Att 1.5 - Fort Harrison EHRM - Drawings Vol 1 Part 5 of 5.pdf

PDF 6 MB Posted

Attached to
Y1DZ--EHRM Infrastructure Upgrades Construction Fort Harrison 436-21-700
Solicitation number
36C77623B0001
Issued by

About this file

This solicitation is for infrastructure upgrades at the Fort Harrison VA Medical Center in Montana. The contractor will demolish existing structures, renovate building spaces, upgrade mechanical, electrical and HVAC systems, install new plumbing and data infrastructure, conduct asbestos abatement, and perform other site work. Buildings to be upgraded include 141, 154A, 154B, 169, 154, 170, 171, 16, 20. Scope includes architectural, structural, electrical, HVAC, plumbing and data communication work. The contractor must provide all labor, materials and equipment to complete the project in accordance with specifications and drawings.

View the file

Other files

File Type Posted
DBA Wage Rates - Lewis and Clark County - 01-20-23.pdf PDF
Tech Questions Tracker - Fort Harrison - Responses 1-23-23.pdf PDF
36C77623B0001 0006.pdf PDF
36C77623B0001 0005.pdf PDF
DBA Wage Rates - Lewis and Clark County - 01-13-23.pdf PDF
DBA Wage Rates - Lewis and Clark County - 01-06-23.pdf PDF
36C77623B0001 0004.pdf PDF
Tech Questions Tracker - Fort Harrison - Responses 1-10-23.pdf PDF
Limitations on Subcontracting - 852.219-75.docx DOCX document
DBA Wage Rates - Lewis and Clark County - 12-09-22.pdf PDF
Site Visit Sign-In Sheet - Fort Harrison EHRM - 12-12-2022.pdf PDF
36C77623B0001 0003.pdf PDF
36C77623B0001 0002.pdf PDF
36C77623B0001 0001.pdf PDF
Site Visit Sign-In Sheet - Fort Harrison EHRM - 11-30-2022.pdf PDF
Att 1.3 - Fort Harrison EHRM - Drawings Vol 1 Part 3 of 5.pdf PDF
Att 5 - Fort Harrison EHRM - Specification Appendix A.pdf PDF
Att 6 - Fort Harrison EHRM - Specification Appendix B.pdf PDF
Contractor Safety and Environmental Record.docx DOCX document
Limitations on Subcontracting.docx DOCX document
Att 1.1 - Fort Harrison EHRM - Drawings Vol 1 Part 1 of 5.pdf PDF
Att 7 - Fort Harrison EHRM - Narrative.pdf PDF
Att 2.1 - Fort Harrison EHRM - Drawings Vol 2 Part 1 of 2.pdf PDF
Fort Harrison - IFB 36C77623B0001 - 11-16-22.pdf PDF
Att 8 - Fort Harrison EHRM - Submittal Register.xlsx XLSX spreadsheet
Att 1.4 - Fort Harrison EHRM - Drawings Vol 1 Part 4 of 5.pdf PDF
DBA Wage Rates - Lewis and Clark County - 09-09-22.pdf PDF
Att 3 - Fort Harrison EHRM - Specification Vol 1.pdf PDF
Brand Name Justification - Fort Harrison.pdf PDF
Att 2.2 - Fort Harrison EHRM - Drawings Vol 2 Part 2 of 2.pdf PDF
Att 4 - Fort Harrison EHRM - Specification Vol 2.pdf PDF
VHA Supp Contract Reqs COVID-19 - 12-14-21.pdf PDF
Att 1.2 - Fort Harrison EHRM - Drawings Vol 1 Part 2 of 5.pdf PDF
Att 9 - Infrastructure Standard for Telecom Spaces v3.1.pdf PDF
436-21-700 - Ft Harrison EHRM - Scope of Work 9-21-2022.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE

ADA TOILET

CORRIDOR

2C-1

CORRIDOR

2C-4

SHARED OFFICE

SHARED OFFICE

HSKP

OFFICE

OFFICE

220-B

OFFICE

220-A

14"Ø S/A

26/14" R/A

3/4" HWR/S

12/6 E/A

W UP/DN

V UP

R/A

S9

14X26 R/A DN

HW

V

CW

FSD

CGS/R UP

11 11 11

OFFICE

OFFICE

OFFICE

OFFICE

ELEVATOR

124B

CORRIDOR

3C-1

CORRIDOR

12"Ø S/A

3/4" HWS/R

W UP/DN

V UP

S9

R/A

R/A DN

FSD

FIRE SPRINKLER

RISER AND VALVES

OFFICE

11 11

CGS/R DN

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:1

A

M

141-MD-301

MECHANICAL DEMOLITION

ENLARGED PLANS - BUILDING 141RSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/4" = 1'-0"1

MECHANICAL DEMOLITION PLAN - BUILDING 141 FLOOR 2 ENLARGED

1/4" = 1'-0"2

MECHANICAL DEMOLITION PLAN - BUILDING 141 FLOOR 3 ENLARGED

PLAN

NORTH

PLAN

NORTH

SHEET NOTES

APPROXIMATE OUTLINE OF NEW TR AREA. SEE REMODEL SHEETS FOR ALL

DISCIPLINES FOR ADDITIONAL INFORMATION.

DEMOLISH DUCTWORK AND DIFFUSERS AS INDICATED. COORDINATE WITH

REMODEL WORK.

RELOCATE VAV. SEE REMODEL SHEETS FOR LOCATION.

DEMOLISH HEATING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.

DEMOLISH AIR CONDITIONING UNIT AND ALL ASSOCIATED PIPING.

DEMOLISH AIR CONDITIONING UNIT CONTROLLER AND ALL ASSOCIATED WIRING.

DEMOLISH 3/4" CONDENSATE PIPING TO DRAIN.

DEMOLISH 2" CGS/R PIPING. PATCH AND SEAL WALL PENETRATIONS.

DEMOLISH VAV SENSOR AND ALL ASSOCIATED WIRING.

DEMOLISH E/A DUCT BACK TO MAIN AND CAP.

SUPPLY AIR DUCTWORK AND VAVS IN THIS AREA NOT SHOWN FOR CLARITY.

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE

NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF

RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS

STEEL DRIP PAN BELOW PIPING.

KEYPLAN - BUILDING 141 FLOOR 2

KEYPLAN - BUILDING 141 FLOOR 3

AREA OF WORK

AREA OF WORK

PLAN

NORTH

PLAN

NORTH

Revisions: Date:

FOR ENLARGED PLAN SEE -

154-MD-300

CRAWL SPACE

BSMT

MECHANICAL

B-100

CRAWL SPACE

B-11C

Room

B-022

PHARMACY

CACHE

B04

MED ADMIN

STORAGE

BSMT

Room

BSMT

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:1

A

M

154-MD-0B1

MECHANICAL DEMOLITION PLAN -

BUILDING 154 - BASEMENTRSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/16" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154 BASEMENT

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

PLAN

NORTH

115-5

CORRIDOR

C101

CORRIDOR

OFFICE

115-3A

COPIER

114A

CORRIDOR

C102

OFFICE

114B

OFFICE

EXAM

MECHANICAL

MECHANICAL

CORRIDOR

C

CLEAN

FOR ENLARGED PLAN SEE -

154-MD-301

154-MD-301

FOR ENLARGED PLAN SEE -

154-MD-302

154-MD-302

FOR ENLARGED PLAN SEE -

154-MD-301

TREATMENT

102G

TREATMENT

102F

SOILED

STORAGE

CORR.

C

STAIR

102J

CLEAN

STORAGE

102I

CANTEEN

LAB

LOBBY

C107

LOBBY

C107

TRAINING

CENTER

S110

MECHANICAL

UTILITY

STORAGE

COMMON AREA

PATIENT ROOM

OFFICE

COMMON AREA

(WAITING)

115-7

VEST

CORRIDOR

C105

LINEN SERVICE

LOBBY

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:1

A

M

154-MD-011

MECHANICAL DEMOLITION PLAN -

BUILDING 154 - FLOOR 1RSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/16" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE

NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF

RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS

STEEL DRIP PAN BELOW PIPING.

PLAN

12 12

239B

EXAM

203L

MOVE OFFICE

239C

FOR ENLARGED PLAN SEE - 1

154-MD-303

FOR ENLARGED PLAN SEE -

154-MD-303

FOR ENLARGED PLAN SEE -

154-MD-303

154-MD-303

EXAM

204L

CORRIDOR

C237

ORTHO

OPERATING

ROOM

217A

MECHANICAL

UTILITY

CYSTOSCOPY

PROCEDURE

CORRIDOR

C201

ENDOSCOPY

PROCEDURE

CORE LAB

211L

MICROBIOLOGY

LAB

210L

ANATOMIC

PATHOLOGY

209L

STAFF LOUNGE

224L

MORGUE

232L

PAD STORAGE

STERILE

ASSEMBLY

ROOM

OPERATING

ROOM

217B

EQUIPMENT

STORAGE

218A

ANAESTHESIA

WORKROOM

PROCEDURE

271A

STRG

273A

FUTURE

MECHANICAL

CORRIDOR

C210

EQUIP.

CORR

C204D

CORR

C204B

CORRIDOR

C201

OFFICE

154-CUAC-1

154-CUAC-2

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:1

A

M

154-MD-021

MECHANICAL DEMOLITION PLAN -

BUILDING 154 - FLOOR 2RSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/16" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 2

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE

NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF

RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS

STEEL DRIP PAN BELOW PIPING.

SHEET NOTES

OUTDOOR CONDENSER FOR BASEMENT CRAC UNIT TO REMAIN.

DEMOLISH OUTDOOR CONDENSER FOR BASEMENT CRAC UNIT.

PIPING FOR CRAC UNITS TO REMAIN. EACH CONDENSER IS CONNECTED TO TWO

SETS OF REFRIGERANT SUPPLY AND RETURN PIPING. SHOWN AS SINGLE LINE FOR

CLARITY.

DEMOLISH PIPING BACK TO CHASE. PIPING IN CHASE TO BE CAPPED, LABELED, AND

ABANDONED IN PLACE.

PLAN

TRAINING

PATIENT ROOM

SUPPLY

FOR ENLARGED PLAN SEE -

154-MD-304

154-MD-304

FOR ENLARGED PLAN SEE -

154-MD-305

FOR ENLARGED PLAN SEE -

154-MD-305

OFFICE

CORRIDOR

C

OFFICE

OFFICE

EXISTING

WAITING

TOILET

NURSE'S

STATION

SAME DAY

SURGERY

NURSE

315J

MECHANICAL

ROOM

OFFICE

PATIENT ROOM

PATIENT ROOM

PATIENT ROOM

CORRIDOR

INTENSIVE CARE

UNIT

CHEMO

CONSULT/OFFICE

307D

CORRIDOR

C

CORRIDOR

C

MED ROOM

SDS INTAKE

AREA

OFFICE

MEN TOILET

CORRIDOR

C

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:2

A

M

154-MD-031

MECHANICAL DEMOLITION PLAN -

BUILDING 154 - FLOOR 3RSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/16" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 3

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE

NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF

RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS

STEEL DRIP PAN BELOW PIPING.

PLAN

PATIENT ROOM

BATH

421A

PATIENT ROOM

STORAGE

422B CORRIDOR

C403

DAY ROOM

FOR ENLARGED PLAN SEE -

154-MD-304

154-MD-304

CORRIDOR

C402

OFFICE

OFFICE

438B

OFFICE

443C

FOR ENLARGED PLAN SEE -

154-MD-305

NURSE'S

STATION

OFFICE

CORRIDOR

C402A

PATIENT ROOM

PATIENT ROOM

BREAK ROOM

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:2

A

M

154-MD-041

MECHANICAL DEMOLITION PLAN -

BUILDING 154 - FLOOR 4RSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/16" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 4

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE

NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF

RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS

STEEL DRIP PAN BELOW PIPING.

PLAN

3 3

CORRIDOR

B-09C

CORRIDOR

B-09C

OIT IMAGING

B-13

CRAWL SPACE

B-11C

CRAWL SPACE

BSMT

CRAWL SPACE

B-11C

CORRIDOR

B-12

3/4" HW

1-1/2" CW

1-1/2" CW

3/4" HW

1/2" HWC

2" W DRAIN

11 MECHANICAL

B-11

STAIR

30X12 44X16 38X16 30X12

154-ECO-1 154-ECO-2

AREA OF WORK

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:2

A

M

154-MD-300

MECHANICAL DEMOLITION

ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/4" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154 BASEMENT ENLARGED

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

SHEET NOTES

DEMOLISH DOWNFLOW CRAC UNITS AND ASSOCIATED REFRIGERATION PIPING.

DEMOLISH CW AND CD PIPING BACK TO MAIN AND CAP.

RELOCATE UPFLOW CRAC UNITS, SEE REMODEL PLAN FOR LOCATION. DEMOLISH

ASSOCIATED DUCTWORK, REFRIGERATION PIPING, AND CW AND CD PIPING.

PRE-ECONOMIZER PUMP BOXES AND PIPING TO ROOF TO REMAIN.

DEMOLISH REFRIGERANT PIPING SERVING CRAC UNITS TO BE RELOCATED. EACH UNIT

HAS TWO SETS OF SUPPLY AND RETURN PIPING, ONLY ONE SET SHOWN FOR CLARITY.

REFRIGERANT PIPING FROM ROOF CONDENSING UNIT TO PUMPED ECONOMIZERS TO

REMAIN. EACH UNIT HAS TWO SETS OF SUPPLY AND RETURN PIPING, ONLY ONE SET

SHOWN FOR CLARITY.

DEMOLISH ALL SUPPLY AND RETURN DUCT, GRILLES, AND DIFFUSERS.

DEMOLISH PRE-ECONOMIZER PUMP BOXES AND ASSOCIATED REFRIGERATION PIPING.

DEMOLISH REFRIGERANT PIPING TO CHASE. CAP PIPING AT CHASE, LABEL, AND

ABANDON IN PLACE.

DEMOLISH CW FOR HUMIDIFIER BACK TO BACKFLOW PREVENTER. BACKFLOW

PREVENTER AND UPSTREAM PIPING TO REMAIN.

DEMOLISH CD BACK TO 2" DRAIN IN WALL. RETAIN 2" DRAIN IN PLACE FOR USE IN

REMODEL WORK.

DEMOLISH WALL CONTROLLER FOR CRAC UNITS.

PLAN

NORTH

EXAM

MECHANICAL

CORRIDOR

C

S

12"Ø R/A

10"Ø S/A

7"Ø S/A

12" LPS

1" LPS

8"Ø E/A

7"Ø E/A

9"Ø E/A UP

TO ROOF

VAV

3/4" HGS/R3/4" HGS/R

FLOOR SINK

EXAM

MECHANICAL

CORRIDOR

C

2" V

1" HW

1" CW

1" HW

1" HW

CORRIDOR

C

FLOOR SINK

2" V

ROOM 109 AREA OF WORK

ROOM 102H AREA OF WORK

TREATMENT

102G

CORR.

C

SOILED

STORAGE

CLEAN

STORAGE

102I

E/A

E/A

S/A

S/A

S/A

VAV

S/A

E/A UP

TO ROOF

EXHAUST FAN

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:2

A

M

154-MD-301

MECHANICAL DEMOLITION

ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/2" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1

ROOM 109 ENLARGED HVAC

1/2" = 1'-0"3

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1

ROOM 109 ENLARGED PLUMBING

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

SHEET NOTES

DEMOLISH DUCTWORK AND DIFFUSERS BACK TO MAIN AND CAP. COORDINATE

WITH REMODEL WORK.

DEMOLISH HEATING PIPING BACK TO MAIN AND CAP.

DEMOLISH HEATING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.

DEMOLISH SINK AND ALL PIPING BACK TO MAIN AND CAP.

DEMOLISH PLUMBING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.

DEMOLISH SENSOR FOR VAV.

DEMOLISH DIFFUSER AND FLEX DUCT.

DEMOLISH EXHAUST GRILLE.

PLAN

NORTH

PLAN

NORTH

1/2" = 1'-0"2

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1

ROOM 102H ENLARGED

PLAN

NORTH

COPIER

114A

OFFICE

115-3A

CORRIDOR

C102

OFFICE

115-5

CORRIDOR

CORRIDOR

C101

HWS/R

S/A

S/A

S/A

S/A

E/A E/A

S4

S/A S/A

E/A UP

30 X 8 R/A DN

30 X 8 R/A DN

S4

OFFICE

115-5

OFFICE

115-3A

COPIER

114A

CORRIDOR

C102

2-1/2" CW

1-1/2" HW

3/4" CW W

CW

AREA OF WORK

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:2

A

M

154-MD-302

MECHANICAL DEMOLITION

ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/2" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1 ROOM 115-3 HVAC ENLARGED.

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

PLAN

NORTH

SHEET NOTES

DEMOLISH DUCTWORK AND DIFFUSERS BACK TO MAIN AND CAP. COORDINATE

WITH REMODEL WORK.

DEMOLISH PLUMBING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.

DEMOLISH VAV AND DUCTWORK BACK TO MAIN AND CAP. COORDINATE WITH

REMODEL WORK

DEMOLISH SENSOR FOR VAV.

DEMOLISH VAV BOX.

1/2" = 1'-0"2

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 1 ROOM 115-3 PLUMBING ENLARGED

PLAN

NORTH

STORAGE

218B

E/A

E/A

S/A

TR

239A

OFFICE

239B

CORRIDOR

C243

E/A

E/A

E/A S/AS/A

S/A

ROOM

E/A

S/A

TR

239A

CORRIDOR

C243

OFFICE

239B

CW

HW

W

CW

CW

HW

CW

HW

V W

CW

W W V H C

FOR WORK IN

THIS AREA, SEE -

154-MD-303

154-MD-303

FOR WORK IN THIS AREA,

SEE - 2

154-MD-303

FOR WORK IN THIS AREA,

SEE - 1

154-MD-303

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:2

A

M

154-MD-303

MECHANICAL DEMOLITION

ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/2" = 1'-0"2

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 2

ROOM 218B ENLARGED

1/2" = 1'-0"3

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 2

ROOM 239 ENLARGED VENTILATION

1/2" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 2

ROOM 272 ENLARGED

1/2" = 1'-0"4

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 2

ROOM 239 ENLARGED PIPING

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

PLAN

NORTH

PLAN

NORTH

PLAN

NORTH

PLAN

NORTH

SHEET NOTES

DEMOLISH DUCTWORK AND DIFFUSERS AS INDICATED. COORDINATE WITH

REMODEL WORK.

DEMOLISH DUCTWORK AND DIFFUSERS BACK TO MAIN AND CAP.

DEMOLISH DIFFUSER AND FLEX DUCT.

DEMOLISH EXHAUST GRILLE.

DEMOLISH PLUMBING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.

APPROXIMATE OUTLINE OF NEW TR AREA. SEE REMODEL SHEETS FOR ALL

DISCIPLINES FOR ADDITIONAL INFORMATION.

TRAINING

CORRIDOR

C

E/A

E/A

S/A

R/A

PATIENT ROOM

S/A DIFFUSER

CORRIDOR

C403

S/A DIFFUSER

VAV

E/A GRILLE E/A UP TO EF

SOIL

422A

S/A

E/A

CORRIDOR

C

3" V UP/DN

4" W UP/DN

3" V UP/DN

TO BE RELOCATED.

1-1/2" HW UP/DN

2-1/2" CW UP/DN

TO BE RELOCATED

PATIENT ROOM

TRAINING

CORRIDOR

C

O2

MA

MV

SOIL

422A

CORRIDOR

C403

V UP/DN

W UP/DN

V UP/DN

TO BE RELOCATED

VERIFY SIZE PRIOR

TO DEMOLITION.

HW DN

CW DN

TO BE RELOCATED

VERIFY SIZE PRIOR

TO DEMOLITION.

PATIENT ROOM

CORRIDOR

C404

FOR WORK IN

THIS AREA, SEE -

154-MD-304

154-MD-304

FOR WORK IN THIS AREA,

SEE -

154-MD-304

154-MD-304

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:3

A

M

154-MD-304

MECHANICAL DEMOLITION

ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/2" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 3

ROOM 323 HVAC ENLARGED

1/2" = 1'-0"2

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 4

ROOM 422 HVAC ENLARGED

1/2" = 1'-0"3

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 3

ROOM 323 PLUMBING ENLARGED

1/2" = 1'-0"4

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 4

ROOM 422 PLUMBING ENLARGED

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

PLAN

NORTH

PLAN

NORTH

PLAN

NORTH

PLAN

NORTH

SHEET NOTES

DEMOLISH DUCTWORK AND DIFFUSERS BACK TO MAIN AND CAP. COORDINATE

WITH REMODEL WORK.

DEMOLISH DUCTWORK AND FIRE DAMPER IN WALL. COORDINATE WITH REMODEL

WORK.

DEMOLISH HEATING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.

DEMOLISH PLUMBING PIPING BACK TO MAIN AND CAP. COORDINATE WITH

REMODEL WORK.

DEMOLISH PLUMBING PIPING AS INDICATED. COORDINATE WITH REMODEL WORK.

TWO SETS OF O2, MEDICAL AIR AND MEDICAL VACUUM PIPING AND OUTLETS IN

HEADWALL TO BE RELOCATED. VERIFY QUANTITY, LAYOUT, AND SIZE OF OUTLETS

AND PIPING PRIOR TO DEMOLITION.

DEMOLISH SENSOR FOR VAV.

DEMOLISH DUCTWORK AS INDICATED.

RELOCATE SINK. SEE REMODEL SHEETS FOR LOCATION.

APPROXIMATE OUTLINE OF NEW TR AREA. SEE REMODEL SHEETS FOR ALL

DISCIPLINES FOR ADDITIONAL INFORMATION.

KEYPLAN BUILDING 154 FLOOR 3

1/64" = 1'-0"6

KEYPLAN BUILDING 154 FLOOR 4

3 3

CONSULT/OFFICE

307D

C.R.

CORRIDOR

C

CORRIDOR

C

E/A

VAV

R/A

S/A

CLEAN SUPPLY

VAV

OFFICE

EXISTING

OFFICE

TOILET

CORRIDOR

C

R/A

E/A R/A

S/A

E/A

OFFICE

443C

OFFICE

438B

OFFICE

BATHROOM

442A

CORRIDOR

C402

FOR WORK IN

THIS AREA, SEE -

154-MD-305

FOR WORK IN

THIS AREA, SEE -

154-MD-305

FOR WORK IN THIS AREA,

SEE - 3

154-MD-305

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:3

A

M

154-MD-305

MECHANICAL DEMOLTION

ENLARGED PLANS - BUILDING 154RSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/2" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 3

ROOM 313 ENLARGED

1/2" = 1'-0"2

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 3

ROOM 340 ENLARGED

1/2" = 1'-0"3

MECHANICAL DEMOLITION PLAN BUILDING 154 FLOOR 4

ROOM 438 ENLARGED

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

SHEET NOTES

DEMOLISH AC UNIT AND ASSOCIATED REFRIGERATION PIPING.

DEMOLISH DIFFUSER AND FLEX DUCT.

DEMOLISH AC UNIT SENSOR AND CONTROLS.

DEMOLISH CONDENSATE DRAIN.

DEMOLISH EXHAUST GRILLE

PLAN

NORTH

PLAN

NORTH

PLAN

NORTH

KEY PLAN BUILDING 154 FLOOR 3

KEY PLAN BUILDING 154 FLOOR 4

154A-MD-300

154A-MD-300

Room

B31O

CORRIDOR

B3

OPERATOR'S

BOOTH

B1

MECHANICAL

B15

CORRIDOR

B3

Room

B17

STORAGE

B70

MECH

B13

OFFICE

B31G

DEMARC

B1A

FOR ENLARGED PLAN SEE -

FOR ENLARGED PLAN SEE -

CALL CENTER

B10

CALL CENTER

B18C

OFFICE

B18B

POLICE

B18A

MED STORAGE

B25

CORRIDOR

B3

MECHANICAL

B2

CORRIDOR

B3

ENTRY

B31A

WAITING

B31B

SPEECH

B31E

TELEMED

B31H

WORK ROOM

B31I

THRERAPY

POOL

B31P

OFFICE

B6

OFFICE

B4

CALL CENTER

B10

OFFICE

B7

OFFICE

B5

1 1

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:3

A

M

154A-MD-0B1

MECHANICAL DEMOLITION PLAN -

BUILDING 154A -BASEMENTRSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/8" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154A BASEMENT

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE

NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF

RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS

STEEL DRIP PAN BELOW PIPING.

PLAN

NORTH

SHEET NOTES

DEMOLISH HWS/R PIPING BACK TO MAIN AS INDICATED.1

154A-MD-301

RESTROOM

A135

COMMON

CORRIDOR

C-104

OFFICE

A133

RESROOM

A136

HALLWAY

A149

PT LTL

A49A

BLOOD DRAW

A149B

WAITING

A197

HSKP

A147A

CHASE

149AB

FOR ENLARGED PLAN SEE -

OFFICE

OFFICE

151A

OFFICE

OFFICE

151C CORRIDOR

C-106

CORRIDOR

C-106

LOBBY

COMMON

CORRIDOR

C-115

STORAGE

A192

EXAM

A191

EXAM

A188

EXAM

A187

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:3

A

M

154A-MD-011

MECHANICAL DEMOLITION PLAN -

BUILDING 154A - FLOOR 1RSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/8" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154A FLOOR 1

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE

NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF

RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS

STEEL DRIP PAN BELOW PIPING.

PLAN

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:3

A

M

154A-MD-021

MECHANICAL DEMOLITION PLAN -

BUILDING 154A - ROOFRSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/8" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154A ROOF

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

SHEET NOTES

DEMOLISH ROOFTOP CONDENSING UNIT AND ALL PIPING AND APPURTENANCES

FOR SPLIT UNIT SERVING TR B-30. FIELD VERIFY LOCATION AND CONNECTIONS

PRIOR TO DEMOLITION.

PLAN

4" RL UP/DN

OPERATOR'S

BOOTH

B1

MECHANICAL

B2

DEMARC

B1A

Room

B17

20 X 6 S/A

10 X 16 S/A

14 X 12 R/A 14 X 12 R/A

HWS

HWR

COND RETURN

HP STEAM

MP STEAM

HWS

2 2

AHU

S/A

S/A DIFFUSER

S/A DIFFUSER

IMAGING LAB

B30

ELEVATOR

B12

OFFICE

B31D

ENTRY

B31A

CORRIDOR

B3

MECH.

B31V

S/A

S/AE/A

154A-MD-300

FOR WORK IN THIS AREA

SEE -

154A-MD-300

FOR WORK IN THIS AREA

SEE -

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:3

A

M

154A-MD-300

MECHANICAL DEMOLITION

ENLARGED PLANS - BUILDING 154ARSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/2" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154A BASEMENT ROOM B1A ENLARGED

1/2" = 1'-0"2

MECHANICAL DEMOLITION PLAN BUILDING 154A BASEMENT ROOM B30 ENLARGED

PLAN

NORTH

PLAN

NORTH

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE

NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF

RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS

STEEL DRIP PAN BELOW PIPING.

SHEET NOTES

DEMOLISH DUCTWORK AND DIFFUSERS BACK TO LAST BRANCH AND CAP.

DEMOLISH DUCT BACK TO MAIN AND CAP.

DEMOLISH HEATING PIPING BACK TO MAIN AND CAP.

DEMOLISH AIR CONDITIONING UNIT AND ASSOCIATED PIPING.

MEASURE AND RECORD AIRFLOWS TO ALL DIFFUSERS CONNECTED TO AHU

PRIOR TO DEMOLITION FOR RE-BALANCE DURING REMODEL WORK.

S/A

R/A

E/A

V

HALLWAY

A149

HSKP

A147A

S/A

E/A

AREA OF WORK

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:4

A

M

154A-MD-301

MECHANICAL DEMOLITION

ENLARGED PLANS - BUILDING 154ARSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE

NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF

RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS

STEEL DRIP PAN BELOW PIPING.

SHEET NOTES

DEMOLISH DUCTWORK AND DIFFUSERS BACK TO MAIN AND CAP.1

1/2" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 154A FLOOR 1

ENLARGED

PLAN

DINING

EXAM

QUIET

GROUP

HALL

HALL

NURSE WORK

NURSE STATION

STORAGE

(EXISTING TR)

FOR ENLARGED DEMOLITION

PLAN IN THIS AREA, SEE -

169-MD-300

FOR ENLARGED DEMOLITION

PLAN IN THIS AREA, SEE -

FOR ENLARGED DEMOLITION

PLAN IN THIS AREA, SEE -

169-MD-300

169-MD-300

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:4

A

M

169-MD-011

MECHANICAL DEMOLITION PLAN -

BUILDING 169 - FLOOR 1RSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

3/32" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 169

PLAN

NORTH

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:4

A

M

169-MD-021

MECHANICAL DEMOLITION PLAN -

BUILDING 169 - ROOFRSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

3/32" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 169 ROOF

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

SHEET NOTES

DEMOLISH CONDENSING UNIT AND ALL ASSOCIATED PIPING AND

APPURTENANCES..

PLAN

R/A

S/A

RS/R PIPING UP

TO ROOF

R/A

S/A

HGS/R

EXAM

EXAM

QUIET

GROUP

SALLY

16/12 R/A

8"Ø S/A

8/4 R/A

FOR WORK IN THIS AREA,

SEE - 3

169-MD-300

FOR WORK IN THIS AREA, SEE -

FOR WORK IN THIS

AREA, SEE -

169-MD-300 2

169-MD-300

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:4

A

M

169-MD-300

MECHANICAL DEMOLITION

ENLARGED PLANS - BUILDING 169RSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/2" = 1'-0"3

MECHANICAL DEMOLITION PLAN BUILDING 169 ROOM 164 ENLARGED

1/2" = 1'-0"2

MECHANICAL DEMOLITION PLAN BUILDING 169 ROOM 173 ENLARGED

1/2" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 169 ROOM 224 ENLARGED

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE

NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF

RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS

STEEL DRIP PAN BELOW PIPING.

SHEET NOTES

APPROXIMATE OUTLINE OF NEW TR AREA. SEE REMODEL SHEETS FOR ALL

DISCIPLINES FOR ADDITIONAL INFORMATION.

DEMOLISH DIFFUSER AND DUCTWORK BACK TO MAIN AND CAP.

DEMOLISH DUCTWORK AS INDICATED. COORDINATE WITH REMODEL WORK.

SUPPLY DUCTWORK TO REMAIN.

DEMOLISH AIR CONDITIONING UNIT AND ASSOCIATED PIPING AND CONTROLS.

DEMOLISH DIFFUSER. SALVAGE DUCTWORK IN PLACE FOR RECONNECTION.

PLAN

NORTH

PLAN

NORTH

PLAN

NORTH

WAREHOUSE

RESTROOM

SHIPPING

RECEIVING

PHARMACY

CARE

DOCK

FOR ENLARGED DEMOLITION

PLAN IN THIS AREA, SEE -

170-MD-011

OFFICE

JANITOR

WAREHOUSE

1-1/2" W DN,

1-1/2" V UP

1/2" HW

1/2" CW

TE

1/2" CW

VAV

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED BY DRAWN BY

DRAWING TITLE

APPROVED:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

FLS

PROGRAM

CONTRACTING

ACTIVITY

CENTRAL (PCAC)

BRIAN P. PEKAR

5/18/2022

ME-11249

B

IM

/2

V

A M e d ic a l C e n te r

F t H a rr is o n

M T

/M S e ri e s r2

.r v t

/2

/2

:4

:4

A

M

170-MD-011

MECHANICAL DEMOLITION PLAN -

BUILDING 170RSA ENGINEERING, INC.

670 W. FIREWEED LN, SUITE 200

ANCHORAGE, AK 99503

907.276.0521

BRIAN PEKAR, P.E.

GDM

100 W STEUBEN ST. UNIT 3

BINGEN, WA 98605

541.436.4723

ADAM GOODIN, P.E.

EHRM INFRASTRUCTURE

UPGRADES

FORT HARRISON, MONTANA

436-21-700

IAWBPP5/20/2022

100% CONSTRUCTION

DOCUMENTS

A/E: MECHANICAL ENGINEER

FULLY SPRINKLERED

1/8" = 1'-0"1

MECHANICAL DEMOLITION PLAN BUILDING 170

GENERAL NOTES

A. THE INFORMATION SHOWN ON THIS DRAWING IS TAKEN FROM AS-BUILT

DRAWINGS AND A NON-DESTRUCTIVE WALK THROUGH OF THE FACILITY.

THERE IS NO WARRANTY OR GUARANTEE AS TO THE ACCURACY OF THE

INFORMATION SHOWN HERE-IN. THE CONTRACTOR SHALL FIELD VERIFY ALL

ITEMS SCHEDULED FOR DEMOLITION PRIOR TO START OF WORK.

B. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL SALVAGEABLE

MATERIALS. THE CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A

LOCATION AS DIRECTED BY THE OWNER IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

C. DASHED OR DOTTED BOLD LINES INDICATE ITEMS TO BE REMOVED.

UNBOLDED LINES INDICATE EXISTING ITEMS TO REMAIN.

D. ALL HVAC/PLUMBING EQUIPMENT AND PIPING CONVEYING FLUIDS IN THE

NEW TR AREA SHALL BE RE-ROUTED OUTSIDE OF THIS AREA IF POSSIBLE. IF

RE-ROUTING IS NOT POSSIBLE, PROVIDE WELDED SEAMLESS STAINLESS

STEEL DRIP PAN BELOW PIPING.

SHEET NOTES

APPROXIMATE OUTLINE OF NEW TR AREA. SEE REMODEL SHEETS FOR ALL

DISCIPLINES FOR ADDITIONAL INFORMATION.

DEMOLISH CONDENSING UNIT AND ASSOCIATED PIPING.

DEMOLISH COOLING UNIT AND ASSOCIATED PIPING.

DUCTWORK TO VAV TO REMAIN.

REROUTE PLUMBING PIPING OUTSIDE TR AREA.

DEMOLISH REFRIGERANT SUPPLY AND RETURN PIPING ROUTED IN MEZZANINE.

DEMOLISH AC UNIT WALL CONTROLLER, SENSORS, AND WIRING.

1/2" = 1'-0"2

MECHANICAL DEMOLITION PLAN BUILDING 170 ROOM 103 ENLARGED

PLAN

NORTH

PLAN

NORTH

PIPING LEGEND

WASTE

SEE ABBREVIATIONS FOR MEDIA

VENT PIPING

COLD WATER

HOT WATER

HOT WATER RECIRCULATED

PIPE UP

PIPE DOWN

TEE UP

TEE DOWN

UNION

DIRECTION OF FLOW

BALL VALVE

2-WAY CONTROL VALVE

CHECK VALVE

BALANCE VALVE

PRESSURE REDUCING VALVE

PRESSURE/TEMPERATURE

RELIEF VALVE

HOSE BIBB

CAP

WATER HAMMER ARRESTOR

PUMP

CLEANOUT

METER

PRESSURE GAUGE W/

ISOLATION COCK

STRAINER W/ BLOWDOWN

FLOOR CLEANOUT

FLOOR DRAIN

FLOOR SINK

3-WAY CONTROL VALVE

REDUCED PRESSURE BACKFLOW

PREVENTER

THERMOMETER

FLEXIBLE PIPING CONNECTOR

DETAILED PIPE UP & DOWN

ABBREVIATIONS

AAV AUTOMATIC AIR VENT

ABV ABOVE

ACUC-X AIR CONDITIONING UNIT DESIGNATOR

ADA AMERICANS WITH DISABILITIES

ACT GUIDELINES

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFMS AIR FLOW MONITORING STATION

AHAP AS HIGH AS POSSIBLE

AHU-X AIR HANDLING UNIT DESIGNATOR

AMPS AMPERES

APD AIR PRESSURE DROP

ARCH ARCHITECTURAL

AS-X AIR SEPARATOR DESIGNATOR

BDD BACKDRAFT DAMPER

BLDG BUILDING

BOD BOTTOM OF DUCT

BTUH BRITISH THERMAL UNIT/HOUR

CD CONDESNATE DRAIN

CFM CUBIC FEET PER MINUTE

CH-X CHILLER DESIGNATOR

CGS CONDENSER GLYCOL SUPPLY

CGR CONDENSER GLYCOL RETURN

CIRC CIRCULATING

CP-X CIRCULATION PUMP DESIGNATOR

CRAC-X COMPUTER ROOM AIR CONDITIONING UNIT

DESIGNATOR

CU-X GYCOL COOLED CONDENSING UNIT

DESIGNATOR

CUAC-X AIR COOLED CONDENSING UNIT DESIGNATOR

CW COLD WATER

dB DECIBELS

DC-X DRY COOLER DESIGNATOR

DEG DEGREE

DIA DIAMETER

DIM DIMENSION

DWG DRAWING

E/A EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECO-X ECONOPHASE PUMPING UNIT DESIGNATOR

EF-X EXHAUST FAN DESIGNATOR

EGT ENTERING GLYCOL TEMPERATURE

ENT ENTERING

ESP EXTERNAL STATIC PRESSURE

ET-X EXPANSION TANK DESIGNATOR

EU-X EVAPORATOR UNIT DESIGNATOR

EXH EXHAUST

F FAHRENHEIT

FCC-X FREE COOLING COIL AIR CONDITIONING UNIT

DESIGNATOR

FCO FLOOR CLEAN OUT

FD-X FLOOR DRAIN DESIGNATOR

FIN FINISHED

FLA FULL LOAD AMPS

FLR FLOOR

FPM FEET PER MINUTE

FSD FIRE/SMOKE DAMPER

FSD-X FIRE/SMOKE DAMPER DESIGNATOR

FT FEET

G NATURAL GAS

GAL GALLONS

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GT-X GLYCOL TANK DESIGNATOR

GTD GLYCOL TEMPERATURE DROP

HC-X HEATING COIL DESIGNATOR

HD HEAD

HGR HEATING GLYCOL RETURN

HGS HEATING GLYCOL SUPPLY

HOA HAND-OFF-AUTO

HP HORSEPOWER

HW HOT WATER

HWC HOT WATER CIRCULATED

IBC INTERNATIONAL BUILDING CODE

IN INCHES

LAT LEAVING AIR TEMPERATURE

LAV LAVATORY

LF LINEAL FEET

LGT LEAVING GLYCOL TEMPERATURE

LWT LEAVING WATER TEMPERATURE

MAX MAXIMUM

MBH THOUSAND BTUH

MCA MINIMUM CIRCUIT AMPACITY

MFGR MANUFACTURER

M/A MAKEUP AIR

MA MEDICAL AIR

MIN/MIN. MINIMUM

MV MEDICAL VACUUM

MOD MOTOR OPERATED DAMPER

NC NOISE CRITERIA

N.C. NORMALLY CLOSED

NO. NUMBER

N.O. NORMALLY OPEN

NTS NOT TO SCALE

O2 OXYGEN

O/A OUTSIDE AIR

O.D. OUTSIDE DIAMETER

OC ON CENTER

P-X PLUMBING FIXTURE DESIGNATOR

PD PRESSURE DROP

PG/P.G. PROPYLENE GLYCOL

PH PHASE

PP-X PUMP PACKAGE DESIGNATOR

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

R/A RETURN AIR

RPM REVOLUTIONS PER MINUTE

S/A SUPPLY AIR

SCFM STANDARD CUBIC FEET PER MINUTE

SP STATIC PRESSURE

SP-X SUMP PUMP DESIGNATOR

T/A TRANSFER AIR

TEMP TEMPERATURE

TOD TOP OF DUCT

TSP TOTAL STATIC PRESSURE

T'STAT THERMOSTAT

TYP/TYP. TYPICAL

UH-X UNIT HEATER DESIGNATOR

UPC UNIFORM PLUMBING CODE

V VENT

VAV-X VAV TERMINAL UNIT DESIGNATOR

VEL VELOCITY

VTR VENT THRU ROOF

W WASTE

W/ WITH

W/O WITHOUT

W.C. WATER COLUMN

WCO WALL CLEAN OUT

WG WATER GAUGE

WHA WATER HAMMER ARRESTOR

WPD WATER PRESSURE DROP

YCO YARD CLEAN OUT

GAS SHUT-OFF VALVE

GATE VALVE

PIPE GUIDE

PIPE ANCHOR

FILTER

DENOTES DEMOLITION

DUCTWORK LEGEND

12/24

THERMOSTAT

DUCT STATIC PRESSURE SENSOR

SUPPLY AIR UP & DOWN

RETURN AIR UP & DOWN

EXHAUST AIR UP & DOWN

VOLUME DAMPER

MOTORIZED CONTROL DAMPER

SOUND LINED DUCTWORK

DUCT SIZE - EXTERIOR INSULATED

(1ST FIGURE-SIDE SHOWN)

(2ND FIGURE-SIDE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .