ATT 4 - 442-303 EED Cheyenne WY FINAL CD VOL 3.pdf

PDF 46 MB Posted

Attached to
VA Construction Project - Expand Emergency Department Cheyenne, WY 442 - 303
Solicitation number
36C77624R0102
Issued by

About this file

This document appears to be a construction drawing (ATT 4 - 442-303 EED Cheyenne WY FINAL CD VOL 3.pdf) related to a Department of Veterans Affairs (VA) solicitation for the Expansion of the Emergency Department at the Cheyenne, Wyoming VA Medical Center (Solicitation Number: 36C77624R0102).

The solicitation requires construction of a third-floor addition on the north side of the existing building, including selective demolition, general construction, and alterations. A site visit is scheduled for October 10th at 2pm MT. The solicitation is being issued by the VA Technology Acquisition Center in Austin, Texas. No other details about the required products/services, response/award dates, pricing, or set asides are provided in this drawing document. This appears to be a technical drawing rather than the full solicitation package.

View the file

Other files

File Type Posted
Amendment 0005.zip ZIP file
Amendment 0004.zip ZIP file
Amendment 0003.zip ZIP file
Amendment 0002.zip ZIP file
ATT 10 - Geotech Report.pdf PDF
Amendment 0001.pdf PDF
ATT 8 - 442-303 Bid Breakdown.docx DOCX document
36C77624R0102 Solicitation 10152024.pdf PDF
Amendment 0001 Attachments.zip ZIP file
ATT 9 - PPQ.docx DOCX document
ATT 5 - 442-303 EED Cheyenne WY FINAL CD VOL 4.pdf PDF
ATT 7 - Limitations on Subcontracting.docx DOCX document
ATT 8 - Copy of Division Cost Breakdown - 5-29-24.xlsx XLSX spreadsheet
ATT 6 - Wage Determination Cheyenne.pdf PDF
ATT 3 - 442-303 EED Cheyenne WY FINAL CD VOL 2.pdf PDF
ATT 1 - 442-303 Expand ED Cheyenne WY FINAL CD Specs.pdf PDF
ATT 2 - 442-303 EED Cheyenne WY FINAL CD VOL 1.pdf PDF
36C77624R0102 Solicitation.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEDUCT ALTERNATES#

ELIMINATE FRONT ENTRANCE CANOPY. INCLUDING THE WRAP-AROUND SUNSCREEN PERGOLA AND COLUMNS. THE

CURRENT FRONT ENTRANCE CANOPY IS 817 SQ. FT.

ELIMINATE THE RENOVATION TO THE POLICE SUITE. THE POLICE FUNCTIONS WOULD REMAIN AS THEY CURRENTLY EXIST AND WOULD NOT EXPAND OR SIMPLY REUSE EXISTING SPACE AS IS. ALL WORK FOR ARCHITECTURAL, ELECTRICAL, PLUMBING, LOW VOLTAGE, AND FIRE PROTECTION FOR THIS AREA TO BE REMOVED. MINOR DUCT MODIFICATIONS WILL NEED TO BE PERFORMED TO DEMOLISH AND RECONNECT THE EXISTING SUPPLY/RETURN DUCTWORK TO THE NEW MAINS INSTALLED DURING PHASE 3. THE POLICE SPACE TO BE RENOVATED IS

APPROXIMATELY 2,572 SQ. FT.

ELIMINATE THE RENOVATION TO THE SECURITY CONTROL CENTER (SCC). THE POLICE FUNCTIONS WOULD REMAIN AS THEY CURRENTLY EXIST AND WOULD NOT EXPAND OR SIMPLY REUSE EXISTING SPACE AS IS. THE

PROPOSED SPACE TO BE RENOVATED IS APPROXIMATELY 421 SQ. FT.

ELIMINATE THE RENOVATIONS IN THE EXISTING EMERGENCY DEPARTMENT (ED). THE TEMPORARY AHU WILL STILL BE REQUIRED TO SERVE THE EXISTING ED WHILE AHU-6 IS BEING DEMOLISHED AND THE NEW AHU IS BEING INSTALLED.

ALL MAJOR DUCTWORK FROM THE NEW AHU THAT WILL SERVE THE EXISTING ED AND THE NEW ADDITION. TO THE MAXIMUM EXTENT PRACTICAL, ALL EXISTING VAV'S SHALL REMAIN AND BE RECONNECTED TO THE NEW DUCT MAINS.

THE CANTEEN STORE AND STORAGE AREAS SHALL BE DISCONNECTED FROM AHU-4 AND RECONNECTED TO THE NEW AHU. EMERGENCY SUPPORT SPACE AS CURRENTLY DESIGNED IS APPROXIMATELY 1,750 SQ. FT.

MEN'S & WOMEN'S STAFF LOCKERS, WEAPON STORAGE LOCKERS, AND POLICE SUITE LOCKERS REMOVED FROM

THE SCOPE FOR PURCHASE AND INSTALLATION.

NEW EMERGENCY POWER PANEL EHP-4 REMOVED FROM THE SCOPE. THIS INCLUDES REMOVING ATS-DPEHB3, DISTRIBUTION BOARD DPEHB3, AND ASSOCIATED NEW FEEDER.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

/1

/2

:0

:4

P

M C

U s e rs \a p u lle n \D o c u m e n ts

\A

-1

C h e y e n n e E

D a p u lle n V

D X

T .r v t

GM-001

COVER

1 1SMR/TB

EXPAND EMERGENCY

DEPARTMENT

CHEYENNE VETERANS AFFAIRS

MEDICAL CENTER

2360 E PERSHING BLVD

CHEYENNE, WY 82001

MARCH 28, 2024

100% BID DOCUMENTS

442-30320-147

BUFFALO

EXPAND EMERGENCY DEPARTMENT

CHEYENNE VETERANS AFFAIRS MEDICAL CENTER

2360 E PERSHING BLVD

CHEYENNE, WY 82001

VA PROJECT #: 442-303

RBK

CAMPUS LOCATION

PROJECT LOCATION

VOLUME 3 OF 4

DRAWING LIST - VOLUME 3 OF 4

GENERAL

GM-001 COVER 1 1

FIRE SUPPRESSION

FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 16

FK101 FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 1 2 16

FK102 FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 2 3 16

FK103 FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 3 4 16

FK103A FIRST FLOOR DEDUCT ALTERNATE FIRE SUPPRESSION DEMOLITION PLAN - PHASE 3 5 16

FK104 FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 4 6 16

FK104A FIRST FLOOR DEDUCT ALTERNATE FIRE SUPPRESSION DEMOLITION PLAN - PHASE 4 7 16

FX101 FIRST FLOOR FIRE SUPPRESSION PLAN - PHASE 1 8 16

FX102 FIRST FLOOR AND SECOND FLOOR FIRE SUPPRESSION PLANS - PHASE 2 9 16

FX103 FIRST FLOOR FIRE SUPPRESSION PLAN - PHASE 3 10 16

FX103A FIRST FLOOR DEDUCT ALTERNATE FIRE SUPPRESSION PLAN - PHASE 3 11 16

FX104 FIRST FLOOR FIRE SUPPRESSION PLAN - PHASE 4 12 16

FX104A FIRST FLOOR DEDUCT ALTERNATE FIRE SUPPRESSION PLAN - PHASE 4 13 16

FX105 FIRST FLOOR FIRE SUPPRESSION PLAN - COMPLETE 14 16

FX301 FIRE SUPPRESSION 3D SECTIONS 15 16

FX501 FIRE SUPPRESSION DETAILS 16 16

PLUMBING

P-001 PLUMBING GENERAL INFORMATION 1 51

PD101 BASEMENT DRAIN, WASTE, AND VENT DEMOLITION PLAN - PHASE 1 2 51

PD102 BASEMENT DRAIN, WASTE, AND VENT DEMOLITION PLAN - PHASE 3 3 51

PD103 FIRST FLOOR DRAIN, WASTE, AND VENT DEMOLITION PLAN - PHASE 1 4 51

PD104 FIRST FLOOR DRAIN, WASTE, AND VENT DEMOLITION PLAN - PHASE 2 5 51

PD105 FIRST FLOOR DRAIN, WASTE, AND VENT DEMOLITION PLAN - PHASE 3 6 51

PD105A FIRST FLOOR DEDUCT ALTERNATE DRAIN, WASTE, AND VENT DEMOLITION PLAN - PHASE 3 7 51

PD106 FIRST FLOOR DRAIN, WASTE, AND VENT DEMOLITION PLAN - PHASE 4 8 51

PD107 FIRST FLOOR DOMESTIC WATER DEMOLITION PLAN - PHASE 1 9 51

PD108 FIRST FLOOR DOMESTIC WATER DEMOLITION PLAN - PHASE 2 10 51

PD109 FIRST FLOOR DOMESTIC WATER DEMOLITION PLAN - PHASE 3 11 51

PD109A FIRST FLOOR DEDUCT ALTERNATE DOMESTIC WATER DEMOLITION PLAN - PHASE 3 12 51

PD110 FIRST FLOOR DOMESTIC WATER DEMOLITION PLAN - PHASE 4 13 51

PD111 FIRST FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 3 14 51

PD111A FIRST FLOOR DEDUCT ALTERNATE MEDICAL GAS DEMOLITION PLAN - PHASE 3 15 51

PD112 FIRST FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 4 16 51

PD112A FIRST FLOOR DEDUCT ALTERNATE MEDICAL GAS DEMOLITION PLAN - PHASE 4 17 51

PW101 BASEMENT DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 1 18 51

PW102 BASEMENT DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 2 19 51

PW103 BASEMENT DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 3 20 51

PW103A BASEMENT DEDUCT ALTERNATE DRAIN, WASTE, VENT, STORM DRAIN PLAN - PHASE 3 21 51

PW104 BASEMENT DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 4 22 51

PW104A BASEMENT DEDUCT ALTERNATE DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 4 23 51

PW105 BASEMENT DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - COMPLETE 24 51

PW106 FIRST FLOOR DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 1 25 51

PW107 FIRST FLOOR DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 2 26 51

PW108 FIRST FLOOR DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 3 27 51

PW108A FIRST FLOOR DEDUCT ALTERNATE DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 3 28 51

PW109 FIRST FLOOR DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 4 29 51

PW109A FIRST FLOOR DEDUCT ALTERNATE DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 4 30 51

PW110 FIRST FLOOR DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - COMPLETE 31 51

