The Forest Service, U.S. Department of Agriculture has adopted FP-14 standard specifications for construction of National Forest System Roads. The contract requires the contractor to blast a pit to generate 66,000 cubic yards of material, obtain all required permits, notify local authorities before blasting, crush 60,000 cubic yards of aggregate base Class "D" as specified in FP-14 Section 703, and stockpile the material near the blasting area. The contract is set aside for small businesses under NAICS code 212319 Other Crushed and Broken Stone Mining and Quarrying with a size standard of 550 employees. No bonds are required as this is a service contract. The contractor shall furnish all labor, equipment, transportation, and supplies necessary to complete the work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents Preface
101 - Terms¸ Format¸ and Definitions
101.01 Meaning of Terms
101.03 Abbrevia�ons
101.04 Defini�ons
102 - Bid¸ Award¸ and Execution of Contract
Delete Sec�on 102
103 - Scope of Work
Delete Subsec�ons 103.02, 103.03, 103.04, 103.05
104 - Control of Work
Delete Subsec�ons 104.01, 104.02, 104.04
104.06 Use of Roads by Contractor
105 - Control of Material
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.01 Conformity with Contract Requirements
106.02 Visual Inspec�on
107 - Legal Relations and Responsibility to the Public
Delete Subsec�on 107.05
108 - Prosecution and Progress
Delete Sec�on 108
109 - Measurement and Payment
Delete Subsec�ons 109.06, 109.07, 109.08, 109.09
109.01 Measurement of Work
109.02 Measurement Terms and Defini�ons
155 - Schedules for Construction Contracts
Delete Sec�on 155
205 - Rock Blasting
205.03 Regula�ons
205.06 Preblast condi�on survey and vibra�on monitoring and control
205.07 Test Blas�ng
205.08 Blas�ng
314 - Stockpiled Aggregates
314.01 Descrip�on
314.04 Stockpile Site
703 - Aggregate
703.05 (c) Surface course aggregate. (3) Plas�c Index
703.05 Subbase, Base, Surface Course, and Screened Aggregate
Preface Preface_wo_06_20_2023
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.
101 - Terms¸ Format¸ and Definitions 101.01_National_11_9_2016
Add the following paragraph to Subsection 101.01:
101.01 Meaning of Terms.
Delete all references to the TAR (Transporta�on Acquisi�on Regula�ons) in the specifica�ons.
101.03_National_11_9_2016
Add the following to Subsection 101.03:
101.03 Abbrevia�ons.
(a) Acronyms.
AGAR — Agriculture Acquisi�on Regula�ons
AFPA — American Forest and Paper Associa�on
FSAR — Forest Service Acquisi�on Regula�ons
MSHA — Mine Safety and Health Administra�on
NESC — Na�onal Electrical Safety Code
WCLIB — West Coast Lumber Inspec�on Bureau
(f) Miscellaneous unit abbrevia�ons.
MP — milepost loca�on ppm — parts per million volume
STA sta�on loca�on
101.04_National_1_22_2020
Make the following changes to Subsection 101.04:
101.04 Defini�ons.
Delete these definitions and replace the following:
Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruc�on such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor — The individual or legal en�ty contrac�ng with the Government for performance of prescribed work. In a �mber sale contract, the contractor is the “Purchaser”.
Culvert — Any structure with a botom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any botomless (natural channel) structure with foo�ngs that will not have wheel loads in direct contact with the top of the structure.
Drawings — (Public Works Contracts) Design sheets or fabrica�on, erec�on, or construc�on details submited to the CO by the Contractor according to FAR Clause 52.236-21 Specifica�ons and Drawings for Construc�on. Also refers to submissions and submitals.
No�ce to Proceed — (Public Works Contracts) Writen no�ce to the Contractor to begin the contract work.
Right-of-Way — A general term deno�ng (1) the privilege to pass over land in some par�cular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Solicita�on—(Public Works Contracts) The complete assembly of documents (whether atached or incorporated by reference) furnished to prospec�ve bidders.
Add the following definitions:
Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisi�on Regula�ons, or “construc�on cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change — “Change” means “change order” as used in the Federal Acquisi�on Regula�ons, or “design change” as used in the Timber Sale Contract.
Forest Service — The United States of America, ac�ng through the Forest Service, U.S. Department of Agriculture.
Neat Line — A line defining the proposed or specified limits of an excava�on or structure.
Pioneer Road — Temporary construc�on access built along the route of the project.
Purchaser — The individual, partnership, joint venture, or corpora�on contrac�ng with the Government under the terms of a Timber Sale Contract and ac�ng independently or through agents, employees, or subcontractors.
Protected Streamcourse — A drainage shown on the plans or �mber sale area map that requires designated mi�ga�on measures.
Road Order — An order affec�ng and controlling traffic on roads under Forest Service jurisdic�on. Road Orders are issued by a designated Forest Officer under the authori�es of 36 CFR, part 260.
Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schema�cs, descrip�ve literature, illustra�ons, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific por�ons of the work required by the contract.
U�liza�on Standards —
The minimum size and percent soundness of trees described in Public Works contract specifica�ons or Timber Sale and IRTC contract provisions to determine merchantable �mber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustra�on of road structure terms.
102 - Bid¸ Award¸ and Execution of Contract 102.00_National_11_9_2016
Delete Section 102 in its entirety.
Delete Sec�on 102.
103 - Scope of Work 103.00_National_11_9_2016
Delete all of Section 103 except Subsection 103.01 Intent of Contract.
Delete Subsec�ons 103.02, 103.03, 103.04, 103.05.
104 - Control of Work 104.00_National_11_9_2016
Delete Subsections 104.01, 104.02, and 104.04.
Delete Subsec�ons 104.01, 104.02, 104.04.
104.06_National_11_9_2016
Add the following to Subsection 104.06:
104.06 Use of Roads by Contractor.
The Contractor is authorized to use roads under the jurisdic�on of the Forest Service for all ac�vi�es necessary to complete this contract, subject to the limita�ons and authoriza�ons designated in the Road Order(s) or described in the contract, when such use will not damage the roads or na�onal forest resources, and when traffic can be accommodated safely.
105 - Control of Material 105.05_National_6_29_2020
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and subs�tute the following:
Materials produced or processed from Government lands in excess of the quan��es required for performance of this contract are the property of the Government. Place excess material safely at government-approved loca�on, at no addi�onal cost to government.
106 - Acceptance of Work 106.01_National_7_18_2017
Delete Subsection 106.01 and replace with the following:
106.01 Conformity with Contract Requirements.
Follow the requirements of FAR Clause 52.246-12 Inspec�on of Construc�on.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authori�es refer to the methods in effect on the date of solicita�on for bids.
Perform all work to the lines, grades, cross-sec�ons, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommenda�ons or to these specifica�ons, whichever is more strict.
Plan dimensions and contract specifica�on values are the values to be strived for and complied with as the design values from which any devia�ons are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor varia�ons from the median zone that are unavoidable for prac�cal reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are iden�fied by gauge, unit mass, sec�on dimensions, etc.), the iden�fica�on will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any �me before final acceptance of the project.
When the Government tests work, copies of test reports are furnished to the Contractor upon request.
Government tests may or may not be performed at the work site. If Contractor tes�ng and inspec�on is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accep�ng work are described in Subsec�ons 106.02 to 106.05 inclusive.
The primary method of acceptance is specified in each Sec�on of work. However, work may be rejected at any �me it is found by any of the methods not to comply with the contract.
Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work;
providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.
(a) Dispu�ng Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved a�er reasonable steps are taken to resolve the dispute, further evalua�on may be obtained by writen request. Include a narra�ve describing the dispute and a proposed resolu�on protocol that addresses the following:
1. Sampling method;
2. Number of samples;
3. Sample transport;
4. Test procedures;
5. Testing laboratories;
6. Reporting;
7. Estimated time and costs; and
8. Validation process.
If the evalua�on requires addi�onal sampling or tes�ng be performed, mutually agree with the Government on witnessing procedures and on sampling and tes�ng by a third party laboratory. Use a third party laboratory accredited by the AASHTO accredita�on program. Provide proof of the laboratory’s accredita�on for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolu�on protocol and may modify it before final approval and execu�on.
The Government will use the approved resolu�on protocol test results to determine the validity of the disputed tes�ng. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolu�on protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolu�on protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolu�on protocol.
(b) Alterna�ves to removing and replacing non-conforming work. As an alterna�ve to removal and replacement, the Contractor may submit a writen request to:
1. Have the work accepted at a reduced price; or
2. Be given permission to perform corrective measures to bring the work into conformity.
The request must contain suppor�ng ra�onale and documenta�on. Include references or data jus�fying the proposal based on an evalua�on of test results, effect on service life, value of material or work, quality, aesthe�cs, and other tangible engineering basis. The CO will determine disposi�on of the nonconforming work.
106.02_National_11_9_2016
Delete Subsection 106.02 and replace with the following:
106.02 Visual Inspec�on.
Acceptance is based on visual inspec�on of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.
107 - Legal Relations and Responsibility to the Public 107.05_National_7_18_2017
Delete Subsection 107.05.
Delete Subsec�on 107.05.
108 - Prosecution and Progress 108.00_National_11_9_2016
Delete Section 108 in its entirety.
Delete Sec�on 108.
109 - Measurement and Payment 109.00_National_11_9_2016
Delete Subsections 109.06, 109.07, 109.08, and 109.09:
Delete Subsec�ons 109.06, 109.07, 109.08, 109.09.
109.01_National_2_22_2019
Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:
109.01 Measurement of Work.
Take measurements as described in Subsec�on 109.02 unless otherwise modified by the Measurement Subsec�on of the sec�on controlling the work being performed. Table 109-1 indicates the accuracy required for quan��es of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.
Table 109-1
Decimal Accuracy of Quan��es for Final Payment
Pay Item Level of Precision Linear Foot 1
Exception--Timber, Steel, and concrete Piles 0.1 Station 0.1 Mile 0.01 Square Foot 0.1 Square Yard 0.1 Each 1 Acre 0.01 Gallon 1 M-Gals. 0.1 Cubic Yard 1
Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;
0.1
Exception--Concrete; Masonry 0.01 Pound 1 Ton 0.1
Exception--Calcium Chloride;
Sodium Chloride; Hydrated Lime;
Bituminous Materials; Pavements;
Bed Course Materials
0.01
Hour 0.1
MFBM 0.01
Station Yard 1 Cubic Yard Mile 1 Ton Mile 1
109.02_National_11_9_2016
Add the following sentence to Subsection 109.02(b):
109.02 Measurement Terms and Defini�ons.
(b) Contract quan�ty.
Contract quan��es will be adjusted only when there are errors in the original design of 15% or more.
155 - Schedules for Construction Contracts 155.00_National_11_9_2016
Delete Section 155 in its entirety.
Delete Sec�on 155.
205 - Rock Blasting 205.00_National_11_8_2016
Add the following to Subsection 205.03:
205.03 Regula�ons
(e) Forest Service. For projects in Na�onal Forest Service lands, comply with Forest Service Manual (FSM) 6745, Explosives and Blasting Materials.
Add the following to Subsection 205.06:
205.06 Preblast condi�on survey and vibra�on monitoring and control.
Limit blas�ng induced vibra�ons in saturated soils or on steep slopes as designated or as directed by the
CO.
No�fy the owners of nearby u�li�es at least 24 hours before blas�ng.
Add the following to Subsection 205.07:
205.07 Test Blas�ng.
Test blast at all new sources, when rock type changes, and when blast layout changes due to slope or other changes.
Add the following to the bulleted list in the eighth paragraph of Subsection 205.08:
205.08 Blas�ng.
• Precipitation exceeds 1 inch in any 24 hour period.
• Precipitation exceeds 3 inches in any 96 hour period.
• Precipitation exceeds 4 inches in any 144 hour period.
• A landslide occurs within 300 feet of a blast site under any precipitation conditions.
314 - Stockpiled Aggregates 314.00_National_7_18_2017
Add the following to Subsection 314.01:
314.01 Descrip�on.
Pit or quarry development work consists of clearing, grubbing, stripping topsoil, removing overburden, construc�ng access roads, conduc�ng restora�on ac�vi�es, and performing other incidental work required for pit or quarry development.
Add the following to Subsection 314.04 after the first sentence of second paragraph:
314.04 Stockpile Site.
Submit a plan of opera�on according to Sec�on 105.02. Perform the work in accordance with MSHA 30 CFR, part 56.
703 - Aggregate 703.05_National_7_18_2017
Delete Subsection 703.05(c)(3) and Replace with the following:
703.05 (c) Surface course aggregate. (3) Plas�c Index
(3) Plas�c Index, AASHTO T 90
If the percent passing the No. 200 sieve is less than 12% 2 to 9 If the percent passing the No. 200 sieve is greater than 12% Less than 2
703.05_National_3_17_2021
Delete 703.05 and replace with the following:
703.05 Subbase, Base, Surface Course, and Screened Aggregate.
(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:
(1) Gradation Table 703-2
(2) Liquid limit, AASHTO T 89 25 max.
(3) Plastic limit, AASHTO T 90 Nonplastic
(4) Los Angeles abrasion, AASHTO T 96 40% max.
(5) Sodium sulfate soundness loss (5 cycles), 12% max.
AASHTO T 104
(6) Durability index (coarse), AASHTO T 210 35 min.
(7) Durability index (fine), AASHTO T 210 35 min.
(8) Fractured faces, ASTM D 5821 50% min.
(9) Free from organic matter and lumps or balls of clay
Do not use material that breaks up when alternately frozen and thawed or wetted and dried.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.
(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:
(1) Gradation Table 703-3
(2) Liquid limit, AASHTO T 89 35 max.
(3) Plastic Index, AASHTO T 90
a) If the percent passing the No. 200 sieve is less than 12% 2 to 9
b) If the percent passing the No. 200 sieve is greater than 12% Less than 2
(4) Los Angeles abrasion, AASHTO T 96 40% max.
(5) Sodium sulfate soundness loss (5 cycles), 12% max.
AASHTO T 104
(6) Durability index (coarse), AASHTO T 210 35 min.
(7) Durability index (fine), AASHTO T 210 35 min.
(8) Fractured faces, ASTM D 5821 75% min.
(9) Free from organic matter and lumps or balls of clay
Do not furnish material that contains asbestos fibers.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.
(c) Screened aggregate – Furnish hard, durable particles or fragments of stone, slag, or gravel conforming the following:
(1) Gradation Table 703-13
(2) Plastic Index, AASHTO T 90 Less than 9
(3) Los Angeles abrasion, AASHTO T 96 55% max.
(4) Free from organic matter and lumps or balls of clay.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.
Delete Table 703-2 and replace with the following:
T ab le
-2 ar ge t V al ue
R an ge s f or S ub ba se a nd B as e
G ra da tio n
Pe rc en t b y M as s P as si ng D es ig na te d Si ev e
(A A
SH
T
O T an d
T
G ra di ng
D es ig na tio n
E (B as e)
(6
(6
(4
4.
7.
(3
T he v al ue in th e pa re nt he se s i s t he a llo w ab le d ev ia tio n
) f ro m th e ta rg et v al ue s..
D (B
(6
(6
(6
(4
4.
7.
(3
C (B
(6
(6
4.
–7 .0
(3
B (S ub ba se
(8
4.
.0 (4
A (S ub ba se
(7
(6
(4
4.
8.
(3
Si ev e Si ze
2½ in ch
1½
3/
1/
N o.
N o.
Delete Table 703-3 and replace with the following:
ab le
-3 ar ge t V al ue R an ge s f or
S ur fa ce
G ra da tio n
Pe rc en t b y M as s P as si ng D es ig na te d Si ev e
(A A
SH
T
O T an d
T
G ra di ng
D es ig na tio n
U
(6
(7
(5
8.
.0 (4
T he v al ue in th e pa re nt he se s i s t he a llo w ab le d ev ia tio n
) f ro m th e ta rg et v al ue s.
If th e pl as tic ity in de x
(P I) is g re at er th an
, t he
T V ra ng e fo r t he
N o.
si ev e si ze is
-1
(4
(7
(5
8.
.0 (4
S 10
(6
(7
(5
8.
.0 (4
H
(6
(6
(5
9.
.0 (4
G
(6
(6
(5
.0
6.
(4
F 10
-1
-8
-6
(6
-5
-3
(6
-2
(5
.0
-1 6.
(4
Si ev e Si ze
N o.
N o.
Add Table 703-13:
Table 703-13 Gradation Requirements for Screened Aggregate
Sieve Size
Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)
Grading Designation L M N O P Q R
6 inch 100 100
4 inch 100 100
3 inch 100 100
2 inch 100
No. 4 15-45 15-45 15-45
| Preface |
| 101 - Terms¸ Format¸ and Definitions |
| 101.01 Meaning of Terms. |
| 101.03 Abbreviations. |
| 101.04 Definitions. |
| 102 - Bid¸ Award¸ and Execution of Contract |
| Delete Section 102. |
| 103 - Scope of Work |
| Delete Subsections 103.02, 103.03, 103.04, 103.05. |
| 104 - Control of Work |
| Delete Subsections 104.01, 104.02, 104.04. |
| 104.06 Use of Roads by Contractor. |
| 105 - Control of Material |
| 105.05 Use of Material Found in the Work. |
| 106 - Acceptance of Work |
| 106.01 Conformity with Contract Requirements. |
| 106.02 Visual Inspection. |
| 107 - Legal Relations and Responsibility to the Public |
| Delete Subsection 107.05. |
| 108 - Prosecution and Progress |
| Delete Section 108. |
| 109 - Measurement and Payment |
| Delete Subsections 109.06, 109.07, 109.08, 109.09. |
| 109.01 Measurement of Work. |
| 109.02 Measurement Terms and Definitions. |
| 155 - Schedules for Construction Contracts |
| Delete Section 155. |
| 205 - Rock Blasting |
| 205.03 Regulations |
| 205.06 Preblast condition survey and vibration monitoring and control. |
| 205.07 Test Blasting. |
| 205.08 Blasting. |
| 314 - Stockpiled Aggregates |
| 314.01 Description. |
| 314.04 Stockpile Site. |
| 703 - Aggregate |
| 703.05 (c) Surface course aggregate. (3) Plastic Index |
| 703.05 Subbase, Base, Surface Course, and Screened Aggregate. |
File details come from the government source that posted it. Updated .