Submittal Register
| TITLE: | PNSY Div 1 Spec | SUBMITTAL REGISTER | ||||||||||||||||||
| JOB NAME: | PNSY-B20 Steam to HW HX project | |||||||||||||||||||
| LOCATION: | Building 20 | |||||||||||||||||||
| CONTRACT NO: | ||||||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||||
| Line | Act-ivity # | Trans-mittal # | Specification Section | SD # | SD Description | Item Submitted | Paragraph # | Classi-fication: GOVT or A/E Revwr | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth - Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Revwr | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 01 14 00.00 22 | 01 | Preconstruction Submittals | List of Contact Personnel | 1.5.1 | G | ||||||||||||||
| 2 | 01 20 00.00 22 | 01 | Preconstruction Submittals | Schedule of Prices | 1.3 | G | ||||||||||||||
| 3 | 01 30 00.00 22 | 01 | Preconstruction Submittals | NAVFAC Red Zone Checklist | 0 | G | ||||||||||||||
| 4 | 01 30 00.00 22 | 01 | Preconstruction Submittals | NAVFAC PWD ME Follow-on Services List | 1.8 | G | ||||||||||||||
| 5 | 01 31 23.13 20 | 01 | Preconstruction Submittals | List of Contractor's Personnel | 1.4.2 | G | ||||||||||||||
| 6 | 01 32 16.00 20 | 01 | Preconstruction Submittals | Construction Schedule | 1.2 | G | ||||||||||||||
| 7 | 01 32 16.00 20 | 01 | Preconstruction Submittals | Construction Schedule (3 Week) | 1.6 | G | ||||||||||||||
| 8 | 01 32 16.00 20 | 01 | Preconstruction Submittals | Construction Schedule (Outages) | 1.8 | G | ||||||||||||||
| 9 | 01 32 16.00 20 | 07 | Certificates | Monthly Updates | 1.4 | G | ||||||||||||||
| 10 | 01 33 00 | 01 | Preconstruction Submittals | Submittal Register | 1.5 | G | ||||||||||||||
| 11 | 01 33 10.05 20 | 01 | Preconstruction Submittals | Consolidated RFP Documents | 2.1 | G | ||||||||||||||
| 12 | 01 33 10.05 20 | 01 | Preconstruction Submittals | Submittal Register | 1.5.5 | G | ||||||||||||||
| 13 | 01 33 10.05 20 | 05 | Design Data | Design Drawings | 1.7 | G | ||||||||||||||
| 14 | 01 33 10.05 20 | 05 | Design Data | Specifications | 1.8 | G | ||||||||||||||
| 15 | 01 33 10.05 20 | 05 | Design Data | Design Analysis | 1.9 | G | ||||||||||||||
| 16 | 01 33 10.05 20 | 05 | Design Data | Design Submittals | 2.2 | G | ||||||||||||||
| 17 | 01 33 10.05 20 | 11 | Closeout Submittals | Record Documents | 0 | G | ||||||||||||||
| 18 | 01 33 10.05 20 | 11 | Closeout Submittals | DD Form 1354 | 0 | G | ||||||||||||||
| 19 | 01 35 26.00 22 | 01 | Preconstruction Submittals | Accident Prevention Plan (APP) | 1.7 | G | ||||||||||||||
| 20 | 01 35 26.00 22 | 06 | Test Reports | Monthly Exposure Reports | 1.4 | G | ||||||||||||||
| 21 | 01 35 26.00 22 | 06 | Test Reports | Notifications and Reports | 1.12 | G | ||||||||||||||
| 22 | 01 35 26.00 22 | 06 | Test Reports | Accident Reports | 1.12.2 | G | ||||||||||||||
| 23 | 01 35 26.00 22 | 06 | Test Reports | LHE Inspection Reports | 1.12.3 | G | ||||||||||||||
| 24 | 01 35 26.00 22 | 07 | Certificates | Crane Operators/Riggers | 1.6.1.5 | G | ||||||||||||||
| 25 | 01 35 26.00 22 | 07 | Certificates | Standard Lift Plan | 1.7.2.2 | G | ||||||||||||||
| 26 | 01 35 26.00 22 | 07 | Certificates | Critical Lift Plan | 1.7.2.3 | G | ||||||||||||||
| 27 | 01 35 26.00 22 | 07 | Certificates | Naval Architecture Analysis | 1.7.2.3 | G | ||||||||||||||