PW111 ROOF PLUMBING PLAN - PHASE 2 32 51

PP101 BASEMENT DOMESTIC WATER PLANS NORTH AND SOUTH - PHASE 1 33 51

PP102 BASEMENT DOMESTIC WATER PLANS NORTH AND SOUTH - PHASE 3 34 51

PP102A BASEMENT DEDUCT ALTERNATE DOMESTIC WATER PLANS NORTH AND SOUTH - PHASE 3 35 51

PP103 FIRST FLOOR DOMESTIC WATER PLAN SOUTH - PHASE 1 36 51

PP104 FIRST FLOOR DOMESTIC WATER PLAN SOUTH - PHASE 2 37 51

PP105 FIRST FLOOR DOMESTIC WATER PLAN SOUTH - PHASE 3 38 51

PP105A FIRST FLOOR DEDUCT ALTERNATE DOMESTIC WATER PLAN SOUTH - PHASE 3 39 51

PP106 FIRST FLOOR DOMESTIC WATER PLAN SOUTH - PHASE 4 40 51

PP106A FIRST FLOOR DEDUCT ALTERNATE DOMESTIC WATER PLAN SOUTH - PHASE 4 41 51

PP107 FIRST FLOOR DOMESTIC WATER PLAN SOUTH - COMPLETE 42 51

PG101 FIRST FLOOR MEDICAL GAS PLAN NORTH - PHASE 2 43 51

PG102 FIRST FLOOR MEDICAL GAS PLAN SOUTH - PHASE 2 44 51

P-501 PLUMBING DETAILS 45 51

P-502 PLUMBING DETAILS 46 51

P-503 PLUMBING DETAILS 47 51

P-601 PLUMBING SCHEDULES 48 51

P-901 DOMESTIC WATER RISER DIAGRAM 49 51

P-902 DRAIN, WASTE, AND VENT RISER DIAGRAM 50 51

P-903 MEDICAL GAS RISER DIAGRAM 51 51

DRAWING LIST - VOLUME 3 OF 4

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 42

MD101 FIRST FLOOR MECHANICAL DEMOLITION PLAN - PHASE 1 2 42

MD102 FIRST FLOOR MECHANICAL DEMOLITION PLAN - PHASE 2 3 42

MD103 FIRST FLOOR MECHANICAL DEMOLITION PLAN - PHASE 3 4 42

MD103A FIRST FLOOR DEDUCT ALTERNATE 5 MECHANICAL DEMOLITION PLAN - PHASE 3 5 42

MD103B FIRST FLOOR DEDUCT ALTERNATE 6 MECHANICAL DEMOLITION PLAN - PHASE 3 6 42

MD104 FIRST FLOOR MECHANICAL DEMOLITION PLAN - PHASE 4 7 42

MD105 PENTHOUSE AND SECOND FLOOR ROOF MECHANICAL DEMOLITION PLAN - PHASE 2 8 42

MD106 PENTHOUSE AND SECOND FLOOR ROOF MECHANICAL DEMOLITION PLAN - PHASE 3 9 42

MH101 FIRST FLOOR HVAC PLAN - PHASE 1 10 42

MH102 FIRST FLOOR HVAC PLAN - PHASE 2 11 42

MH103 FIRST FLOOR HVAC PLAN - PHASE 3 12 42

MH103A FIRST FLOOR DEDUCT ALTERNATE 5 HVAC PLAN - PHASE 3 13 42

MH103B FIRST FLOOR DEDUCT ALTERNATE 6 HVAC PLAN - PHASE 3 14 42

MH104 FIRST FLOOR HVAC PLAN - PHASE 4 15 42

MH105 FIRST FLOOR HVAC PLAN - COMPLETE 16 42

MH106 SECOND FLOOR AND FIRST FLOOR ROOF HVAC PLAN 17 42

MH107 PENTHOUSE, SECOND FLOOR ROOF, AND PENTHOUSE ROOF HVAC PLANS - PHASE 1 18 42

MH108 PENTHOUSE, SECOND FLOOR ROOF, AND PENTHOUSE ROOF HVAC PLANS - PHASE 2 19 42

MP101 BASEMENT MECHANICAL PIPING PLAN - PHASE 1 20 42

MP102 BASEMENT MECHANICAL PIPING PLAN - PHASE 3 21 42

MP103 FIRST FLOOR MECHANICAL PIPING PLAN - PHASE 1 22 42

MP104 FIRST FLOOR MECHANICAL PIPING PLAN - PHASE 3 23 42

MP104A FIRST FLOOR DEDUCT ALTERNATE 5 MECHANICAL PIPING PLAN - PHASE 3 24 42

MP105 FIRST FLOOR MECHANICAL PIPING PLAN - PHASE 4 25 42

MP106 FIRST FLOOR MECHANICAL PIPING PLAN - COMPLETE 26 42

MP107 PENTHOUSE AND NORTH SECOND FLOOR ROOF MECHANICAL PIPING PLAN - PHASE 1 27 42

MP108 PENTHOUSE AND NORTH SECOND FLOOR ROOF MECHANICAL PIPING PLAN - PHASE 2 28 42

M-301 MECHANICAL SECTIONS 29 42

M-401 ENLARGED FIRST FLOOR ADDITION HVAC PLAN - PHASE 2 30 42

M-402 ENLARGED FIRST FLOOR ADDITION MECHANICAL PIPING PLAN - PHASE 2 31 42

M-403 PARTIAL PENTHOUSE HVAC PLAN 32 42

M-501 MECHANICAL DETAILS 33 42

M-502 MECHANICAL DETAILS 34 42

M-503 MECHANICAL DETAILS 35 42

M-504 MECHANICAL CONTROLS 36 42

M-505 MECHANICAL CONTROLS 37 42

M-601 MECHANICAL SCHEDULES 38 42

M-602 MECHANICAL SCHEDULES 39 42

M-603 MECHANICAL SCHEDULES 40 42

M-604 MECHANICAL SCHEDULES 41 42

M-605 MECHANICAL AIRFLOW SCHEMATICS 42 42

Docusign Envelope ID: 8C911331-036A-4842-B33A-F7F0A53B25B6

7/19/2024

NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT

SEMI-RECESSED SPRINKLER HEAD

UPRIGHT SPRINKLER HEAD

FIRE LINEFL

CONCEALED SPRINKLER HEAD

PENDANT SPRINKLER HEAD

SIDEWALL SPRINKLER HEAD

FIRE DEPARTMENT CONNECTION (FDC)

FIRE DRAINDRAIN

CONNECT TO EXISTING

LIMIT OF DEMOLITION

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

FIRE PROTECTION CONTRACTORFPC

TAMPER SWITCH

FLOW SWITCH

CHECK VALVE

GATE VALVE

EXTERIOR ALARM GONG (WATER ACTIVATED)

TEST AND DRAIN ASSEMBLY

BACKFLOW PREVENTER

T&D

TS

FS

ORDINARY HAZARD

GROUP 1 OCCUPANCY

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

ORDINARY HAZARD

GROUP 2 OCCUPANCY

LIGHT HAZARD

FIRE SUPPRESSION SYMBOLS & ABBREVIATIONS

FIRE LINE UNDERGROUNDFL NEW CONNECTION

THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA 13.

IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE PROTECTION

WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS DRAWING IS “FOR

INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE PROTECTION CONTRACTOR TO

BASE THE DESIGN OF THE FIRE PROTECTION SYSTEM ON. THE CONTRACTOR SHALL

VERIFY THE EXACT CONDITIONS THAT THIS DRAWING REPRESENTS, INCLUDING ANY

PERCEIVED CONCEALED SPACES, AND THE BUILDING TYPE AND CONSTRUCTION AS

OUTLINED IN THE INTERNATIONAL BUILDING CODE, PRIOR TO THE START OF WORK.

REFER TO NFPA 13, AND THE PROJECT SPECIFICATIONS FOR OTHER FIRE PROTECTION

REQUIREMENTS.

1. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS AND VALVES PRIOR TO START OF

WORK.

2. COORDINATE WITH COR FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE. GIVE THE

COR THREE (14) DAYS NOTICE PRIOR TO PLANNED SHUTDOWN OR INTERRUPTION.

3. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT

OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.

4. FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN OFFSITE AND

DISPOSED OF.

5. REMOVE SPRINKLER MAINS, BRANCHES AND SPRINKLERS BACK TO THE ZONE CONTROL VALVE AS NEEDED TO INSTALL NEW

SPRINKLER SYSTEM.

FIRE SUPPRESSION DEMOLITION GENERAL NOTES

1. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS.

COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS.

LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA REQUIREMENTS FOR THE APPROPRIATE

HAZARD CLASSIFICATION.

2. THIS FACILITY IS FULLY SPRINKLERED. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS REQUIRED BY NFPA AND VA

REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.

3. FIRE PROTECTION CONTRACTOR SHALL OBTAIN LATEST FLOW TEST DATA INDICATING THE WATER FLOW, STATIC PRESSURE AVAILABLE WITH NO FLOW, AND RESIDUAL PRESSURE AT FULL FLOW TO THE FACILITY. SUBMIT HYDRAULIC CALCULATIONS

AND PLANS RELATED TO A MINIMUM OF 1 REMOTE AREA FOR REVIEW.

4. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING. SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES TO AVOID CONFLICT.

5. SUPPORT NEW PIPING AND EQUIPMENT FROM STRUCTURE. PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. DESIGN SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS

AT PRIMARY BUILDING STRUCTURAL MEMBERS.

6. REPAIR OR REPLACE NON-CONFORMING AND INADEQUATE NEW WORK AT NO ADDITIONAL COST TO THE VA.

7. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL

PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.

8. WATER SERVICE AND DOUBLE CHECK DETECTOR TYPE BACKFLOW ASSEMBLY WITH TAMPER SWITCHES TO BE PROVIDED AND TESTED AS WORK OF DIVISION 22. INCORPORATE ASSOCIATED PRESSURE DROP OF SELECTED BACKFLOW ASSEMBLY

IN HYDRAULIC CALCULATIONS.

9. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS OR CORRIDORS.

LOCATE CENTERED IN CEILING TILE WHERE POSSIBLE.

FIRE SUPPRESSION GENERAL NOTES

1. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS OUT OF COMMISSION, CONTRACTOR SHALL HAVE SUFFICIENT PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY IN ACCORDANCE WITH VA REQUIREMENTS. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION. REFER TO INTERNATIONAL FIRE CODE CHAPTER 9, SECTION 901.7.

2. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS

PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.

3. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS USE.

4. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND

ROOM OF THE FIRE AREA IS COVERED.

BUILDING AND OCCUPANT SAFETY - INTERRUPTION OF

FIRE PROTECTION SERVICE

1. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN DUST

CONTROL PLAN.

2. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE MAINTAINED.

3. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.

PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.

4. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC

PATHOGENS.

5. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE COR ACCEPTANCE.

INFECTION CONTROL MEASURES

STATIC PSI RESIDUAL PSI FLOW PSI DATE LOCATION FLOW TEST PERFORMED BY

118 100 95 2023

HYDRANT #12, SOUTH

OF PRIMARY CARE

VA CHEYENNE

MEDICAL CENTER

THE FLOW TEST INFORMATION LISTED ABOVE IS INTENDED AS A REFERENCE FOR THE FIRE PROTECTION CONTRACTOR. THE FIRE

PROTECTION CONTRACTOR SHALL PERFORM A HYDRAULIC FLOW TEST NEAR THE PROJECT SITE TO VERIFY ACTUAL FLOW

CONDITIONS ON WHICH TO BASE THE FIRE PROTECTION DESIGN.

FLOW TEST INFORMATION (NEW SERVICE)

GPM CALCULATED

STATIC PSI RESIDUAL PSI FLOW PSI DATE LOCATION FLOW TEST PERFORMED BY

118 100 95 2023

HYDRANT #13, NORTH

OF BUFFALO SW

PARKING LOT

VA CHEYENNE

MEDICAL CENTER

THE FLOW TEST INFORMATION LISTED ABOVE IS INTENDED AS A REFERENCE FOR THE FIRE PROTECTION CONTRACTOR. THE FIRE

PROTECTION CONTRACTOR SHALL PERFORM A HYDRAULIC FLOW TEST NEAR THE PROJECT SITE TO VERIFY ACTUAL FLOW

CONDITIONS ON WHICH TO BASE THE FIRE PROTECTION DESIGN.

FLOW TEST INFORMATION (EXISTING SERVICE)

GPM CALCULATED

GENERAL REQUIREMENTS:

1. ALL PHASES OF WORK ARE SHOWN ON THESE PLANS.

2. WORK COVERED IN THE DIFFERENT PHASES ARE NOTED ON THE DRAWINGS.

3. WORK IS TO BE DONE IN THE ORDER LISTED BELOW UNLESS APPROVED BY THE ENGINEER AND COR.

PHASE 1:

1. INSTALL NEW 6" FIRE SERVICE IN CRAWL SPACE AND ROUTE TO TEMPORARY RISER LOCATION.

2. TEMPORARILY INSTALL BACKFLOW PREVENTER FOR NEW FIRE SERVICE.

3. DEMOLISH EXISTING FDC AND ASSOCIATED PIPING BACK TO THE CRAWL SPACE. EXTEND OUT FDC PIPING FROM THE

CRAWL SPACE TO A TEMPORARY FDC STANDPIPE APPROXIMATELY 10' OUTSIDE OF THE BUILDING.

4. MODIFY OR DEMOLISH EXISTING HEADS AND PIPING IN REMODELED TR B1-41, ELEC B1-45, AND OFFICE B1-41A AS

REQUIRED FOR THE NEW LAYOUT.

5. INSTALL AND CONNECT NEW HEADS AND PIPING IN THE REMODELED TR B1-41, ELEC B1-45, AND OFFICE B1-41A AS

REQUIRED FOR THE NEW LAYOUT.

PHASE 2:

1. MODIFY OR DEMOLISH EXISTING HEADS AND PIPING IN REMODELED EXISTING WAITING ROOM AREA B1-80.

2. INSTALL AND CONNECT NEW HEADS AND PIPING IN REMODELED EXISTING WAITING ROOM AREA B1-80.

3. INSTALL AND CONNECT NEW HEADS AND PIPING IN MECH B2-41K ON THE SECOND FLOOR.

4. CONSTRUCTION OF NEW ADDITION AND ALL FIRE SUPPRESSION SYSTEMS SHOWN IN IT.

5. RUN PIPING FROM TEMPORARY FIRE RISER TO NEW ADDITION.

PHASE 3:

1. MODIFY OR DEMOLISH EXISTING HEADS AND PIPING IN REMODELED AREA AS REQUIRED FOR THE NEW LAYOUT.

2. INSTALL AND CONNECT NEW HEADS AND PIPING IN REMODELED AREA AS REQUIRED FOR THE NEW LAYOUT.

3. DEMOLISH TEMPORARY FDC STANDPIPE. PERMANENTLY INSTALL EXISTING FDC AND PROVIDE NEW PIPING. CONNECT TO

EXISTING MAIN IN THE STAIRWELL.

4. PROVIDE NEW FDC FOR NEW ADDITION AND PART OF THE REMODELED AREA.

5. RELOCATE THE TEMPORARY FIRE RISER FROM THE VESTIBULE TO THE NEW FIRE RISER ROOM. PERMANENTLY INSTALL

BACKFLOW PREVENTER FOR NEW FIRE SERVICE.

PHASE 4:

1. MODIFY OR DEMOLISH EXISTING HEADS AND PIPING IN REMODELED EXISTING POLICE AREA INTO THE SECURITY AREA, ROOM NUMBERS B1-84, 84A, AND 84B.

2. INSTALL AND CONNECT NEW HEADS AND PIPING IN REMODELED EXISTING POLICE AREA INTO THE SECURITY AREA, ROOM NUMBERS B1-84, 84A, AND 84B.

FIRE SUPPRESSION PHASING NOTES

DEDUCT ALTERNATES#

ELIMINATE FRONT ENTRANCE CANOPY. INCLUDING THE WRAP-AROUND SUNSCREEN PERGOLA AND COLUMNS. THE

CURRENT FRONT ENTRANCE CANOPY IS 817 SQ. FT.

ELIMINATE THE RENOVATION TO THE POLICE SUITE. THE POLICE FUNCTIONS WOULD REMAIN AS THEY CURRENTLY EXIST AND WOULD NOT EXPAND OR SIMPLY REUSE EXISTING SPACE AS IS. ALL WORK FOR ARCHITECTURAL, ELECTRICAL, PLUMBING, LOW VOLTAGE, AND FIRE PROTECTION FOR THIS AREA TO BE REMOVED. MINOR DUCT MODIFICATIONS WILL NEED TO BE PERFORMED TO DEMOLISH AND RECONNECT THE EXISTING SUPPLY/RETURN DUCTWORK TO THE NEW MAINS INSTALLED DURING PHASE 3. THE POLICE SPACE TO BE RENOVATED IS APPROXIMATELY 2,572 SQ. FT.

ELIMINATE THE RENOVATION TO THE SECURITY CONTROL CENTER (SCC). THE POLICE FUNCTIONS WOULD REMAIN AS THEY CURRENTLY EXIST AND WOULD NOT EXPAND OR SIMPLY REUSE EXISTING SPACE AS IS. ALL WORK FOR ARCHITECTURAL, ELECTRICAL, PLUMBING, LOW VOLTAGE, AND FIRE PROTECTION FOR THIS AREA TO

BE REMOVED. THE PROPOSED SCC SPACE TO BE RENOVATED IS APPROXIMATELY 421 SQ. FT.

ELIMINATE THE RENOVATIONS IN THE EXISTING EMERGENCY DEPARTMENT (ED). THE TEMPORARY AHU WILL STILL BE REQUIRED TO SERVE THE EXISTING ED WHILE AHU-6 IS BEING DEMOLISHED AND THE NEW AHU IS BEING INSTALLED.

ALL MAJOR DUCTWORK FROM THE NEW AHU THAT WILL SERVE THE EXISTING ED AND THE NEW ADDITION. TO THE MAXIMUM EXTENT PRACTICAL, ALL EXISTING VAV'S SHALL REMAIN AND BE RECONNECTED TO THE NEW DUCT MAINS.

THE CANTEEN STORE AND STORAGE AREAS SHALL BE DISCONNECTED FROM AHU-4 AND RECONNECTED TO THE NEW AHU. EMERGENCY SUPPORT SPACE AS CURRENLTY DESIGNED IS APPROXIMATELY 1,750 SQ. FT.

MEN'S & WOMEN'S STAFF LOCKERS, WEAPON STORAGE LOCKERS, AND POLICE SUITE LOCKERS REMOVED FROM

THE SCOPE FOR PURCHASE AND INSTALLATION.

NEW EMERGENCY POWER PANEL EHP-4 REMOVED FROM THE SCOPE. THIS INCLUDES REMOVING ATS-DPEHB3, DISTRIBUTION BOARD DPEHB3, AND ASSOCIATED NEW FEEDER.

FIRE PROTECTION WATER SUPPLY

DEMAND ESTIMATE (NEW SERVICE)

DESIGN DATA:

SYSTEM TYPE: WET

OCCUPATION CLASSIFICATION: ORD. GR. 1

DENSITY: 0.15 GPM/FT2

AREA OF APPLICATION: 1500

MINIMUM SPRINKLER DEMAND: 225 GPM

HOSE STREAMS: 250 GPM

OVERFLOW FACTOR (10%): 22.5 GPM

TOTAL WATER REQUIRED

(INCLUDING HOSE STREAMS): 497.5 GPM

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4

:1

P

M C

R e v it p ro je c ts

\P

-1

C h e y e n n e E

D tb u d a i.

rv t

FX001

FIRE SUPPRESSION GENERAL

INFORMATION

1 16SMR/TB

EXPAND EMERGENCY

DEPARTMENT

CHEYENNE VETERANS AFFAIRS

MEDICAL CENTER

2360 E PERSHING BLVD

CHEYENNE, WY 82001

MARCH 28, 2024

100% BID DOCUMENTS

442-30320-147

BUFFALO

RBK

FIRE SERVICE BACKFLOW PREVENTER SCHEDULE (NEW SERVICE)

