Att 2. SP451026Q1022_Price Schedule.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- SP451026Q1022
- Issued by
-
Defense Logistics Agency
About this file
This is a price schedule attachment for the DLA Disposition Services Fort Lewis Material Handling Equipment (MHE) Repair and Maintenance contract (SP451026Q1022). The price schedule establishes a Firm Fixed Price IDIQ contract structure with a 12-month base period and two optional 12-month extension periods. The contract covers preventive maintenance services for multiple equipment types including electric and diesel forklifts (ranging from 3,000 to 70,000 pound capacities), front-end loaders, container handlers, warehouse tractors, utility task vehicles, warehouse sweepers, warehouse trailers, and ramp mobiles. The schedule specifies quantities for each equipment category during the base year and option periods, with all preventive maintenance line items priced at $0.00 as they are evaluated uniformly across all offerors.
The contract includes two additional pricing components beyond preventive maintenance: CLIN 0014/1014/2014 for Repair/Replacement Parts on a Reimbursable basis at actual cost (priced at $1.00 per unit with a $50,000 Rough Order of Magnitude allocation), and CLIN 0015/1015/2015 for Labor for Unscheduled Repairs/Corrective Maintenance priced at $0.00. The base year total contract value is $50,000, with identical pricing projected for both option periods. This contract is a 100% small business set-aside with a NAICS code of 811310 and a small business size standard of $12.5 million. Quotes were due by 03:00 PM EST on June 30, 2026, with submission required via email to june.lee@dla.mil.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att 1. SP451026Q1022_PWS.pdf | ||
| Att 5. SP451026Q1022_WD_15-5539.txt | TXT text file | |
| Att 3. SP451026Q1022_Past Performance Q.doc | DOC document | |
| Att 4. SP451026Q1022_Equipment.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGE
| Price Schedule for Lewis MHE Service Contract | |||||
| The Parts Reimbursable CLIN (0014 / 1014 / 2014) reimburses parts at actual cost, see Performance Work Statement (PWS). Offerors are not to change this line on the price scheduled. This line will be evaluated the same for all offerors. | |||||
| CLIN | BASE Period - (12 Months) | Unit of Issue | Amount | Price | Extended Price |
| 0001 | Preventive Maintenance: Electric Forklift, 3-4k | EA | 8 | $0.00 | $0.00 |
| 0002 | Preventive Maintenance: Diesel Forklift, 3-4k | EA | 1 | $0.00 | $0.00 |
| 0003 | Preventive Maintenance: Forklift, 5-10k | EA | 3 | $0.00 | $0.00 |
| 0004 | Preventive Maintenance: Forklift, 12-19k | EA | 2 | $0.00 | $0.00 |
| 0005 | Preventive Maintenance: Forklift, 20-29k | EA | 1 | $0.00 | $0.00 |
| 0006 | Preventive Maintenance: Forklift, 50-70k | EA | 1 | $0.00 | $0.00 |
| 0007 | Preventive Maintenance: Front End Loader | EA | 2 | $0.00 | $0.00 |
| 0008 | Preventive Maintenance: Container Handler | EA | 1 | $0.00 | $0.00 |
| 0009 | Preventive Maintenance: Warehouse Tractor | EA | 1 | $0.00 | $0.00 |
| 0010 | Preventive Maintenance: Utility Task Vehicle | EA | 3 | $0.00 | $0.00 |
| 0011 | Preventive Maintenance: Warehouse Sweeper | EA | 1 | $0.00 | $0.00 |
| 0012 | Preventive Maintenance: Warehouse Trailer | EA | 15 | $0.00 | $0.00 |
| 0013 | Preventive Maintenance: Ramp Mobile | EA | 3 | $0.00 | $0.00 |
| 0014 | Repair/Replacement Parts | ROM - UN | 50000 | $1.00 | $50,000.00 |
| 0015 | Labor for Unscheduled Repairs/Corrective Maintenance | ROM - HR | 160 | $0.00 | $0.00 |
| Base Year Total | $50,000.00 |
| OPTION 1 - (12 Months) | Unit of Issue | Amount | Price | Extended Price | |
| 1001 | Preventive Maintenance: Electric Forklift, 3-4k | EA | 8 | $0.00 | $0.00 |
| 1002 | Preventive Maintenance: Diesel Forklift, 3-4k | EA | 1 | $0.00 | $0.00 |
| 1003 | Preventive Maintenance: Forklift, 5-10k | EA | 3 | $0.00 | $0.00 |
| 1004 | Preventive Maintenance: Forklift, 12-19k | EA | 2 | $0.00 | $0.00 |
| 1005 | Preventive Maintenance: Forklift, 20-29k | EA | 1 | $0.00 | $0.00 |
| 1006 | Preventive Maintenance: Forklift, 50-70k | EA | 1 | $0.00 | $0.00 |
| 1007 | Preventive Maintenance: Front End Loader | EA | 2 | $0.00 | $0.00 |
| 1008 | Preventive Maintenance: Container Handler | EA | 1 | $0.00 | $0.00 |
| 1009 | Preventive Maintenance: Warehouse Tractor | EA | 1 | $0.00 | $0.00 |
| 1010 | Preventive Maintenance: Utility Task Vehicle | EA | 3 | $0.00 | $0.00 |
| 1011 | Preventive Maintenance: Warehouse Sweeper | EA | 1 | $0.00 | $0.00 |
| 1012 | Preventive Maintenance: Warehouse Trailer | EA | 15 | $0.00 | $0.00 |
| 1013 | Preventive Maintenance: Ramp Mobile | EA | 3 | $0.00 | $0.00 |
| 1014 | Repair/Replacement Parts | ROM - UN | 50000 | $1.00 | $50,000.00 |
| 1015 | Labor for Unscheduled Repairs/Corrective Maintenance | ROM - HR | 160 | $0.00 | $0.00 |
| Base Year Total | $50,000.00 |
| OPTION 2 - (12 Months) | Unit of Issue | Amount | Price | Extended Price | |
| 2001 | Preventive Maintenance: Electric Forklift, 3-4k | EA | 8 | $0.00 | $0.00 |
| 2002 | Preventive Maintenance: Diesel Forklift, 3-4k | EA | 1 | $0.00 | $0.00 |
| 2003 | Preventive Maintenance: Forklift, 5-10k | EA | 3 | $0.00 | $0.00 |
| 2004 | Preventive Maintenance: Forklift, 12-19k | EA | 2 | $0.00 | $0.00 |
| 2005 | Preventive Maintenance: Forklift, 20-29k | EA | 1 | $0.00 | $0.00 |
| 2006 | Preventive Maintenance: Forklift, 50-70k | EA | 1 | $0.00 | $0.00 |
| 2007 | Preventive Maintenance: Front End Loader | EA | 2 | $0.00 | $0.00 |
| 2008 | Preventive Maintenance: Container Handler | EA | 1 | $0.00 | $0.00 |
| 2009 | Preventive Maintenance: Warehouse Tractor | EA | 1 | $0.00 | $0.00 |
| 2010 | Preventive Maintenance: Utility Task Vehicle | EA | 3 | $0.00 | $0.00 |
| 2011 | Preventive Maintenance: Warehouse Sweeper | EA | 1 | $0.00 | $0.00 |
| 2012 | Preventive Maintenance: Warehouse Trailer | EA | 15 | $0.00 | $0.00 |
| 2013 | Preventive Maintenance: Ramp Mobile | EA | 3 | $0.00 | $0.00 |
| 2014 | Repair/Replacement Parts | ROM - UN | 50000 | $1.00 | $50,000.00 |
| 2015 | Labor for Unscheduled Repairs/Corrective Maintenance | ROM - HR | 160 | $0.00 | $0.00 |
| Base Year Total | $50,000.00 |
&"-,Bold"&14FOR OFFICIAL USE ONLY&"-,Regular"&11
PROCUREMENT SENSITIVE - SOURCE SELECTION INFORMATION
File details come from the government source that posted it. Updated .