ATT 4 - 442-303 EED Cheyenne WY FINAL CD VOL 3.pdf
PDF 46 MB Posted
- Solicitation number
- 36C77624R0102
About this file
This document appears to be a construction drawing (ATT 4 - 442-303 EED Cheyenne WY FINAL CD VOL 3.pdf) related to a Department of Veterans Affairs (VA) solicitation for the Expansion of the Emergency Department at the Cheyenne, Wyoming VA Medical Center (Solicitation Number: 36C77624R0102).
The solicitation requires construction of a third-floor addition on the north side of the existing building, including selective demolition, general construction, and alterations. A site visit is scheduled for October 10th at 2pm MT. The solicitation is being issued by the VA Technology Acquisition Center in Austin, Texas. No other details about the required products/services, response/award dates, pricing, or set asides are provided in this drawing document. This appears to be a technical drawing rather than the full solicitation package.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0005.zip | ZIP file | |
| Amendment 0004.zip | ZIP file | |
| Amendment 0003.zip | ZIP file | |
| Amendment 0002.zip | ZIP file | |
| ATT 10 - Geotech Report.pdf | ||
| Amendment 0001.pdf | ||
| ATT 8 - 442-303 Bid Breakdown.docx | DOCX document | |
| 36C77624R0102 Solicitation 10152024.pdf | ||
| Amendment 0001 Attachments.zip | ZIP file | |
| ATT 9 - PPQ.docx | DOCX document | |
| ATT 5 - 442-303 EED Cheyenne WY FINAL CD VOL 4.pdf | ||
| ATT 7 - Limitations on Subcontracting.docx | DOCX document | |
| ATT 8 - Copy of Division Cost Breakdown - 5-29-24.xlsx | XLSX spreadsheet | |
| ATT 6 - Wage Determination Cheyenne.pdf | ||
| ATT 3 - 442-303 EED Cheyenne WY FINAL CD VOL 2.pdf | ||
| ATT 1 - 442-303 Expand ED Cheyenne WY FINAL CD Specs.pdf | ||
| ATT 2 - 442-303 EED Cheyenne WY FINAL CD VOL 1.pdf | ||
| 36C77624R0102 Solicitation.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEDUCT ALTERNATES#
ELIMINATE FRONT ENTRANCE CANOPY. INCLUDING THE WRAP-AROUND SUNSCREEN PERGOLA AND COLUMNS. THE
CURRENT FRONT ENTRANCE CANOPY IS 817 SQ. FT.
ELIMINATE THE RENOVATION TO THE POLICE SUITE. THE POLICE FUNCTIONS WOULD REMAIN AS THEY CURRENTLY EXIST AND WOULD NOT EXPAND OR SIMPLY REUSE EXISTING SPACE AS IS. ALL WORK FOR ARCHITECTURAL, ELECTRICAL, PLUMBING, LOW VOLTAGE, AND FIRE PROTECTION FOR THIS AREA TO BE REMOVED. MINOR DUCT MODIFICATIONS WILL NEED TO BE PERFORMED TO DEMOLISH AND RECONNECT THE EXISTING SUPPLY/RETURN DUCTWORK TO THE NEW MAINS INSTALLED DURING PHASE 3. THE POLICE SPACE TO BE RENOVATED IS
APPROXIMATELY 2,572 SQ. FT.
ELIMINATE THE RENOVATION TO THE SECURITY CONTROL CENTER (SCC). THE POLICE FUNCTIONS WOULD REMAIN AS THEY CURRENTLY EXIST AND WOULD NOT EXPAND OR SIMPLY REUSE EXISTING SPACE AS IS. THE
PROPOSED SPACE TO BE RENOVATED IS APPROXIMATELY 421 SQ. FT.
ELIMINATE THE RENOVATIONS IN THE EXISTING EMERGENCY DEPARTMENT (ED). THE TEMPORARY AHU WILL STILL BE REQUIRED TO SERVE THE EXISTING ED WHILE AHU-6 IS BEING DEMOLISHED AND THE NEW AHU IS BEING INSTALLED.
ALL MAJOR DUCTWORK FROM THE NEW AHU THAT WILL SERVE THE EXISTING ED AND THE NEW ADDITION. TO THE MAXIMUM EXTENT PRACTICAL, ALL EXISTING VAV'S SHALL REMAIN AND BE RECONNECTED TO THE NEW DUCT MAINS.
THE CANTEEN STORE AND STORAGE AREAS SHALL BE DISCONNECTED FROM AHU-4 AND RECONNECTED TO THE NEW AHU. EMERGENCY SUPPORT SPACE AS CURRENTLY DESIGNED IS APPROXIMATELY 1,750 SQ. FT.
MEN'S & WOMEN'S STAFF LOCKERS, WEAPON STORAGE LOCKERS, AND POLICE SUITE LOCKERS REMOVED FROM
THE SCOPE FOR PURCHASE AND INSTALLATION.
NEW EMERGENCY POWER PANEL EHP-4 REMOVED FROM THE SCOPE. THIS INCLUDES REMOVING ATS-DPEHB3, DISTRIBUTION BOARD DPEHB3, AND ASSOCIATED NEW FEEDER.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/1
/2
:0
:4
P
M C
U s e rs \a p u lle n \D o c u m e n ts
\A
-1
C h e y e n n e E
D a p u lle n V
D X
T .r v t
GM-001
COVER
1 1SMR/TB
EXPAND EMERGENCY
DEPARTMENT
CHEYENNE VETERANS AFFAIRS
MEDICAL CENTER
2360 E PERSHING BLVD
CHEYENNE, WY 82001
MARCH 28, 2024
100% BID DOCUMENTS
442-30320-147
BUFFALO
EXPAND EMERGENCY DEPARTMENT
CHEYENNE VETERANS AFFAIRS MEDICAL CENTER
2360 E PERSHING BLVD
CHEYENNE, WY 82001
VA PROJECT #: 442-303
RBK
CAMPUS LOCATION
PROJECT LOCATION
VOLUME 3 OF 4
DRAWING LIST - VOLUME 3 OF 4
GENERAL
GM-001 COVER 1 1
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 16
FK101 FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 1 2 16
FK102 FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 2 3 16
FK103 FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 3 4 16
FK103A FIRST FLOOR DEDUCT ALTERNATE FIRE SUPPRESSION DEMOLITION PLAN - PHASE 3 5 16
FK104 FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 4 6 16
FK104A FIRST FLOOR DEDUCT ALTERNATE FIRE SUPPRESSION DEMOLITION PLAN - PHASE 4 7 16
FX101 FIRST FLOOR FIRE SUPPRESSION PLAN - PHASE 1 8 16
FX102 FIRST FLOOR AND SECOND FLOOR FIRE SUPPRESSION PLANS - PHASE 2 9 16
FX103 FIRST FLOOR FIRE SUPPRESSION PLAN - PHASE 3 10 16
FX103A FIRST FLOOR DEDUCT ALTERNATE FIRE SUPPRESSION PLAN - PHASE 3 11 16
FX104 FIRST FLOOR FIRE SUPPRESSION PLAN - PHASE 4 12 16
FX104A FIRST FLOOR DEDUCT ALTERNATE FIRE SUPPRESSION PLAN - PHASE 4 13 16
FX105 FIRST FLOOR FIRE SUPPRESSION PLAN - COMPLETE 14 16
FX301 FIRE SUPPRESSION 3D SECTIONS 15 16
FX501 FIRE SUPPRESSION DETAILS 16 16
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 51
PD101 BASEMENT DRAIN, WASTE, AND VENT DEMOLITION PLAN - PHASE 1 2 51
PD102 BASEMENT DRAIN, WASTE, AND VENT DEMOLITION PLAN - PHASE 3 3 51
PD103 FIRST FLOOR DRAIN, WASTE, AND VENT DEMOLITION PLAN - PHASE 1 4 51
PD104 FIRST FLOOR DRAIN, WASTE, AND VENT DEMOLITION PLAN - PHASE 2 5 51
PD105 FIRST FLOOR DRAIN, WASTE, AND VENT DEMOLITION PLAN - PHASE 3 6 51
PD105A FIRST FLOOR DEDUCT ALTERNATE DRAIN, WASTE, AND VENT DEMOLITION PLAN - PHASE 3 7 51
PD106 FIRST FLOOR DRAIN, WASTE, AND VENT DEMOLITION PLAN - PHASE 4 8 51
PD107 FIRST FLOOR DOMESTIC WATER DEMOLITION PLAN - PHASE 1 9 51
PD108 FIRST FLOOR DOMESTIC WATER DEMOLITION PLAN - PHASE 2 10 51
PD109 FIRST FLOOR DOMESTIC WATER DEMOLITION PLAN - PHASE 3 11 51
PD109A FIRST FLOOR DEDUCT ALTERNATE DOMESTIC WATER DEMOLITION PLAN - PHASE 3 12 51
PD110 FIRST FLOOR DOMESTIC WATER DEMOLITION PLAN - PHASE 4 13 51
PD111 FIRST FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 3 14 51
PD111A FIRST FLOOR DEDUCT ALTERNATE MEDICAL GAS DEMOLITION PLAN - PHASE 3 15 51
PD112 FIRST FLOOR MEDICAL GAS DEMOLITION PLAN - PHASE 4 16 51
PD112A FIRST FLOOR DEDUCT ALTERNATE MEDICAL GAS DEMOLITION PLAN - PHASE 4 17 51
PW101 BASEMENT DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 1 18 51
PW102 BASEMENT DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 2 19 51
PW103 BASEMENT DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 3 20 51
PW103A BASEMENT DEDUCT ALTERNATE DRAIN, WASTE, VENT, STORM DRAIN PLAN - PHASE 3 21 51
PW104 BASEMENT DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 4 22 51
PW104A BASEMENT DEDUCT ALTERNATE DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 4 23 51
PW105 BASEMENT DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - COMPLETE 24 51
PW106 FIRST FLOOR DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 1 25 51
PW107 FIRST FLOOR DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 2 26 51
PW108 FIRST FLOOR DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 3 27 51
PW108A FIRST FLOOR DEDUCT ALTERNATE DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 3 28 51
PW109 FIRST FLOOR DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 4 29 51
PW109A FIRST FLOOR DEDUCT ALTERNATE DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - PHASE 4 30 51
PW110 FIRST FLOOR DRAIN, WASTE, VENT, AND STORM DRAIN PLAN - COMPLETE 31 51
PW111 ROOF PLUMBING PLAN - PHASE 2 32 51
PP101 BASEMENT DOMESTIC WATER PLANS NORTH AND SOUTH - PHASE 1 33 51
PP102 BASEMENT DOMESTIC WATER PLANS NORTH AND SOUTH - PHASE 3 34 51
PP102A BASEMENT DEDUCT ALTERNATE DOMESTIC WATER PLANS NORTH AND SOUTH - PHASE 3 35 51
PP103 FIRST FLOOR DOMESTIC WATER PLAN SOUTH - PHASE 1 36 51
PP104 FIRST FLOOR DOMESTIC WATER PLAN SOUTH - PHASE 2 37 51
PP105 FIRST FLOOR DOMESTIC WATER PLAN SOUTH - PHASE 3 38 51
PP105A FIRST FLOOR DEDUCT ALTERNATE DOMESTIC WATER PLAN SOUTH - PHASE 3 39 51
PP106 FIRST FLOOR DOMESTIC WATER PLAN SOUTH - PHASE 4 40 51
PP106A FIRST FLOOR DEDUCT ALTERNATE DOMESTIC WATER PLAN SOUTH - PHASE 4 41 51
PP107 FIRST FLOOR DOMESTIC WATER PLAN SOUTH - COMPLETE 42 51
PG101 FIRST FLOOR MEDICAL GAS PLAN NORTH - PHASE 2 43 51
PG102 FIRST FLOOR MEDICAL GAS PLAN SOUTH - PHASE 2 44 51
P-501 PLUMBING DETAILS 45 51
P-502 PLUMBING DETAILS 46 51
P-503 PLUMBING DETAILS 47 51
P-601 PLUMBING SCHEDULES 48 51
P-901 DOMESTIC WATER RISER DIAGRAM 49 51
P-902 DRAIN, WASTE, AND VENT RISER DIAGRAM 50 51
P-903 MEDICAL GAS RISER DIAGRAM 51 51
DRAWING LIST - VOLUME 3 OF 4
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 42
MD101 FIRST FLOOR MECHANICAL DEMOLITION PLAN - PHASE 1 2 42
MD102 FIRST FLOOR MECHANICAL DEMOLITION PLAN - PHASE 2 3 42
MD103 FIRST FLOOR MECHANICAL DEMOLITION PLAN - PHASE 3 4 42
MD103A FIRST FLOOR DEDUCT ALTERNATE 5 MECHANICAL DEMOLITION PLAN - PHASE 3 5 42
MD103B FIRST FLOOR DEDUCT ALTERNATE 6 MECHANICAL DEMOLITION PLAN - PHASE 3 6 42
MD104 FIRST FLOOR MECHANICAL DEMOLITION PLAN - PHASE 4 7 42
MD105 PENTHOUSE AND SECOND FLOOR ROOF MECHANICAL DEMOLITION PLAN - PHASE 2 8 42
MD106 PENTHOUSE AND SECOND FLOOR ROOF MECHANICAL DEMOLITION PLAN - PHASE 3 9 42
MH101 FIRST FLOOR HVAC PLAN - PHASE 1 10 42
MH102 FIRST FLOOR HVAC PLAN - PHASE 2 11 42
MH103 FIRST FLOOR HVAC PLAN - PHASE 3 12 42
MH103A FIRST FLOOR DEDUCT ALTERNATE 5 HVAC PLAN - PHASE 3 13 42
MH103B FIRST FLOOR DEDUCT ALTERNATE 6 HVAC PLAN - PHASE 3 14 42
MH104 FIRST FLOOR HVAC PLAN - PHASE 4 15 42
MH105 FIRST FLOOR HVAC PLAN - COMPLETE 16 42
MH106 SECOND FLOOR AND FIRST FLOOR ROOF HVAC PLAN 17 42
MH107 PENTHOUSE, SECOND FLOOR ROOF, AND PENTHOUSE ROOF HVAC PLANS - PHASE 1 18 42
MH108 PENTHOUSE, SECOND FLOOR ROOF, AND PENTHOUSE ROOF HVAC PLANS - PHASE 2 19 42
MP101 BASEMENT MECHANICAL PIPING PLAN - PHASE 1 20 42
MP102 BASEMENT MECHANICAL PIPING PLAN - PHASE 3 21 42
MP103 FIRST FLOOR MECHANICAL PIPING PLAN - PHASE 1 22 42
MP104 FIRST FLOOR MECHANICAL PIPING PLAN - PHASE 3 23 42
MP104A FIRST FLOOR DEDUCT ALTERNATE 5 MECHANICAL PIPING PLAN - PHASE 3 24 42
MP105 FIRST FLOOR MECHANICAL PIPING PLAN - PHASE 4 25 42
MP106 FIRST FLOOR MECHANICAL PIPING PLAN - COMPLETE 26 42
MP107 PENTHOUSE AND NORTH SECOND FLOOR ROOF MECHANICAL PIPING PLAN - PHASE 1 27 42
MP108 PENTHOUSE AND NORTH SECOND FLOOR ROOF MECHANICAL PIPING PLAN - PHASE 2 28 42
M-301 MECHANICAL SECTIONS 29 42
M-401 ENLARGED FIRST FLOOR ADDITION HVAC PLAN - PHASE 2 30 42
M-402 ENLARGED FIRST FLOOR ADDITION MECHANICAL PIPING PLAN - PHASE 2 31 42
M-403 PARTIAL PENTHOUSE HVAC PLAN 32 42
M-501 MECHANICAL DETAILS 33 42
M-502 MECHANICAL DETAILS 34 42
M-503 MECHANICAL DETAILS 35 42
M-504 MECHANICAL CONTROLS 36 42
M-505 MECHANICAL CONTROLS 37 42
M-601 MECHANICAL SCHEDULES 38 42
M-602 MECHANICAL SCHEDULES 39 42
M-603 MECHANICAL SCHEDULES 40 42
M-604 MECHANICAL SCHEDULES 41 42
M-605 MECHANICAL AIRFLOW SCHEMATICS 42 42
Docusign Envelope ID: 8C911331-036A-4842-B33A-F7F0A53B25B6
7/19/2024
NOTE: NOT ALL SYMBOLS MAY BE USED ON THIS PROJECT
SEMI-RECESSED SPRINKLER HEAD
UPRIGHT SPRINKLER HEAD
FIRE LINEFL
CONCEALED SPRINKLER HEAD
PENDANT SPRINKLER HEAD
SIDEWALL SPRINKLER HEAD
FIRE DEPARTMENT CONNECTION (FDC)
FIRE DRAINDRAIN
CONNECT TO EXISTING
LIMIT OF DEMOLITION
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
FIRE PROTECTION CONTRACTORFPC
TAMPER SWITCH
FLOW SWITCH
CHECK VALVE
GATE VALVE
EXTERIOR ALARM GONG (WATER ACTIVATED)
TEST AND DRAIN ASSEMBLY
BACKFLOW PREVENTER
T&D
TS
FS
ORDINARY HAZARD
GROUP 1 OCCUPANCY
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
ORDINARY HAZARD
GROUP 2 OCCUPANCY
LIGHT HAZARD
FIRE SUPPRESSION SYMBOLS & ABBREVIATIONS
FIRE LINE UNDERGROUNDFL NEW CONNECTION
THE FIRE PROTECTION DRAWING IS DESIGNED TO BE IN CONFORMANCE WITH NFPA 13.
IT IS A PERFORMANCE BASED DRAWING INDICATING THE EXTENT OF FIRE PROTECTION
WORK FOR THE AREA THAT THIS DRAWING REPRESENTS. THIS DRAWING IS “FOR
INFORMATION ONLY”, AS A REFERENCE FOR THE FIRE PROTECTION CONTRACTOR TO
BASE THE DESIGN OF THE FIRE PROTECTION SYSTEM ON. THE CONTRACTOR SHALL
VERIFY THE EXACT CONDITIONS THAT THIS DRAWING REPRESENTS, INCLUDING ANY
PERCEIVED CONCEALED SPACES, AND THE BUILDING TYPE AND CONSTRUCTION AS
OUTLINED IN THE INTERNATIONAL BUILDING CODE, PRIOR TO THE START OF WORK.
REFER TO NFPA 13, AND THE PROJECT SPECIFICATIONS FOR OTHER FIRE PROTECTION
REQUIREMENTS.
1. LOCATIONS SHOWN FOR EXISTING FIRE PROTECTION PIPE AND EQUIPMENT ARE APPROXIMATE. FIELD VERIFY THE EXACT LOCATIONS OF EXISTING FIRE PROTECTION LINES AND EQUIPMENT INCLUDING RISERS AND VALVES PRIOR TO START OF
WORK.
2. COORDINATE WITH COR FOR ANY SHUTDOWNS OR PLANNED INTERRUPTIONS OF THE FIRE PROTECTION SERVICE. GIVE THE
COR THREE (14) DAYS NOTICE PRIOR TO PLANNED SHUTDOWN OR INTERRUPTION.
3. COORDINATE DEMOLITION OF FIRE PROTECTION PIPING WITH OTHER PIPING WHICH IS NOT TO BE REMOVED. PROTECT
OTHER PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT, AND DEBRIS.
4. FIRE PROTECTION RELATED EQUIPMENT AND PIPING WHICH IS REMOVED FROM THE BUILDING IS TO BE TAKEN OFFSITE AND
DISPOSED OF.
5. REMOVE SPRINKLER MAINS, BRANCHES AND SPRINKLERS BACK TO THE ZONE CONTROL VALVE AS NEEDED TO INSTALL NEW
SPRINKLER SYSTEM.
FIRE SUPPRESSION DEMOLITION GENERAL NOTES
1. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ROOM FINISH SCHEDULE WHICH INDICATE CEILING HEIGHTS.
COORDINATE WITH ARCHITECT'S REFLECTED CEILING PLAN FOR LOCATION OF SPRINKLER HEADS IN AREAS WITH CEILINGS.
LOCATE HEADS IN AREAS WITHOUT CEILINGS AS REQUIRED BY NFPA AND VA REQUIREMENTS FOR THE APPROPRIATE
HAZARD CLASSIFICATION.
2. THIS FACILITY IS FULLY SPRINKLERED. FIRE SUPPRESSION SYSTEM SHALL BE WET PIPE TYPE SYSTEM WITH COMPLETE SPRINKLER PROTECTION UNLESS NOTED OTHERWISE. SYSTEM TO BE DESIGNED AS REQUIRED BY NFPA AND VA
REQUIREMENTS FOR THE APPROPRIATE HAZARD CLASSIFICATION.
3. FIRE PROTECTION CONTRACTOR SHALL OBTAIN LATEST FLOW TEST DATA INDICATING THE WATER FLOW, STATIC PRESSURE AVAILABLE WITH NO FLOW, AND RESIDUAL PRESSURE AT FULL FLOW TO THE FACILITY. SUBMIT HYDRAULIC CALCULATIONS
AND PLANS RELATED TO A MINIMUM OF 1 REMOTE AREA FOR REVIEW.
4. PIPING IS SHOWN IN SCHEMATIC FORM TO INDICATE APPROXIMATE ARRANGEMENT OF EQUIPMENT AND PIPING. SPRINKLER CONTRACTOR SHALL DESIGN THE SYSTEM AND ROUTE PIPING AS REQUIRED FOR CONFORMANCE WITH ACTUAL BUILDING CONDITIONS AND NFPA REQUIREMENTS. COORDINATE SPRINKLER WORK WITH ALL OTHER TRADES TO AVOID CONFLICT.