MARK LOCATION SYSTEM TYPE SIZE REMARKS

1-DCVDA-1 B1-255 FIRE RISER

ROOM

FIRE SERVICE DOUBLE CHECK DETECTOR

TYPE BACKFLOW ASSEMBLY

WITH TAMPER SWITCHES

6" -

DocuSign Envelope ID: B1DF547C-B35E-4008-A6CF-4D5EBD84C992

3/27/2024

S SS

S S

S

SS S

S S

S

SS

S

SS SSS

S S

S S

S

SS S

S S

S S

S S

S S

S

SS SS

S S

S S

S S

S

S SS S

S S

S

S S

S S

S S

SS

S S

S

SS

S

SS SSSSS

S

S S

S

S SS

S

VALVE AND FLOW SWITCH IN CORRIDOR

FLOW AND

TAMPER

SWITCHES,

ZONE 2-4-4

DRAIN AND

TEST, ZONE

2-4-4

2 1/2" FL

2 1/2" FL

2 1/2" FL

3" FL

2 1/2" FL

ZONE 2-4-4

Z O

N E

-4

-4

4'' DN TO BASEMENT

3'' RISER

ASSEMBLY FOR

FLR SPRINKLER

SYSTEM

ZONE 2-4-3ZONE 2-4-3

ZONE 2-4-4

EXISTING FDC

1 1/2" FL

1"1" 3

ABCDEFGH

Z O

N E

-4

-3

C O

R R

ID

O

R A

B -0

C

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FLFL

FL FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL FL

FL

FL

FL

FL

FL

FL

FL

FL

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

CORRIDOR

B1-07DTREATMENT

B1-10

TOILET

B1-10B

ER MEDS

B1-10A

ER

EXAM/TRTMT

B1-08

ER

MULTI-PURPOSE

B1-09

SOILED

UTILITY

B1-07

POLICE

B1-44

STAIRS

S2F1

OCCUPATIONAL

HEALTH

B1-47

OCCUPATIONAL

HEALTH

B1-48

BDSL

B1-49

CORRIDOR

B1-14C

ELEC

VAULT

B1-45

CORRIDOR

B1-09C

BDSL

B1-50

TOILET

B1-43 TOILET

B1-52

TOILET

B1-51A

F TOILET

B1-78

BREAK

ROOM

B1-51

M TOILET

B1-77

WAITING

ROOM

B1-80

CORRIDOR

B1-13CMED

ADMIN

CLERK

B1-73

BUSINESS

OFFICE

CLERK

B1-75

CORRIDOR

B1-11C

MED

ADMIN

OFFICE

B1-74

MED

ADMIN

B1-72

TRAVEL

OFFICE

B1-71

VTS

B1-68VTS

B1-68A

CORRIDOR

B1-68B

TELEHEALTH

NETWORK

B1-76

NON VA

CARE

B1-53

CORRIDOR

B1-07C

WHEELCHAIR

STORAGE

B1-06

CORRIDOR

B1-12C

ER

WAITING

ROOM

B1-03

SUPPLY

ROOM

B1-04

ER EXAM

B1-05

ENTRY

B1-01B

CORRIDOR

AB1-01C

WAITING

ROOM

A1-01

RECEPTION

A1-03

EDUCATION

BREAK

ROOM

A1-02

INTERVIEW

A1-14

INTERVIEW

A1-13

INTERVIEW

A1-12

INTERVIEW

A1-11

INTERVIEW

A1-10

CORRIDOR

A1-11C

WORK

ROOM

A1-15

CORRIDOR

A1-10C

SOCIAL

WORKER

A1-06

PHARMACY

CONSELOR

A1-05

NUTRITION

A1-04 CHIEF

A1-128

ECG

A1-130

CORRIDOR

A1-15C

CORRIDOR

A1-13C

ER CLERK

B1-02

ER

RECEPTION

B1-01

EXAM

B1-16

ER

WAITING

RM

B1-15 AUDIOLOGY

OFFICE

B1-61

STORAGE

B1-63

HEARING

BOOTH

B1-65

HEARING

BOOTH

B1-65A

CORRIDOR

B1-10C

DELIVERY

SHOOT

B1-75A

VESTIBULE

B1-79

SECURITY

B1-84

SECURITY

B1-86

POLICE

OFFICE

B1-88

DAV

B1-80A

ED ROOM

B1-27

ER EXAM

B1-28

ER EXAM

B1-29

VET

EXPRESS

OFFICE

B1-30

ER HAC

B1-31

WC EXAM

B1-32

TOILET

B1-25

VET

EXPRESS

CHECK IN

B1-17

TELEHEALTH

B1-40

VET

EXPRESS

OFFICE

B1-37

CORRIDOR

B1-18C

WC EXAM

B1-34

VET

EXPRESS

EXAM

B1-36

VET

EXPRESS

EXAM

B1-38

AUDIOLOGY

EXAM

B1-54

AUDIOLOGY

EXAM

B1-55

AUDIOLOGY

EXAM

B1-56

AUDIOLOGY

EXAM

B1-57

TELE RET

B1-83

EXAM

B1-95

EXAM

PODIATRY

B1-93

CORRIDOR

B1-08C

STOARGE

B1-90A

SUPPLY

B1-106

STORAGE

PODIATRY

B1-92

EXAM

PODIATRY

B1-94

EXAM

PODIATRY

B1-96

SOILED

UTILITY

B1-98

MECH

CHASE

B1-S03

FISCAL

AGENT

CASHIER

B1-70

WOMENS

CLINIC

RECEPTION

B1-20

WC

OFFICE

B1-21

CORRIDOR

B1-17C

WC

CONFERENCE

B1-22

WC EXAM

B1-23

TOILET

B1-24

ER OFFICE

B1-41A

IN/PT

THERAPY

A1-142

EEKG

A1-140

ECHO

A1-138

EMG

A1-136

EEG

A1-134

ECHO

A1-132

ELEVATOR

B7-1

ELEVATOR

B6-1

ELEC

VAULT

B1-104

IT CLOSET

B1-103

PATIENT

EDUCATION

A1-107

SLEEP LAB

A1-120

TOILET

A1-120A

TOILET

A1-126A

MONITOR

A1-123

OXYGEN

A1-121

RESPIRATORY

STORAGE

A1-119

SOILED

LINEN

A1-117

PFT

A1-137

STRESS

LAB

A1-135

OFFICE

A1-133

TOILET

A1-127

TOILET

A1-129

HAC

A1-125

SLEEP LAB

A1-126

WOMENS

RR

A1-07

MENS RR

A1-09

STORAGE

A1-71

HAC

A1-08

CORRIDOR

A1-09C

C&P EXAM

CORRIDOR

A1-05C

MENTAL

HEALTH

A1-25

MENTAL

HEALTH

A1-24

INTERVIEW

A1-17

CORRIDOR

A1-14C

INTERVIEW

A1-18

IT/COMM

A1-26

COMM/ELEC

A1-16

SPD

STORAGE

A1-115

SPS/SPD

STORAGE

A1-139

BREAK RM

A1-110

STORAGE

A1-105

OXYGEN

A1-70

ELECTRICAL

A1-108

CORRIDOR

A1-02C

CORRIDOR

A1-02C

CORRIDOR

A1-07C

STORAGE

A1-122

CORRIDOR

A1-01C

NURSE

B1-90

DECON

STORAGE

B1-01A

CORRIDOR

B1-08C

SOUND

BOOTH

B1-62

OFFICE

B1-89

HAC

B1-102

SCOPE OF WORK LEGEND

NOT IN SCOPE

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE BARRIER

2 HR - FIRE BARRIER

SMOKE RESISTIVE

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

1 HR - SMOKE BARRIERS S S S

/2

/2

:4

:2

P

M C

R e v it p ro je c ts

\P

-1

C h e y e n n e E

D tb u d a i.

rv t

FK101

FIRST FLOOR FIRE SUPPRESSION

DEMOLITION PLAN - PHASE 1

2 16SMR/TB

EXPAND EMERGENCY

DEPARTMENT

CHEYENNE VETERANS AFFAIRS

MEDICAL CENTER

2360 E PERSHING BLVD

CHEYENNE, WY 82001

MARCH 28, 2024

100% BID DOCUMENTS

442-30320-147

BUFFALO

RBK

N

NEW WORK

KEY PLAN

SCALE: NO SCALE

AREA OF WORK

NEW ED

NORTH

0 4 8 16

Scale: 1/8" = 1'-0"

FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 1

1 DEMOLISH SPRINKLER HEAD AND ASSOCIATED

BRANCH PIPING INSIDE AREA OF WORK AS

REQUIRED TO ACCOMODATE NEW SPRINKLER

HEAD LAYOUT.

2 DEMOLISH EXISTING FDC AND ASSOCIATED

PIPING BACK TO THE CRAWL SPACE.

3 DEMOLISH VESTIBULE SPRINKLER HEADS AND

ASSOCIATED PIPING BACK TO MAIN ON SECOND

FLOOR AND CAP WITHIN CEILING SPACE.

A. REMOVE EXISTING SPRINKLER HEADS IN THE

AREAS BEING RENOVATED.

B. DEMOLISH SPRINKLER BRANCH PIPING TO

MAINS AND CAP, AS NECESSARY, FOR NEW

LAYOUT.

C. EXISTING PIPE SIZES ARE APPROXIMATE,

CONTRACTOR TO FIELD VERIFY.

D. PROVIDE FIRE WATCH FOR THE PERIOD

SPRINKLER SYSTEM IS NOT FUNCTIONAL.

E. AFTER DISCONNECTING PIPING SERVING THE

RENOVATED AREAS, SPRINKLER SYSTEM

SHALL BE MADE FUNCTIONAL TO HAVE ACTIVE

SPRINKLER SYSTEM IN THE EXISTING AREA.

F. FIRE TRUCK ACCESS TO FDC SHALL BE

MAINTAINED AT ALL TIMES DURING

CONSTRUCTION.

G. CONTRACTOR TO PROVIDE FIRE PROTECTION

WITHIN THE AREA OF WORK DURING

CONSTRUCTION PER NFPA REQUIREMENTS.

H. CONTRACTOR SHALL BE RESPONSIBLE FOR

DRAINING THE SYSTEM TO ALLOW FOR

MODIFICATION OF EXISITNG SPRINKLER

SYSTEM (PIPING AND HEADS) AND REFILLING

THE SYSTEM AFTER MODIFICATION WORK IS

DONE. FIRE WATCH SHALL BE PROVIDED FOR

THE DURATION SPRINKLER IS NOT IN

OPERATION.

I. ZONE REFERENCED ARE SPRINKLER ZONES

PER RECORD DRAWINGS.

