ATT 2. N6264926RA043 Prop Breakdown.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
USS BLUE RIDGE (LCC-19) 5C1 DSRA 3819P24302A02
Solicitation number
N6264926RA043
Issued by

About this file

This is a proposal pricing breakdown template for ship repair services on the USS BLUE RIDGE (LCC-19). The spreadsheet is designed for offerors responding to solicitation N6264926RA043 to submit labor, material, and other direct cost (ODC) estimates for docking-selected restricted availability (DSRA) work at Commander, Fleet Activities Yokosuka Naval Base in Japan. The solicitation involves one Task Group Instruction (TGI) numbered 3819P24302A02 for fabricating a new sleeve of propeller and stern tube shaft, with an anticipated contract performance period from 21 JUL 2026 to 14 SEP 2026. The proposal deadline is 15 APR 2026 at 10:00 AM Japan Standard Time, with solicitation amendment 0001 extending the due date to 22 APR 2026.

The pricing template requires offerors to input labor hours broken down by in-house and sub-contractor personnel across specific work categories including structural (SFTR), installation (INSL), welding (WELD), sheet metal (SMTL), riggers (RGRS), painters (PNTR), electricians (ELEC), pipe fitters (PFTR), quality assurance (QA), and others, along with corresponding labor costs in Japanese Yen, material costs, and ODCs. The template automatically calculates totals and includes provisions for a 21 percent growth CLIN (Contract Line Item Number) for potential expansion work. Offerors must request access to detailed work specifications and drawings through the Department of Defense Secure Area File Exchange (DoD SAFE) system and coordinate with the Contracting Officer Peter Arrieta and Contract Specialist Irene Saito at the Naval Supply Systems Command.

View the file

Other files

File Type Posted
N6264926RA0430003.pdf PDF
N6264926RA0430002 SF 30.pdf PDF
N6264926RA0430001 SF 30.pdf PDF
ATT 04. GFP_List_V3.xlsx XLSX spreadsheet
ATT 06. Warranty Tracking Information.pdf PDF
Exhibit (B) CDRL (IPS).pdf PDF
ATT 03. Request for Information Form.pdf PDF
ATT 04. GFP_List_V3_sum.xlsx XLSX spreadsheet
Exhibit (A) CDRL (GFM).pdf PDF
Solicitation - N6264926RA043.pdf PDF
ATT 05. Source of Repair Instruction.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

OFFEROR/COMPANY NAME:

TABSUMMARYSUMMARYCLINTotal Labor (MH)Labor CostMaterial CostODC CostProposed Price
SOLICITATION NO:n6264926RA043CLIN 0001(1 TGIs)0¥0¥0¥0¥0
SHIP NAME:USS BLUE RIDGE (LCC-19)CLIN 0002 (Growth CLIN)0¥0¥0¥0¥0
AVAILABILITY:51C DSRATotal for All CLIN0¥0¥0¥0¥0
Total TGIs (Specify Total)1Total Evaluated Price¥0
Growth CLIN %21.00%
Note to Offerors: The values in this Summary table is linked to the corresponding data from Tabs for each TGI listed, manual input is not necessary.
No.TGI No.DESCRIPTIONProposed LaborMaterial/ODCsProposed Price (JPY)
In-House Labor (MH)Sub-Contractor Labor (MH)Total Labor (MH)Overall Total Labor Cost (JPY)Material Cost (JPY)ODC (JPY)
13819P24302A02F/0 FABRICATE NEW SLEEVE OF PROPELLER AND STERN TUBE SHAFT000¥0¥0¥0¥0
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200

1_3819P24302A02

SHIP NAME/AVAILABILITY:USS BLUE RIDGE (LCC-19) - 51C DSRATGI 1_3819P24302A02 SUMMARY
SOLICITATION #:n6264926RA043
SRF-JRMC TGI #:1_3819P24302A02In-House MHSub-KTR MHLabor Cost (JPY)Material (JPY)ODC (JPY)TOTAL (JPY)
DESCRIPTION:F/0 FABRICATE NEW SLEEVE OF PROPELLER AND STERN TUBE SHAFT00¥0¥0¥0¥0
Note to Offerrors: Please input data on cells highlighted in ORANGE. The TOTAL will not show if KEY WORK ITEM column is empty. Please insert rows as needed.
IN-HOUSE LABOR HOUR BREAKDOWN
KEY WORK ITEMSFTRINSLWELDSMTLRGRSPNTRELECPFTRQAOTHERSTOTAL

TOTAL IN-HOUSE M/Hs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

KEY WORK ITEMIN-HOUSE LABOR BREAKDOWNSUB-CONTRACTOR LABOR BREAKDOWNTOTAL
TOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL
HOURSTOTAL MAN HOURS (MH)# PERSONNELHOURS PER DAY# DAYSADDITIONAL

HOURS

TOTAL M/Hs0TOTAL M/Hs0
COST PER M/H (¥)<--- Please input in-house labor rateCOST PER M/H (¥)<--- Please input sub-contractor labor rate
LABOR COST (¥)¥0LABOR COST (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Plese insert rows as needed.
MATERIAL COST BREAKDOWN
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS
TOTAL (¥)¥0
Note: The EXTENDED PRICE will not show if the DESCRIPTION column is empty. Please insert rows as needed.
OTHER DIRECT COST (ODC) (IF ANY)
DESCRIPTIONQUANTITYUNIT OF ISSUEUNIT PRICE (¥)EXTENDED PRICE (¥)REMARKS

TOTAL (¥) ¥0

File details come from the government source that posted it. Updated .