Att 09 - Site Visit Q and A_0002.pdf
PDF 68 KB Posted
- Attached to
- Underground Propane Piping and Tank Installation Federal contract opportunity
- Solicitation number
- 140P8420R0007
About this file
This document includes a solicitation for underground propane piping and tank installation at Lassen Volcanic National Park in California. The National Park Service requires the removal of existing above-ground 500-gallon propane tanks serving park buildings and installation of two new underground 6500-gallon propane storage tanks at a central tank farm. The contractor shall distribute propane gas from the tank farm to all park buildings via an underground main piping system. Additional requirements include installation of a direct-fired vaporizer and truck-fill station. The contractor must provide all labor, equipment, testing and supplies for the installation and related services outlined in project specifications. The acquisition is set aside for total HUBZone small businesses. The estimated value is between $500,000 to $1,000,000.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8420R0007_Amd_0004.pdf | ||
| Sol_140P8420R0007_Amd_0003.pdf | ||
| Sol_140P8420R0007_Amd_0002.pdf | ||
| Sol_140P8420R0007_Amd_0001.pdf | ||
| Att 03- Drawings.pdf | ||
| Att 01- Bid Schedule.pdf | ||
| Sol_140P8420R0007.pdf | ||
| Att 06- Key Personnel Form.pdf | ||
| Att 07- PP Questionnaire.pdf | ||
| Att 04- Construction Wage Rates.pdf | ||
| Att 08- Standard Form-24 Bid Bond.pdf | ||
| Att 02- Specifications.pdf | ||
| Att 05- Technical Information Form.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 09 Solicitation: 140P8420R0007
Site Visit Attendees and Questions
Attendees:
White Bear Construction
Site Work Solutions
Questions & Answers:
Q1) What is acceptable for driving surfaces after trenching occurs?
A1) Cold mix asphalt is acceptable as the entire roads network in the housing area is slated for re-paving in 2021.
Q2) The 6500 gallon tanks requested may require a longer time to fabricate and deliver than the stated period of performance
A2) Market research indicates that any tank over 2,000 gallons will have to be custom-constructed. It is suggested that if the offeror can suggest alternate sizes with a delivery schedule, and that information will be considered during the evaluation process.