S

S

SS S

S S

S

SS

S

SS SSS

S S

S S

S

SS S

S S

S S

S S

S S

S

SS SS

S S

S S

S S

S

S SS S

S S

S

S S

S S

S S

SS

S S

S

SS

S

SS SSSSS

S

S S

S

S SS

S

ABCDEFGH

VALVE AND FLOW SWITCH IN CORRIDOR

FLOW AND

TAMPER

SWITCHES,

ZONE 2-4-4

DRAIN AND

TEST, ZONE

2-4-4

2 1/2" FL

2 1/2" FL

2 1/2" FL

3" FL

2 1/2" FL

ZONE 2-4-4

Z O

N E

-4

-4

4'' FIRE RISER IN BASEMENT

3'' RISER

ASSEMBLY FOR

FLR SPRINKLER

SYSTEM

ZONE 2-4-3ZONE 2-4-3

ZONE 2-4-4

1 1/2" FL

Z O

N E

-4

-3

WAITING

ROOM

B1-80

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FLFL

FL FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL FL

FL

FL

FL

FL

FL

FL

FL

FL

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

1 1 2

TREATMENT

B1-10

TOILET

B1-10B

ER MEDS

B1-10A

ER

EXAM/TRTMT

B1-08

ER

MULTI-PURPOSE

B1-09

SOILED

UTIL

B1-07

POLICE

B1-44

STAIRS

S2F1

OCCUPATIONAL

HEALTH

B1-47

OCCUPATIONAL

HEALTH

B1-48

BDSL

B1-49

CORRIDOR

B1-14C

ELEC

VAULT

B1-45

CORRIDOR

B1-09C

INTERVENTION

B1-50

TOILET

B1-43 TOILET

B1-52

TOILET

B1-51A

TOILET

B1-78

BREAK

ROOM

B1-51

M TOILET

B1-77

MED

ADMIN

CLERK

B1-73

BUSINESS

OFFICE

CLERK

B1-75

CORRIDOR

B1-11C

MED

ADMIN

OFFICE

B1-74

MED

ADMIN

B1-72

TRAVEL

OFFICE

B1-71VTS

B1-68

VTS

B1-68A

CORRIDOR

B1-68B

TELE

HEALTH

NETWORK

B1-76

NON VA

CARE

B1-53

CORRIDOR

B1-07C

WHEELCHAIR

STORAGE

B1-06

CORRIDOR

B1-12C

ER

WAITING

ROOM

B1-03

SUPPLY

ROOM

B1-04

ER EXAM

B1-05

ENTRY

B1-01B

CORRIDOR

AB1-01C

ER CLERK

B1-02

RECEPTION

B1-01

EXAM

B1-16

ER

WAITING

RM

B1-15

AUDIOLOGY

OFFICE

B1-61

SOUND

BOOTH

B1-61A

STORAGE

B1-63

HEARING

BOOTH

B1-65

HEARING

BOOTH

B1-65A

CORRIDOR

B1-10C

DELIVERY

SHOOT

B1-75A

SECURITY

B1-84

SECURITY

B1-86

POLICE

OFFICE

B1-88

STORAGE

B1-27

EXAM

B1-28

EXAM

B1-29

EXAM

B1-30

HAC

B1-31

EXAM

B1-32

TOILET

B1-25

VET

EXPRESS

CHECK IN

B1-17

TELEHEALTH

B1-40

VET

EXPRESS

OFFICE

B1-37

CORRIDOR

B1-18C

EXAM

B1-34

EXAM

B1-36

EXAM

B1-38

AUDIOLOGY

EXAM

B1-54

AUDIOLOGY

EXAM

B1-55

AUDIOLOGY

EXAM

B1-56

AUDIOLOGY

EXAM

B1-57

TELE RET

B1-83

PODIATRY

B1-95

PODIATRY

B1-93

CORRIDOR

B1-08C

WAITING

AREA

B1-90A

HAC

B1-106

PODIATRY

B1-92

PODIATRY

B1-94

PODIATRY

B1-96

SOILED

UTILITY

B1-98

MECH

CHASE

B1-S03

FISCAL

AGENT

CASHIER

B1-70

WOMENS

CLINIC

RECEPTION

B1-20

WC CLINIC

B1-21

CORRIDOR

B1-17C

WC

CONFERENCE

B1-22

WC EXAM

B1-23

TOILET

B1-24

TR

B1-41

OFFICE

B1-41A

CORRIDOR

B1-13C

ELEVATOR

B7-1

ELEVATOR

B6-1

ELEC

VAULT

B1-104

IT CLOSET

B1-103

WAITING

ROOM

B1-161

RECEPTION

B1-163

EDUCATION

BREAK

ROOM

B1-164

INTERVIEW

B1-166

INTERVIEW

B1-168

INTERVIEW

B1-169

INTERVIEW

B1-170

INTERVIEW

B1-171

CORRIDOR

B1-172

WORK

ROOM

B1-173

CORRIDOR

A1-10C

SOCIAL

WORKER

B1-174

PHARMACY

CONSELOR

B1-175

NUTRITION

B1-176

CHIEF

B1-177

ECG

B1-178

CORRIDOR

B1-179

CORRIDOR

B1-180

IN/PT

THERAPY

A1-142

EEKG

B1-181

ECHO

B1-182

EMG

B1-183

EEG

B1-184

ECHO

B1-185

PATIENT

EDUCATION

A1-107

SLEEP LAB

A1-120

TOILET

A1-120A

TOILET

A1-126A

MONITOR

A1-123

OXYGEN

A1-121

RESPIRATORY

STORAGE

A1-119

SOILED

LINEN

A1-117

PFT

A1-137

STRESS

LAB

A1-135

OFFICE

A1-133

TOILET

A1-127

TOILET

A1-129

HAC

A1-125

SLEEP LAB

A1-126

WOMENS

RR

A1-07

MENS RR

A1-09

STORAGE

A1-71

HAC

A1-08

CORRIDOR

A1-09C

C&P EXAM

CORRIDOR

A1-05C

MENTAL

HEALTH

A1-25

MENTAL

HEALTH

A1-24

INTERVIEW

A1-17

CORRIDOR

A1-14C

INTERVIEW

A1-18

IT/COMM

A1-26

COMM/ELEC

A1-16

SPD

STORAGE

A1-115

SPS/SPD

STORAGE

A1-139

BREAK RM

A1-110

STORAGE

A1-105

OXYGEN

A1-70

ELECTRICAL

A1-108

CORRIDOR

A1-07C

STORAGE

A1-122

SCOPE OF WORK LEGEND

NOT IN SCOPE

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE BARRIER

2 HR - FIRE BARRIER

SMOKE RESISTIVE

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

1 HR - SMOKE BARRIERS S S S

/2

/2

:4

:3

P

M C

R e v it p ro je c ts

\P

-1

C h e y e n n e E

D tb u d a i.

rv t

FK102

FIRST FLOOR FIRE SUPPRESSION

DEMOLITION PLAN - PHASE 2

3 16SMR/TB

EXPAND EMERGENCY

DEPARTMENT

CHEYENNE VETERANS AFFAIRS

MEDICAL CENTER

2360 E PERSHING BLVD

CHEYENNE, WY 82001

MARCH 28, 2024

100% BID DOCUMENTS

442-30320-147

BUFFALO

RBK

N

KEY PLAN

SCALE: NO SCALE

AREA OF WORK

NORTH

0 4 8 16

Scale: 1/8" = 1'-0"

FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 2

1 DEMOLISH SPRINKLER HEAD AND ASSOCIATED

PIPING INSIDE AREA OF WORK BACK TO THE

LIMIT OF THE DEMOLITION AND CAP EXISTING

PIPING.

2 EXISTING SPRINKLER HEAD TO REMAIN.

A. REMOVE EXISTING SPRINKLER HEADS IN THE

AREAS BEING RENOVATED.

B. DEMOLISH SPRINKLER BRANCH PIPING TO

MAINS AND CAP AS NECESSARY FOR NEW

LAYOUT.

C. EXISTING PIPE SIZES ARE APPROXIMATE,

CONTRACTOR TO FIELD VERIFY.

D. PROVIDE FIRE WATCH FOR THE PERIOD

SPRINKLER SYSTEM IS NOT FUNCTIONAL.

E. AFTER DISCONNECTING PIPING SERVING THE

RENOVATED AREAS, SPRINKLER SYSTEM

SHALL BE MADE FUNCTIONAL TO HAVE ACTIVE

SPRINKLER SYSTEM IN THE EXISTING AREA.

F. FIRE TRUCK ACCESS TO FDC SHALL BE

MAINTAINED AT ALL TIMES DURING

CONSTRUCTION.

G. CONTRACTOR TO PROVIDE FIRE PROTECTION

WITHIN THE AREA OF WORK DURING

CONSTRUCTION PER NFPA REQUIREMENTS.

H. CONTRACTOR SHALL BE RESPONSIBLE FOR

DRAINING THE SYSTEM TO ALLOW FOR

MODIFICATION OF EXISITNG SPRINKLER

SYSTEM (PIPING AND HEADS) AND REFILLING

THE SYSTEM AFTER MODIFICATION WORK IS

DONE. FIRE WATCH SHALL BE PROVIDED FOR

THE DURATION SPRINKLER IS NOT IN

OPERATION.

I. ZONE REFERENCED ARE SPRINKLER ZONES

PER RECORD DRAWINGS.

T ectonic Cop yright 2007

S SS

S S

S

SS S

S S

S

S S

S S

S

SS

S

SS SSSSS SS

S S

S S

S S

S

S SS S

S S

S

S S

S S

S S

SS

S S

S

S SS S S

S S

S S

S

SS S

S S

S S

S SS S S S S

S S

S S

S S

S SS S S S

S S

S

SS

S

SS SSSSS

S

S S

S S

S S

S

S S

S S

S S

S SS

S

ABCDEFGH

VALVE AND FLOW SWITCH IN CORRIDOR

FLOW AND

TAMPER

SWITCHES,

ZONE 2-4-4

DRAIN AND

TEST, ZONE

2-4-4

2 1/2" FL

2 1/2" FL

2 1/2" FL

3" FL

2 1/2" FL

Z O

N E

-4

-4

3'' RISER

ASSEMBLY FOR

FLR SPRINKLER

SYSTEM

ZONE 2-4-3ZONE 2-4-3

1 1

1 1

1 1

1 1

1 1/2" FL

Z O

N E

-4

-3

ENTRY

B1-01B

ER EXAM

TREATMENT

B1-08

ER MEDS

B1-10A

TOILET

B1-10B

TREATMENT

B1-10

ER

MULTI-PURPOSE

B1-09

SOILED

UTILITY

B1-07

POLICE

B1-44

ER EXAM

B1-05

SUPPLY ROOM

B1-04

ER WAITING

RM

B1-03

WHEELCHAIR

STORAGE

1B-06

RECEPTION

B1-01

D E

C O

N S

T O

R A

G E

B -0

A

CORRIDOR

AB1-01C

ER CLERK

B1-02

C O

R R

ID

O

R A

B -0

C

ER WAITING

ROOM

B1-15

ER OFFICE

B1-16

C O

R R

ID

O

R B

-0

C

C O

R R

ID

O

R B

-0

C

AUDIOLOGY

OFFICE

B1-61

CORRIDOR

B1-10C

UNOCCUPPIED

B1-61A

NON VA CARE

B1-53

TOILET

B1-52

TOILET

B1-43

INTERVENTION

B1-50

C O

R R

ID

O

R B

-0

C

CORRIDOR

B1-14C

STAIRS

S2F1

PATIENT

ADVOCATE

B1-47

PATIENT

ADVOCATE

B1-48

PATIENT

ADVOCATE

B1-49

TOILET

B1-78

TOILET

B1-51A

MENS TOILET

B1-77

TELE

HEALTH

B1-76

S T

O R

A G

E B

-6

HEARING

BOOTH

B1-65

HEARING

BOOTH

B1-65A

C O

R R

ID

O

R B

-1

C

MED ADMIN

B1-74

VTS

B1-68A

VTS

B1-68

CORRIDOR

B1-68B

TRAVEL

OFFICE

B1-71

MED ADMIN

B1-72

BUSINESS

OFFICE CLERK

B1-75

DELIVERY

SHOOT

B1-75A

MED ADMIN

CLERK

B1-73

C O

R R

ID

O

R B

-1

C

WAITING

ROOM

B1-80

CORRIDOR

B1-12C

BREAK ROOM

B1-51

POLICE

OFFICE

B1-88

SECURITY

B1-86

SECURITY

B1-84

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FLFL

FL FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL FL

FL

FL

FL

FL

FLFL

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

FL

6" FL

FL

6" FL

ELEC

B1-45

LAB HAC

B1-115

FLOW AND

TAMPER

SWITCHES,

ZONE 2-4-3

DRAIN AND

TEST, ZONE

2-4-3

FL

FL

4'' FL DN TO BASEMENT

ZONE 2-4-4ZONE 2-4-4

4" FL

ZONE 2-4-4

NEW ED

ADDITION ZONE

SCOPE OF WORK LEGEND

NOT IN SCOPE

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE BARRIER

2 HR - FIRE BARRIER

SMOKE RESISTIVE

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

1 HR - SMOKE BARRIERS S S S

/2

/2

:4

:4

P

M C

R e v it p ro je c ts

\P

-1

C h e y e n n e E

D tb u d a i.

rv t

FK103

FIRST FLOOR FIRE SUPPRESSION

DEMOLITION PLAN - PHASE 3

4 16SMR/TB

EXPAND EMERGENCY

DEPARTMENT

CHEYENNE VETERANS AFFAIRS

MEDICAL CENTER

2360 E PERSHING BLVD

CHEYENNE, WY 82001

MARCH 28, 2024

100% BID DOCUMENTS

442-30320-147

BUFFALO

RBK

N

NEW WORK

KEY PLAN

SCALE: NO SCALE

AREA OF WORK

NEW ED

NORTH

0 4 8 16

Scale: 1/8" = 1'-0"

FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 3

1 DEMOLISH SPRINKLER HEAD AND ASSOCIATED

PIPING INSIDE AREA OF WORK COMPLETE AND

CAP EXISTING PIPING.

2 DEMOLISH TEMPORARY FDC STANDPIPE BACK

TO THE LIMIT OF DEMOLITION. PREPARE FDC

PIPING FOR RECONNECTION.

3 SPRINKLER HEAD IN ELEC B1-45 TO REMAIN.

DEMOLISH ASSOCIATED BRANCH PIPING.

4 DEMOLISH SPRINKLER HEAD AND ASSOCIATED

BRANCH PIPING BACK TO MAIN AND CAP.

5 DEMOLISH OUT OF SERVICE DRY PIPE FIRE

SPRINKLER SYSTEM COMPLETE IN THIS ROOM.

6 DEMOLISH TEMPORARY FIRE SPRINKLER RISER

AND TEMPORARY BACKFLOW PREVENTER FOR

FUTURE RELOCATION IN THE NEW FIRE RISER

ROOM.

A. REMOVE EXISTING SPRINKLER HEADS IN THE

AREAS BEING RENOVATED.

B. DEMOLISH SPRINKLER BRANCH PIPING TO

MAINS AND CAP AS NECESSARY FOR NEW

LAYOUT.

C. EXISTING PIPE SIZES ARE APPROXIMATE,

CONTRACTOR TO FIELD VERIFY.

D. PROVIDE FIRE WATCH FOR THE PERIOD

SPRINKLER SYSTEM IS NOT FUNCTIONAL.

E. AFTER DISCONNECTING PIPING SERVING THE

RENOVATED AREAS, SPRINKLER SYSTEM

SHALL BE MADE FUNCTIONAL TO HAVE ACTIVE

SPRINKLER SYSTEM IN THE EXISTING AREA.

F. FIRE TRUCK ACCESS TO FDC SHALL BE

MAINTAINED AT ALL TIMES DURING

CONSTRUCTION.

G. CONTRACTOR TO PROVIDE FIRE PROTECTION

WITHIN THE AREA OF WORK DURING

CONSTRUCTION PER NFPA REQUIREMENTS.

H. CONTRACTOR SHALL BE RESPONSIBLE FOR

DRAINING THE SYSTEM TO ALLOW FOR

MODIFICATION OF EXISITNG SPRINKLER

SYSTEM (PIPING AND HEADS) AND REFILLING

THE SYSTEM AFTER MODIFICATION WORK IS

DONE. FIRE WATCH SHALL BE PROVIDED FOR

THE DURATION SPRINKLER IS NOT IN

OPERATION.

I. ZONE REFERENCED ARE SPRINKLER ZONES

PER RECORD DRAWINGS.

J. NEW SPRINKLER SYSTEM IS THE SOUTH

EMERGENCY DEPARTMENT (ED) EXPANSION.

K. EXISTING SPRINKLER SYSTEM MAIN IS 4".

LOCATED ON PLAN NORTH SIDE IN BASEMENT

CHILLER ROOM APPROXIMATELY 26 FT FROM

2-1/2" MAIN SERVING THIS SMOKE

COMPARTMENT.

yright 2007

S S

S

S SS S S

S S

S S

S

SS S

S

S

S SS

S S

S

SS S

S S

SS

S

S SS S S S S

S S

S S

S S

S SS S S S

SS

S

SS SSSSS

S

SS

S

SS SSSSS SS

S S

S S

S

S S

S S

S S

S S

S

S S

S S

S S

S S

S SS S

SS

S S

S S

S

S SS S

S S

S

ABCDEFGH

VALVE AND FLOW SWITCH IN CORRIDOR

FLOW AND

TAMPER

SWITCHES,

ZONE 2-4-4

DRAIN AND

TEST, ZONE

2-4-4

2 1/2" FL

2 1/2" FL

2 1/2" FL

3" FL

2 1/2" FL

ZONE 2-4-4

Z O

N E

-4

-4

3'' RISER

ASSEMBLY FOR

FLR SPRINKLER

SYSTEM

ZONE 2-4-3ZONE 2-4-3

ZONE 2-4-4

1 1

1 1/2" FL

Z O

N E

-4

-3

ENTRY

B1-01B

ER EXAM

TREATMENT

B1-08

ER MEDS

B1-10A

TOILET

B1-10B

TREATMENT

B1-10

ER

MULTI-PURPOSE

B1-09

SOILED

UTILITY

B1-07

POLICE

B1-44

ER EXAM

B1-05

SUPPLY ROOM

B1-04

ER WAITING

RM

B1-03

WHEELCHAIR

STORAGE

1B-06

RECEPTION

B1-01

D E

C O

N S

T O

R A

G E

B -0

A

CORRIDOR

AB1-01C

ER CLERK

B1-02

C O

R R

ID

O

R A

B -0

C

ER WAITING

ROOM

B1-15

ER OFFICE

B1-16

C O

R R

ID

O

R B

-0

C

C O

R R

ID

O

R B

-0

C

AUDIOLOGY

OFFICE

B1-61

CORRIDOR

B1-10C

UNOCCUPPIED

B1-61A

NON VA CARE

B1-53

TOILET

B1-52

TOILET

B1-43

INTERVENTION

B1-50

C O

R R

ID

O

R B

-0

C

CORRIDOR

B1-14C

STAIRS

S2F1

PATIENT

ADVOCATE

B1-47

PATIENT

ADVOCATE

B1-48

PATIENT

ADVOCATE

B1-49

TOILET

B1-78

TOILET

B1-51A

MENS TOILET

B1-77

TELE

HEALTH

B1-76

S T

O R

A G

E B

-6

HEARING

BOOTH

B1-65

HEARING

BOOTH

B1-65A

C O

R R

ID

O

R B

-1

C

MED ADMIN

B1-74

VTS

B1-68A

VTS

B1-68

CORRIDOR

B1-68B

TRAVEL

OFFICE

B1-71

MED ADMIN

B1-72

BUSINESS

OFFICE CLERK

B1-75

DELIVERY

SHOOT

B1-75A

MED ADMIN

CLERK

B1-73

C O

R R

ID

O

R B

-1

C

WAITING

ROOM

B1-80

CORRIDOR

B1-12C

BREAK ROOM

B1-51

POLICE

OFFICE

B1-88

SECURITY

B1-86

SECURITY

B1-84

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FLFL

FL FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL FL

FL

FL

FL

FL

FL

FL

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

FL

6" FL

FL

6" FL

3" FL

ELEC

B1-45

5 DEDUCT ALTERNATE

EXISTING TO REMAIN

DEDUCT ALTERNATE

EXISTING TO REMAIN

33 3

3 3

FLOW AND

TAMPER

SWITCHES,

ZONE 2-4-3

DRAIN AND

TEST, ZONE

2-4-3

LAB HAC

B1-115

4'' FS RISER IN BASEMENT

ZONE 2-4-4

4" FL

NEW ED

ADDITION ZONE

SCOPE OF WORK LEGEND

INDICATES AREA OF DEDUCT

ALTERNATE

NOT IN SCOPE

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

WALL RATING LEGEND

1 HR - FIRE BARRIER

2 HR - FIRE BARRIER

SMOKE RESISTIVE S S S S

1 HR - SMOKE BARRIERS S S S

/2

/2

:1

:1

P

M C

R e v it p ro je c ts

\P

-1

C h e y e n n e

E D

D

E D

U C

T tb u d a i.

rv t

FK103A

FIRST FLOOR DEDUCT ALTERNATE

FIRE SUPPRESSION DEMOLITION PLAN

- PHASE 3

5 16SMR/TB

EXPAND EMERGENCY

DEPARTMENT

CHEYENNE VETERANS AFFAIRS

MEDICAL CENTER

2360 E PERSHING BLVD

CHEYENNE, WY 82001

MARCH 28, 2024

100% BID DOCUMENTS

442-30320-147

BUFFALO

RBK

N

NEW WORK

KEY PLAN

SCALE: NO SCALE

AREA OF WORK

NEW ED

NORTH

0 4 8 16

Scale: 1/8" = 1'-0"

FIRST FLOOR DEDUCT ALTERNATE FIRE SUPPRESSION DEMOLITION PLAN - PHASE 3

1 DEMOLISH SPRINKLER HEAD AND ASSOCIATED

PIPING INSIDE AREA OF WORK COMPLETE AND

CAP EXISTING PIPING.

2 DEMOLISH TEMPORARY FDC STANDPIPE BACK

TO THE LIMIT OF DEMOLITION. PREPARE FDC

PIPING FOR RECONNECTION.

3 EXISTING SPRINKLER HEAD TO REMAIN.

4 DEMOLISH SPRINKLER HEAD AND ASSOCIATED

BRANCH PIPING BACK TO MAIN AND CAP.

5 DEMOLISH TEMPORARY FIRE SPRINKLER RISER

AND TEMPORARY BACKFLOW PREVENTER FOR

FUTURE RELOCATION IN THE NEW FIRE RISER

ROOM.

6 EXISTING SPRINKLER HEAD TO REMAIN AS IS TO

BE RECONNECTED TO THE FS LINE IN ZONE

2-4-4. DEMOLISH ASSOCIATED BRANCH PIPING

BACK TO MAIN AND CAP.

DEDUCT ALTERNATES

1. ELIMINATE THE RENOVATION TO THE POLICE

SUITE. THE POLICE FUNCTIONS WOULD REMAIN AS

THEY CURRENTLY EXIST AND WOULD NOT EXPAND

OR SIMPLY REUSE EXISTING SPACE AS IS. ALL

WORK FOR ARCHITECTURAL, ELECTRICAL,

PLUMBING, LOW VOLTAGE, AND FIRE PROTECTION

FOR THIS AREA TO BE REMOVED. MINOR DUCT

MODIFICATIONS WILL NEED TO BE PERFORMED TO

DEMOLISH AND RECONNECT THE EXISTING

SUPPLY/RETURN DUCTWORK TO THE NEW MAINS

INSTALLED DURING PHASE 3. THE POLICE SPACE

TO BE RENOVATED IS APPROXIMATELY 2,572 SQ.

FT.

2. ELIMINATE THE RENOVATIONS IN THE EXISTING

EMERGENCY DEPARTMENT (ED). THE TEMPORARY

AHU WILL STILL BE REQUIRED TO SERVE THE

EXISTING ED WHILE AHU-6 IS BEING DEMOLISHED

AND THE NEW AHU IS BEING INSTALLED. ALL

MAJOR DUCTWORK FROM THE NEW AHU THAT

WILL SERVE THE EXISTING ED AND THE NEW

ADDITION. TO THE MAXIMUM EXTENT PRACTICAL,

ALL EXISTING VAV'S SHALL REMAIN AND BE

RECONNECTED TO THE NEW DUCT MAINS. THE

CANTEEN STORE AND STORAGE AREAS SHALL BE

DISCONNECTED FROM AHU-4 AND RECONNECTED

TO THE NEW AHU. EMERGENCY SUPPORT SPACE

AS CURRENLTY DESIGNED IS APPROXIMATELY

1,750 SQ. FT.

A. REMOVE EXISTING SPRINKLER HEADS IN THE

AREAS BEING RENOVATED.

B. DEMOLISH SPRINKLER BRANCH PIPING TO

MAINS AND CAP AS NECESSARY FOR NEW

LAYOUT.

C. EXISTING PIPE SIZES ARE APPROXIMATE,

CONTRACTOR TO FIELD VERIFY.

D. PROVIDE FIRE WATCH FOR THE PERIOD

SPRINKLER SYSTEM IS NOT FUNCTIONAL.

E. AFTER DISCONNECTING PIPING SERVING THE

RENOVATED AREAS, SPRINKLER SYSTEM

SHALL BE MADE FUNCTIONAL TO HAVE ACTIVE

SPRINKLER SYSTEM IN THE EXISTING AREA.

F. FIRE TRUCK ACCESS TO FDC SHALL BE

MAINTAINED AT ALL TIMES DURING

CONSTRUCTION.

G. CONTRACTOR TO PROVIDE FIRE PROTECTION

WITHIN THE AREA OF WORK DURING

CONSTRUCTION PER NFPA REQUIREMENTS.

H. CONTRACTOR SHALL BE RESPONSIBLE FOR

DRAINING THE SYSTEM TO ALLOW FOR

MODIFICATION OF EXISITNG SPRINKLER

SYSTEM (PIPING AND HEADS) AND REFILLING

THE SYSTEM AFTER MODIFICATION WORK IS

DONE. FIRE WATCH SHALL BE PROVIDED FOR

THE DURATION SPRINKLER IS NOT IN

OPERATION.

I. ZONE REFERENCED ARE SPRINKLER ZONES

PER RECORD DRAWINGS.

J. NEW SPRINKLER SYSTEM IS THE SOUTH

EMERGENCY DEPARTMENT (ED) EXPANSION.

K. EXISTING SPRINKLER SYSTEM MAIN IS 4".

LOCATED ON PLAN NORTH SIDE IN BASEMENT

CHILLER ROOM APPROXIMATELY 26 FT FROM

2-1/2" MAIN SERVING THIS SMOKE

COMPARTMENT.

SS

S

SS SSS

S SS S S S S

S S

S S

S S

S SS S S S

SS S

S S

S

S

S S

S S

S S

S S

S S

S S

S S

S

S SS S S

SS

S

S S SS S

S S

S

S

SSS SSS

S S

S

SS

SS SS

S S

S

SS

S

SS SSSSS

S

S S

S

S SS

S

ABCDEFGH

VALVE AND FLOW SWITCH IN CORRIDOR

FLOW AND

TAMPER

SWITCHES,

ZONE 2-4-4

DRAIN AND

TEST, ZONE

2-4-4

2 1/2" FL

2 1/2" FL

2 1/2" FL

3" FL

4'' FL DN TO BASEMENT

3'' RISER

ASSEMBLY FOR

FLR SPRINKLER

SYSTEM

1 1/2" FL

POLICE

OFFICE

B1-88

SECURITY

B1-86

SECURITY

B1-84

FL

FL

FL

FL

FLFL

FL FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL FL

FL

FL

FL

FL

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

6" FL

4" FL

FL 6" FL

3" FL

FL

FL

FL

STAIRS

S2F1

ELEC

VAULT

B1-45

MED

ADMIN

CLERK

B1-73

BUSINESS

OFFICE

CLERK

B1-75

CORRIDOR

B1-11C

MED

ADMIN

OFFICE

B1-74

MED

ADMIN

B1-72

TRAVEL

OFFICE

B1-71

VTS

B1-68

VTS

B1-68A

CORRIDOR

B1-68B

WAITING

ROOM

A1-01

RECEPTION

A1-03

EDUCATION

BREAK

ROOM

A1-02

INTERVIEW

A1-14

INTERVIEW

A1-13

INTERVIEW

A1-12

INTERVIEW

A1-11

INTERVIEW

A1-10

CORRIDOR

A1-11C

WORK

ROOM

A1-15

SOCIAL

WORKER

A1-06

PHARMACY

CONSELOR

A1-05

NUTRITION

A1-04 CHIEF

A1-128

ECG

A1-130

CORRIDOR

A1-15C

CORRIDOR

A1-13C

EXAM

B1-16

AUDIOLOGY

OFFICE

B1-61

SOUND

BOOTH

B1-61A STORAGE

B1-63

HEARING

BOOTH

B1-65

HEARING

BOOTH

B1-65A

CORRIDOR

B1-10C

DELIVERY

SHOOT

B1-75A

STORAGE

B1-27

EXAM

B1-28

EXAM

B1-29

EXAM

B1-30

HAC

B1-31

EXAM

B1-32

Room

B1-25

VET

EXPRESS

CHECK IN

B1-17

TELEHEALTH

B1-40

VET

EXPRESS

OFFICE

B1-37

CORRIDOR

B1-18C

EXAM

B1-34

EXAM

B1-36

EXAM

B1-38

AUDIOLOGY

EXAM

B1-54

AUDIOLOGY

EXAM

B1-55

AUDIOLOGY

EXAM

B1-56

AUDIOLOGY

EXAM

B1-57

TELE RET

B1-83

PODIATRY

B1-95

PODIATRY

B1-93

CORRIDOR

B1-08C

WAITING

AREA

B1-90A

HAC

B1-106

PODIATRY

B1-92

PODIATRY

B1-94

PODIATRY

B1-96

SOILED

UTILITY

B1-98

MECH

CHASE

B1-S03

FISCAL

AGENT

CASHIER

B1-70

WOMENS

CLINIC

RECEPTION

B1-20

WC CLINIC

B1-21

CORRIDOR

B1-17C

WC

CONFERENCE

B1-22

WC EXAM

B1-23

TOILET

B1-24

BREAKROOM

B1-209

CORRIDOR

B1-115

NURSE

STATION

B1-207A

RESUSCITATION

B1-223

EXAM 4

B1-214

TOILET

B1-202

TOILET

B1-203

EXAM 1

B1-204

EXAM 2

B1-205

EXAM 3

B1-206

INTERVENTION

B1-213

HAC

B1-210

TOILET

B1-211

MENTAL

HEALTH

EXAM

B1-212

SOIL

B1-207

CLEAN

SUPPLY

B1-208

NURSE

STATION

B1-207C

WC

B1-201D

CHECK-IN

B1-201A

CORRIDOR

B1-194

CORRIDOR

B1-227

CORRIDOR

B1-228

CORRIDOR

B1-201E

OFFICE, N

MGR

B1-233

OFFICE,

CHIEF EM

B1-231

OFFICE,

DAV

B1-47

CONSULT

B1-46

TOILET

B1-237

CORRIDOR

B1-124

CORRIDOR

B1-230

ADMIN

B1-240B

BREAK

AREA

B1-242

WORKSTATIONS

B1-245

DEPUTY

CHIEF

B1-243

TRAP

B1-240A

HOLDING

B1-241

CHIEF

OFFICE

B1-244

M LOCKER

B1-250

TOILET

B1-248

W LOCKER

B1-251

ARMORY

B1-249

EVIDENCE

B1-247

TLT/SHWR

B1-235

OFFICE

B1-48

CORRIDOR

AB1-01C

FIRE

RISER

B1-225

CORRIDOR

B1-229

CORRIDOR

AB1-01

TRAP

B1-252

MEN'S

TOILET

B1-77

TOILET

B1-78

INTERVIEW

B1-246

CORRIDOR

B1-240

M

LOCKERS

B1-234

W

LOCKERS

B1-236

ON-CALL

B1-238

STORAGE

B1-232

OFFICE,

DAV

B1-47A

WAITING

B1-15

LOBBY

B1-02

TR

B1-41

OFFICE

B1-41A

EEKG

A1-140

ECHO

A1-138

EMG

A1-136

EEG

A1-134

ECHO

A1-132

CORRIDOR

B1-13C

ELEVATOR

B7-1

ELEVATOR

B6-1

ELEC

VAULT

B1-104

IT CLOSET

B1-103

ZONE 2-4-4

Z O

N E

-4

-4

ZONE 2-4-3ZONE 2-4-3

ZONE 2-4-4

Z O

N E

-4

-3

FL

FL

FLFL

FL

FL

FL

FL

FL FL

FL

FL

FL

FL

FL

FL

FL

FL

ZONE 2-4-4

NEW ED

ADDITION ZONE

SCOPE OF WORK LEGEND

NOT IN SCOPE

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE BARRIER

2 HR - FIRE BARRIER

SMOKE RESISTIVE

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

1 HR - SMOKE BARRIERS S S S

/2

/2

:4

:5

P

M C

R e v it p ro je c ts

\P

-1

C h e y e n n e E

D tb u d a i.

rv t

FK104

FIRST FLOOR FIRE SUPPRESSION

DEMOLITION PLAN - PHASE 4

6 16SMR/TB

EXPAND EMERGENCY

DEPARTMENT

CHEYENNE VETERANS AFFAIRS

MEDICAL CENTER

2360 E PERSHING BLVD

CHEYENNE, WY 82001

MARCH 28, 2024

100% BID DOCUMENTS

442-30320-147

BUFFALO

RBK

N

NEW WORK

KEY PLAN

SCALE: NO SCALE

AREA OF WORK

NEW ED

NORTH

0 4 8 16

Scale: 1/8" = 1'-0"

FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 4

1 DEMOLISH SPRINKLER HEAD AND ASSOCIATED

BRANCH PIPING BACK TO THE LIMIT OF

DEMOLITION INSIDE AREA OF WORK AS

REQUIRED TO ACCOMODATE NEW SPRINKLER

HEAD LAYOUT.

A. REMOVE EXISTING SPRINKLER HEADS IN THE

AREAS BEING RENOVATED.

B. DEMOLISH SPRINKLER BRANCH PIPING TO

MAINS AND CAP AS NECESSARY FOR NEW

LAYOUT.

C. EXISTING PIPE SIZES ARE APPROXIMATE,

CONTRACTOR TO FIELD VERIFY.

D. PROVIDE FIRE WATCH FOR THE PERIOD

SPRINKLER SYSTEM IS NOT FUNCTIONAL.

E. AFTER DISCONNECTING PIPING SERVING THE

RENOVATED AREAS, SPRINKLER SYSTEM

SHALL BE MADE FUNCTIONAL TO HAVE ACTIVE

SPRINKLER SYSTEM IN THE EXISTING AREA.

F. FIRE TRUCK ACCESS TO FDC SHALL BE

MAINTAINED AT ALL TIMES DURING

CONSTRUCTION.

G. CONTRACTOR TO PROVIDE FIRE PROTECTION

WITHIN THE AREA OF WORK DURING

CONSTRUCTION PER NFPA REQUIREMENTS.

H. CONTRACTOR SHALL BE RESPONSIBLE FOR

DRAINING THE SYSTEM TO ALLOW FOR

MODIFICATION OF EXISITNG SPRINKLER

SYSTEM (PIPING AND HEADS) AND REFILLING

THE SYSTEM AFTER MODIFICATION WORK IS

DONE. FIRE WATCH SHALL BE PROVIDED FOR

THE DURATION SPRINKLER IS NOT IN

OPERATION.

I. ZONE REFERENCED ARE SPRINKLER ZONES

PER RECORD DRAWINGS.

J. NEW SPRINKLER SYSTEM IS THE SOUTH

EMERGENCY DEPARTMENT (ED) EXPANSION.

S

S SS S S

SS

S

SS SSSSS

S

SS

S

SS SSS

S

SS

S S

S

S

S S

S

S SS S

S S

S S

S

SS SSS

S SS S S S S

S S

S S

S S

S SS S S S

S S

SS SS

S

S S

S S

S S

S S

S S

S SS S

SS

S S

S S

S

S SS S

S S

S

ABCDEFGH

VALVE AND FLOW SWITCH IN CORRIDOR

FLOW AND

TAMPER

SWITCHES,

ZONE 2-4-4

DRAIN AND

TEST, ZONE

2-4-4

2 1/2" FL

2 1/2" FL

2 1/2" FL

3" FL

3'' RISER

ASSEMBLY FOR

FLR SPRINKLER

SYSTEM

1 1/2" FL

POLICE

OFFICE

B1-88

SECURITY

B1-86

SECURITY

B1-84

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FLFL

FL FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FLFL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL

FL FL

FL

FL

FL

FL

FL

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

R E

N O

V A

T

IO

N N

E W

6" FL

FL 6" FL

3" FL

FL

FL

FL

DEDUCT ALTERNATE

EXISTING TO REMAIN

STAIRS

S2F1

MED

ADMIN

CLERK

B1-73

BUSINESS

OFFICE

CLERK

B1-75

CORRIDOR

B1-11C

MED

ADMIN

OFFICE

B1-74

MED

ADMIN

B1-72

TRAVEL

OFFICE

B1-71VTS

B1-68

VTS

B1-68A

CORRIDOR

B1-68B

WAITING

ROOM

A1-01

RECEPTION

A1-03

EDUCATION

BREAK

ROOM

A1-02

INTERVIEW

A1-14

INTERVIEW

A1-13

INTERVIEW

A1-12

INTERVIEW

A1-11

INTERVIEW

A1-10

CORRIDOR

A1-11C

WORK

ROOM

A1-15

SOCIAL

WORKER

A1-06

PHARMACY

CONSELOR

A1-05

NUTRITION

A1-04 CHIEF

A1-128

ECG

A1-130

CORRIDOR

A1-15C

CORRIDOR

A1-13C

EXAM

B1-16

AUDIOLOGY

OFFICE

B1-61

SOUND

BOOTH

B1-61A

STORAGE

B1-63

HEARING

BOOTH

B1-65

HEARING

BOOTH

B1-65A

CORRIDOR

B1-10C

DELIVERY

SHOOT

B1-75A

STORAGE

B1-27

EXAM

B1-28

EXAM

B1-29

EXAM

B1-30

HAC

B1-31

EXAM

B1-32

Room

B1-25

VET

EXPRESS

CHECK IN

B1-17

TELEHEALTH

B1-40

VET

EXPRESS

OFFICE

B1-37

CORRIDOR

B1-18C

EXAM

B1-34

EXAM

B1-36

EXAM

B1-38

AUDIOLOGY

EXAM

B1-54

AUDIOLOGY

EXAM

B1-55

AUDIOLOGY

EXAM

B1-56

AUDIOLOGY

EXAM

B1-57

TELE RET

B1-83

PODIATRY

B1-95

PODIATRY

B1-93

CORRIDOR

B1-08C

WAITING

AREA

B1-90A

HAC

B1-106

PODIATRY

B1-92

PODIATRY

B1-94

PODIATRY

B1-96

SOILED

UTILITY

B1-98

MECH

CHASE

B1-S03

FISCAL

AGENT

CASHIER

B1-70

WOMENS

CLINIC

RECEPTION

B1-20

WC CLINIC

B1-21 CORRIDOR

B1-17C

WC

CONFERENCE

B1-22

WC EXAM

B1-23

TOILET

B1-24

BREAKROOM

B1-209

CORRIDOR

B1-115

NURSE

STATION

B1-207A

RESUSCITATION

B1-223

EXAM 4

B1-214

TOILET

B1-202

TOILET

B1-203

EXAM 1

B1-204

EXAM 2

B1-205

EXAM 3

B1-206

INTERVENTION

B1-213

HAC

B1-210

TOILET

B1-211 MENTAL

HEALTH

EXAM

B1-212

SOIL

B1-207

CLEAN

SUPPLY

B1-208

NURSE

STATION

B1-207C

WC

B1-201D

CHECK-IN

B1-201A

CORRIDOR

B1-194

CORRIDOR

B1-227

CORRIDOR

B1-228

CORRIDOR

B1-201E

OFFICE,

DAV

B1-47ADMIN

B1-240B

OFFICE

B1-48

CORRIDOR

AB1-01C FIRE

RISER

B1-225

CORRIDOR

B1-229

CORRIDOR

AB1-01

MEN'S

TOILET

B1-77

TOILET

B1-78

OFFICE,

DAV

B1-47A

WAITING

B1-15

LOBBY

B1-02

TR

B1-41

OFFICE

B1-41A

EEKG

A1-140

ECHO

A1-138

EMG

A1-136

EEG

A1-134

ECHO

A1-132

CORRIDOR

B1-13C

ELEVATOR

B7-1

ELEVATOR

B6-1

ELEC

VAULT

B1-104

IT CLOSET

B1-103

4'' FL DN TO BASEMENT

ZONE 2-4-4

Z O

N E

-4

-4

ZONE 2-4-3ZONE 2-4-3

ZONE 2-4-4

Z O

N E

-4

-3

FL

FL

ZONE 2-4-4

ELEC

VAULT

B1-45

NEW ED

ADDITION ZONE

SCOPE OF WORK LEGEND

INDICATES AREA OF DEDUCT

ALTERNATE

NOT IN SCOPE

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .