ATT 8 - 442-303 Bid Breakdown.docx

DOCX document 40 KB Posted

Attached to
VA Construction Project - Expand Emergency Department Cheyenne, WY 442 - 303
Solicitation number
36C77624R0102
Issued by

About this file

This document appears to be a bid breakdown for a federal construction contract opportunity. The work required includes selective demolition, general construction, and alterations to the Cheyenne VA Medical Center Emergency Department. The project involves constructing a third-floor addition on the north side of the building and addressing architectural, fire protection, plumbing, mechanical, electrical, and telecommunications systems. The document provides detailed cost breakdowns for the base bid and six deduct alternates, including items like the electrical scope, staff lockers, the entrance canopy, security control center, police suite, and emergency department renovations. The overall federal contract opportunity is for the Cheyenne VA Medical Center Project 422-303, Expand Emergency Department Construction. The solicitation number is 36C77624R0102, and the procuring agency is the Department of Veterans Affairs Technology Acquisition Center Austin.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE BID – GENERAL CONSTRUCTION: Work includes selective demolition, general construction, and alterations (including necessary removal of existing structures and construction and certain other items). Work includes all labor, material, equipment and supervision to perform the required demolition and construction work on this project including Architectural and Site Modifications, Fire Protection Systems, Plumbing Systems, Mechanical Systems, Electrical Systems, and Telecommunication Systems as described in the Specifications and indicated on the Construction Documents.

DIVISION
LABOR
MATERIAL
TOTAL
DIVISION 1 – GENERAL REQUIREMENTS
$
$
$
DIVISION 2 – EXISTING CONDITIONS
$
$
$
DIVISION 3 – CONCRETE
$
$
$
DIVISION 4 – MASONRY
$
$
$
DIVISION 5 – METALS
$
$
$
DIVISION 6 – WOOD AND PLASTIC
$
$
$
DIVISION 7 – THERMAN AND MOISTURE
$
$
$
DIVISION 8 – DOORS AND WINDOWS
$
$
$
DIVISION 9 – FINISHES
$
$
$
DIVISION 10 – SPECIALTIES
$
$
$
DIVISION 11 – EQUIPMENT
$
$
$
DIVISION 12 – FURNISHINGS
$
$
$
DIVISION 13 – SPECIAL CONSTRUCTION
$
$
$
DIVISION 14 – CONCEYING EQUIPMENT
$
$
$
DIVISION 21 – FIRE SUPPRESSION
$
$
$
DIVISION 22 – PLUMBING
$
$
$
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
$
$
$
DIVISION 25 – INTEGRATED AUTOMATION
$
$
$
DIVISION 26 – ELECTRICAL
$
$
$
DIVISION 27 – COMMUNICATIONS
$
$
$
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
$
$
$
DIVISION 31 – EARTHWORK
$
$
$
DIVISION 32 – EXTERIOR
$
$
$
DIVISION 33 – UTILITIES
$
$
$
DIVISION 34 – TRANSPORTATION
$
$
$
SUM OF ALL DIVISION TOTALS
$
BONDS & INSURANCE
$
CONTRACTOR OVERHEAD
$
CONTRACTOR PROFIT
$
OTHER: _________________________________
$
OTHER: _________________________________
$
LUMP SUM TOTAL AMOUNT:
$

DEDUCT ALTERNATE 1: All electrical scope associated with new panel EHP-4 in the penthouse. Including work related to panels EH11, NBM-2, DPEHB3 and ATS DPEHB3.

DIVISION
LABOR
MATERIAL
TOTAL
DIVISION 1 – GENERAL REQUIREMENTS
$
$
$
DIVISION 2 – EXISTING CONDITIONS
$
$
$
DIVISION 3 – CONCRETE
$
$
$
DIVISION 4 – MASONRY
$
$
$
DIVISION 5 – METALS
$
$
$
DIVISION 6 – WOOD AND PLASTIC
$
$
$
DIVISION 7 – THERMAN AND MOISTURE
$
$
$
DIVISION 8 – DOORS AND WINDOWS
$
$
$
DIVISION 9 – FINISHES
$
$
$
DIVISION 10 – SPECIALTIES
$
$
$
DIVISION 11 – EQUIPMENT
$
$
$
DIVISION 12 – FURNISHINGS
$
$
$
DIVISION 13 – SPECIAL CONSTRUCTION
$
$
$
DIVISION 14 – CONCEYING EQUIPMENT
$
$
$
DIVISION 21 – FIRE SUPPRESSION
$
$
$
DIVISION 22 – PLUMBING
$
$
$
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
$
$
$
DIVISION 25 – INTEGRATED AUTOMATION
$
$
$
DIVISION 26 – ELECTRICAL
$
$
$
DIVISION 27 – COMMUNICATIONS
$
$
$
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
$
$
$
DIVISION 31 – EARTHWORK
$
$
$
DIVISION 32 – EXTERIOR
$
$
$
DIVISION 33 – UTILITIES
$
$
$
DIVISION 34 – TRANSPORTATION
$
$
$
SUM OF ALL DIVISION TOTALS
$
BONDS & INSURANCE
$
CONTRACTOR OVERHEAD
$
CONTRACTOR PROFIT
$
OTHER: _________________________________
$
OTHER: _________________________________
$
LUMP SUM TOTAL AMOUNT:
$

DEDUCT ALTERNATE 2: Men's & Women's staff lockers, weapon storage lockers, and police suite locker room lockers furnished by contractor.

DIVISION
LABOR
MATERIAL
TOTAL
DIVISION 1 – GENERAL REQUIREMENTS
$
$
$
DIVISION 2 – EXISTING CONDITIONS
$
$
$
DIVISION 3 – CONCRETE
$
$
$
DIVISION 4 – MASONRY
$
$
$
DIVISION 5 – METALS
$
$
$
DIVISION 6 – WOOD AND PLASTIC
$
$
$
DIVISION 7 – THERMAN AND MOISTURE
$
$
$
DIVISION 8 – DOORS AND WINDOWS
$
$
$
DIVISION 9 – FINISHES
$
$
$
DIVISION 10 – SPECIALTIES
$
$
$
DIVISION 11 – EQUIPMENT
$
$
$
DIVISION 12 – FURNISHINGS
$
$
$
DIVISION 13 – SPECIAL CONSTRUCTION
$
$
$
DIVISION 14 – CONCEYING EQUIPMENT
$
$
$
DIVISION 21 – FIRE SUPPRESSION
$
$
$
DIVISION 22 – PLUMBING
$
$
$
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
$
$
$
DIVISION 25 – INTEGRATED AUTOMATION
$
$
$
DIVISION 26 – ELECTRICAL
$
$
$
DIVISION 27 – COMMUNICATIONS
$
$
$
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
$
$
$
DIVISION 31 – EARTHWORK
$
$
$
DIVISION 32 – EXTERIOR
$
$
$
DIVISION 33 – UTILITIES
$
$
$
DIVISION 34 – TRANSPORTATION
$
$
$
SUM OF ALL DIVISION TOTALS
$
BONDS & INSURANCE
$
CONTRACTOR OVERHEAD
$
CONTRACTOR PROFIT
$
OTHER: _________________________________
$
OTHER: _________________________________
$
LUMP SUM TOTAL AMOUNT:
$

DEDUCT ALTERNATE 3: Eliminate front entrance canopy. Including the wrap-around sunscreen pergola feature and columns.

DIVISION
LABOR
MATERIAL
TOTAL
DIVISION 1 – GENERAL REQUIREMENTS
$
$
$
DIVISION 2 – EXISTING CONDITIONS
$
$
$
DIVISION 3 – CONCRETE
$
$
$
DIVISION 4 – MASONRY
$
$
$
DIVISION 5 – METALS
$
$
$
DIVISION 6 – WOOD AND PLASTIC
$
$
$
DIVISION 7 – THERMAN AND MOISTURE
$
$
$
DIVISION 8 – DOORS AND WINDOWS
$
$
$
DIVISION 9 – FINISHES
$
$
$
DIVISION 10 – SPECIALTIES
$
$
$
DIVISION 11 – EQUIPMENT
$
$
$
DIVISION 12 – FURNISHINGS
$
$
$
DIVISION 13 – SPECIAL CONSTRUCTION
$
$
$
DIVISION 14 – CONCEYING EQUIPMENT
$
$
$
DIVISION 21 – FIRE SUPPRESSION
$
$
$
DIVISION 22 – PLUMBING
$
$
$
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
$
$
$
DIVISION 25 – INTEGRATED AUTOMATION
$
$
$
DIVISION 26 – ELECTRICAL
$
$
$
DIVISION 27 – COMMUNICATIONS
$
$
$
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
$
$
$
DIVISION 31 – EARTHWORK
$
$
$
DIVISION 32 – EXTERIOR
$
$
$
DIVISION 33 – UTILITIES
$
$
$
DIVISION 34 – TRANSPORTATION
$
$
$
SUM OF ALL DIVISION TOTALS
$
BONDS & INSURANCE
$
CONTRACTOR OVERHEAD
$
CONTRACTOR PROFIT
$
OTHER: _________________________________
$
OTHER: _________________________________
$
LUMP SUM TOTAL AMOUNT:
$

DEDUCT ALTERNATE 4: Eliminate the renovation to the security control center (SCC). The police functions would remain as they currently exist in the SCC.

DIVISION
LABOR
MATERIAL
TOTAL
DIVISION 1 – GENERAL REQUIREMENTS
$
$
$
DIVISION 2 – EXISTING CONDITIONS
$
$
$
DIVISION 3 – CONCRETE
$
$
$
DIVISION 4 – MASONRY
$
$
$
DIVISION 5 – METALS
$
$
$
DIVISION 6 – WOOD AND PLASTIC
$
$
$
DIVISION 7 – THERMAN AND MOISTURE
$
$
$
DIVISION 8 – DOORS AND WINDOWS
$
$
$
DIVISION 9 – FINISHES
$
$
$
DIVISION 10 – SPECIALTIES
$
$
$
DIVISION 11 – EQUIPMENT
$
$
$
DIVISION 12 – FURNISHINGS
$
$
$
DIVISION 13 – SPECIAL CONSTRUCTION
$
$
$
DIVISION 14 – CONCEYING EQUIPMENT
$
$
$
DIVISION 21 – FIRE SUPPRESSION
$
$
$
DIVISION 22 – PLUMBING
$
$
$
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
$
$
$
DIVISION 25 – INTEGRATED AUTOMATION
$
$
$
DIVISION 26 – ELECTRICAL
$
$
$
DIVISION 27 – COMMUNICATIONS
$
$
$
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
$
$
$
DIVISION 31 – EARTHWORK
$
$
$
DIVISION 32 – EXTERIOR
$
$
$
DIVISION 33 – UTILITIES
$
$
$
DIVISION 34 – TRANSPORTATION
$
$
$
SUM OF ALL DIVISION TOTALS
$
BONDS & INSURANCE
$
CONTRACTOR OVERHEAD
$
CONTRACTOR PROFIT
$
OTHER: _________________________________
$
OTHER: _________________________________
$
LUMP SUM TOTAL AMOUNT:
$

DEDUCT ALTERNATE 5: Eliminate the renovation to the police suite. The police functions would remain as they currently exist. All work for architectural, electrical, plumbing, low voltage, and fire protection for this area to be removed. Minor duct modifications will need to be performed to demolish and reconnect the existing supply/return ductwork to the new mains installed during phase 3.

DIVISION
LABOR
MATERIAL
TOTAL
DIVISION 1 – GENERAL REQUIREMENTS
$
$
$
DIVISION 2 – EXISTING CONDITIONS
$
$
$
DIVISION 3 – CONCRETE
$
$
$
DIVISION 4 – MASONRY
$
$
$
DIVISION 5 – METALS
$
$
$
DIVISION 6 – WOOD AND PLASTIC
$
$
$
DIVISION 7 – THERMAN AND MOISTURE
$
$
$
DIVISION 8 – DOORS AND WINDOWS
$
$
$
DIVISION 9 – FINISHES
$
$
$
DIVISION 10 – SPECIALTIES
$
$
$
DIVISION 11 – EQUIPMENT
$
$
$
DIVISION 12 – FURNISHINGS
$
$
$
DIVISION 13 – SPECIAL CONSTRUCTION
$
$
$
DIVISION 14 – CONCEYING EQUIPMENT
$
$
$
DIVISION 21 – FIRE SUPPRESSION
$
$
$
DIVISION 22 – PLUMBING
$
$
$
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
$
$
$
DIVISION 25 – INTEGRATED AUTOMATION
$
$
$
DIVISION 26 – ELECTRICAL
$
$
$
DIVISION 27 – COMMUNICATIONS
$
$
$
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
$
$
$
DIVISION 31 – EARTHWORK
$
$
$
DIVISION 32 – EXTERIOR
$
$
$
DIVISION 33 – UTILITIES
$
$
$
DIVISION 34 – TRANSPORTATION
$
$
$
SUM OF ALL DIVISION TOTALS
$
BONDS & INSURANCE
$
CONTRACTOR OVERHEAD
$
CONTRACTOR PROFIT
$
OTHER: _________________________________
$
OTHER: _________________________________
$
LUMP SUM TOTAL AMOUNT:
$

DEDUCT ALTERNATE 6: Eliminate the renovation in the existing emergency department (ED). The temporary AHU will still be required to serve the existing ED while AHU-6 is being demolished and the new AHU is being installed. To the maximum extent practical, all existing VAV’s shall remain and be reconnected to the new duct mains. The canteen store and storage areas shall be disconnected from AHU-4 and reconnected to the new AHU.

DIVISION
LABOR
MATERIAL
TOTAL
DIVISION 1 – GENERAL REQUIREMENTS
$
$
$
DIVISION 2 – EXISTING CONDITIONS
$
$
$
DIVISION 3 – CONCRETE
$
$
$
DIVISION 4 – MASONRY
$
$
$
DIVISION 5 – METALS
$
$
$
DIVISION 6 – WOOD AND PLASTIC
$
$
$
DIVISION 7 – THERMAN AND MOISTURE
$
$
$
DIVISION 8 – DOORS AND WINDOWS
$
$
$
DIVISION 9 – FINISHES
$
$
$
DIVISION 10 – SPECIALTIES
$
$
$
DIVISION 11 – EQUIPMENT
$
$
$
DIVISION 12 – FURNISHINGS
$
$
$
DIVISION 13 – SPECIAL CONSTRUCTION
$
$
$
DIVISION 14 – CONCEYING EQUIPMENT
$
$
$
DIVISION 21 – FIRE SUPPRESSION
$
$
$
DIVISION 22 – PLUMBING
$
$
$
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
$
$
$
DIVISION 25 – INTEGRATED AUTOMATION
$
$
$
DIVISION 26 – ELECTRICAL
$
$
$
DIVISION 27 – COMMUNICATIONS
$
$
$
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
$
$
$
DIVISION 31 – EARTHWORK
$
$
$
DIVISION 32 – EXTERIOR
$
$
$
DIVISION 33 – UTILITIES
$
$
$
DIVISION 34 – TRANSPORTATION
$
$
$
SUM OF ALL DIVISION TOTALS
$
BONDS & INSURANCE
$
CONTRACTOR OVERHEAD
$
CONTRACTOR PROFIT
$
OTHER: _________________________________
$
OTHER: _________________________________
$
LUMP SUM TOTAL AMOUNT:
$

File details come from the government source that posted it. Updated .