Att 07- PP Questionnaire.pdf
PDF 171 KB Posted
- Attached to
- Underground Propane Piping and Tank Installation Federal contract opportunity
- Solicitation number
- 140P8420R0007
About this file
This document contains a past performance questionnaire and related federal contract opportunity solicitation. The past performance questionnaire is to be completed by an offeror and reference for a prime or subcontract performed for underground propane piping and tank installation at Lassen Volcanic National Park. It requests ratings on quality, timeliness, and business relations and comments on ratings of excellent or unsatisfactory performance.
The related federal contract opportunity solicitation is for the installation of underground propane piping and storage tanks throughout the headquarters area of Lassen Volcanic National Park. It involves removing above-ground propane tanks and installing underground tanks with distribution piping. The estimated value is $500,000 to $1,000,000. Responses are due by August 24, 2020. The requirement is a total HUBZone small business set-aside for NAICS code 237120. The selected contractor will obtain permits and perform the installation and services in accordance with specifications and requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8420R0007_Amd_0004.pdf | ||
| Sol_140P8420R0007_Amd_0003.pdf | ||
| Att 09 - Site Visit Q and A_0002.pdf | ||
| Sol_140P8420R0007_Amd_0002.pdf | ||
| Sol_140P8420R0007_Amd_0001.pdf | ||
| Att 03- Drawings.pdf | ||
| Att 01- Bid Schedule.pdf | ||
| Sol_140P8420R0007.pdf | ||
| Att 06- Key Personnel Form.pdf | ||
| Att 05- Technical Information Form.pdf | ||
| Att 04- Construction Wage Rates.pdf | ||
| Att 08- Standard Form-24 Bid Bond.pdf | ||
| Att 02- Specifications.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Att 07- Past Performance 140P8420R0007
Offeror Name:
NPS – Lassen Volcanic National Park
PAST PERFORMANCE QUESTIONNAIRE PACKAGE INFORMATION AND FORMS:
Instructions to Offeror for sending Reference Questionnaire Forms:
Prepare and submit to the owners of the projects in which you have submitted for Prime/Sub Contractor Experience, a Past Performance Reference Package. For Government contracts, send to Contracting Officer.
For commercial references send to personnel with duties similar to those for Government contracts. Offerors should follow-up and encourage references to get the completed questionnaires to the Contracting Officer before the closing date and time of the solicitation. If you have multiple references at one location (Park, etc.), send one cover letter and questionnaire for each contract you want a reference for. Your questionnaire package should contain the following:
Cover Letter (See SAMPLE below) (page 2 of this document)
Past Performance Questionnaire (pages 3 and 4 of this document) Offeror must complete Sections I & II of the questionnaire in the spaces indicated for identification purposes, and reference must complete Sections III & IV.
Suggested – email directly to Contracting Officer at elizabeth_chico@nps.gov
Please Note:
OFFEROR SHOULD PLACE THEIR NAME ON TOP OF EACH QUESTIONNAIRE PAGE!
OFFEROR SHOULD DELETE THESE INSTRUCTIONS BEFORE SENDING OUT QUESTIONNAIRES
SAMPLE TRANSMITTAL LETTER AND PAST PERFORMANCE QUESTIONNAIRE
Your Company Letterhead Date:
To:
We have listed your firm as a reference for the work we as the prime contractor, or one of our proposed subcontractors, has performed for your firm as listed in Section I of the attached Past Performance Questionnaire.
Our firm has submitted a proposal under a project advertised by the National Park Service (Installation of Underground Propane Piping and Storage at Lassen Volcanic National Park); responses are due to the Contracting Office no later than 2:00 PM PT on August 24, 2020.
In accordance with the Federal Acquisition Regulation (FAR), they will evaluate our firm's (and any proposed subcontractor’s) past performance. Your candid response to the attached questionnaire will assist the evaluation team in this process. We understand that you have a busy schedule and your participation in this evaluation is greatly appreciated. Please complete the enclosed questionnaire as thoroughly as possible. Space is provided for comments. Understand that while the responses to this questionnaire may be released to the offeror, FAR 15.306 (e)(4) prohibits the release of the names of the persons providing the responses. Complete confidentiality will be maintained. Only one response from each office is required.
Please send your completed questionnaire to the following email to: elizabeth_chico@nps.gov to arrive NOT LATER THAN AUGUST 24, 2020 at 2:00 PM PT. Do not return them to our company.
If you have questions regarding the attached questionnaire, or require assistance, please contact Elizabeth Chico via telephone (530) 595-6113 or email at elizabeth_chico@nps.gov. Thank you for your assistance.
E
G
G
S
S
M
M
U
U
N
G
S
M
U
PAST PERFORMANCE QUESTIONNAIRE
(OFFEROR COMPLETE SECTIONS I & II AND PRIOR CUSTOMER/REFERENCE
COMPLETE SECTIONS III & IV AND SEND TO CONTRACTING OFFICER)
I. CONTRACT IDENTIFICATION
CONTRACTOR NAME: CONTRACT NO:
CONTRACTOR ADDRESS: CONTRACT TYPE: FIRM-
FIXED-PRICE COST
REIMBURSEMENT
OTHER: (specify)
ACTIVE COMPLETED
ROUTINE COMPLEX
DATES OF PERFORMANCE: AWARD AMOUNT: $
TOTAL WITH MODS $
PROJECT DESCRIPTION:
II. AGENCY (CUSTOMER) IDENTIFICATION
AGENCY (CUSTOMER) NAME:
POC NAME/TITLE/PHONE:
III. PAST PERFORMANCE RATING
Rating Scale: E = Excellent. Considerably surpassed requirements/expectations.
G = Good. Surpassed requirements/expectations.
S = Satisfactory. Met requirements/expectations M = Marginal. Met some requirements/expectations U = Unsatisfactory. Did not meet requirements/expectations N = Neutral/Unrated. No record of past performance is available – no points of contact could be reached.
1. QUALITY: (Circle applicable rating)
a. Conformance with contract requirements
b. Quality of workmanship (including subcontractors)
c. General oversight by project manager and superintendent
d. Coordination with and control of subcontractors
e. Compliance w/Davis-Bacon wage rate & labor usage requirements
f. Avoidance of accidents/safety violations
2. TIMELINESS:
a. Adherence to project delivery schedules E G S M U N
b. Submission of change proposals E G S M U N
c. Response to technical direction and change orders E G S M U N
d. Response to correction of identified problems E G S M U N
e. Submission of timely/accurate/complete billings E G S M U N
f. Submission of materials/other submittals E G S M U N
3. BUSINESS RELATIONS:
a. Flexibility and cooperativeness in resolving problems E G S M U N
b. Tenacity and innovativeness in resolving problems E G S M U N
c. Relationships with subcontractors, including prompt payment E G S M U N
d. End user was satisfied with services performed E G S M U N
IV. COMMENTS
Required for ratings of E (Considerably Surpassed Requirements) or U (Did Not Meet Requirements)
Item No. Comment
Evaluator Name and Title (typed or neatly written):
Evaluator Signature:
Date:
File details come from the government source that posted it. Updated .