5. SUPPORT NEW PIPING AND EQUIPMENT FROM STRUCTURE. PROVIDE ALL SUPPLEMENTAL STEEL TO SPAN BETWEEN PRIMARY BUILDING STRUCTURAL MEMBERS. DESIGN SUPPLEMENTAL STEEL AND SUPPORTS INCLUDING REACTION LOADS
AT PRIMARY BUILDING STRUCTURAL MEMBERS.
6. REPAIR OR REPLACE NON-CONFORMING AND INADEQUATE NEW WORK AT NO ADDITIONAL COST TO THE VA.
7. PROVIDE FIRE STOPS / SEALANT AT ALL PIPE PENETRATIONS THROUGHOUT FIRE RATED WALLS. REVIEW ARCHITECTURAL
PLANS PRIOR TO BIDDING AND INDICATE PENETRATIONS ON SPRINKLER LAYOUT SUBMITTAL.
8. WATER SERVICE AND DOUBLE CHECK DETECTOR TYPE BACKFLOW ASSEMBLY WITH TAMPER SWITCHES TO BE PROVIDED AND TESTED AS WORK OF DIVISION 22. INCORPORATE ASSOCIATED PRESSURE DROP OF SELECTED BACKFLOW ASSEMBLY
IN HYDRAULIC CALCULATIONS.
9. SPRINKLER HEADS SHALL BE IN A SYMMETRICAL PATTERN, NOT NECESSARILY IN THE CENTER OF ROOMS OR CORRIDORS.
LOCATE CENTERED IN CEILING TILE WHERE POSSIBLE.
FIRE SUPPRESSION GENERAL NOTES
1. DURING THE TIME THAT THE FIRE PROTECTION RENOVATION WORK IS BEING PERFORMED, AND THE FIRE PROTECTION SYSTEM IS OUT OF COMMISSION, CONTRACTOR SHALL HAVE SUFFICIENT PERSONNEL ONSITE TO KEEP A “FIRE WATCH” ON THE FACILITY IN ACCORDANCE WITH VA REQUIREMENTS. AN OUT OF SERVICE TAG MUST BE PLACED AT THE FIRE ALARM PANEL AND THE FIRE DEPARTMENT CONNECTION. REFER TO INTERNATIONAL FIRE CODE CHAPTER 9, SECTION 901.7.
2. FIRE WATCH PERSONNEL ARE TO KEEP WATCH FOR FIRES IN THE GENERAL AREA OF PERFORMANCE, THE PERSONS
PERFORMING THE FIRE WATCH ARE NOT PERMITTED TO PERFORM ANY OTHER DUTIES.
3. FIRE WATCH PERSONNEL ARE TO HAVE FIRE EXTINGUISHING EQUIPMENT READILY AVAILABLE AND TO BE TRAINED IN ITS USE.
4. THE QUANTITY OF PERSONNEL INVOLVED IN THE FIRE WATCH IS TO BE ADEQUATE SUCH THAT EACH FLOOR, LEVEL, AND
ROOM OF THE FIRE AREA IS COVERED.
BUILDING AND OCCUPANT SAFETY - INTERRUPTION OF
FIRE PROTECTION SERVICE
1. CONTRACTOR SHALL COMPLY WITH THE VA'S INFECTION CONTROL RISK ASSESSMENT REQUIREMENTS AND WRITTEN DUST
CONTROL PLAN.
2. EXISTING AIR QUALITY REQUIREMENTS AND OTHER UTILITY REQUIREMENTS FOR OCCUPIED AREAS SHALL BE MAINTAINED.
3. RENOVATION AREAS SHALL BE ISOLATED FROM OCCUPIED AREAS DURING CONSTRUCTION USING AIRTIGHT BARRIERS.
PROVIDE EXHAUST AIRFLOW IN A MANNER THAT SHALL BE SUFFICIENT TO MAINTAIN NEGATIVE AIR PRESSURE IN THE CONSTRUCTION ZONE. COORDINATE TEMPORARY BARRIERS WITH INTERIM LIFE SAFETY MEASURES.
4. FIRE PROTECTION SYSTEM REVISIONS SHALL BE PROPERLY PERFORMED TO LIMIT WATERBORNE OPPORTUNISTIC
PATHOGENS.
5. CRUCIAL VENTILATION SPECIFICATIONS FOR AIR BALANCE AND FILTRATION SHALL BE VERIFIED BEFORE COR ACCEPTANCE.
INFECTION CONTROL MEASURES
STATIC PSI RESIDUAL PSI FLOW PSI DATE LOCATION FLOW TEST PERFORMED BY
118 100 95 2023
HYDRANT #12, SOUTH
OF PRIMARY CARE
VA CHEYENNE
MEDICAL CENTER
THE FLOW TEST INFORMATION LISTED ABOVE IS INTENDED AS A REFERENCE FOR THE FIRE PROTECTION CONTRACTOR. THE FIRE
PROTECTION CONTRACTOR SHALL PERFORM A HYDRAULIC FLOW TEST NEAR THE PROJECT SITE TO VERIFY ACTUAL FLOW
CONDITIONS ON WHICH TO BASE THE FIRE PROTECTION DESIGN.
FLOW TEST INFORMATION (NEW SERVICE)
GPM CALCULATED
STATIC PSI RESIDUAL PSI FLOW PSI DATE LOCATION FLOW TEST PERFORMED BY
118 100 95 2023
HYDRANT #13, NORTH
OF BUFFALO SW
PARKING LOT
VA CHEYENNE
MEDICAL CENTER
THE FLOW TEST INFORMATION LISTED ABOVE IS INTENDED AS A REFERENCE FOR THE FIRE PROTECTION CONTRACTOR. THE FIRE
PROTECTION CONTRACTOR SHALL PERFORM A HYDRAULIC FLOW TEST NEAR THE PROJECT SITE TO VERIFY ACTUAL FLOW
CONDITIONS ON WHICH TO BASE THE FIRE PROTECTION DESIGN.
FLOW TEST INFORMATION (EXISTING SERVICE)
GPM CALCULATED
GENERAL REQUIREMENTS:
1. ALL PHASES OF WORK ARE SHOWN ON THESE PLANS.
2. WORK COVERED IN THE DIFFERENT PHASES ARE NOTED ON THE DRAWINGS.
3. WORK IS TO BE DONE IN THE ORDER LISTED BELOW UNLESS APPROVED BY THE ENGINEER AND COR.
PHASE 1:
1. INSTALL NEW 6" FIRE SERVICE IN CRAWL SPACE AND ROUTE TO TEMPORARY RISER LOCATION.
2. TEMPORARILY INSTALL BACKFLOW PREVENTER FOR NEW FIRE SERVICE.
3. DEMOLISH EXISTING FDC AND ASSOCIATED PIPING BACK TO THE CRAWL SPACE. EXTEND OUT FDC PIPING FROM THE
CRAWL SPACE TO A TEMPORARY FDC STANDPIPE APPROXIMATELY 10' OUTSIDE OF THE BUILDING.
4. MODIFY OR DEMOLISH EXISTING HEADS AND PIPING IN REMODELED TR B1-41, ELEC B1-45, AND OFFICE B1-41A AS
REQUIRED FOR THE NEW LAYOUT.
5. INSTALL AND CONNECT NEW HEADS AND PIPING IN THE REMODELED TR B1-41, ELEC B1-45, AND OFFICE B1-41A AS
REQUIRED FOR THE NEW LAYOUT.
PHASE 2:
1. MODIFY OR DEMOLISH EXISTING HEADS AND PIPING IN REMODELED EXISTING WAITING ROOM AREA B1-80.
2. INSTALL AND CONNECT NEW HEADS AND PIPING IN REMODELED EXISTING WAITING ROOM AREA B1-80.
3. INSTALL AND CONNECT NEW HEADS AND PIPING IN MECH B2-41K ON THE SECOND FLOOR.
4. CONSTRUCTION OF NEW ADDITION AND ALL FIRE SUPPRESSION SYSTEMS SHOWN IN IT.
5. RUN PIPING FROM TEMPORARY FIRE RISER TO NEW ADDITION.
PHASE 3:
1. MODIFY OR DEMOLISH EXISTING HEADS AND PIPING IN REMODELED AREA AS REQUIRED FOR THE NEW LAYOUT.
2. INSTALL AND CONNECT NEW HEADS AND PIPING IN REMODELED AREA AS REQUIRED FOR THE NEW LAYOUT.
3. DEMOLISH TEMPORARY FDC STANDPIPE. PERMANENTLY INSTALL EXISTING FDC AND PROVIDE NEW PIPING. CONNECT TO
EXISTING MAIN IN THE STAIRWELL.
4. PROVIDE NEW FDC FOR NEW ADDITION AND PART OF THE REMODELED AREA.
5. RELOCATE THE TEMPORARY FIRE RISER FROM THE VESTIBULE TO THE NEW FIRE RISER ROOM. PERMANENTLY INSTALL
BACKFLOW PREVENTER FOR NEW FIRE SERVICE.
PHASE 4:
1. MODIFY OR DEMOLISH EXISTING HEADS AND PIPING IN REMODELED EXISTING POLICE AREA INTO THE SECURITY AREA, ROOM NUMBERS B1-84, 84A, AND 84B.
2. INSTALL AND CONNECT NEW HEADS AND PIPING IN REMODELED EXISTING POLICE AREA INTO THE SECURITY AREA, ROOM NUMBERS B1-84, 84A, AND 84B.
FIRE SUPPRESSION PHASING NOTES
DEDUCT ALTERNATES#
ELIMINATE FRONT ENTRANCE CANOPY. INCLUDING THE WRAP-AROUND SUNSCREEN PERGOLA AND COLUMNS. THE
CURRENT FRONT ENTRANCE CANOPY IS 817 SQ. FT.
ELIMINATE THE RENOVATION TO THE POLICE SUITE. THE POLICE FUNCTIONS WOULD REMAIN AS THEY CURRENTLY EXIST AND WOULD NOT EXPAND OR SIMPLY REUSE EXISTING SPACE AS IS. ALL WORK FOR ARCHITECTURAL, ELECTRICAL, PLUMBING, LOW VOLTAGE, AND FIRE PROTECTION FOR THIS AREA TO BE REMOVED. MINOR DUCT MODIFICATIONS WILL NEED TO BE PERFORMED TO DEMOLISH AND RECONNECT THE EXISTING SUPPLY/RETURN DUCTWORK TO THE NEW MAINS INSTALLED DURING PHASE 3. THE POLICE SPACE TO BE RENOVATED IS APPROXIMATELY 2,572 SQ. FT.
ELIMINATE THE RENOVATION TO THE SECURITY CONTROL CENTER (SCC). THE POLICE FUNCTIONS WOULD REMAIN AS THEY CURRENTLY EXIST AND WOULD NOT EXPAND OR SIMPLY REUSE EXISTING SPACE AS IS. ALL WORK FOR ARCHITECTURAL, ELECTRICAL, PLUMBING, LOW VOLTAGE, AND FIRE PROTECTION FOR THIS AREA TO
BE REMOVED. THE PROPOSED SCC SPACE TO BE RENOVATED IS APPROXIMATELY 421 SQ. FT.
ELIMINATE THE RENOVATIONS IN THE EXISTING EMERGENCY DEPARTMENT (ED). THE TEMPORARY AHU WILL STILL BE REQUIRED TO SERVE THE EXISTING ED WHILE AHU-6 IS BEING DEMOLISHED AND THE NEW AHU IS BEING INSTALLED.
ALL MAJOR DUCTWORK FROM THE NEW AHU THAT WILL SERVE THE EXISTING ED AND THE NEW ADDITION. TO THE MAXIMUM EXTENT PRACTICAL, ALL EXISTING VAV'S SHALL REMAIN AND BE RECONNECTED TO THE NEW DUCT MAINS.
THE CANTEEN STORE AND STORAGE AREAS SHALL BE DISCONNECTED FROM AHU-4 AND RECONNECTED TO THE NEW AHU. EMERGENCY SUPPORT SPACE AS CURRENLTY DESIGNED IS APPROXIMATELY 1,750 SQ. FT.
MEN'S & WOMEN'S STAFF LOCKERS, WEAPON STORAGE LOCKERS, AND POLICE SUITE LOCKERS REMOVED FROM
THE SCOPE FOR PURCHASE AND INSTALLATION.
NEW EMERGENCY POWER PANEL EHP-4 REMOVED FROM THE SCOPE. THIS INCLUDES REMOVING ATS-DPEHB3, DISTRIBUTION BOARD DPEHB3, AND ASSOCIATED NEW FEEDER.
FIRE PROTECTION WATER SUPPLY
DEMAND ESTIMATE (NEW SERVICE)
DESIGN DATA:
SYSTEM TYPE: WET
OCCUPATION CLASSIFICATION: ORD. GR. 1
DENSITY: 0.15 GPM/FT2
AREA OF APPLICATION: 1500
MINIMUM SPRINKLER DEMAND: 225 GPM
HOSE STREAMS: 250 GPM
OVERFLOW FACTOR (10%): 22.5 GPM
TOTAL WATER REQUIRED
(INCLUDING HOSE STREAMS): 497.5 GPM
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4
:1
P
M C
R e v it p ro je c ts
\P
-1
C h e y e n n e E
D tb u d a i.
rv t
FX001
FIRE SUPPRESSION GENERAL
INFORMATION
1 16SMR/TB
EXPAND EMERGENCY
DEPARTMENT
CHEYENNE VETERANS AFFAIRS
MEDICAL CENTER
2360 E PERSHING BLVD
CHEYENNE, WY 82001
MARCH 28, 2024
100% BID DOCUMENTS
442-30320-147
BUFFALO
RBK
FIRE SERVICE BACKFLOW PREVENTER SCHEDULE (NEW SERVICE)
MARK LOCATION SYSTEM TYPE SIZE REMARKS
1-DCVDA-1 B1-255 FIRE RISER
ROOM
FIRE SERVICE DOUBLE CHECK DETECTOR
TYPE BACKFLOW ASSEMBLY
WITH TAMPER SWITCHES
6" -
DocuSign Envelope ID: B1DF547C-B35E-4008-A6CF-4D5EBD84C992
3/27/2024
S SS
S S
S
SS S
S S
S
SS
S
SS SSS
S S
S S
S
SS S
S S
S S
S S
S S
S
SS SS
S S
S S
S S
S
S SS S
S S
S
S S
S S
S S
SS
S S
S
SS
S
SS SSSSS
S
S S
S
S SS
S
VALVE AND FLOW SWITCH IN CORRIDOR
FLOW AND
TAMPER
SWITCHES,
ZONE 2-4-4
DRAIN AND
TEST, ZONE
2-4-4
2 1/2" FL
2 1/2" FL
2 1/2" FL
3" FL
2 1/2" FL
ZONE 2-4-4
Z O
N E
-4
-4
4'' DN TO BASEMENT
3'' RISER
ASSEMBLY FOR
FLR SPRINKLER
SYSTEM
ZONE 2-4-3ZONE 2-4-3
ZONE 2-4-4
EXISTING FDC
1 1/2" FL
1"1" 3
ABCDEFGH
Z O
N E
-4
-3
C O
R R
ID
O
R A
B -0
C
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FLFL
FL FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL FL
FL
FL
FL
FL
FL
FL
FL
FL
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
CORRIDOR
B1-07DTREATMENT
B1-10
TOILET
B1-10B
ER MEDS
B1-10A
ER
EXAM/TRTMT
B1-08
ER
MULTI-PURPOSE
B1-09
SOILED
UTILITY
B1-07
POLICE
B1-44
STAIRS
S2F1
OCCUPATIONAL
HEALTH
B1-47
OCCUPATIONAL
HEALTH
B1-48
BDSL
B1-49
CORRIDOR
B1-14C
ELEC
VAULT
B1-45
CORRIDOR
B1-09C
BDSL
B1-50
TOILET
B1-43 TOILET
B1-52
TOILET
B1-51A
F TOILET
B1-78
BREAK
ROOM
B1-51
M TOILET
B1-77
WAITING
ROOM
B1-80
CORRIDOR
B1-13CMED
ADMIN
CLERK
B1-73
BUSINESS
OFFICE
CLERK
B1-75
CORRIDOR
B1-11C
MED
ADMIN
OFFICE
B1-74
MED
ADMIN
B1-72
TRAVEL
OFFICE
B1-71
VTS
B1-68VTS
B1-68A
CORRIDOR
B1-68B
TELEHEALTH
NETWORK
B1-76
NON VA
CARE
B1-53
CORRIDOR
B1-07C
WHEELCHAIR
STORAGE
B1-06
CORRIDOR
B1-12C
ER
WAITING
ROOM
B1-03
SUPPLY
ROOM
B1-04
ER EXAM
B1-05
ENTRY
B1-01B
CORRIDOR
AB1-01C
WAITING
ROOM
A1-01
RECEPTION
A1-03
EDUCATION
BREAK
ROOM
A1-02
INTERVIEW
A1-14
INTERVIEW
A1-13
INTERVIEW
A1-12
INTERVIEW
A1-11
INTERVIEW
A1-10
CORRIDOR
A1-11C
WORK
ROOM
A1-15
CORRIDOR
A1-10C
SOCIAL
WORKER
A1-06
PHARMACY
CONSELOR
A1-05
NUTRITION
A1-04 CHIEF
A1-128
ECG
A1-130
CORRIDOR
A1-15C
CORRIDOR
A1-13C
ER CLERK
B1-02
ER
RECEPTION
B1-01
EXAM
B1-16
ER
WAITING
RM
B1-15 AUDIOLOGY
OFFICE
B1-61
STORAGE
B1-63
HEARING
BOOTH
B1-65
HEARING
BOOTH
B1-65A
CORRIDOR
B1-10C
DELIVERY
SHOOT
B1-75A
VESTIBULE
B1-79
SECURITY
B1-84
SECURITY
B1-86
POLICE
OFFICE
B1-88
DAV
B1-80A
ED ROOM
B1-27
ER EXAM
B1-28
ER EXAM
B1-29
VET
EXPRESS
OFFICE
B1-30
ER HAC
B1-31
WC EXAM
B1-32
TOILET
B1-25
VET
EXPRESS
CHECK IN
B1-17
TELEHEALTH
B1-40
VET
EXPRESS
OFFICE
B1-37
CORRIDOR
B1-18C
WC EXAM
B1-34
VET
EXPRESS
EXAM
B1-36
VET
EXPRESS
EXAM
B1-38
AUDIOLOGY
EXAM
B1-54
AUDIOLOGY
EXAM
B1-55
AUDIOLOGY
EXAM
B1-56
AUDIOLOGY
EXAM
B1-57
TELE RET
B1-83
EXAM
B1-95
EXAM
PODIATRY
B1-93
CORRIDOR
B1-08C
STOARGE
B1-90A
SUPPLY
B1-106
STORAGE
PODIATRY
B1-92
EXAM
PODIATRY
B1-94
EXAM
PODIATRY
B1-96
SOILED
UTILITY
B1-98
MECH
CHASE
B1-S03
FISCAL
AGENT
CASHIER
B1-70
WOMENS
CLINIC
RECEPTION
B1-20
WC
OFFICE
B1-21
CORRIDOR
B1-17C
WC
CONFERENCE
B1-22
WC EXAM
B1-23
TOILET
B1-24
ER OFFICE
B1-41A
IN/PT
THERAPY
A1-142
EEKG
A1-140
ECHO
A1-138
EMG
A1-136
EEG
A1-134
ECHO
A1-132
ELEVATOR
B7-1
ELEVATOR
B6-1
ELEC
VAULT
B1-104
IT CLOSET
B1-103
PATIENT
EDUCATION
A1-107
SLEEP LAB
A1-120
TOILET
A1-120A
TOILET
A1-126A
MONITOR
A1-123
OXYGEN
A1-121
RESPIRATORY
STORAGE
A1-119
SOILED
LINEN
A1-117
PFT
A1-137
STRESS
LAB
A1-135
OFFICE
A1-133
TOILET
A1-127
TOILET
A1-129
HAC
A1-125
SLEEP LAB
A1-126
WOMENS
RR
A1-07
MENS RR
A1-09
STORAGE
A1-71
HAC
A1-08
CORRIDOR
A1-09C
C&P EXAM
CORRIDOR
A1-05C
MENTAL
HEALTH
A1-25
MENTAL
HEALTH
A1-24
INTERVIEW
A1-17
CORRIDOR
A1-14C
INTERVIEW
A1-18
IT/COMM
A1-26
COMM/ELEC
A1-16
SPD
STORAGE
A1-115
SPS/SPD
STORAGE
A1-139
BREAK RM
A1-110
STORAGE
A1-105
OXYGEN
A1-70
ELECTRICAL
A1-108
CORRIDOR
A1-02C
CORRIDOR
A1-02C
CORRIDOR
A1-07C
STORAGE
A1-122
CORRIDOR
A1-01C
NURSE
B1-90
DECON
STORAGE
B1-01A
CORRIDOR
B1-08C
SOUND
BOOTH
B1-62
OFFICE
B1-89
HAC
B1-102
SCOPE OF WORK LEGEND
NOT IN SCOPE
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE BARRIER
2 HR - FIRE BARRIER
SMOKE RESISTIVE
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1 HR - SMOKE BARRIERS S S S
/2
/2
:4
:2
P
M C
R e v it p ro je c ts
\P
-1
C h e y e n n e E
D tb u d a i.
rv t
FK101
FIRST FLOOR FIRE SUPPRESSION
DEMOLITION PLAN - PHASE 1
2 16SMR/TB
EXPAND EMERGENCY
DEPARTMENT
CHEYENNE VETERANS AFFAIRS
MEDICAL CENTER
2360 E PERSHING BLVD
CHEYENNE, WY 82001
MARCH 28, 2024
100% BID DOCUMENTS
442-30320-147
BUFFALO
RBK
N
NEW WORK
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
NEW ED
NORTH
0 4 8 16
Scale: 1/8" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 1
1 DEMOLISH SPRINKLER HEAD AND ASSOCIATED
BRANCH PIPING INSIDE AREA OF WORK AS
REQUIRED TO ACCOMODATE NEW SPRINKLER
HEAD LAYOUT.
2 DEMOLISH EXISTING FDC AND ASSOCIATED
PIPING BACK TO THE CRAWL SPACE.
3 DEMOLISH VESTIBULE SPRINKLER HEADS AND
ASSOCIATED PIPING BACK TO MAIN ON SECOND
FLOOR AND CAP WITHIN CEILING SPACE.
A. REMOVE EXISTING SPRINKLER HEADS IN THE
AREAS BEING RENOVATED.
B. DEMOLISH SPRINKLER BRANCH PIPING TO
MAINS AND CAP, AS NECESSARY, FOR NEW
LAYOUT.
C. EXISTING PIPE SIZES ARE APPROXIMATE,
CONTRACTOR TO FIELD VERIFY.
D. PROVIDE FIRE WATCH FOR THE PERIOD
SPRINKLER SYSTEM IS NOT FUNCTIONAL.
E. AFTER DISCONNECTING PIPING SERVING THE
RENOVATED AREAS, SPRINKLER SYSTEM
SHALL BE MADE FUNCTIONAL TO HAVE ACTIVE
SPRINKLER SYSTEM IN THE EXISTING AREA.
F. FIRE TRUCK ACCESS TO FDC SHALL BE
MAINTAINED AT ALL TIMES DURING
CONSTRUCTION.
G. CONTRACTOR TO PROVIDE FIRE PROTECTION
WITHIN THE AREA OF WORK DURING
CONSTRUCTION PER NFPA REQUIREMENTS.
H. CONTRACTOR SHALL BE RESPONSIBLE FOR
DRAINING THE SYSTEM TO ALLOW FOR
MODIFICATION OF EXISITNG SPRINKLER
SYSTEM (PIPING AND HEADS) AND REFILLING
THE SYSTEM AFTER MODIFICATION WORK IS
DONE. FIRE WATCH SHALL BE PROVIDED FOR
THE DURATION SPRINKLER IS NOT IN
OPERATION.
I. ZONE REFERENCED ARE SPRINKLER ZONES
PER RECORD DRAWINGS.
S
S
SS S
S S
S
SS
S
SS SSS
S S
S S
S
SS S
S S
S S
S S
S S
S
SS SS
S S
S S
S S
S
S SS S
S S
S
S S
S S
S S
SS
S S
S
SS
S
SS SSSSS
S
S S
S
S SS
S
ABCDEFGH
VALVE AND FLOW SWITCH IN CORRIDOR
FLOW AND
TAMPER
SWITCHES,
ZONE 2-4-4
DRAIN AND
TEST, ZONE
2-4-4
2 1/2" FL
2 1/2" FL
2 1/2" FL
3" FL
2 1/2" FL
ZONE 2-4-4
Z O
N E
-4
-4
4'' FIRE RISER IN BASEMENT
3'' RISER
ASSEMBLY FOR
FLR SPRINKLER
SYSTEM
ZONE 2-4-3ZONE 2-4-3
ZONE 2-4-4
1 1/2" FL
Z O
N E
-4
-3
WAITING
ROOM
B1-80
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FLFL
FL FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL FL
FL
FL
FL
FL
FL
FL
FL
FL
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
1 1 2
TREATMENT
B1-10
TOILET
B1-10B
ER MEDS
B1-10A
ER
EXAM/TRTMT
B1-08
ER
MULTI-PURPOSE
B1-09
SOILED
UTIL
B1-07
POLICE
B1-44
STAIRS
S2F1
OCCUPATIONAL
HEALTH
B1-47
OCCUPATIONAL
HEALTH
B1-48
BDSL
B1-49
CORRIDOR
B1-14C
ELEC
VAULT
B1-45
CORRIDOR
B1-09C
INTERVENTION
B1-50
TOILET
B1-43 TOILET
B1-52
TOILET
B1-51A
TOILET
B1-78
BREAK
ROOM
B1-51
M TOILET
B1-77
MED
ADMIN
CLERK
B1-73
BUSINESS
OFFICE
CLERK
B1-75
CORRIDOR
B1-11C
MED
ADMIN
OFFICE
B1-74
MED
ADMIN
B1-72
TRAVEL
OFFICE
B1-71VTS
B1-68
VTS
B1-68A
CORRIDOR
B1-68B
TELE
HEALTH
NETWORK
B1-76
NON VA
CARE
B1-53
CORRIDOR
B1-07C
WHEELCHAIR
STORAGE
B1-06
CORRIDOR
B1-12C
ER
WAITING
ROOM
B1-03
SUPPLY
ROOM
B1-04
ER EXAM
B1-05
ENTRY
B1-01B
CORRIDOR
AB1-01C
ER CLERK
B1-02
RECEPTION
B1-01
EXAM
B1-16
ER
WAITING
RM
B1-15
AUDIOLOGY
OFFICE
B1-61
SOUND
BOOTH
B1-61A
STORAGE
B1-63
HEARING
BOOTH
B1-65
HEARING
BOOTH
B1-65A
CORRIDOR
B1-10C
DELIVERY
SHOOT
B1-75A
SECURITY
B1-84
SECURITY
B1-86
POLICE
OFFICE
B1-88
STORAGE
B1-27
EXAM
B1-28
EXAM
B1-29
EXAM
B1-30
HAC
B1-31
EXAM
B1-32
TOILET
B1-25
VET
EXPRESS
CHECK IN
B1-17
TELEHEALTH
B1-40
VET
EXPRESS
OFFICE
B1-37
CORRIDOR
B1-18C
EXAM
B1-34
EXAM
B1-36
EXAM
B1-38
AUDIOLOGY
EXAM
B1-54
AUDIOLOGY
EXAM
B1-55
AUDIOLOGY
EXAM
B1-56
AUDIOLOGY
EXAM
B1-57
TELE RET
B1-83
PODIATRY
B1-95
PODIATRY
B1-93
CORRIDOR
B1-08C
WAITING
AREA
B1-90A
HAC
B1-106
PODIATRY
B1-92
PODIATRY
B1-94
PODIATRY
B1-96
SOILED
UTILITY
B1-98
MECH
CHASE
B1-S03
FISCAL
AGENT
CASHIER
B1-70
WOMENS
CLINIC
RECEPTION
B1-20
WC CLINIC
B1-21
CORRIDOR
B1-17C
WC
CONFERENCE
B1-22
WC EXAM
B1-23
TOILET
B1-24
TR
B1-41
OFFICE
B1-41A
CORRIDOR
B1-13C
ELEVATOR
B7-1
ELEVATOR
B6-1
ELEC
VAULT
B1-104
IT CLOSET
B1-103
WAITING
ROOM
B1-161
RECEPTION
B1-163
EDUCATION
BREAK
ROOM
B1-164
INTERVIEW
B1-166
INTERVIEW
B1-168
INTERVIEW
B1-169
INTERVIEW
B1-170
INTERVIEW
B1-171
CORRIDOR
B1-172
WORK
ROOM
B1-173
CORRIDOR
A1-10C
SOCIAL
WORKER
B1-174
PHARMACY
CONSELOR
B1-175
NUTRITION
B1-176
CHIEF
B1-177
ECG
B1-178
CORRIDOR
B1-179
CORRIDOR
B1-180
IN/PT
THERAPY
A1-142
EEKG
B1-181
ECHO
B1-182
EMG
B1-183
EEG
B1-184
ECHO
B1-185
PATIENT
EDUCATION
A1-107
SLEEP LAB
A1-120
TOILET
A1-120A
TOILET
A1-126A
MONITOR
A1-123
OXYGEN
A1-121
RESPIRATORY
STORAGE
A1-119
SOILED
LINEN
A1-117
PFT
A1-137
STRESS
LAB
A1-135
OFFICE
A1-133
TOILET
A1-127
TOILET
A1-129
HAC
A1-125
SLEEP LAB
A1-126
WOMENS
RR
A1-07
MENS RR
A1-09
STORAGE
A1-71
HAC
A1-08
CORRIDOR
A1-09C
C&P EXAM
CORRIDOR
A1-05C
MENTAL
HEALTH
A1-25
MENTAL
HEALTH
A1-24
INTERVIEW
A1-17
CORRIDOR
A1-14C
INTERVIEW
A1-18
IT/COMM
A1-26
COMM/ELEC
A1-16
SPD
STORAGE
A1-115
SPS/SPD
STORAGE
A1-139
BREAK RM
A1-110
STORAGE
A1-105
OXYGEN
A1-70
ELECTRICAL
A1-108
CORRIDOR
A1-07C
STORAGE
A1-122
SCOPE OF WORK LEGEND
NOT IN SCOPE
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE BARRIER
2 HR - FIRE BARRIER
SMOKE RESISTIVE
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1 HR - SMOKE BARRIERS S S S
/2
/2
:4
:3
P
M C
R e v it p ro je c ts
\P
-1
C h e y e n n e E
D tb u d a i.
rv t
FK102
FIRST FLOOR FIRE SUPPRESSION
DEMOLITION PLAN - PHASE 2
3 16SMR/TB
EXPAND EMERGENCY
DEPARTMENT
CHEYENNE VETERANS AFFAIRS
MEDICAL CENTER
2360 E PERSHING BLVD
CHEYENNE, WY 82001
MARCH 28, 2024
100% BID DOCUMENTS
442-30320-147
BUFFALO
RBK
N
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
NORTH
0 4 8 16
Scale: 1/8" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 2
1 DEMOLISH SPRINKLER HEAD AND ASSOCIATED
PIPING INSIDE AREA OF WORK BACK TO THE
LIMIT OF THE DEMOLITION AND CAP EXISTING
PIPING.
2 EXISTING SPRINKLER HEAD TO REMAIN.
A. REMOVE EXISTING SPRINKLER HEADS IN THE
AREAS BEING RENOVATED.
B. DEMOLISH SPRINKLER BRANCH PIPING TO
MAINS AND CAP AS NECESSARY FOR NEW
LAYOUT.
C. EXISTING PIPE SIZES ARE APPROXIMATE,
CONTRACTOR TO FIELD VERIFY.
D. PROVIDE FIRE WATCH FOR THE PERIOD
SPRINKLER SYSTEM IS NOT FUNCTIONAL.
E. AFTER DISCONNECTING PIPING SERVING THE
RENOVATED AREAS, SPRINKLER SYSTEM
SHALL BE MADE FUNCTIONAL TO HAVE ACTIVE
SPRINKLER SYSTEM IN THE EXISTING AREA.
F. FIRE TRUCK ACCESS TO FDC SHALL BE
MAINTAINED AT ALL TIMES DURING
CONSTRUCTION.
G. CONTRACTOR TO PROVIDE FIRE PROTECTION
WITHIN THE AREA OF WORK DURING
CONSTRUCTION PER NFPA REQUIREMENTS.
H. CONTRACTOR SHALL BE RESPONSIBLE FOR
DRAINING THE SYSTEM TO ALLOW FOR
MODIFICATION OF EXISITNG SPRINKLER
SYSTEM (PIPING AND HEADS) AND REFILLING
THE SYSTEM AFTER MODIFICATION WORK IS
DONE. FIRE WATCH SHALL BE PROVIDED FOR
THE DURATION SPRINKLER IS NOT IN
OPERATION.
I. ZONE REFERENCED ARE SPRINKLER ZONES
PER RECORD DRAWINGS.
T ectonic Cop yright 2007
S SS
S S
S
SS S
S S
S
S S
S S
S
SS
S
SS SSSSS SS
S S
S S
S S
S
S SS S
S S
S
S S
S S
S S
SS
S S
S
S SS S S
S S
S S
S
SS S
S S
S S
S SS S S S S
S S
S S
S S
S SS S S S
S S
S
SS
S
SS SSSSS
S
S S
S S
S S
S
S S
S S
S S
S SS
S
ABCDEFGH
VALVE AND FLOW SWITCH IN CORRIDOR
FLOW AND
TAMPER
SWITCHES,
ZONE 2-4-4
DRAIN AND
TEST, ZONE
2-4-4
2 1/2" FL
2 1/2" FL
2 1/2" FL
3" FL
2 1/2" FL
Z O
N E
-4
-4
3'' RISER
ASSEMBLY FOR
FLR SPRINKLER
SYSTEM
ZONE 2-4-3ZONE 2-4-3
1 1
1 1
1 1
1 1
1 1/2" FL
Z O
N E
-4
-3
ENTRY
B1-01B
ER EXAM
TREATMENT
B1-08
ER MEDS
B1-10A
TOILET
B1-10B
TREATMENT
B1-10
ER
MULTI-PURPOSE
B1-09
SOILED
UTILITY
B1-07
POLICE
B1-44
ER EXAM
B1-05
SUPPLY ROOM
B1-04
ER WAITING
RM
B1-03
WHEELCHAIR
STORAGE
1B-06
RECEPTION
B1-01
D E
C O
N S
T O
R A
G E
B -0
A
CORRIDOR
AB1-01C
ER CLERK
B1-02
C O
R R
ID
O
R A
B -0
C
ER WAITING
ROOM
B1-15
ER OFFICE
B1-16
C O
R R
ID
O
R B
-0
C
C O
R R
ID
O
R B
-0
C
AUDIOLOGY
OFFICE
B1-61
CORRIDOR
B1-10C
UNOCCUPPIED
B1-61A
NON VA CARE
B1-53
TOILET
B1-52
TOILET
B1-43
INTERVENTION
B1-50
C O
R R
ID
O
R B
-0
C
CORRIDOR
B1-14C
STAIRS
S2F1
PATIENT
ADVOCATE
B1-47
PATIENT
ADVOCATE
B1-48
PATIENT
ADVOCATE
B1-49
TOILET
B1-78
TOILET
B1-51A
MENS TOILET
B1-77
TELE
HEALTH
B1-76
S T
O R
A G
E B
-6
HEARING
BOOTH
B1-65
HEARING
BOOTH
B1-65A
C O
R R
ID
O
R B
-1
C
MED ADMIN
B1-74
VTS
B1-68A
VTS
B1-68
CORRIDOR
B1-68B
TRAVEL
OFFICE
B1-71
MED ADMIN
B1-72
BUSINESS
OFFICE CLERK
B1-75
DELIVERY
SHOOT
B1-75A
MED ADMIN
CLERK
B1-73
C O
R R
ID
O
R B
-1
C
WAITING
ROOM
B1-80
CORRIDOR
B1-12C
BREAK ROOM
B1-51
POLICE
OFFICE
B1-88
SECURITY
B1-86
SECURITY
B1-84
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FLFL
FL FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL FL
FL
FL
FL
FL
FLFL
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
FL
6" FL
FL
6" FL
ELEC
B1-45
LAB HAC
B1-115
FLOW AND
TAMPER
SWITCHES,
ZONE 2-4-3
DRAIN AND
TEST, ZONE
2-4-3
FL
FL
4'' FL DN TO BASEMENT
ZONE 2-4-4ZONE 2-4-4
4" FL
ZONE 2-4-4
NEW ED
ADDITION ZONE
SCOPE OF WORK LEGEND
NOT IN SCOPE
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE BARRIER
2 HR - FIRE BARRIER
SMOKE RESISTIVE
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1 HR - SMOKE BARRIERS S S S
/2
/2
:4
:4
P
M C
R e v it p ro je c ts
\P
-1
C h e y e n n e E
D tb u d a i.
rv t
FK103
FIRST FLOOR FIRE SUPPRESSION
DEMOLITION PLAN - PHASE 3
4 16SMR/TB
EXPAND EMERGENCY
DEPARTMENT
CHEYENNE VETERANS AFFAIRS
MEDICAL CENTER
2360 E PERSHING BLVD
CHEYENNE, WY 82001
MARCH 28, 2024
100% BID DOCUMENTS
442-30320-147
BUFFALO
RBK
N
NEW WORK
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
NEW ED
NORTH
0 4 8 16
Scale: 1/8" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 3
1 DEMOLISH SPRINKLER HEAD AND ASSOCIATED
PIPING INSIDE AREA OF WORK COMPLETE AND
CAP EXISTING PIPING.
2 DEMOLISH TEMPORARY FDC STANDPIPE BACK
TO THE LIMIT OF DEMOLITION. PREPARE FDC
PIPING FOR RECONNECTION.
3 SPRINKLER HEAD IN ELEC B1-45 TO REMAIN.
DEMOLISH ASSOCIATED BRANCH PIPING.
4 DEMOLISH SPRINKLER HEAD AND ASSOCIATED
BRANCH PIPING BACK TO MAIN AND CAP.
5 DEMOLISH OUT OF SERVICE DRY PIPE FIRE
SPRINKLER SYSTEM COMPLETE IN THIS ROOM.
6 DEMOLISH TEMPORARY FIRE SPRINKLER RISER
AND TEMPORARY BACKFLOW PREVENTER FOR
FUTURE RELOCATION IN THE NEW FIRE RISER
ROOM.
A. REMOVE EXISTING SPRINKLER HEADS IN THE
AREAS BEING RENOVATED.
B. DEMOLISH SPRINKLER BRANCH PIPING TO
MAINS AND CAP AS NECESSARY FOR NEW
LAYOUT.
C. EXISTING PIPE SIZES ARE APPROXIMATE,
CONTRACTOR TO FIELD VERIFY.
D. PROVIDE FIRE WATCH FOR THE PERIOD
SPRINKLER SYSTEM IS NOT FUNCTIONAL.
E. AFTER DISCONNECTING PIPING SERVING THE
RENOVATED AREAS, SPRINKLER SYSTEM
SHALL BE MADE FUNCTIONAL TO HAVE ACTIVE
SPRINKLER SYSTEM IN THE EXISTING AREA.
F. FIRE TRUCK ACCESS TO FDC SHALL BE
MAINTAINED AT ALL TIMES DURING
CONSTRUCTION.
G. CONTRACTOR TO PROVIDE FIRE PROTECTION
WITHIN THE AREA OF WORK DURING
CONSTRUCTION PER NFPA REQUIREMENTS.
H. CONTRACTOR SHALL BE RESPONSIBLE FOR
DRAINING THE SYSTEM TO ALLOW FOR
MODIFICATION OF EXISITNG SPRINKLER
SYSTEM (PIPING AND HEADS) AND REFILLING
THE SYSTEM AFTER MODIFICATION WORK IS
DONE. FIRE WATCH SHALL BE PROVIDED FOR
THE DURATION SPRINKLER IS NOT IN
OPERATION.
I. ZONE REFERENCED ARE SPRINKLER ZONES
PER RECORD DRAWINGS.
J. NEW SPRINKLER SYSTEM IS THE SOUTH
EMERGENCY DEPARTMENT (ED) EXPANSION.
K. EXISTING SPRINKLER SYSTEM MAIN IS 4".
LOCATED ON PLAN NORTH SIDE IN BASEMENT
CHILLER ROOM APPROXIMATELY 26 FT FROM
2-1/2" MAIN SERVING THIS SMOKE
COMPARTMENT.
yright 2007
S S
S
S SS S S
S S
S S
S
SS S
S
S
S SS
S S
S
SS S
S S
SS
S
S SS S S S S
S S
S S
S S
S SS S S S
SS
S
SS SSSSS
S
SS
S
SS SSSSS SS
S S
S S
S
S S
S S
S S
S S
S
S S
S S
S S
S S
S SS S
SS
S S
S S
S
S SS S
S S
S
ABCDEFGH
VALVE AND FLOW SWITCH IN CORRIDOR
FLOW AND
TAMPER
SWITCHES,
ZONE 2-4-4
DRAIN AND
TEST, ZONE
2-4-4
2 1/2" FL
2 1/2" FL
2 1/2" FL
3" FL
2 1/2" FL
ZONE 2-4-4
Z O
N E
-4
-4
3'' RISER
ASSEMBLY FOR
FLR SPRINKLER
SYSTEM
ZONE 2-4-3ZONE 2-4-3
ZONE 2-4-4
1 1
1 1/2" FL
Z O
N E
-4
-3
ENTRY
B1-01B
ER EXAM
TREATMENT
B1-08
ER MEDS
B1-10A
TOILET
B1-10B
TREATMENT
B1-10
ER
MULTI-PURPOSE
B1-09
SOILED
UTILITY
B1-07
POLICE
B1-44
ER EXAM
B1-05
SUPPLY ROOM
B1-04
ER WAITING
RM
B1-03
WHEELCHAIR
STORAGE
1B-06
RECEPTION
B1-01
D E
C O
N S
T O
R A
G E
B -0
A
CORRIDOR
AB1-01C
ER CLERK
B1-02
C O
R R
ID
O
R A
B -0
C
ER WAITING
ROOM
B1-15
ER OFFICE
B1-16
C O
R R
ID
O
R B
-0
C
C O
R R
ID
O
R B
-0
C
AUDIOLOGY
OFFICE
B1-61
CORRIDOR
B1-10C
UNOCCUPPIED
B1-61A
NON VA CARE
B1-53
TOILET
B1-52
TOILET
B1-43
INTERVENTION
B1-50
C O
R R
ID
O
R B
-0
C
CORRIDOR
B1-14C
STAIRS
S2F1
PATIENT
ADVOCATE
B1-47
PATIENT
ADVOCATE
B1-48
PATIENT
ADVOCATE
B1-49
TOILET
B1-78
TOILET
B1-51A
MENS TOILET
B1-77
TELE
HEALTH
B1-76
S T
O R
A G
E B
-6
HEARING
BOOTH
B1-65
HEARING
BOOTH
B1-65A
C O
R R
ID
O
R B
-1
C
MED ADMIN
B1-74
VTS
B1-68A
VTS
B1-68
CORRIDOR
B1-68B
TRAVEL
OFFICE
B1-71
MED ADMIN
B1-72
BUSINESS
OFFICE CLERK
B1-75
DELIVERY
SHOOT
B1-75A
MED ADMIN
CLERK
B1-73
C O
R R
ID
O
R B
-1
C
WAITING
ROOM
B1-80
CORRIDOR
B1-12C
BREAK ROOM
B1-51
POLICE
OFFICE
B1-88
SECURITY
B1-86
SECURITY
B1-84
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FLFL
FL FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL FL
FL
FL
FL
FL
FL
FL
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
FL
6" FL
FL
6" FL
3" FL
ELEC
B1-45
5 DEDUCT ALTERNATE
EXISTING TO REMAIN
DEDUCT ALTERNATE
EXISTING TO REMAIN
33 3
3 3
FLOW AND
TAMPER
SWITCHES,
ZONE 2-4-3
DRAIN AND
TEST, ZONE
2-4-3
LAB HAC
B1-115
4'' FS RISER IN BASEMENT
ZONE 2-4-4
4" FL
NEW ED
ADDITION ZONE
SCOPE OF WORK LEGEND
INDICATES AREA OF DEDUCT
ALTERNATE
NOT IN SCOPE
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
WALL RATING LEGEND
1 HR - FIRE BARRIER
2 HR - FIRE BARRIER
SMOKE RESISTIVE S S S S
1 HR - SMOKE BARRIERS S S S
/2
/2
:1
:1
P
M C
R e v it p ro je c ts
\P
-1
C h e y e n n e
E D
D
E D
U C
T tb u d a i.
rv t
FK103A
FIRST FLOOR DEDUCT ALTERNATE
FIRE SUPPRESSION DEMOLITION PLAN
- PHASE 3
5 16SMR/TB
EXPAND EMERGENCY
DEPARTMENT
CHEYENNE VETERANS AFFAIRS
MEDICAL CENTER
2360 E PERSHING BLVD
CHEYENNE, WY 82001
MARCH 28, 2024
100% BID DOCUMENTS
442-30320-147
BUFFALO
RBK
N
NEW WORK
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
NEW ED
NORTH
0 4 8 16
Scale: 1/8" = 1'-0"
FIRST FLOOR DEDUCT ALTERNATE FIRE SUPPRESSION DEMOLITION PLAN - PHASE 3
1 DEMOLISH SPRINKLER HEAD AND ASSOCIATED
PIPING INSIDE AREA OF WORK COMPLETE AND
CAP EXISTING PIPING.
2 DEMOLISH TEMPORARY FDC STANDPIPE BACK
TO THE LIMIT OF DEMOLITION. PREPARE FDC
PIPING FOR RECONNECTION.
3 EXISTING SPRINKLER HEAD TO REMAIN.
4 DEMOLISH SPRINKLER HEAD AND ASSOCIATED
BRANCH PIPING BACK TO MAIN AND CAP.
5 DEMOLISH TEMPORARY FIRE SPRINKLER RISER
AND TEMPORARY BACKFLOW PREVENTER FOR
FUTURE RELOCATION IN THE NEW FIRE RISER
ROOM.
6 EXISTING SPRINKLER HEAD TO REMAIN AS IS TO
BE RECONNECTED TO THE FS LINE IN ZONE
2-4-4. DEMOLISH ASSOCIATED BRANCH PIPING
BACK TO MAIN AND CAP.
DEDUCT ALTERNATES
1. ELIMINATE THE RENOVATION TO THE POLICE
SUITE. THE POLICE FUNCTIONS WOULD REMAIN AS
THEY CURRENTLY EXIST AND WOULD NOT EXPAND
OR SIMPLY REUSE EXISTING SPACE AS IS. ALL
WORK FOR ARCHITECTURAL, ELECTRICAL,
PLUMBING, LOW VOLTAGE, AND FIRE PROTECTION
FOR THIS AREA TO BE REMOVED. MINOR DUCT
MODIFICATIONS WILL NEED TO BE PERFORMED TO
DEMOLISH AND RECONNECT THE EXISTING
SUPPLY/RETURN DUCTWORK TO THE NEW MAINS
INSTALLED DURING PHASE 3. THE POLICE SPACE
TO BE RENOVATED IS APPROXIMATELY 2,572 SQ.
FT.
2. ELIMINATE THE RENOVATIONS IN THE EXISTING
EMERGENCY DEPARTMENT (ED). THE TEMPORARY
AHU WILL STILL BE REQUIRED TO SERVE THE
EXISTING ED WHILE AHU-6 IS BEING DEMOLISHED
AND THE NEW AHU IS BEING INSTALLED. ALL
MAJOR DUCTWORK FROM THE NEW AHU THAT
WILL SERVE THE EXISTING ED AND THE NEW
ADDITION. TO THE MAXIMUM EXTENT PRACTICAL,
ALL EXISTING VAV'S SHALL REMAIN AND BE
RECONNECTED TO THE NEW DUCT MAINS. THE
CANTEEN STORE AND STORAGE AREAS SHALL BE
DISCONNECTED FROM AHU-4 AND RECONNECTED
TO THE NEW AHU. EMERGENCY SUPPORT SPACE
AS CURRENLTY DESIGNED IS APPROXIMATELY
1,750 SQ. FT.
A. REMOVE EXISTING SPRINKLER HEADS IN THE
AREAS BEING RENOVATED.
B. DEMOLISH SPRINKLER BRANCH PIPING TO
MAINS AND CAP AS NECESSARY FOR NEW
LAYOUT.
C. EXISTING PIPE SIZES ARE APPROXIMATE,
CONTRACTOR TO FIELD VERIFY.
D. PROVIDE FIRE WATCH FOR THE PERIOD
SPRINKLER SYSTEM IS NOT FUNCTIONAL.
E. AFTER DISCONNECTING PIPING SERVING THE
RENOVATED AREAS, SPRINKLER SYSTEM
SHALL BE MADE FUNCTIONAL TO HAVE ACTIVE
SPRINKLER SYSTEM IN THE EXISTING AREA.
F. FIRE TRUCK ACCESS TO FDC SHALL BE
MAINTAINED AT ALL TIMES DURING
CONSTRUCTION.
G. CONTRACTOR TO PROVIDE FIRE PROTECTION
WITHIN THE AREA OF WORK DURING
CONSTRUCTION PER NFPA REQUIREMENTS.
H. CONTRACTOR SHALL BE RESPONSIBLE FOR
DRAINING THE SYSTEM TO ALLOW FOR
MODIFICATION OF EXISITNG SPRINKLER
SYSTEM (PIPING AND HEADS) AND REFILLING
THE SYSTEM AFTER MODIFICATION WORK IS
DONE. FIRE WATCH SHALL BE PROVIDED FOR
THE DURATION SPRINKLER IS NOT IN
OPERATION.
I. ZONE REFERENCED ARE SPRINKLER ZONES
PER RECORD DRAWINGS.
J. NEW SPRINKLER SYSTEM IS THE SOUTH
EMERGENCY DEPARTMENT (ED) EXPANSION.
K. EXISTING SPRINKLER SYSTEM MAIN IS 4".
LOCATED ON PLAN NORTH SIDE IN BASEMENT
CHILLER ROOM APPROXIMATELY 26 FT FROM
2-1/2" MAIN SERVING THIS SMOKE
COMPARTMENT.
SS
S
SS SSS
S SS S S S S
S S
S S
S S
S SS S S S
SS S
S S
S
S
S S
S S
S S
S S
S S
S S
S S
S
S SS S S
SS
S
S S SS S
S S
S
S
SSS SSS
S S
S
SS
SS SS
S S
S
SS
S
SS SSSSS
S
S S
S
S SS
S
ABCDEFGH
VALVE AND FLOW SWITCH IN CORRIDOR
FLOW AND
TAMPER
SWITCHES,
ZONE 2-4-4
DRAIN AND
TEST, ZONE
2-4-4
2 1/2" FL
2 1/2" FL
2 1/2" FL
3" FL
4'' FL DN TO BASEMENT
3'' RISER
ASSEMBLY FOR
FLR SPRINKLER
SYSTEM
1 1/2" FL
POLICE
OFFICE
B1-88
SECURITY
B1-86
SECURITY
B1-84
FL
FL
FL
FL
FLFL
FL FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL FL
FL
FL
FL
FL
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
6" FL
4" FL
FL 6" FL
3" FL
FL
FL
FL
STAIRS
S2F1
ELEC
VAULT
B1-45
MED
ADMIN
CLERK
B1-73
BUSINESS
OFFICE
CLERK
B1-75
CORRIDOR
B1-11C
MED
ADMIN
OFFICE
B1-74
MED
ADMIN
B1-72
TRAVEL
OFFICE
B1-71
VTS
B1-68
VTS
B1-68A
CORRIDOR
B1-68B
WAITING
ROOM
A1-01
RECEPTION
A1-03
EDUCATION
BREAK
ROOM
A1-02
INTERVIEW
A1-14
INTERVIEW
A1-13
INTERVIEW
A1-12
INTERVIEW
A1-11
INTERVIEW
A1-10
CORRIDOR
A1-11C
WORK
ROOM
A1-15
SOCIAL
WORKER
A1-06
PHARMACY
CONSELOR
A1-05
NUTRITION
A1-04 CHIEF
A1-128
ECG
A1-130
CORRIDOR
A1-15C
CORRIDOR
A1-13C
EXAM
B1-16
AUDIOLOGY
OFFICE
B1-61
SOUND
BOOTH
B1-61A STORAGE
B1-63
HEARING
BOOTH
B1-65
HEARING
BOOTH
B1-65A
CORRIDOR
B1-10C
DELIVERY
SHOOT
B1-75A
STORAGE
B1-27
EXAM
B1-28
EXAM
B1-29
EXAM
B1-30
HAC
B1-31
EXAM
B1-32
Room
B1-25
VET
EXPRESS
CHECK IN
B1-17
TELEHEALTH
B1-40
VET
EXPRESS
OFFICE
B1-37
CORRIDOR
B1-18C
EXAM
B1-34
EXAM
B1-36
EXAM
B1-38
AUDIOLOGY
EXAM
B1-54
AUDIOLOGY
EXAM
B1-55
AUDIOLOGY
EXAM
B1-56
AUDIOLOGY
EXAM
B1-57
TELE RET
B1-83
PODIATRY
B1-95
PODIATRY
B1-93
CORRIDOR
B1-08C
WAITING
AREA
B1-90A
HAC
B1-106
PODIATRY
B1-92
PODIATRY
B1-94
PODIATRY
B1-96
SOILED
UTILITY
B1-98
MECH
CHASE
B1-S03
FISCAL
AGENT
CASHIER
B1-70
WOMENS
CLINIC
RECEPTION
B1-20
WC CLINIC
B1-21
CORRIDOR
B1-17C
WC
CONFERENCE
B1-22
WC EXAM
B1-23
TOILET
B1-24
BREAKROOM
B1-209
CORRIDOR
B1-115
NURSE
STATION
B1-207A
RESUSCITATION
B1-223
EXAM 4
B1-214
TOILET
B1-202
TOILET
B1-203
EXAM 1
B1-204
EXAM 2
B1-205
EXAM 3
B1-206
INTERVENTION
B1-213
HAC
B1-210
TOILET
B1-211
MENTAL
HEALTH
EXAM
B1-212
SOIL
B1-207
CLEAN
SUPPLY
B1-208
NURSE
STATION
B1-207C
WC
B1-201D
CHECK-IN
B1-201A
CORRIDOR
B1-194
CORRIDOR
B1-227
CORRIDOR
B1-228
CORRIDOR
B1-201E
OFFICE, N
MGR
B1-233
OFFICE,
CHIEF EM
B1-231
OFFICE,
DAV
B1-47
CONSULT
B1-46
TOILET
B1-237
CORRIDOR
B1-124
CORRIDOR
B1-230
ADMIN
B1-240B
BREAK
AREA
B1-242
WORKSTATIONS
B1-245
DEPUTY
CHIEF
B1-243
TRAP
B1-240A
HOLDING
B1-241
CHIEF
OFFICE
B1-244
M LOCKER
B1-250
TOILET
B1-248
W LOCKER
B1-251
ARMORY
B1-249
EVIDENCE
B1-247
TLT/SHWR
B1-235
OFFICE
B1-48
CORRIDOR
AB1-01C
FIRE
RISER
B1-225
CORRIDOR
B1-229
CORRIDOR
AB1-01
TRAP
B1-252
MEN'S
TOILET
B1-77
TOILET
B1-78
INTERVIEW
B1-246
CORRIDOR
B1-240
M
LOCKERS
B1-234
W
LOCKERS
B1-236
ON-CALL
B1-238
STORAGE
B1-232
OFFICE,
DAV
B1-47A
WAITING
B1-15
LOBBY
B1-02
TR
B1-41
OFFICE
B1-41A
EEKG
A1-140
ECHO
A1-138
EMG
A1-136
EEG
A1-134
ECHO
A1-132
CORRIDOR
B1-13C
ELEVATOR
B7-1
ELEVATOR
B6-1
ELEC
VAULT
B1-104
IT CLOSET
B1-103
ZONE 2-4-4
Z O
N E
-4
-4
ZONE 2-4-3ZONE 2-4-3
ZONE 2-4-4
Z O
N E
-4
-3
FL
FL
FLFL
FL
FL
FL
FL
FL FL
FL
FL
FL
FL
FL
FL
FL
FL
ZONE 2-4-4
NEW ED
ADDITION ZONE
SCOPE OF WORK LEGEND
NOT IN SCOPE
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE BARRIER
2 HR - FIRE BARRIER
SMOKE RESISTIVE
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
1 HR - SMOKE BARRIERS S S S
/2
/2
:4
:5
P
M C
R e v it p ro je c ts
\P
-1
C h e y e n n e E
D tb u d a i.
rv t
FK104
FIRST FLOOR FIRE SUPPRESSION
DEMOLITION PLAN - PHASE 4
6 16SMR/TB
EXPAND EMERGENCY
DEPARTMENT
CHEYENNE VETERANS AFFAIRS
MEDICAL CENTER
2360 E PERSHING BLVD
CHEYENNE, WY 82001
MARCH 28, 2024
100% BID DOCUMENTS
442-30320-147
BUFFALO
RBK
N
NEW WORK
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
NEW ED
NORTH
0 4 8 16
Scale: 1/8" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN - PHASE 4
1 DEMOLISH SPRINKLER HEAD AND ASSOCIATED
BRANCH PIPING BACK TO THE LIMIT OF
DEMOLITION INSIDE AREA OF WORK AS
REQUIRED TO ACCOMODATE NEW SPRINKLER
HEAD LAYOUT.
A. REMOVE EXISTING SPRINKLER HEADS IN THE
AREAS BEING RENOVATED.
B. DEMOLISH SPRINKLER BRANCH PIPING TO
MAINS AND CAP AS NECESSARY FOR NEW
LAYOUT.
C. EXISTING PIPE SIZES ARE APPROXIMATE,
CONTRACTOR TO FIELD VERIFY.
D. PROVIDE FIRE WATCH FOR THE PERIOD
SPRINKLER SYSTEM IS NOT FUNCTIONAL.
E. AFTER DISCONNECTING PIPING SERVING THE
RENOVATED AREAS, SPRINKLER SYSTEM
SHALL BE MADE FUNCTIONAL TO HAVE ACTIVE
SPRINKLER SYSTEM IN THE EXISTING AREA.
F. FIRE TRUCK ACCESS TO FDC SHALL BE
MAINTAINED AT ALL TIMES DURING
CONSTRUCTION.
G. CONTRACTOR TO PROVIDE FIRE PROTECTION
WITHIN THE AREA OF WORK DURING
CONSTRUCTION PER NFPA REQUIREMENTS.
H. CONTRACTOR SHALL BE RESPONSIBLE FOR
DRAINING THE SYSTEM TO ALLOW FOR
MODIFICATION OF EXISITNG SPRINKLER
SYSTEM (PIPING AND HEADS) AND REFILLING
THE SYSTEM AFTER MODIFICATION WORK IS
DONE. FIRE WATCH SHALL BE PROVIDED FOR
THE DURATION SPRINKLER IS NOT IN
OPERATION.
I. ZONE REFERENCED ARE SPRINKLER ZONES
PER RECORD DRAWINGS.
J. NEW SPRINKLER SYSTEM IS THE SOUTH
EMERGENCY DEPARTMENT (ED) EXPANSION.
S
S SS S S
SS
S
SS SSSSS
S
SS
S
SS SSS
S
SS
S S
S
S
S S
S
S SS S
S S
S S
S
SS SSS
S SS S S S S
S S
S S
S S
S SS S S S
S S
SS SS
S
S S
S S
S S
S S
S S
S SS S
SS
S S
S S
S
S SS S
S S
S
ABCDEFGH
VALVE AND FLOW SWITCH IN CORRIDOR
FLOW AND
TAMPER
SWITCHES,
ZONE 2-4-4
DRAIN AND
TEST, ZONE
2-4-4
2 1/2" FL
2 1/2" FL
2 1/2" FL
3" FL
3'' RISER
ASSEMBLY FOR
FLR SPRINKLER
SYSTEM
1 1/2" FL
POLICE
OFFICE
B1-88
SECURITY
B1-86
SECURITY
B1-84
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FLFL
FL FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FLFL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL FL
FL
FL
FL
FL
FL
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
R E
N O
V A
T
IO
N N
E W
6" FL
FL 6" FL
3" FL
FL
FL
FL
DEDUCT ALTERNATE
EXISTING TO REMAIN
STAIRS
S2F1
MED
ADMIN
CLERK
B1-73
BUSINESS
OFFICE
CLERK
B1-75
CORRIDOR
B1-11C
MED
ADMIN
OFFICE
B1-74
MED
ADMIN
B1-72
TRAVEL
OFFICE
B1-71VTS
B1-68
VTS
B1-68A
CORRIDOR
B1-68B
WAITING
ROOM
A1-01
RECEPTION
A1-03
EDUCATION
BREAK
ROOM
A1-02
INTERVIEW
A1-14
INTERVIEW
A1-13
INTERVIEW
A1-12
INTERVIEW
A1-11
INTERVIEW
A1-10
CORRIDOR
A1-11C
WORK
ROOM
A1-15
SOCIAL
WORKER
A1-06
PHARMACY
CONSELOR
A1-05
NUTRITION
A1-04 CHIEF
A1-128
ECG
A1-130
CORRIDOR
A1-15C
CORRIDOR
A1-13C
EXAM
B1-16
AUDIOLOGY
OFFICE
B1-61
SOUND
BOOTH
B1-61A
STORAGE
B1-63
HEARING
BOOTH
B1-65
HEARING
BOOTH
B1-65A
CORRIDOR
B1-10C
DELIVERY
SHOOT
B1-75A
STORAGE
B1-27
EXAM
B1-28
EXAM
B1-29
EXAM
B1-30
HAC
B1-31
EXAM
B1-32
Room
B1-25
VET
EXPRESS
CHECK IN
B1-17
TELEHEALTH
B1-40
VET
EXPRESS
OFFICE
B1-37
CORRIDOR
B1-18C
EXAM
B1-34
EXAM
B1-36
EXAM
B1-38
AUDIOLOGY
EXAM
B1-54
AUDIOLOGY
EXAM
B1-55
AUDIOLOGY
EXAM
B1-56
AUDIOLOGY
EXAM
B1-57
TELE RET
B1-83
PODIATRY
B1-95
PODIATRY
B1-93
CORRIDOR
B1-08C
WAITING
AREA
B1-90A
HAC
B1-106
PODIATRY
B1-92
PODIATRY
B1-94
PODIATRY
B1-96
SOILED
UTILITY
B1-98
MECH
CHASE
B1-S03
FISCAL
AGENT
CASHIER
B1-70
WOMENS
CLINIC
RECEPTION
B1-20
WC CLINIC
B1-21 CORRIDOR
B1-17C
WC
CONFERENCE
B1-22
WC EXAM
B1-23
TOILET
B1-24
BREAKROOM
B1-209
CORRIDOR
B1-115
NURSE
STATION
B1-207A
RESUSCITATION
B1-223
EXAM 4
B1-214
TOILET
B1-202
TOILET
B1-203
EXAM 1
B1-204
EXAM 2
B1-205
EXAM 3
B1-206
INTERVENTION
B1-213
HAC
B1-210
TOILET
B1-211 MENTAL
HEALTH
EXAM
B1-212
SOIL
B1-207
CLEAN
SUPPLY
B1-208
NURSE
STATION
B1-207C
WC
B1-201D
CHECK-IN
B1-201A
CORRIDOR
B1-194
CORRIDOR
B1-227
CORRIDOR
B1-228
CORRIDOR
B1-201E
OFFICE,
DAV
B1-47ADMIN
B1-240B
OFFICE
B1-48
CORRIDOR
AB1-01C FIRE
RISER
B1-225
CORRIDOR
B1-229
CORRIDOR
AB1-01
MEN'S
TOILET
B1-77
TOILET
B1-78
OFFICE,
DAV
B1-47A
WAITING
B1-15
LOBBY
B1-02
TR
B1-41
OFFICE
B1-41A
EEKG
A1-140
ECHO
A1-138
EMG
A1-136
EEG
A1-134
ECHO
A1-132
CORRIDOR
B1-13C
ELEVATOR
B7-1
ELEVATOR
B6-1
ELEC
VAULT
B1-104
IT CLOSET
B1-103
4'' FL DN TO BASEMENT
ZONE 2-4-4
Z O
N E
-4
-4
ZONE 2-4-3ZONE 2-4-3
ZONE 2-4-4
Z O
N E
-4
-3
FL
FL
ZONE 2-4-4
ELEC
VAULT
B1-45
NEW ED
ADDITION ZONE
SCOPE OF WORK LEGEND
INDICATES AREA OF DEDUCT
ALTERNATE
NOT IN SCOPE
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .