This document is a Statement of Work (SOW) for the Plumas National Forest Franklin Hill Pit Development project. The SOW outlines the requirements for the contractor to provide labor, equipment, transportation, and supplies to blast a 66,000 cubic yard pit, crush 60,000 cubic yards of aggregate base material, and stockpile the material near the blasting area. The project is located in the Feather River Ranger District and the estimated period of performance is May 31, 2024 to October 31, 2024.
The related federal contract opportunity is a Request for Quotation (RFQ) solicitation for the Plumas National Forest Franklin Hill Rock Crushing project. This is a commercial item procurement set aside for small businesses under NAICS code 212319 with a size standard of 550 employees. The contractor shall perform the same scope of work as described in the SOW. No bonds will be required for this service project. Interested parties can contact Alax Parker to view the site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
FEATHER RIVER
RANGER DISTRICT
FRANKLIN HILL PIT
DEVELOPMENT
BRIEF DESCRIPTION OF PROJECT:
Contractor shall furnish Labor, equipment, transportation, and supplies necessary to complete work under this Contract; blast pit to generate 66,000 cubic yards of material, obtain all required permits, notification to Plumas County Sheriff and Plumas National Forest Dispatch Center before blasting pit, crush 60,000 cubic yards of ¾" aggregate base Class "D" as specified Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP- 14, Specification in Spec 703 -Table 703-2 and stockpile material in designated area near blasting area.
Location:
Access to Franklin Hill Pit project area is as follows: Highway 70 to Oroville, California take Oro-Dam Blvd access road. Head East on Oro-Dam Blvd (Highway 162) approximately 1.5 miles, turn right on Highway 162 at major intersection, travel 9 miles to intersection of Foberstown Road, turn right on Foberstown Road travel 6.2 mile to intersection of Feather Falls, turn left on to Butte County Road 27672 (Lumpkin Ridge Road) travel 12 miles to town of Feather Falls, then turn on Forest Service Road 22N27, travel 19.5 miles to intersection of Forest Service Road 22N94, turn left on to Road 22N94, travel 8 miles to intersection of Road 22N94C, and turn right on Road 22N94C, travel 0.5 mile to project location T22N, R8E, Sec.
17.
Period of Performance:
Contract time begins on the effective date of the Notice to Proceed (NTP) and runs until the appropriate number of calendar day’s elapse. Estimated time to start work is 31MAY2024-
31OCT2024.