| 28 | 01 35 26.00 22 | 07 | Certificates | Activity Hazard Analysis (AHA) | 1.8 | G | ||||||||||||||
| 29 | 01 35 26.00 22 | 07 | Certificates | Confined Space Entry Permit | 1.9.1 | G | ||||||||||||||
| 30 | 01 35 26.00 22 | 07 | Certificates | Hot Work Permit | 1.9.1 | G | ||||||||||||||
| 31 | 01 35 26.00 22 | 07 | Certificates | Certificate of Compliance | 1.12.4 | G | ||||||||||||||
| 32 | 01 35 26.00 22 | 07 | Certificates | Third Party Certification of Barge-Mounted Mobile Cranes | 0 | G | ||||||||||||||
| 33 | 01 35 26.00 22 | 07 | Certificates | License Certificates | 1.14 | G | ||||||||||||||
| 34 | 01 35 26.00 22 | 07 | Certificates | Radiography Operation Planning Work Sheet | 1.14.1 | G | ||||||||||||||
| 35 | 01 45 00.10 22 | 01 | Preconstruction Submittals | QC Plan | 1.6 | G | ||||||||||||||
| 36 | 01 50 00.00 22 | 01 | Preconstruction Submittals | Construction site plan | 1.4 | G | ||||||||||||||
| 37 | 01 50 00.00 22 | 01 | Preconstruction Submittals | Traffic control plan | 3.3.1 | G | ||||||||||||||
| 38 | 01 50 00.00 22 | 06 | Test Reports | Backflow Preventer Tests | 2.2.5 | G | ||||||||||||||
| 39 | 01 50 00.00 22 | 07 | Certificates | Backflow Tester | 1.5.1 | G | ||||||||||||||
| 40 | 01 50 00.00 22 | 07 | Certificates | Backflow Preventers | 1.5 | G | ||||||||||||||
| 41 | 01 57 19.00 22 | 01 | Preconstruction Submittals | Preconstruction Survey | 1.5.1 | G | ||||||||||||||
| 42 | 01 57 19.00 22 | 01 | Preconstruction Submittals | Solid Waste Management Plan | 3.4 | G | ||||||||||||||
| 43 | 01 57 19.00 22 | 01 | Preconstruction Submittals | Regulatory Notifications | 1.5.2 | G | ||||||||||||||
| 44 | 01 57 19.00 22 | 01 | Preconstruction Submittals | Environmental Management Plan (EMP) | 3.1 | G | ||||||||||||||
| 45 | 01 57 19.00 22 | 01 | Preconstruction Submittals | Dirt and Dust Control Plan | 3.14.1 | G | ||||||||||||||
| 46 | 01 57 19.00 22 | 01 | Preconstruction Submittals | Contractor Hazardous Material Inventory Log | 3.6 | G | ||||||||||||||
| 47 | 01 57 19.00 22 | 01 | Preconstruction Submittals | Storm Water Management/Erosion and Sedimentation Control Plan | 3.2.1 | G | ||||||||||||||
| 48 | 01 57 19.00 22 | 06 | Test Reports | Laboratory Analysis | 3.13.4.2 | G | ||||||||||||||
| 49 | 01 57 19.00 22 | 06 | Test Reports | Disposal Requirements | 3.15.2 | G | ||||||||||||||
| 50 | 01 57 19.00 22 | 06 | Test Reports | Erosion and Sediment Control Inspection Reports | 3.2.4 | G | ||||||||||||||
| 51 | 01 57 19.00 22 | 06 | Test Reports | Solid Waste Management Report | 3.4.1 | G | ||||||||||||||
| 52 | 01 57 19.00 22 | 11 | Closeout Submittals | Storm Water Management and Erosion Control Compliance Notebook | 3.2.1 | G | ||||||||||||||
| 53 | 01 57 19.00 22 | 11 | Closeout Submittals | Waste Determination Documentation | 3.5 | G | ||||||||||||||
| 54 | 01 57 19.00 22 | 11 | Closeout Submittals | Disposal Documentation for Hazardous and Regulated Waste | 3.13.4.4 | G | ||||||||||||||
| 55 | 01 57 19.00 22 | 11 | Closeout Submittals | Contractor 40 CFR Employee Training Records | 1.5.5 | G | ||||||||||||||
| 56 | 01 57 19.00 22 | 11 | Closeout Submittals | Solid Waste Management Report | 3.4.1 | G | ||||||||||||||
| 57 | 01 57 19.00 22 | 11 | Closeout Submittals | Contractor Hazardous Material Inventory Log | 3.6 | G | ||||||||||||||
| 58 | 01 57 19.00 22 | 11 | Closeout Submittals | Hazardous Waste/Debris Management | 3.13.4 | G | ||||||||||||||
| 59 | 01 57 19.00 22 | 11 | Closeout Submittals | Regulatory Notifications | 1.5.2 | G | ||||||||||||||
| 60 | 01 74 19.00 22 | 01 | Preconstruction Submittals | Waste Management Plan | 1.3 | G | ||||||||||||||
| 61 | 01 74 19.00 22 | 11 | Closeout Submittals | Records | 1.4 | G | ||||||||||||||
| 62 | 01 78 00.00 22 | 03 | Product Data | As-Built Record of Equipment and Materials | 1.3.2 | G | ||||||||||||||
| 63 | 01 78 00.00 22 | 03 | Product Data | Warranty Management Plan | 1.7.1 | G | ||||||||||||||
| 64 | 01 78 00.00 22 | 03 | Product Data | Warranty Tags | 1.7.4 | G | ||||||||||||||
| 65 | 01 78 00.00 22 | 03 | Product Data | Final Cleaning | 0 | G | ||||||||||||||
| 66 | 01 78 00.00 22 | 03 | Product Data | Spare Parts Data | 1.4 | G | ||||||||||||||
| 67 | 01 78 00.00 22 | 08 | Manufacturer’s Instructions | Preventative Maintenance | 1.5 | G | ||||||||||||||
| 68 | 01 78 00.00 22 | 08 | Manufacturer’s Instructions | Condition Monitoring (Predictive Testing) | 1.5 | G | ||||||||||||||
| 69 | 01 78 00.00 22 | 08 | Manufacturer’s Instructions | Inspection | 1.5 | G | ||||||||||||||
| 70 | 01 78 00.00 22 | 08 | Manufacturer’s Instructions | Instructions | 1.7.1 | G | ||||||||||||||
| 71 | 01 78 00.00 22 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 1.9 | G | ||||||||||||||
| 72 | 01 78 00.00 22 | 11 | Closeout Submittals | Record Drawings | 1.3.1 | G | ||||||||||||||
| 73 | 01 78 00.00 22 | 11 | Closeout Submittals | Certification of EPA Designated Items | 1.6 | G | ||||||||||||||
| 74 | 01 78 00.00 22 | 11 | Closeout Submittals | Certification of EPA Designated Items | 1.6 | G | ||||||||||||||
| 75 | 01 78 00.00 22 | 11 | Closeout Submittals | Red Zone Documents | 1.3.6 | G | ||||||||||||||
| 76 | 01 78 23 | 10 | Operation and Maintenance Data | O&M Database | 0 | G | ||||||||||||||
| 77 | 01 78 23 | 10 | Operation and Maintenance Data | Training Plan | 3.1.1 | G | ||||||||||||||
| 78 | 01 78 23 | 10 | Operation and Maintenance Data | Training Outline | 3.1.3 | G | ||||||||||||||
| 79 | 01 78 23 | 10 | Operation and Maintenance Data | Training Content | 3.1.2 | G | ||||||||||||||
| 80 | 01 78 23 | 11 | Closeout Submittals | Training Video Recording | 3.1.4 | G | ||||||||||||||
| 81 | 01 78 23 | 11 | Closeout Submittals | Validation of Training Completion | 3.1.6 | G | ||||||||||||||
| 82 | 01 78 24.00 22 | 11 | Closeout Submittals | eOMSI, Progress Submittal | 1.4.1 | G | ||||||||||||||
| 83 | 01 78 24.00 22 | 11 | Closeout Submittals | eOMSI, Prefinal Submittal | 1.4.2 | G | ||||||||||||||
| 84 | 01 78 24.00 22 | 11 | Closeout Submittals | eOMSI, Final Submittal | 1.4.3 | G | ||||||||||||||
| 85 | 01 33 00 | 01 | Preconstruction Submittals | Submittal Register | 1.8 | G | ||||||||||||||
| 86 | 02 82 00.00 22 | 03 | Product Data | Amended Water | 1.2.2 | G | ||||||||||||||
| 87 | 02 82 00.00 22 | 03 | Product Data | Safety Data Sheets (SDS) for All Materials | 1.3.9 | G | ||||||||||||||
| 88 | 02 82 00.00 22 | 03 | Product Data | Encapsulants | 2.1 | G | ||||||||||||||
| 89 | 02 82 00.00 22 | 03 | Product Data | Respirators | 3.1.2.1 | G | ||||||||||||||
| 90 | 02 82 00.00 22 | 03 | Product Data | Local Exhaust Equipment | 3.1.7 | G | ||||||||||||||
| 91 | 02 82 00.00 22 | 03 | Product Data | Pressure Differential Automatic Recording Instrument | 3.1.7 | G | ||||||||||||||
| 92 | 02 82 00.00 22 | 03 | Product Data | Vacuums | 3.1.8 | G | ||||||||||||||
| 93 | 02 82 00.00 22 | 03 | Product Data | Glovebags | 3.1.10 | G | ||||||||||||||
| 94 | 02 82 00.00 22 | 06 | Test Reports | Air Sampling Results | 1.5.5 | G | ||||||||||||||
| 95 | 02 82 00.00 22 | 06 | Test Reports | Pressure Differential Recordings for Local Exhaust System | 1.5.6 | G | ||||||||||||||
| 96 | 02 82 00.00 22 | 06 | Test Reports | Encapsulation Test Patches | 3.2.12.2 | G | ||||||||||||||
| 97 | 02 82 00.00 22 | 06 | Test Reports | Clearance Sampling | 3.2.14.5 | G | ||||||||||||||
| 98 | 02 82 00.00 22 | 06 | Test Reports | Asbestos Disposal Quantity Report | 3.3.3.2 | G | ||||||||||||||
| 99 | 02 82 00.00 22 | 07 | Certificates | Employee Training | 1.3.4 | G | ||||||||||||||
| 100 | 02 82 00.00 22 | 07 | Certificates | Notifications | 1.3.5 | G | ||||||||||||||
| 101 | 02 82 00.00 22 | 07 | Certificates | Respiratory Protection Program | 1.3.7 | G | ||||||||||||||
| 102 | 02 82 00.00 22 | 07 | Certificates | Asbestos Hazard Abatement Plan | 1.3.10 | G | ||||||||||||||
| 103 | 02 82 00.00 22 | 07 | Certificates | Testing Laboratory | 1.3.11 | G | ||||||||||||||
| 104 | 02 82 00.00 22 | 07 | Certificates | Medical Certification | 1.3.14 | G | ||||||||||||||
| 105 | 02 82 00.00 22 | 07 | Certificates | Private Qualified Person Documentation | 1.5.1 | G | ||||||||||||||
| 106 | 02 82 00.00 22 | 07 | Certificates | Competent Person | 1.5.2 | G | ||||||||||||||
| 107 | 02 82 00.00 22 | 07 | Certificates | Worker's License | 1.5.3 | G | ||||||||||||||
| 108 | 02 82 00.00 22 | 07 | Certificates | Contractor's License | 1.5.4 | G | ||||||||||||||
| 109 | 02 82 00.00 22 | 07 | Certificates | Federal, State or Local Citations on Previous Projects | 1.5.7 | G | ||||||||||||||
| 110 | 02 82 00.00 22 | 07 | Certificates | Encapsulants | 2.1 | G | ||||||||||||||
| 111 | 02 82 00.00 22 | 07 | Certificates | Equipment Used to Contain Airborne Asbestos Fibers | 3.1 | G | ||||||||||||||
| 112 | 02 82 00.00 22 | 07 | Certificates | Water Filtration Equipment | 3.1.3.3 | G | ||||||||||||||
| 113 | 02 82 00.00 22 | 07 | Certificates | Vacuums | 3.1.8 | G | ||||||||||||||
| 114 | 02 82 00.00 22 | 07 | Certificates | Ventilation Systems | 3.1.8 | G | ||||||||||||||
| 115 | 02 82 00.00 22 | 11 | Closeout Submittals | Permits | 1.3.5 | |||||||||||||||
| 116 | 02 82 00.00 22 | 11 | Closeout Submittals | Licenses | 1.3.5 | G | ||||||||||||||
| 117 | 02 82 00.00 22 | 11 | Closeout Submittals | Notifications | 1.3.5 | G | ||||||||||||||
| 118 | 02 82 00.00 22 | 11 | Closeout Submittals | Respirator Program Records | 1.3.7.1 | G | ||||||||||||||
| 119 | 02 82 00.00 22 | 11 | Closeout Submittals | Rental Equipment | 1.7.1 | G | ||||||||||||||
| 120 | 02 83 00.00 22 | 01 | Preconstruction Submittals | Competent Person | 1.5.1.1 | G | ||||||||||||||
| 121 | 02 83 00.00 22 | 01 | Preconstruction Submittals | Training Certification | 1.5.1.2 | G | ||||||||||||||
| 122 | 02 83 00.00 22 | 01 | Preconstruction Submittals | Occupational and Environmental Assessment Data Report | 1.5.2.3 | G | ||||||||||||||
| 123 | 02 83 00.00 22 | 01 | Preconstruction Submittals | Medical Examinations | 1.5.2.4 | G | ||||||||||||||
| 124 | 02 83 00.00 22 | 01 | Preconstruction Submittals | Lead, Cadmium, and Chromium Waste Management Plan | 1.5.2.8 | G | ||||||||||||||
| 125 | 02 83 00.00 22 | 01 | Preconstruction Submittals | Licenses, Permits and Notifications | 1.5.4 | G | ||||||||||||||
| 126 | 02 83 00.00 22 | 01 | Preconstruction Submittals | Occupant Protection Plan | 1.5.2.1 | G | ||||||||||||||
| 127 | 02 83 00.00 22 | 01 | Preconstruction Submittals | Occupant Protection Plan | 1.5.5 | G | ||||||||||||||
| 128 | 02 83 00.00 22 | 01 | Preconstruction Submittals | Lead, Cadmium, and Chromium Compliance Plan | 1.5.2.2 | G | ||||||||||||||
| 129 | 02 83 00.00 22 | 01 | Preconstruction Submittals | Initial Sample Results | 3.4.1.1 | G | ||||||||||||||
| 130 | 02 83 00.00 22 | 03 | Product Data | Respirators | 1.6.1 | G | ||||||||||||||
| 131 | 02 83 00.00 22 | 03 | Product Data | Vacuum Filters | 1.6.4 | G | ||||||||||||||
| 132 | 02 83 00.00 22 | 03 | Product Data | Negative Air Pressure System | 1.6.7 | G | ||||||||||||||
| 133 | 02 83 00.00 22 | 03 | Product Data | Materials and Equipment | 2.1 | G | ||||||||||||||
| 134 | 02 83 00.00 22 | 03 | Product Data | Expendable Supplies | 2.1.1 | G | ||||||||||||||
| 135 | 02 83 00.00 22 | 03 | Product Data | Local Exhaust Equipment | 3.1.1.5 | G | ||||||||||||||
| 136 | 02 83 00.00 22 | 03 | Product Data | Pressure Differential Automatic Recording Instrument | 3.1.1.5 | G | ||||||||||||||
| 137 | 02 83 00.00 22 | 03 | Product Data | Pressure Differential Log | 3.1.1.6 | G | ||||||||||||||
| 138 | 02 83 00.00 22 | 06 | Test Reports | Sampling and Analysis | 1.3.3 | G | ||||||||||||||
| 139 | 02 83 00.00 22 | 06 | Test Reports | Occupational and Environmental Assessment Data Report | 1.5.2.3 | G | ||||||||||||||
| 140 | 02 83 00.00 22 | 06 | Test Reports | Sampling Results | 1.5.2.3 | G | ||||||||||||||
| 141 | 02 83 00.00 22 | 06 | Test Reports | Pressure Differential Recordings For Local Exhaust System | 1.5.3 | G | ||||||||||||||
| 142 | 02 83 00.00 22 | 07 | Certificates | Testing Laboratory | 1.5.1.3 | G | ||||||||||||||
| 143 | 02 83 00.00 22 | 07 | Certificates | Third Party Consultant Qualifications | 1.5.1.4 | G | ||||||||||||||
| 144 | 02 83 00.00 22 | 07 | Certificates | Occupant Notification | 3.1.1.1 | G | ||||||||||||||
| 145 | 02 83 00.00 22 | 07 | Certificates | Notification of the Commencement of [LBP] Hazard Abatement | 3.1.1.1 | G | ||||||||||||||
| 146 | 02 83 00.00 22 | 07 | Certificates | Clearance Certification | 3.5.1.1 | G | ||||||||||||||
| 147 | 02 83 00.00 22 | 11 | Closeout Submittals | Turn-In Documents or Weight Tickets | 3.5.2.1 | G | ||||||||||||||
| 148 | 23 57 10.00 10 | 02 | Shop Drawings | Heating System | 2.6 | |||||||||||||||
| 149 | 23 57 10.00 10 | 03 | Product Data | Spare Parts | 1.5 | |||||||||||||||
| 150 | 23 57 10.00 10 | 03 | Product Data | Welding | 3.2 | |||||||||||||||
| 151 | 23 57 10.00 10 | 03 | Product Data | Framed Instructions | 3.9 | |||||||||||||||
| 152 | 23 57 10.00 10 | 06 | Test Reports | Testing and Cleaning | 3.8 | |||||||||||||||
| 153 | 23 57 10.00 10 | 06 | Test Reports | Water Treatment Testing | 0 | |||||||||||||||
| 154 | 23 57 10.00 10 | 07 | Certificates | Bolts | 2.2.9.3 | |||||||||||||||
| 155 | 23 57 10.00 10 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 3.10 | G |