ATT 6- 635-21-700 Bid Breakdown.docx

DOCX document 23 KB Posted

Attached to
Y1DA--635-21-700 | Construction EHRM Infrastructure Upgrades -OKC, OK- 73104
Solicitation number
36C77625R0044
Issued by

About this file

This document is a Bid Breakdown template for a construction infrastructure upgrade project for the Department of Veterans Affairs in Oklahoma City. The base bid for general construction encompasses comprehensive infrastructure improvements across multiple buildings (Buildings 1, 5, 19, 21, Lawton, and Friendship House), including electrical panel upgrades, power systems, bonding, UPS, building management system interfaces, HVAC assessments, space reconfiguration and renovation, communication infrastructure upgrades, physical improvements, and fiber infrastructure backbone enhancements.

The bid breakdown template provides a detailed divisional cost breakdown structure covering 28 construction divisions, allowing contractors to itemize labor and material costs across categories such as general requirements, existing conditions, concrete, masonry, electrical, communications, and mechanical systems. The template includes sections for bonds, insurance, contractor overhead, profit, and a final lump sum total amount, indicating this is a comprehensive construction project solicitation under VA Technology Acquisition Center Austin, with the specific solicitation number 36C77625R0044 for infrastructure upgrades in Oklahoma City.

View the file

Other files

File Type Posted
S06 - Latest David Bacon Wages Determination 07-18-2-2025.pdf PDF
S06- 0008 Amendment - Latest David Bacon Wages Determination.pdf PDF
S06- 0007 amendment - Fire Protection Drawing.pdf PDF
ATT 8- Sprinkler reference drawing.pdf PDF
S05 - 635-21-700 -All responses Tech Questions- 07-15-2025.docx DOCX document
S06- 0006 amendment- All Tech questions responses 07-15-25.pdf PDF
S05 - 635-21-700 -Tech Questions Responses - EHRM OKC-OK - 001.docx DOCX document
S06- 0005 amendment- extend bid due date and RFIs responses.pdf PDF
S06- 0004 Amendment - Extend Bid due date 07-23-25 - 36C77625R0044.pdf PDF
S06- 0003 Amendment - Extend bid due date - 36C77625R0044.pdf PDF
S06- 0002 amendment- Signed site visit sign in sheet.pdf PDF
S04- 635-21-700 - Site visit sign-in sheet - SIGNED 06052025.pdf PDF
S04- Site Visit Instructions - 635-21-700 - Construction EHRM Infrastructure Upgrades.pdf PDF
S06- 0001 amendment - Site visit date change and Site visit instructions.pdf PDF
ATT 2- 635-21-700 - 100CD Drawings.pdf PDF
ATT 4 - PPQ.docx DOCX document
ATT 1- 635-21-700 -10 CD Specs.pdf PDF
36C77625R0044.docx DOCX document
ATT 5 - Limitations on Subcontracting.docx DOCX document
ATT 3- Wages Determination- OKC OK.pdf PDF
ATT 7- Spec 01 31 00.01 Project Management and Coordination.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE BID – GENERAL CONSTRUCTION:

This project includes but not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal and emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, hazardous material abatement. Project Buildings locations include Buildings 1,5,19,21, site, Lawton and Friendship House.

DIVISION
LABOR
MATERIAL
TOTAL
DIVISION 1 – GENERAL REQUIREMENTS
$
$
$
DIVISION 2 – EXISTING CONDITIONS
$
$
$
DIVISION 3 – CONCRETE
$
$
$
DIVISION 4 – MASONRY
$
$
$
DIVISION 5 – METALS
$
$
$
DIVISION 6 – WOOD AND PLASTIC
$
$
$
DIVISION 7 – THERMAL AND MOISTURE
$
$
$
DIVISION 8 – DOORS AND WINDOWS (OPENINGS)
$
$
$
DIVISION 9 – FINISHES
$
$
$
DIVISION 10 – SPECIALTIES
$
$
$
DIVISION 11 – EQUIPMENT – N/A
$
$
$
DIVISION 12 – FURNISHINGS – N/A
$
$
$
DIVISION 13 – SPECIAL CONSTRUCTION
$
$
$
DIVISION 14 – CONVEYING EQUIPMENT
$
$
$
DIVISION 21 – FIRE SUPPRESSION
$
$
$
DIVISION 22 – PLUMBING
$
$
$
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
$
$
$
DIVISION 25 – INTEGRATED AUTOMATION – N/A
$
$
$
DIVISION 26 – ELECTRICAL
$
$
$
DIVISION 27 – COMMUNICATIONS
$
$
$
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
$
$
$
DIVISION 31 – EARTHWORK – N/A
$
$
$
DIVISION 32 – EXTERIOR – N/A
$
$
$
DIVISION 33 – UTILITIES – N/A
$
$
$
DIVISION 34 – TRANSPORTATION – N/A
$
$
$
SUM OF ALL DIVISION TOTALS
$
BONDS & INSURANCE
$
CONTRACTOR OVERHEAD
$
CONTRACTOR PROFIT
$
OTHER: _________________________________
$
OTHER: _________________________________
$
LUMP SUM TOTAL AMOUNT:
$