This statement of work and related solicitation request quotations for alarm monitoring services for Lassen Volcanic National Park. The National Park Service requires 24/7 monitoring of fire and intrusion alarm systems at eight park locations through January 2025, with options to extend through 2029. The successful offeror will receive alarm signals from Honeywell and Vista control panels, maintain connection and response protocols, and log all activity online with park staff access. The firm fixed price purchase order will be awarded by February 2024 to a contractor that provides UL-certified central station protection, is licensed for the work, and complies with all relevant standards and regulations.

View the file

Other files

File Type Posted
Att_1_SOW_rev_1_0001.pdf PDF
Sol_140P8424Q0012_Amd_0001.pdf PDF
Att_4_52_204-24.pdf PDF
Att_2_Wage_Determination.pdf PDF
Sol_140P8424Q0012.pdf PDF
Att_3_52_212-3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 – RFQ No. 140P8424Q0012

STATEMENT OF WORK

FIRE AND INTRUSION ALARM MONITORING

LASSEN VOLCANIC NATIONAL PARK

1.0 BACKGROUND

Lassen Volcanic National Park (LAVO) has a requirement for 24-hour continuous alarm monitoring and notification services for multiple fire and intrusion alarm systems by a licensed and certified central station. The anticipated period of performance for the base year of this service agreement shall be February 1, 2024 to January 31, 2025, with options for four additional years.

Most of the fire and intrusion alarm infrastructure in the locations listed below (Section 1.2, Physical Locations) were installed in 2020 to NFPA 72 and manufacturer’s specifications. Each newly installed fire alarm control system utilizes Honeywell FCI Gamewell 7075 panels using Honeywell SWIFT wireless technology. Each newly installed intrusion system utilizes Honeywell Vista 128BP security panels. Three buildings will continue to utilize existing combined fire/intrusion systems using Honeywell Vista control panels.

1.1 SPECIFIC REQUIREMENTS

A. The National Park Service (NPS) Contracting Officer’s Representative (COR) shall provide the offeror a list of up to eight names and phone numbers to set up a calling protocol for fire, intrusion, and trouble alarms. The offeror shall have sufficient infrastructure and personnel available to receive fire, intrusion and maintenance alarm calls at the locations cited below, 24 hours a day, 7 days per week during the performance period. Offeror shall coordinate any necessary emergency response by immediately calling the responsible park staff as soon as any zones go into alarm.

B. As part of this service agreement, offeror shall maintain an Internet-based log showing all activity at the locations listed below. NPS staff shall be provided the authority and clearances to log on, at any time and from any computer, to review the log to monitor any alarms, service down times, records of phone calls, contacts made, etc.

C. The fire and intrusion alarms in Building Locations 1 – 8 (below) have been commissioned by a licensed alarm monitoring company and the NPS authority having jurisdiction and are fully on-line. The offeror shall ensure their equipment and staff successfully communicate between dialers and the central station.

1.2 PERIOD OF PERFORMANCE

A. The anticipated period of performance of the base year of this service agreement shall be February 1, 2024 to January 31, 2025. The Government may unilaterally award up to four option years, subject to the availability of funding and performance by the contractor.

1.3 PHYSICAL LOCATIONS

A. Program and make fire and intrusion alarm systems and all components fully functional for 24/7 alarm monitoring at the following park locations:

1. Loomis Home-Ranger Station Bldg. #39 (Manzanita Lake). Fire and Intrusion

2. Loomis Museum Bldg. #43 (Manzanita Lake) Fire and Intrusion

3. Loomis Entrance Station-Fee Office Bldg. #49 (Manzanita Lake). This system includes the Fee Kiosk Bldg. #50 (ML) Intrusion only

4. Entrance Station Office and Kiosk #343 and #344 (Southwest) Fire and

Intrusion

5. Admin Bldg. #1 (HQ) Fire and Intrusion

6. Discovery Center Building #41 (Manzanita Lake) Fire and Intrusion

7. Kohm-Yah-Mah-Nee Visitor Center #350 (Southwest) Fire and Intrusion

8. Maintenance Building #133 (Manzanita Lake) Intrusion only

1.4 DELIVERABLES

No deliverables required as part of this service contract.

1.5 OTHER DIRECT COSTS

No known further direct costs are required.

1.6 GENERAL INFORMATION

a. Hours of Work. All onsite work will be coordinated by the park’s COR. Any required programming work occurring at alarm panels shall be done during normal business hours unless otherwise approved by the COR.

b. Place of Performance. The 24 hour/7 day a week monitoring shall occur on all Lassen Volcanic National Park fire and intrusion alarm systems during the period of performance at the buildings listed in Section 1.3, Physical Locations, above.

c. Coordination of Trades. The offeror shall coordinate work so that there is no interruption in the fire and intrusion alarm monitoring presently existing at the buildings listed in Section 1.3, Physical Locations, above.

d. Licenses and Qualifications.

UL® Certification for Central Station Protective Signaling Services – Monitoring

Evidence of the qualifications must be submitted with the proposal.

e. Changes. Any changes affecting this statement of work shall originate from the park’s COR and be approved by the Contracting Officer (CO). Any work, not in this statement of work, performed without approval shall be at the offeror’s expense.

f. The offeror will comply with all federal laws and regulations in regard to this contract and performing the work.

g. Referenced Standards UL 827, the Standard for Central Station Alarm Services NFPA 72, National Fire Alarm and Signaling Code, 2022 edition