN SEE -
FOR ENLARGED PLAN SEE -
CALL CENTER
B10
CALL CENTER
B18C
OFFICE
B18B
POLICE
B18A
MED STORAGE
B25
CORRIDOR
B3
MECHANICAL
B2
CORRIDOR
B3
ENTRY
B31A
WAITING
B31B
SPEECH
B31E
TELEMED
B31H
WORK ROOM
B31I
THRERAPY
POOL
B31P
OFFICE
B6
OFFICE
B4
CALL CENTER
B10
OFFICE
B7
OFFICE
B5
1 1
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:3
A
M
154A-MD-0B1
MECHANICAL DEMOLITION PLAN -
BUILDING 154A -BASEMENTRSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154A BASEMENT
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
PLAN
NORTH
SHEET NOTES
DEMOLISH HWS/R PIPING BACK TO MAIN AS INDICATED.1
154A-MD-301
RESTROOM
A135
COMMON
CORRIDOR
C-104
OFFICE
A133
RESROOM
A136
HALLWAY
A149
PT LTL
A49A
BLOOD DRAW
A149B
WAITING
A197
HSKP
A147A
CHASE
149AB
FOR ENLARGED PLAN SEE -
OFFICE
OFFICE
151A
OFFICE
OFFICE
151C CORRIDOR
C-106
CORRIDOR
C-106
LOBBY
COMMON
CORRIDOR
C-115
STORAGE
A192
EXAM
A191
EXAM
A188
EXAM
A187
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:3
A
M
154A-MD-011
MECHANICAL DEMOLITION PLAN -
BUILDING 154A - FLOOR 1RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154A FLOOR 1
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
PLAN
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:3
A
M
154A-MD-021
MECHANICAL DEMOLITION PLAN -
BUILDING 154A - ROOFRSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154A ROOF
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
SHEET NOTES
DEMOLISH ROOFTOP CONDENSING UNIT AND ALL PIPING AND APPURTENANCES
FOR SPLIT UNIT SERVING TR B-30. FIELD VERIFY LOCATION AND CONNECTIONS
PRIOR TO DEMOLITION.
PLAN
4" RL UP/DN
OPERATOR'S
BOOTH
B1
MECHANICAL
B2
DEMARC
B1A
Room
B17
20 X 6 S/A
10 X 16 S/A
14 X 12 R/A 14 X 12 R/A
HWS
HWR
COND RETURN
HP STEAM
MP STEAM
HWS
2 2
AHU
S/A
S/A DIFFUSER
S/A DIFFUSER
IMAGING LAB
B30
ELEVATOR
B12
OFFICE
B31D
ENTRY
B31A
CORRIDOR
B3
MECH.
B31V
S/A
S/AE/A
154A-MD-300
FOR WORK IN THIS AREA
SEE -
154A-MD-300
FOR WORK IN THIS AREA
SEE -
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:3
A
M
154A-MD-300
MECHANICAL DEMOLITION
ENLARGED PLANS - BUILDING 154ARSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/2" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154A BASEMENT ROOM B1A ENLARGED
1/2" = 1'-0"2
MECHANICAL DEMOLITION PLAN BUILDING 154A BASEMENT ROOM B30 ENLARGED
PLAN
NORTH
PLAN
NORTH
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
SHEET NOTES
DEMOLISH DUCTWORK AND DIFFUSERS BACK TO LAST BRANCH AND CAP.
DEMOLISH DUCT BACK TO MAIN AND CAP.
DEMOLISH HEATING PIPING BACK TO MAIN AND CAP.
DEMOLISH AIR CONDITIONING UNIT AND ASSOCIATED PIPING.
MEASURE AND RECORD AIRFLOWS TO ALL DIFFUSERS CONNECTED TO AHU
PRIOR TO DEMOLITION FOR RE-BALANCE DURING REMODEL WORK.
S/A
R/A
E/A
V
HALLWAY
A149
HSKP
A147A
S/A
E/A
AREA OF WORK
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:4
A
M
154A-MD-301
MECHANICAL DEMOLITION
ENLARGED PLANS - BUILDING 154ARSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
SHEET NOTES
DEMOLISH DUCTWORK AND DIFFUSERS BACK TO MAIN AND CAP.1
1/2" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 154A FLOOR 1
ENLARGED
PLAN
DINING
EXAM
QUIET
GROUP
HALL
HALL
NURSE WORK
NURSE STATION
STORAGE
(EXISTING TR)
FOR ENLARGED DEMOLITION
PLAN IN THIS AREA, SEE -
169-MD-300
FOR ENLARGED DEMOLITION
PLAN IN THIS AREA, SEE -
FOR ENLARGED DEMOLITION
PLAN IN THIS AREA, SEE -
169-MD-300
169-MD-300
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:4
A
M
169-MD-011
MECHANICAL DEMOLITION PLAN -
BUILDING 169 - FLOOR 1RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
3/32" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 169
PLAN
NORTH
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:4
A
M
169-MD-021
MECHANICAL DEMOLITION PLAN -
BUILDING 169 - ROOFRSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
3/32" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 169 ROOF
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
SHEET NOTES
DEMOLISH CONDENSING UNIT AND ALL ASSOCIATED PIPING AND
APPURTENANCES..
PLAN
R/A
S/A
RS/R PIPING UP
TO ROOF
R/A
S/A
HGS/R
EXAM
EXAM
QUIET
GROUP
SALLY
16/12 R/A
8"Ø S/A
8/4 R/A
FOR WORK IN THIS AREA,
SEE - 3
169-MD-300
FOR WORK IN THIS AREA, SEE -
FOR WORK IN THIS
AREA, SEE -
169-MD-300 2
169-MD-300
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:4
A
M
169-MD-300
MECHANICAL DEMOLITION
ENLARGED PLANS - BUILDING 169RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/2" = 1'-0"3
MECHANICAL DEMOLITION PLAN BUILDING 169 ROOM 164 ENLARGED
1/2" = 1'-0"2
MECHANICAL DEMOLITION PLAN BUILDING 169 ROOM 173 ENLARGED
1/2" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 169 ROOM 224 ENLARGED
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
SHEET NOTES
APPROXIMATE OUTLINE OF NEW TR AREA. SEE REMODEL SHEETS FOR ALL
DISCIPLINES FOR ADDITIONAL INFORMATION.
DEMOLISH DIFFUSER AND DUCTWORK BACK TO MAIN AND CAP.
DEMOLISH DUCTWORK AS INDICATED. COORDINATE WITH REMODEL WORK.
SUPPLY DUCTWORK TO REMAIN.
DEMOLISH AIR CONDITIONING UNIT AND ASSOCIATED PIPING AND CONTROLS.
DEMOLISH DIFFUSER. SALVAGE DUCTWORK IN PLACE FOR RECONNECTION.
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
WAREHOUSE
RESTROOM
SHIPPING
RECEIVING
PHARMACY
CARE
DOCK
FOR ENLARGED DEMOLITION
PLAN IN THIS AREA, SEE -
170-MD-011
OFFICE
JANITOR
WAREHOUSE
1-1/2" W DN,
1-1/2" V UP
1/2" HW
1/2" CW
TE
1/2" CW
VAV
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED BY DRAWN BY
DRAWING TITLE
APPROVED:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FLS
PROGRAM
CONTRACTING
ACTIVITY
CENTRAL (PCAC)
BRIAN P. PEKAR
5/18/2022
ME-11249
B
IM
/2
V
A M e d ic a l C e n te r
F t H a rr is o n
M T
/M S e ri e s r2
.r v t
/2
/2
:4
:4
A
M
170-MD-011
MECHANICAL DEMOLITION PLAN -
BUILDING 170RSA ENGINEERING, INC.
670 W. FIREWEED LN, SUITE 200
ANCHORAGE, AK 99503
907.276.0521
BRIAN PEKAR, P.E.
GDM
100 W STEUBEN ST. UNIT 3
BINGEN, WA 98605
541.436.4723
ADAM GOODIN, P.E.
EHRM INFRASTRUCTURE
UPGRADES
FORT HARRISON, MONTANA
436-21-700
IAWBPP5/20/2022
100% CONSTRUCTION
DOCUMENTS
A/E: MECHANICAL ENGINEER
FULLY SPRINKLERED
1/8" = 1'-0"1
MECHANICAL DEMOLITION PLAN BUILDING 170
GENERAL NOTES
A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT
DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.
THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE
INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL
ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.
B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE
MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A
LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.
UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.
D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE
NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF
RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS
STEEL DRIP PAN BELOW PIPING.
SHEET NOTES
APPROXIMATE OUTLINE OF NEW TR AREA. SEE REMODEL SHEETS FOR ALL
DISCIPLINES FOR ADDITIONAL INFORMATION.
DEMOLISH CONDENSING UNIT AND ASSOCIATED PIPING.
DEMOLISH COOLING UNIT AND ASSOCIATED PIPING.
DUCTWORK TO VAV TO REMAIN.
REROUTE PLUMBING PIPING OUTSIDE TR AREA.
DEMOLISH REFRIGERANT SUPPLY AND RETURN PIPING ROUTED IN MEZZANINE.
DEMOLISH AC UNIT WALL CONTROLLER, SENSORS, AND WIRING.
1/2" = 1'-0"2
MECHANICAL DEMOLITION PLAN BUILDING 170 ROOM 103 ENLARGED
PLAN
NORTH
PLAN
NORTH
PIPING LEGEND
WASTE
SEE ABBREVIATIONS FOR MEDIA
VENT PIPING
COLD WATER
HOT WATER
HOT WATER RECIRCULATED
PIPE UP
PIPE DOWN
TEE UP
TEE DOWN
UNION
DIRECTION OF FLOW
BALL VALVE
2-WAY CONTROL VALVE
CHECK VALVE
BALANCE VALVE
PRESSURE REDUCING VALVE
PRESSURE/TEMPERATURE
RELIEF VALVE
HOSE BIBB
CAP
WATER HAMMER ARRESTOR
PUMP
CLEANOUT
METER
PRESSURE GAUGE W/
ISOLATION COCK
STRAINER W/ BLOWDOWN
FLOOR CLEANOUT
FLOOR DRAIN
FLOOR SINK
3-WAY CONTROL VALVE
REDUCED PRESSURE BACKFLOW
PREVENTER
THERMOMETER
FLEXIBLE PIPING CONNECTOR
DETAILED PIPE UP & DOWN
ABBREVIATIONS
AAV AUTOMATIC AIR VENT
ABV ABOVE
ACUC-X AIR CONDITIONING UNIT DESIGNATOR
ADA AMERICANS WITH DISABILITIES
ACT GUIDELINES
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFMS AIR FLOW MONITORING STATION
AHAP AS HIGH AS POSSIBLE
AHU-X AIR HANDLING UNIT DESIGNATOR
AMPS AMPERES
APD AIR PRESSURE DROP
ARCH ARCHITECTURAL
AS-X AIR SEPARATOR DESIGNATOR
BDD BACKDRAFT DAMPER
BLDG BUILDING
BOD BOTTOM OF DUCT
BTUH BRITISH THERMAL UNIT/HOUR
CD CONDESNATE DRAIN
CFM CUBIC FEET PER MINUTE
CH-X CHILLER DESIGNATOR
CGS CONDENSER GLYCOL SUPPLY
CGR CONDENSER GLYCOL RETURN
CIRC CIRCULATING
CP-X CIRCULATION PUMP DESIGNATOR
CRAC-X COMPUTER ROOM AIR CONDITIONING UNIT
DESIGNATOR
CU-X GYCOL COOLED CONDENSING UNIT
DESIGNATOR
CUAC-X AIR COOLED CONDENSING UNIT DESIGNATOR
CW COLD WATER
dB DECIBELS
DC-X DRY COOLER DESIGNATOR
DEG DEGREE
DIA DIAMETER
DIM DIMENSION
DWG DRAWING
E/A EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECO-X ECONOPHASE PUMPING UNIT DESIGNATOR
EF-X EXHAUST FAN DESIGNATOR
EGT ENTERING GLYCOL TEMPERATURE
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
ET-X EXPANSION TANK DESIGNATOR
EU-X EVAPORATOR UNIT DESIGNATOR
EXH EXHAUST
F FAHRENHEIT
FCC-X FREE COOLING COIL AIR CONDITIONING UNIT
DESIGNATOR
FCO FLOOR CLEAN OUT
FD-X FLOOR DRAIN DESIGNATOR
FIN FINISHED
FLA FULL LOAD AMPS
FLR FLOOR
FPM FEET PER MINUTE
FSD FIRE/SMOKE DAMPER
FSD-X FIRE/SMOKE DAMPER DESIGNATOR
FT FEET
G NATURAL GAS
GAL GALLONS
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GT-X GLYCOL TANK DESIGNATOR
GTD GLYCOL TEMPERATURE DROP
HC-X HEATING COIL DESIGNATOR
HD HEAD
HGR HEATING GLYCOL RETURN
HGS HEATING GLYCOL SUPPLY
HOA HAND-OFF-AUTO
HP HORSEPOWER
HW HOT WATER
HWC HOT WATER CIRCULATED
IBC INTERNATIONAL BUILDING CODE
IN INCHES
LAT LEAVING AIR TEMPERATURE
LAV LAVATORY
LF LINEAL FEET
LGT LEAVING GLYCOL TEMPERATURE
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH THOUSAND BTUH
MCA MINIMUM CIRCUIT AMPACITY
MFGR MANUFACTURER
M/A MAKEUP AIR
MA MEDICAL AIR
MIN/MIN. MINIMUM
MV MEDICAL VACUUM
MOD MOTOR OPERATED DAMPER
NC NOISE CRITERIA
N.C. NORMALLY CLOSED
NO. NUMBER
N.O. NORMALLY OPEN
NTS NOT TO SCALE
O2 OXYGEN
O/A OUTSIDE AIR
O.D. OUTSIDE DIAMETER
OC ON CENTER
P-X PLUMBING FIXTURE DESIGNATOR
PD PRESSURE DROP
PG/P.G. PROPYLENE GLYCOL
PH PHASE
PP-X PUMP PACKAGE DESIGNATOR
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
R/A RETURN AIR
RPM REVOLUTIONS PER MINUTE
S/A SUPPLY AIR
SCFM STANDARD CUBIC FEET PER MINUTE
SP STATIC PRESSURE
SP-X SUMP PUMP DESIGNATOR
T/A TRANSFER AIR
TEMP TEMPERATURE
TOD TOP OF DUCT
TSP TOTAL STATIC PRESSURE
T'STAT THERMOSTAT
TYP/TYP. TYPICAL
UH-X UNIT HEATER DESIGNATOR
UPC UNIFORM PLUMBING CODE
V VENT
VAV-X VAV TERMINAL UNIT DESIGNATOR
VEL VELOCITY
VTR VENT THRU ROOF
W WASTE
W/ WITH
W/O WITHOUT
W.C. WATER COLUMN
WCO WALL CLEAN OUT
WG WATER GAUGE
WHA WATER HAMMER ARRESTOR
WPD WATER PRESSURE DROP
YCO YARD CLEAN OUT
GAS SHUT-OFF VALVE
GATE VALVE
PIPE GUIDE
PIPE ANCHOR
FILTER
DENOTES DEMOLITION
DUCTWORK LEGEND
12/24
THERMOSTAT
DUCT STATIC PRESSURE SENSOR
SUPPLY AIR UP & DOWN
RETURN AIR UP & DOWN
EXHAUST AIR UP & DOWN
VOLUME DAMPER
MOTORIZED CONTROL DAMPER
SOUND LINED DUCTWORK
DUCT SIZE - EXTERIOR INSULATED
(1ST FIGURE-SIDE SHOWN)
(2ND FIGURE-SIDE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .