Att 04_Embankment Stabilization Project_Drawings.pdf
PDF 22 MB Posted
- Solicitation number
- 12445526B0007
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a solicitation package for FR-76 Embankment Stabilization project at Monongahela National Forest in Nicholas County/Webster County, West Virginia, issued by the U.S. Army Corps of Engineers, Huntington District.
The project consists of two primary sites involving embankment stabilization along Forest Road 76 through installation of retaining walls, steel soldier piles, concrete lagging, drainage systems, and roadway reconstruction. Site 1 spans approximately 2.17 miles with work including 19 drilled shafts and HP12X74 steel piles for Retaining Wall A, 18 drilled shafts and W18X119 steel piles for Retaining Wall B, precast concrete lagging (8-inch thickness at 4-foot and 6-foot spacing), storm culverts (18-inch HDPE and 6-inch PVC), subbase grading, aggregate surface course placement, guardrail removal and reset, and temporary stream diversion. Site 2 spans approximately 0.65 miles featuring 18 drilled shafts and HP12X74 steel piles for Retaining Wall C with similar lagging and drainage requirements. The estimate of quantities indicates total material requirements including 1,335 linear feet of steel H-piles, 1,175.5 square feet of concrete lagging, 234 tons of subbase grading B, 154 tons of reinforcing steel, and 255 linear feet of pipe culverts across both sites. Work must comply with Federal Project Specifications (FP-14), includes erosion control measures, environmental protection requirements including bat habitat protections (no tree clearing except November 15 through April 1), and temporary traffic control with road closures. The documents include detailed cross-sections, typical details, boring logs, geotechnical data, and retaining wall specifications. Issue date is March 6, 2025, with no specific award date or pricing terms provided in the cover documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening_12445526B0007.docx | DOCX document | |
| Q and A_12445526B0007.xlsx | XLSX spreadsheet | |
| SIGN IN SHEET_PRE-BID_12445526B0007.pdf | ||
| Q and A_12445526B0007.xlsx | XLSX spreadsheet | |
| Amd_0002_12445526B0007.pdf | ||
| Amd_0001_12445526B0007.pdf | ||
| Att 03_FP-14 Standard Specifications.pdf | ||
| Att 02_SOW - FR 76 Embankment Stabilization.docx | DOCX document | |
| HOW TO FOLLOW PROJECTS ON SAM FOR EMAIL ALERTS.pdf | ||
| Att 05_Wage Rates.pdf | ||
| Sol_12445526B0007.pdf | ||
| Att 01_SCHEDULE OF ITEMS FR 76 EMBANKMENT REPAIR PROJECT (ERFO).xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
HUNTINGTON DISTRICT
MONONGAHELA NATIONAL FOREST
NICHOLAS COUNTY / WEBSTER COUNTY, WV
FR-76 EMBANKMENT STABILIZATION
MARCH 6, 2025
US Army Corps of Engineers ®
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
U .S
A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
H U
N
TI
N G
TO
N
D
IS
TR
IC
T H
U N
TI
N
G
TO
N , W
ES
T
VI
R
G
IN
IA
H U
N
TI
N G
TO
N
D
IS
TR
IC
T
8T
H S
TR
EE
T H
U N
TI
N
G
TO
N , W
V
AN
SI
F U
LL
B
LE
ED
D (2
2.
X
4.
IN
C
H
ES
N
IC
H O
LA
S
C O
U N
TY
, W
V / W
EB
ST
ER
C
O U
N
TY
, W V
M O
N O
N G
AH
EL
A N
AT
IO
N
AL
F O
R
ES
T
SE
R
VI
C E
FR
-7
EM
BA
N
KM
EN
T
ST
AB
IL
IZ
AT
IO
N
C
ER
TI
FI
ED
F
IN
AL
D O
C U
M
EN
TS
R
TA
JA
T
BR
S
JA
T
M W
C C
O
VE
R S
H
EE
T
GI000
THIS PROJECT WAS DESIGNED BY THE HUNTINGTON DISTRICT OF THE
U. S. ARMY CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES AND
REGISTRATION DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE
PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS
REQUIRED BY ER 1110-1-8152.
DENNIS E. HUGHES, PE
CHIEF, ENGINEERING & CONSTRUCTION DIVISION (EC)
MATTHEW W. CLARK, PE
CHIEF, CIVIL DESIGN SECTION (ECD-C)
CHRISTOPHER L. CHANDLER, PE
CHIEF, STRUCTURAL SECTION (ECD-S)
ANDREA L. MARCUM, PE
CHIEF, GEOTECHNICAL ENGINEERING SECTION (ECG-G)
SITE 1 TRAVEL DIRECTIONS:
FROM THE GAULEY RANGER STATION OF THE MONONGAHELA NATIONAL FOREST
SERVICE (932 N CHERRY RD, RICHWOOD, WV) TRAVEL SOUTHWEST ON WV-39 FOR 0.9
MI THEN TURN RIGHT ONTO CRANBERRY RD. CONTINUE NORTH ON CRANBERRY RD
FOR 2.4 MI TO THE INTERSECTION, TURN RIGHT ONTO COUNTRY CLUB RD, THEN
TURN LEFT ONTO FOREST ROAD 76 (FR-76) TO PROJECT SITE (MILE POST 2.17).
LAT: 38.28354° N
LONG: -80.52807° W
SITE 1 - PROJECT LOCATION MAP
SITE 2 TRAVEL DIRECTIONS:
FROM THE GAULEY RANGER STATION OF THE MONONGAHLEA NATIONAL FOREST
SERVICE (932 N CHERRY RD, RICHWOOD, WV) TURN RIGHT ONTO WV-39 EAST BOUND
AND TRAVEL FOR 19.9 MI THEN TURN LEFT ONTO FOREST ROAD 102 (FR-102).
CONTINUE ON FR-102 FOR 6.9 MI, THEN CONTINUE STRAIGHT ONTO FR-76 FOR 7 MI TO
PROJECT SITE 2 (MILE POST 14.88).
LAT: 38.27190° N
LONG: -80.40930° W
SITE 2 - PROJECT LOCATION MAP
SHEET INDEX
SHEET NO. SHEET ID. SHEET TITLE SHEET NO. SHEET ID. SHEET TITLE
1 GI000 COVER SHEET 30 CS326 SITE 1 STREAMBED CROSS SECTIONS STA. 5+40.00 TO STA. 5+50.00
2 GI001 GENERAL NOTES SHEET 1 OF 3 31 CS327 SITE 1 STREAMBED CROSS SECTIONS STA. 5+60.00 TO STA. 5+70.00
3 GI002 GENERAL NOTES SHEET 2 OF 3 32 CS328 SITE 1 STREAMBED CROSS SECTIONS STA. 5+80.00 TO STA. 5+90.00
4 GI003 GENERAL NOTES SHEET 3 OF 3 33 CS329 SITE 1 STREAMBED CROSS SECTIONS STA. 5+94.04 TO STA. 6+00.00
5 GI004 ENVIRONMENTAL PROTECTION MEASURES 34 CS330 SITE 1 STREAMBED CROSS SECTIONS STA. 6+10.00 TO STA. 6+20.00
6 GI005 GENERAL LEGEND 35 CS331 SITE 1 STREAMBED CROSS SECTIONS STA. 6+30.00 TO STA. 6+36.41
7 CS100 OVERALL PROJECT SITE 1 PLAN 36 CS332 SITE 1 STREAMBED CROSS SECTIONS STA. 6+40.00 TO STA. 6+44.23
8 CS101 SITE 1 PLAN AND PROFILE STA. 10+00.00 TO STA. 12+50.00 37 CS333 SITE 1 STREAMBED CROSS SECTIONS STA. 6+50.00 TO STA. 6+60.00
9 CS102 SITE 1 PLAN AND PROFILE STA. 12+50.00 TO STA. 13+80.00 38 CS105 SITE 2 PLAN AND PROFILE STA. 20+00.00 TO STA. 22+60.00
10 CS103 SITE 1 PLAN AND PROFILE STA. 13+80.00 TO STA. 16+15.00 39 CS303 SITE 2 TYPICALL SECTIONS
11 CS301 SITE 1 TYPICALL SECTIONS 1 OF 2 40 CS334 SITE 2 CROSS SECTIONS STA. 20+00.00 TO STA. 20+25.00
12 CS310 SITE 1 CROSS SECTIONS STA. 10+25.00 TO STA. 10+40.00 41 CS335 SITE 2 CROSS SECTIONS STA. 20+50.00 TO STA. 20+75.00
13 CS311 SITE 1 CROSS SECTIONS STA. 10+50.00 TO STA. 10+75.00 42 CS336 SITE 2 CROSS SECTIONS STA. 20+95.00 TO STA. 21+25.00
14 CS312 SITE 1 CROSS SECTIONS STA. 11+04.00 TO STA. 11+25.00 43 CS337 SITE 2 CROSS SECTIONS STA. 21+50.00 TO STA. 21+75.00
15 CS313 SITE 1 CROSS SECTIONS STA. 11+50.00 TO STA. 11+76.00 44 CS338 SITE 2 CROSS SECTIONS STA. 21+98.85 TO STA. 22+25.00
16 CS314 SITE 1 CROSS SECTIONS STA. 12+00.00 TO STA. 12+25.00 45 CS339 SITE 2 CROSS SECTIONS STA. 22+40.00 TO STA. 22+60.00
17 CS315 SITE 1 CROSS SECTIONS STA. 12+28.00 TO STA. 12+50.00 46 CS501 RETAINING WALL NOTES AND DATA TABLES
18 CS316 SITE 1 CROSS SECTIONS STA. 12+75.00 TO STA. 13+01.33 47 CS502 RETAINING WALL A DETAILS
19 CS317 SITE 1 CROSS SECTIONS STA. 13+21.58 TO STA. 13+50.00 48 CS503 RETAINING WALL B DETAILS
20 CS318 SITE 1 CROSS SECTIONS STA. 13+75.00 TO STA. 14+00.00 49 CS504 RETAINING WALL C DETAILS
21 CS319 SITE 1 CROSS SECTIONS STA. 14+08.00 TO STA. 14+18.00 50 CS505 GUARDRAIL DETAILS (SHEET 1 OF 2)
22 CS320 SITE 1 CROSS SECTIONS STA. 14+50.00 TO STA. 14+75.00 51 CS506 GUARDRAIL DETAILS (SHEET 2 OF 2)
23 CS321 SITE 1 CROSS SECTIONS STA. 15+00.00 TO STA. 15+26.93 52 CS507 STORM DRAINAGE DETAILS
24 CS322 SITE 1 CROSS SECTIONS STA. 15+50.00 TO STA. 15+60.00 53 CT101 SITE 1 MAINTENANCE OF TRAFFIC PLAN
25 CS323 SITE 1 CROSS SECTIONS STA. 15+75.00 TO STA. 16+00.00 54 CT102 SITE 2 MAINTENANCE OF TRAFFIC PLAN
26 CS104 SITE 1 STREAMBED PLAN AND PROFILE STA. 5+00.00 TO STA. 6+65.00 55 BB601 SITE 1 BORING LOGS (SHEET 1 OF 2)
27 CS302 SITE 1 STREAMBED TYPICAL SECTIONS 56 BB602 SITE 1 BORING LOGS (SHEET 2 OF 2)
28 CS324 SITE 1 STREAMBED CROSS SECTIONS STA. 5+00.00 TO STA. 5+10.00 57 BB603 SITE 2 BORING LOGS
29 CS325 SITE 1 STREAMBED CROSS SECTIONS STA. 5+23.87 TO STA. 5+30.00
HUGHES.DENNIS.E.122974
Digitally signed by
HUGHES.DENNIS.E.1229740691
Date: 2025.03.14 12:45:33 -04'00'
CLARK.MATTHEW.W.1516711244
Digitally signed by CLARK.MATTHEW.W.1516711244
DN: CN=CLARK.MATTHEW.W.1516711244, OU=USA, OU=PKI,
OU=DoD, O=U.S. Government, C=US Date: 2025.03.14 09:39:38-04'00'
CHANDLER.CHRISTOPH
ER.L.1376421593
Digitally signed by
CHANDLER.CHRISTOPHER.L.1376421593
Date: 2025.03.14 10:07:46 -04'00'
Date: 2025.03.14 10:30:13 -04'00'
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
H U
N
TI
N G
TO
N
D
IS
TR
IC
T H
U N
TI
N
G
TO
N , W
ES
T
VI
R
G
IN
IA
H U
N
TI
N G
TO
N
D
IS
TR
IC
T
8T
H S
TR
EE
T H
U N
TI
N
G
TO
N , W
V
AN
SI
D
N
IC
H O
LA
S
C O
U N
TY
, W
V / W
EB
ST
ER
C
O U
N
TY
, W V
M O
N O
N G
AH
EL
A N
AT
IO
N
AL
F O
R
ES
T
SE
R
VI
C E
FR
-7
EM
BA
N
KM
EN
T
ST
AB
IL
IZ
AT
IO
N
C
ER
TI
FI
ED
F
IN
AL
D O
C U
M
EN
TS
R
TA
JA
T
D M
U
JA
T
M W
C
SH
EE
T
O
F
G
EN
ER
AL
N O
TE
S
GI001
GENERAL NOTES
2.5:1
(MAX)_
3:1
3%
2.0% (MIN.)
PROJECT NOTES
1) THE TOPOGRAPHICAL MAPPING ON THE DRAWINGS IS BASE ON THE WEST VIRGINIA PLANE U.S. FOOT COORDINATE
SYSTEM, SOUTH ZONE, NAD 1983. THE VERTICAL CONTROL IS BASED ON NAVD 1988.
2) REFERENCES TO FP-14 STANDARD SPECIFICATIONS IN THESE PLANS REFER TO THE "STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, 2014 (FP-14)"
WITH FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS).
3) ANY MODIFICATION TO THE SPECIFICATIONS OR CHANGES TO THE WORK AS SHOWN ON THESE DRAWINGS MUST
HAVE PRIOR WRITTEN APPROVAL OF THE COR PRIOR TO THE START OF SAID WORK.
4) WITH RESPECT TO CONFLICTS BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, THE SPECIFICATIONS SHALL
GOVERN.
5) WITH RESPECT TO CONFLICTS IN THE DRAWINGS, LABELED DIMENSIONS SHALL GOVERN OVER SCALED DISTANCES.
WHERE NO DIMENSION ARE GIVEN, THE CONTRACTOR SHALL USE SCALED DISTANCES AND VERIFY THE LOCATION
WITH THE COR.
6) ALL ITEMS OF WORK CALLED FOR IN THE DRAWINGS FOR WHICH NO SPECIFIC ITEM OF CONSTRUCTION IS IDENTIFIED SHALL BE PERFORMED BY THE CONTRACTOR AND THE COST OF SAME SHALL BE INCIDENTAL TO THE
CONSTRUCTION OF IDENTIFIED ITEMS.
7) COMPLIANCE WITH THE SAFETY AND HEALTH ACT OF 1970 IS REQUIRED OF THE CONTRACTOR AND ALL
SUBCONTRACTORS ON THE PROJECT.
8) THE COR SHALL BE NOTIFIED BY THE CONTRACTOR IN WRITING AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR
TO THE START OF ANY WORK.
9) CONTRACTOR SHALL SUBMIT A SEQUENCE OF CONSTRUCTION PLAN AT LEAST THIRTY (30) CALENDAR DAYS PRIOR
TO EARTH WORK ACTIVITIES FOR APPROVAL.
10) FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND ELEVATIONS BEFORE PROCEEDING WITH THE WORK.
ANY DISCREPANCIES BETWEEN THE CONTRACT DOCUMENTS AND THE ACTUAL FIELD CONDITIONS MUST BE
REPORTED IMMEDIATELY TO THE COR.
11) THE IDENTITY AND LOCATION OF THE EXISTING UNDERGROUND UTILITY FACILITIES KNOWN TO BE LOCATED IN THE CONSTRUCTION AREA HAVE BEEN SHOWN ON THE PLANS AS ACCURATELY AS POSSIBLE FROM EXISTING AS- BUILT DRAWINGS AND / OR SURVEYS. THE GOVERNMENT ASSUMES NO RESPONSIBILITY AS TO THE ACCURACY OR THE DEPTHS OF THE UNDERGROUND FACILITY SHOWN IN THE DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR
CALLING THE WEST VIRGINIA 811, 72 HOURS PRIOR TO DIGGING AND INVESTIGATING, LOCATING, SUPPORTING, AND PROTECTING ALL EXISTING UTILITIES AND APPURTENANCES WHETHER SHOWN ON THESE PLANS OR NOT. THE CONTRACTOR SHALL EXPOSE ALL UTILITIES OR STRUCTURES PRIOR TO CONSTRUCTION TO VERIFY THE VERTICAL
AND HORIZONTAL EFFECT ON THE PROPOSED CONSTRUCTION.
12) ANY EXISTING PROJECT FEATURES OR NEW CONSTRUCTION, NOT PLANNED FOR CONSTRUCTION, THAT IS DAMAGED OR DESTROYED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S
EXPENSE TO THE SATISFACTION OF THE COR.
13) THE CONTRACTOR SHALL CLEAN UP ALL DEBRIS AND MATERIALS RESULTING FROM HIS OPERATION AND RESTORE ALL SURFACES, STRUCTURES, DITCHES, AND PROPERTY TO ITS ORIGINAL CONDITION TO THE SATISFACTION OF
THE COR.
14) THE CLEANUP AND DISPOSAL OF EXCESS EXCAVATED MATERIALS SHALL BE DONE AS SOON AS PRACTICAL AND AS THE COR MAY DIRECT. SILT FENCES AND OTHER NECESSARY FILTERING DEVICES SHALL BE MAINTAINED AT AREAS
OF STOCKPILED MATERIALS, EXCAVATED AREAS, CATCH BASINS, AND OTHER STORM WATER INLET STRUCTURES IN
COMPLIANCE WITH FEDERAL, STATE AND LOCAL LAWS.
15) UNSATISFACTORY MATERIALS CONTAINING TRASH; REFUSE; ORGANICS; CONSTRUCTION DEBRIS; OR HAZARDOUS, TOXIC, OR RADIOACTIVE WASTE (HTRW) OR CONTAMINANTS, IF ENCOUNTERED, SHALL BE DISPOSED OF, AT AN
APPROVED LANDFILL, FOLLOWING NOTIFICATION TO, AND APPROVAL FROM, THE COR.
16) DIRT, MUD, OR GRAVEL WHICH IS TRACKED ONTO PAVED SURFACES SHALL BE CLEANED AWAY DAILY.
17) REMOVE ALL MATERIAL AND REMAINS FROM WORK AND DISPOSE OFF OF GOVERNMENT LANDS IN ACCORDANCE WITH EXISTING LOCAL, STATE, AND FEDERAL REGULATIONS. DISPOSE OF UNSUITABLE OR EXCESS MATERIAL ACCORDING TO FP-14 203.05 (a), FOLLOWING NOTIFICATION TO, AND APPROVAL FROM, THE COR.
18) THE CONTRACTOR SHALL MAINTAIN A FREE, SAFE, AND APPROVED MEANS OF INGRESS AND EGRESS FROM THE
WORK AREA IN ACCORDANCE WITH THE REQUIREMENTS OF ALL APPLICABLE AGENCIES.
19) THE CONTRACTOR SHALL ERECT AND MAINTAIN TEMPORARY FENCING / BARRICADES TO PREVENT PUBLIC ACCESS TO CONSTRUCTION AREAS. BARRICADES SHALL BE SECURELY PLACED, CLEARLY VISIBLE WITH ADEQUATE ILLUMINATION TO PROVIDE SUFFICIENT VISUAL WARNING OF THE HAZARD DURING BOTH DAY AND NIGHT.
20) ALL TEMPORARY CONSTRUCTION FENCING / BARRICADES SHALL BE REMOVED AFTER CONSTRUCTION OF PROJECT
IS COMPLETED.
21) THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS NOT OBTAINED BY THE GOVERNMENT PRIOR TO THE
START OF ANY CONSTRUCTION.
22) THE CONTRACTOR SHALL PERFORM ALL GRADING IN SMOOTH AND CONTINUOUS SLOPES.
23) SLOPES ARE SHOWN ON THE DRAWINGS WITH A HORIZONTAL COMPONENT AND VERTICAL COMPONENT
OR BY A PERCENTAGE. FOR EXAMPLE:
IS A SLOPE WHERE THE HORIZONTAL COMPONENT IS
EQUAL TO OR GREATER THAN 2.5 TIMES THE VERTICAL
COMPONENT. ONLY SLOPES FLATTER THAN A 1 VERTICAL
TO 2.5 HORIZONTAL RATIO ARE PERMITTED.
IS A SLOPE WHERE THE HORIZONTAL COMPONENT IS
EQUAL TO 3 TIMES THE VERTICAL COMPONENT.
IS A SLOPE WHERE VERTICAL COMPONENT IS 3% OF THE
HORIZONTAL COMPONENT.
IS A SLOPE WHERE VERTICAL COMPONENT IS EQUAL TO
OR GREATER THAN 2.0% OF THE HORIZONTAL COMPONENT.
NO SLOPES FLATTER THAN 2% ARE PERMITTED.
24) ALL DISTURBED AREAS SHALL BE SEEDED, MULCHED, AND RESTORED TO ORIGINAL CONDITION AND IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
25) THE TERM SHALL, MUST, AND WILL ARE INTERPRETED TO MEAN MANDATORY.
26) THE TERM SHOULD IS INTERPRETED TO MEAN RECOMMENDED.
27) THE TERM MAY IS INTERPRETED TO MEAN OPTIONAL.
28) TREE CLEARING SHALL BE PERFORMED BETWEEN NOVEMBER 15 AND APRIL 1. IF TREES CANNOT BE CLEARED BETWEEN THESE DATES, THE COR SHALL BE NOTIFIED PRIOR TO ANY PROPOSED TREE CLEARING AND THE CONTRACTOR SHALL NOT PROCEED UNTIL WRITTEN AUTHORIZATION IS PROVIDED.
FINAL CLEARING LIMITS SHALL BE ESTABLISHED AND APPROVED BY THE COR IN THE FIELD. DISPOSE OF CLEARING AND GRUBBING DEBRIS FROM PROJECT SITE IN ACCORDANCE WITH FP-14, 203.05 (a).
29) THE CONTRACTOR IS RESPONSIBLE FOR ALL GRUBBING NECESSARY TO ACCOMMODATE THE WORK IN THE CONTRACTOR'S PROPOSAL AND SHALL NOT EXCEED THE LIMITS AS APPROVED BY THE COR.
30) THE CONTRACTOR SHALL KEEP CONSTRUCTION ACTIVITIES UNDER SURVEILLANCE AND CONTROL TO AVOID AND MINIMIZE DISTURBANCE TO THE IMMEDIATE AREA. CONSTRUCTION WORK SHALL BE LIMITED
TO DAYTIME HOURS.
31) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION STAKING NEEDED TO COMPLETE
THE CONSTRUCTION SHOWN IN THE CONTRACT DOCUMENTS.
32) SHOP DRAWINGS PREPARED BY CONTRACTORS, SUPPLIERS, ETC., WILL BE REVIEWED BY THE COR FOR CONFORMANCE WITH DESIGN CONCEPT. NO WORK AFFECTED BY A SUBMITTED SHOP DRAWING SHALL
BE STARTED UNTIL THE REVIEW IS COMPLETE AND THE SHOP DRAWINGS ARE APPROVED.
33) ROCK BLASTING IS NOT PERMITTED ON THIS PROJECT.
34) CARE SHALL BE EXERCISED WHEN WORKING THE AREA AROUND EXISTING TREES AND SHRUBS. ANY TREES OR SHRUBS NOT MARKED FOR REMOVAL THAT ARE DAMAGED BY THE CONTRACTOR WILL HAVE
TO BE REPLACED BY THE CONTRACTOR TO THE SATISFACTION OF THE COR.
35) THE CONTRACTOR IS RESPONSIBLE FOR THE PROVISION AND MAINTENANCE OF A PORTABLE TOILET
ON THE SITE DURING ALL PHASES OF CONSTRUCTION.
36) ALL DRAINAGE FLOOD ROUTES, SWALES, AND DITCHES ARE TO BE DESIGNED AND GRADED WITH A
MINIMUM FLOW LINE GRADE AND A MAXIMUM SIDE SLOPE AS SHOWN IN THE DRAWINGS.
1) THE SITE IS BROKEN INTO TWO DIFFERENT CONTRACTOR WORK LIMITS (CWL). THE CWL
WILL BE AVAILABLE UPON THE NOTICE TO PROCEED OF THE CONTRACT. THE
CONTRACTOR SHALL CONFINE THEIR ACTIVITIES TO THE ESTABLISHED CWL AND SHALL
NOT TRESPASS UPON OTHER PRIVATE PROPERTY.
2) ANY PERMANENT SURVEY MARKERS OR MONUMENTATION DISTURBED DURING
CONSTRUCTION SHALL BE REESTABLISHED BY A SURVEYOR DULY REGISTERED WITH THE
WEST VIRGINIA STATE BOARD OF EXAMINERS FOR LAND SURVEYORS.
3) A PLAN OF THE CONTRACTOR WORK LIMITS (CWL) IS SHOWN ON SHEETS CS100 AND
CS104. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MARKING THE BOUNDARIES OF
ALL CWL AREAS AS RESPONSIBILITY TO ENFORCE THESE WORK AREA LIMITS AGAINST
UNAUTHORIZED USE BY THE CONTRACTOR'S PERSONNEL, THE PUBLIC, AND OTHER
CONTRACTORS.
4) FOR ANY FEATURES OR SURFACE MATERIALS ENCOUNTERED DURING CONSTRUCTION
AND OR DEMOLITION THAT HAVE NOT BEEN REPRESENTED ON THESE DRAWINGS, THE
CONTRACTOR SHALL HAVE APPROVAL FROM THE COR BEFORE REMOVING AND OR
DEMOLITION CAN TAKE PLACE.
5) ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE IN PLACE PRIOR TO ANY EARTH
DISTURBING ACTIVITIES.
6) EROSION CONTROL MEASURES ARE TO BE IMPLEMENTED BY THE CONTRACTOR DURING
CONSTRUCTION TO PROTECT STREAMS AND DITCHES FROM SILT, MUD AND DEBRIS.
7) CONTRACTOR SHALL MAINTAIN ALL SILT FENCE LOCATED WITHIN THE CWL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR PAYMENT OF FEES ASSOCIATED WITH
PERMITS.
8) ALL SEDIMENT AND EROSION CONTROL PRODUCTS SHALL BE INSTALLED PER THE
MANUFACTURER'S RECOMMENDATIONS UNLESS NOTED OTHERWISE OR APPROVED BY
THE COR.
9) DISTURBED SOILS SHALL BE SEEDED AND MULCHED IN ACCORDANCE WITH FP-14 SECTION
625 WITHIN 14 CALENDAR DAYS OF SOIL DISTURBANCE.
10) THE CONTRACTOR SHALL PREPARE AND SUBMIT A SITE-SPECIFIC SEDIMENT AND
EROSION CONTROL PLAN TO THE COR FOR REVIEW AND APPROVAL. SEDIMENT AND
EROSION CONTROL MEASURES SHALL BE MAINTAINED AT AREAS OF STOCKPILED
MATERIALS, EXCAVATED AREAS, CATCH BASINS, SWALES AND DITCHES IN COMPLIANCE
WITH SEDIMENT AND EROSION CONTROL BMP'S.
SEDIMENT AND EROSION CONTROL PLAN SHALL INCLUDE AT A MINIMUM:
SILT FENCE LOCATIONS
FILTER SOCK LOCATIONS
CHECK DAMS
WASHOUT AREAS
VEHICLE WASH OFF AREAS
LIMITS OF DISTURBANCE
TEMPORARY DEWATERING OPERATIONS AND METHOD TO CONTROL RUNOFF
SEDIMENT FILTER BAGS
STOCKPILE AREAS
TEMPORARY STREAM IMPACTS
SEEDING AND MULCHING AREAS
ROADWAY GENERAL NOTES
1) ACCOMMODATE TRAFFIC ACCORDING TO THE LATEST EDITION OF THE MUTCD,
MAINTENANCE OF TRAFFIC CONTROL PLAN (SEE SHEETS CT101 AND CT102) AND THE
PROJECT SPECIFICATIONS. NOTIFY THE COR AT LEAST THIRTY (30) CALENDAR DAYS PRIOR
TO ERECTING ANY TRAFFIC CONTROL / CLOSURE MEASURES.
2) TRAFFIC CONTROL DEVICES FOR ROAD CLOSURE SHALL BE FURNISHED, ERECTED,
MAINTAINED, AND REMOVED BY THE CONTRACTOR IN ACCORDANCE WITH STATE AND
LOCAL REGULATIONS AND THE MUTCD.
3) LOAD LIMITS POSTED ON PUBLIC ROADWAY MUST BE MAINTAINED. THE DELIVERY OF WIDE
LOADS OR HEAVY LOADS SHALL BE COORDINATED WITH THE COR. ALL NECESSARY
PERMITS MUST BE OBTAINED BY THE CONTRACTOR IN ADVANCE OF ANY LOAD
MOVEMENTS.
4) THE CONTRACTOR SHALL CLEAN ALL EQUIPMENT OF DEBRIS, MUD, AND SEEDS PRIOR TO
MOVING EQUIPMENT ONTO FOREST PROPERTY. EQUIPMENT SHALL BE FREE OF LEAKS
AND MECHANICALLY SOUND. EQUIPMENT SHALL BE MADE AVAILABLE FOR INSPECTION
PRIOR TO MOBILIZATION ONTO FOREST PROPERTY.
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
H U
N
TI
N G
TO
N
D
IS
TR
IC
T H
U N
TI
N
G
TO
N , W
ES
T
VI
R
G
IN
IA
H U
N
TI
N G
TO
N
D
IS
TR
IC
T
8T
H S
TR
EE
T H
U N
TI
N
G
TO
N , W
V
AN
SI
D
N
IC
H O
LA
S
C O
U N
TY
, W
V / W
EB
ST
ER
C
O U
N
TY
, W V
M O
N O
N G
AH
EL
A N
AT
IO
N
AL
F O
R
ES
T
SE
R
VI
C E
FR
-7
EM
BA
N
KM
EN
T
ST
AB
IL
IZ
AT
IO
N
C
ER
TI
FI
ED
F
IN
AL
D O
C U
M
EN
TS
R
TA
JA
T
D M
U
JA
T
M W
C
SH
EE
T
O
F
G
EN
ER
AL
N O
TE
S
GI002
CONTINGENCY QUANTITIES
THE CONTRACTOR SHALL NOT ORDER ANY MATERIALS OR PERFORM WORK FOR ITEMS DESIGNED TO BE USED "AS DIRECTED" UNLESS AUTHORIZED BY THE COR. THE ACTUAL WORK LOCATIONS AND QUANTITIES USED AT THE COR DISCRETION SHALL BE MADE A MATTER OF RECORD BY INCORPORATION INTO THE FINAL
CHANGE ORDER GOVERNING COMPLETION OF THIS PROJECT.
ITEM 157 - SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION
THIS WORK SHALL CONSIST OF THE TEMPORARY DIVERSION OF BARRENSHE RUN CHANNEL FLOWS DURING THE FOLLOWING CONSTRUCTION PROJECT ACTIVITIES, AS WELL AS ANY OTHER WORK REQUIRED TO BE
PERFORMED FROM WITHIN THE STREAM:
· EXCAVATION AND REMOVAL OF BARRENSHE RUN STREAMBED LOAD DEPOSITS AND LOOSE ROCK
WITHIN IDENTIFIED AND APPROVED AREAS.
· GROUTING UNDERNEATH AND AROUND EXISTING BRIDGE ABUTMENT FOOTINGS.
· PLACEMENT OF RIPRAP ALONG STREAMBANKS AND BRIDGE ABUTMENT FOUNDATIONS.
CONTRACTOR SHALL DEWATER THE WORK AREA AS NECESSARY TO COMPLETE THE WORK AND DISPOSE OF WATER ACCORDING TO FEDERAL, STATE, AND LOCAL REGULATIONS. CONTRACTOR SHALL SUBMIT A TEMPORARY DIVERSION WORK PLAN, TO INCLUDE DETAILS, DESCRIPTIONS, PROCEDURES, MEANS, METHODS, AND MEASURES FOR DIVERSION OF ACTIVE FLOWS, DEWATERING OF WORK AREA, TIMEFRAME FOR DIVERTED FLOWS, AND ALL APPLICABLE EXHIBITS AND DRAWINGS WHICH ILLUSTRATE CONTRACTOR'S DIVERSION PLAN. NO IN-WATER WORK SHALL OCCUR UNTIL THE DIVERSION PLAN IS APPROVED BY THE
GOVERNMENT. CONTRACTOR SHALL PERFORM DIVERSION AND DEWATERING OPERATIONS IN
ACCORDANCE WITH FP-14, 157.10.
PAYMENT FOR THE ABOVE WORK SHALL BE MADE AT THE UNIT PRICE BID FOR ITEM 15702-6000, SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION, AND SHALL INCLUDE ALL PROVISIONS AS SET FORTH IN THESE DRAWINGS AND IN THE SPECIFICATIONS UNDER ITEM 157, AS WELL AS ALL LABOR, TOOLS, EQUIPMENT, AND MATERIALS NECESSARY TO COMPLETE THE WORK. ALL COSTS FOR SEEDING AND
MULCHING SHALL BE CONSIDERED INCIDENTAL.
ITEM 201 - CLEARING AND GRUBBING, AS DIRECTED
THIS WORK SHALL CONSIST OF THE REMOVAL OF ALL TREES AND STUMPS SPECIFICALLY MARKED BY THE GOVERNMENT FOR REMOVAL WITHIN THE LIMITS OF THE PROJECT. ANY ADDITIONAL CLEARING AND
GRUBBING NEEDED TO ACCOMMODATE CONTRACTOR'S MEANS AND METHODS SHALL HAVE PRIOR
APPROVAL FROM THE GOVERNMENT. CONTRACTOR SHALL DISPOSE OF CLEARING AND GRUBBING DEBRIS ACCORDING TO FP-14, 203.05(a).
PAYMENT FOR THE ABOVE WORK SHALL BE MADE AT THE UNIT PRICE BID FOR ITEM 20102, CLEARING AND GRUBBING, AS DIRECTED, AND SHALL INCLUDE ALL PROVISIONS AS SET FORTH IN THESE DRAWINGS AND IN THE SPECIFICATIONS UNDER ITEM 201, AS WELL AS ALL LABOR, TOOLS, EQUIPMENT, AND MATERIALS
NECESSARY TO COMPLETE THE WORK.
ITEM 203 - REMOVAL OF PIPE CULVERT
THIS WORK SHALL CONSIST OF THE REMOVAL AND DISPOSAL OF EXISTING PIPE CULVERTS DESIGNATED FOR REMOVAL IN THESE DRAWINGS. CONTRACTOR SHALL BACKFILL AND COMPACT ALL CAVITIES AND TRENCHES LEFT BY PIPE REMOVAL WITH SATISFACTORY BACKFILL AND APPROVED AGGREGATE MATERIAL TO THE LINES AND GRADES AS SHOWN IN THESE DRAWINGS. DISPOSAL OF REMOVED PIPE SHALL BE IN ACCORDANCE WITH FP-14, 203.05(a).
PAYMENT FOR THE ABOVE WORK SHALL BE MADE AT THE UNIT PRICE BID FOR ITEM 20302-2100, REMOVAL OF PIPE CULVERT, AND SHALL INCLUDE ALL PROVISIONS AS SET FORTH IN THESE DRAWINGS AND IN THE SPECIFICATIONS UNDER ITEM 203, AS WELL AS ALL LABOR, TOOLS, EQUIPMENT, AND MATERIALS NECESSARY TO COMPLETE THE WORK. ASSOCIATED COSTS FOR EXCAVATION, HAULING, PLACING AND
COMPACTING BACKFILL SHALL BE CONSIDERED INCIDENTAL.
ITEM 204 - UNCLASSIFIED BORROW, AS DIRECTED
THIS WORK SHALL CONSIST OF THE REMOVAL AND EXCAVATION OF LOOSE ROCK AND OTHER STREAMBED
LOAD DEPOSITS FROM BARRENSHE RUN CHANNEL WITHIN THE CONSTRUCTION WORK LIMITS.
APPROXIMATE EXCAVATION LIMITS WITHIN THE STREAM HAVE BEEN SHOWN IN THE DRAWINGS. PRIOR TO ANY WORK BEING PERFORMED WITHIN THE STREAM, THE CONTRACTOR AND COR SHALL MEET ON SITE AND THE COR SHALL IDENTIFY AND APPROVE OF THE FINAL EXCAVATION LIMITS BASED ON VISUAL
OBSERVATIONS.
THE CONTRACTOR SHALL REMOVE UNCLASSIFIED BORROW MATERIAL FROM THE STREAMBED AND PLACE ALONG ADJACENT STREAMBANKS AND WITHIN ANY OTHER APPROVED AREAS DESIGNATED AND/OR CALLED
FOR IN THESE DRAWINGS, OR AS DIRECTED BY THE COR.
PAYMENT FOR THE ABOVE WORK SHALL BE MADE AT THE UNIT PRICE BID FOR ITEM 20403 UNCLASSIFIED BORROW, AS DIRECTED, AND SHALL INCLUDE ALL PROVISIONS AS SET FORTH IN THESE DRAWINGS AND IN THE SPECIFICATIONS UNDER ITEM 204, AS WELL AS ALL LABOR, TOOLS, EQUIPMENT, AND MATERIALS NECESSARY TO COMPLETE THE WORK. ASSOCIATED COSTS FOR PLACEMENT OF MATERIAL AND GRADING, AT THE DIRECTION OF THE COR, SHALL BE CONSIDERED INCIDENTAL.
ITEM 251 - RIPRAP
THIS WORK SHALL CONSIST OF FURNISHING AND PLACING RIPRAP COMPOSED OF THE TYPES AND CLASSES AS INDICATED IN THE DRAWINGS AND IN ACCORDANCE WITH FP-14 SECTION 251. SUBMIT SOURCE AND PRODUCT DATA FOR GOVERNMENT APPROVAL. PLACE RIPRAP CLASS 3 AND CLASS 7 ON BEDDING MATERIAL. ALL RIPRAP AND BEDDING THICKNESS SHALL BE PLACED AS INDICATED IN THE DRAWINGS.
PAYMENT FOR THE ABOVE WORK SHALL BE MADE AT THE UNIT PRICE BID FOR ITEM 25102-0200, PLACED RIPRAP, METHOD A, CLASS 2; ITEM 25102-0300, PLACED RIPRAP, METHOD A, CLASS 3; AND ITEM 25102-0700, PLACED RIPRAP, METHOD A, CLASS 7, AND SHALL INCLUDE ALL PROVISIONS AS SET FORTH IN THESE DRAWINGS AND IN THE SPECIFICATIONS UNDER ITEM 251, AS WELL AS ALL LABOR, TOOLS, EQUIPMENT, MATERIALS, EXCAVATION, HAULING, HANDLING, AND PLACING OF RIPRAP NECESSARY TO COMPLETE THE
WORK. COSTS FOR BEDDING MATERIAL SHALL BE CONSIDERED INCIDENTAL.
ITEM 263 - CONCRETE LAGGING, 8-INCH THICKNESS
THIS WORK CONSISTS OF FURNISHING AND PLACING PRECAST REINFORCED CONCRETE PANELS BETWEEN
THE SOLIDER PILES TO FUNCTION AS LAGGING FOR THE RETAINING WALLS. PROVIDE PRECAST CONCRETE LAGGING FROM A CERTIFIED PRECAST CONCRETE MANUFACTURER. PRE-CAST CONCRETE LAGGING SHALL HAVE A MINIMUM 28-DAY CONCRETE COMPRESSIVE STRENGTH OF 3,000 PSI AND AN ENTRAINED AIR CONTENT OF 7% +/- 2.5%. DO NOT ALLOW THE DIMENSIONS OF THE LAGGING OR LOCATION OF THE REINFORCING STEEL TO VARY BY MORE THAN 1/4-INCH. CAST THREADED INSERTS INTO THE TOP OF EACH
PANEL FOR LIFTING AND PLACEMENT.
PERMANENTLY MARK EACH PRECAST CONCRETE LAGGING PANEL TO INDICATE WHICH FACE WILL BE PLACED AGAINST THE SOIL. PLACE THE PANEL BETWEEN THE FLANGES OF THE SOLDIER PILES AND BEARING AGAINST THE FLANGES ON THE EXPOSED SIDE OF THE WALL SO THAT THE SOLDIER PILE FLANGE OVERLAPS THE END OF THE LAGGING BY AT LEAST THREE INCHES AT BOTH ENDS OF THE LAGGING.
HANDLE, STORE, AND SHIP THE PRECAST CONCRETE LAGGING PANELS TO AVOID CHIPPING, CRACKING AND FRACTURING THE PANELS. SUPPORT THE PANELS ON FIRM BACKING WHILE STORING AND SHIPPING. DO NOT SHIP PANELS UNTIL CONCRETE HAS ATTAINED THE REQUIRED COMPRESSIVE STRENGTH. SUBMIT SHIPMENT DOCUMENTATION TO THE COR AS THE PANELS ARE DELIVERED TO THE PROJECT, INCLUDING THE PRECASTER'S RECORD OF FINAL INSPECTION, THE MEASUREMENTS AND TOLERANCES, STRENGTH, AND DIMENSIONS OF EACH PANEL, ALONG WITH THE SHIPPING DOCUMENTS.
INSPECT ALL PRECAST CONCRETE LAGGING PANELS AND REJECT PANELS HAVING ANY OF THE FOLLOWING:
1. DEFECTS THAT INDICATE IMPERFECT MOLDING.
2. DEFECTS THAT INDICATE HONEYCOMBED OR OPEN TEXTURE CONCRETE.
3. DEFECTS IN THE PHYSICAL CHARACTERISTICS OF THE CONCRETE, OR DAMAGE TO THE AESTHETIC
SURFACE TREATMENTS.
4. CONCRETE CHIPS OR SPALLS THAT ARE LARGER THAN 4 INCHES WIDE OR 2 INCHES DEEP. REPAIR ALL
CHIPS AND SPALLS THAT ARE SMALLER.
5. STAINED FORM FACES, DUE TO FORM OIL, CURING OR OTHER CONTAMINANTS.
6. SIGNS OF AGGREGATE SEGREGATION.
7. CRACKS WIDER THAN 0.01 INCH OR PENETRATING MORE THAN 1 INCH OR LONGER THAN 20 PERCENT
OF THE LENGTH OF THE FACE CONTAINING THE CRACK.
8. PANELS THAT DO NOT MEET THE SPECIFIED DIMENSIONAL TOLERANCES.
9. UNUSABLE LIFTING INSERTS.
10. EXPOSED REINFORCING STEEL.
11. INSUFFICIENT CONCRETE COMPRESSIVE STRENGTH.
EITHER REPLACE DAMAGED PRECAST CONCRETE LAGGING PANELS OR DOCUMENT THE DAMAGE AND
PROPOSE TO THE COR A REPAIR METHOD FOR THE DAMAGED PANEL. PROVIDE ACCEPTABLE
REPLACEMENT PANELS FOR ANY THAT ARE REJECTED. WHEN INSTALLING THE PRECAST CONCRETE LAGGING PANELS, PLACE HARDWOOD WEDGES NEAR THE TOP AND BOTTOM ON EACH SIDE TO HOLD THE
LAGGING PANELS AGAINST THE FRONT INSIDE FLANGE OF THE STEEL PILES.
PLACE NONWOVEN GEOTEXTILE FILTER FABRIC ALONG THE BACK FACE OF THE EXCAVATION FOR STABILIZED VOLUME OF BACKFILL. BACKFILL THE STABILIZED VOLUME WITH SELECT GRANULAR BACKFILL CONFORMING TO FP-14, 704.08. PLACE SELECT GRANULAR BACKFILL MATERIAL FROM BEHIND THE WALL TO THE LINES AND GRADES SHOWN IN THE DRAWINGS. COMPACT EACH LAYER ACCORDING TO FP-14, 204.11.
INSTALL A FOUR (4) INCH DIAMETER PERFORATED CORRUGATED PE PIPE CONFORMING TO FP-14, 708.04
ALONG THE LIMITS OF THE BACK OF THE WALL AS SHOWN IN THE DRAWINGS.
PAYMENT FOR THE ABOVE WORK SHALL BE MADE AT THE UNIT PRICE BID FOR ITEM 26303-0100, CONCRETE LAGGING, 8-INCH THICKNESS, 4-FEET SPACING; AND ITEM 26303-0200, CONCRETE LAGGING, 8-INCH THICKNESS, 6-FEET SPACING, AND SHALL INCLUDE ALL PROVISIONS AS SET FORTH IN THESE DRAWINGS AND IN THE SPECIFICATIONS UNDER ITEM 263, AS WELL AS ALL LABOR, EQUIPMENT, MATERIAL, AND BACKFILLING REQUIRED TO FABRICATE, TRANSPORT, AND INSTALL THE PRECAST REINFORCED CONCRETE PANELS. ALL COSTS FOR GEOTEXTILE, SELECT GRANULAR BACKFILL, AND PERFORATED PIPE SHALL BE
INCIDENTAL TO THE LAGGING WORK.
ITEM 263 - STEEL H-PILES
THIS WORK CONSISTS OF FURNISHING AND PLACING STEEL SOLDIER PILES INTO DRILLED HOLES. FURNISH SOLDIER PILES CONSISTING OF STRUCTURAL STEEL MEMBERS THAT MEET THE PLAN REQUIREMENTS AND CONFORM TO ASTM A572, GRADE 50 IN ACCORDANCE WITH FP-14, 715.06. FIELD WELD STEEL SOLDIER PILES AT THE DIRECTION OF THE COR. SOLDIER PILES AND WALES SHALL BE SHOP PAINTED, AND ANY EXPOSED UNPAINTED SURFACES OBSERVED DURING CONSTRUCTION SHALL BE FIELD PAINTED, WITH A THREE COAT PAINT SYSTEM 3 PER FP-14, 563.08(b). COLOR SHALL BE THE SAME AS THE PRECAST PANELS.
FURNISH AND INSTALL THE DRILLED SHAFTS IN ACCORDANCE WITH FP-14 SECTION 263. EXCAVATE THE HOLE FOR THE DRILLED SHAFT WITHIN 3 INCHES OF THE PLAN LOCATION. PLACE THE SOLIDER PILE WITHIN THE HOLE SO IT IS VERTICAL AND NOT INCLINED MORE THAN 1 INCH BETWEEN TOP TO BOTTOM. PLACE THE SOLIDER PILE SO THAT THE FLANGES ARE PARALLEL TO THE CENTERLINE OF THE ROW OF DRILLED SHAFTS. DO NOT ALLOW THE ORIENTATION OF THE FLANGES TO VARY BY MORE THAN 5 DEGREES.
SUPPORT THE SOLDIER PILE SO THAT IT DOES NOT MOVE DURING CONCRETE PLACEMENT.
USE CONCRETE ACCORDING TO FP-14 SECTION 601. PLACE CONCRETE TO THE ELEVATION FOR THE TOP OF THE DRILLED SHAFT. THE CONTRACTOR MAY PLACE CONCRETE USING THE FREE FALL METHOD PROVIDED THE DEPTH OF WATER IS LESS THAN 6 INCHES AND THE CONCRETE FALLS WITHOUT STRIKING THE SIDES
OF THE HOLE. POURING CONCRETE ALONG THE WEB OF THE SOLIDER PILE IS ACCEPTABLE.
CHECK THE POSITION, THE VERTICAL ALIGNMENT AND ORIENTATION OF THE SOLDIER PILE IMMEDIATELY AFTER CONCRETE PLACEMENT. MAKE CORRECTIONS AS NECESSARY TO MEET THE ABOVE TOLERANCES.
REMOVE CONCRETE AS NECESSARY FROM AROUND THE SOLDIER PILE IN ORDER TO PLACE THE LAGGING.
PLACE LAGGING SO THAT THE SOLDIER PILE FLANGE OVERLAPS THE END OF THE LAGGING BY AT LEAST 3 INCHES AT BOTH ENDS OF THE LAGGING. WAIT AT LEAST 12 HOURS AFTER PLACING CONCRETE BEFORE
PLACING LAGGING.
PAYMENT FOR THE ABOVE WORK SHALL BE MADE AT THE UNIT PRICE BID FOR ITEM 26304-0100 STEEL H-PILE, HP12X74, IN PLACE; AND ITEM 26304-0200 STEEL H-PILE, W18X119, IN PLACE, AND SHALL INCLUDE ALL PROVISIONS AS SET FORTH IN THESE DRAWINGS AND IN THE SPECIFICATIONS UNDER ITEM 263, AS WELL AS ALL ALL LABOR, TOOLS, EQUIPMENT, AND MATERIALS NECESSARY TO COMPLETE THE WORK. COSTS FOR DRILLING, PAINTING, FURNISHING AND PLACING CONCRETE, WALES, SPLICES, AND REMOVING CONCRETE FROM AROUND THE SOLIDER PILE IN ORDER TO PLACE LAGGING SHALL BE CONSIDERED INCIDENTAL.
ANY TEMPORARY GRADING, EXCAVATION, EMBANKMENT, AGGREGATE, DRAINAGE, SHEETING, ETC., NEEDED TO COMPLETE THE WORK SHALL BE INCLUDED IN THE BID PRICE FOR THE STEEL H-PILES. THE COST OF ANY EXCAVATION AND SUBSEQUENT REPLACEMENT OF EMBANKMENT (PER ITEM 204) SHALL BE INCLUDED IN THE VARIOUS BID ITEMS FOR THE STEEL H-PILES AND LAGGING, UNLESS SEPARATELY ITEMIZED. NO
SEPARATE PAYMENT WILL BE MADE.
ITEM 301 - AGGREGATE
THIS WORK CONSISTS OF THE PLACEMENT OF SUBBASE GRADING B MATERIAL TO THE LINES, GRADES, AND CROSS SECTIONS AS SHOWN IN THE DRAWINGS, AS WELL AS THE REMOVAL AND BACKFILL OF ANY
SUITABLE OR UNSUITABLE SUBGRADE MATERIALS ENCOUNTERED DURING RETAINING WALL
CONSTRUCTION. AGGREGATE SHALL CONFORM TO GRADING DESIGNATION B AS PER FP-14, 703.05.
REMOVED SUBGRADE MATERIALS SHALL BE REPLACED WITH SUBBASE GRADING B MATERIAL. FULL DEPTH REPLACEMENT OF THE ROADWAY SHALL ONLY OCCUR IN AREAS WHERE THE CONTRACTOR EXCAVATES INTO THE EXISTING BASE LAYER OF THE ROADWAY, OR IN ANY ADDITIONAL AREAS IDENTIFIED BY THE COR
IN THE FIELD.
THE CONTRACTOR SHALL REMOVE AND REPLACE UNSUITABLE SOILS (SILTS, GRAVEL, OR STONE FRAGMENTS WITH SAND AND SILT, ELASTIC SILT AND CLAY, OR PLASTIC CLAY) AND ANY COAL OR ROCK REQUIRING REMOVAL PRIOR TO PROOF ROLLING. CONSTRUCT AND COMPACT THE SUBGRADE ACCORDING TO FP-14 SECTION 301. ONCE AREAS OF EXPOSED SUBGRADE HAVE BEEN COMPACTED, PROOF ROLLED, AND INSPECTED BY THE COR, BACKFILL OVER THE COMPACTED SUBGRADE WITH A MINIMUM OF 5'' OF SUBBASE GRADING B AND 3'' OF AGGREGATE SURFACE COURSE, GRADING F TO THE LINES, GRADES, AND
CROSS SECTIONS SHOWN IN THESE DRAWINGS.
THE COR WILL DETERMINE THE ACTUAL LOCATIONS AND LIMITS OF UNDERCUTS BASED ON THE PROOF ROLLING RESULTS AND VISUAL OBSERVATIONS, AND ADJUST THE AREAS AND DEPTHS OF THE EXCAVATION
SHOWN IN THE DRAWINGS AS NECESSARY.
62 TONS OF THIS LINE ITEM QUANTITY FOR SITE 1 IS FOR CONTINGENCY. 34 TONS OF THIS LINE ITEM
QUANTITY FOR SITE 2 IS FOR CONTINGENCY.
PAYMENT FOR THE ABOVE WORK SHALL BE MADE AT THE UNIT PRICE BID FOR ITEM 30105-2000, SUBBASE GRADING B, AND SHALL INCLUDE ALL PROVISIONS AS SET FORTH IN THESE DRAWINGS AND IN THE SPECIFICATIONS UNDER ITEM 301, AS WELL AS ALL LABOR, TOOLS, EQUIPMENT, HAULING, HANDLING, PROOF ROLLING, PLACING, COMPACTING, AND MATERIALS NECESSARY TO COMPLETE THE WORK. COSTS FOR ADDITIONAL EXCAVATION, SUBGRADE UNDERCUT, AND BACKFILL SHALL BE CONSIDERED INCIDENTAL.
ITEM 552 - GROUT
THIS WORK CONSISTS OF INSTALLING NON-SHRINK, HIGH STRENGTH GROUT UNDERNEATH THE EXISTING BRIDGE ABUTMENT FOOTINGS AT SITE 1. CONTRACTOR SHALL EXCAVATE AND REMOVE STREAMBED DEBRIS AND LOOSE ROCK MATERIAL (AS DIRECTED BY THE COR). GROUTING SHALL BE CONDUCTED IN A MANNER TO SUCCESSFULLY FILL EXISTING VOIDS BENEATH THE FOOTINGS AND PROVIDE ADEQUATE BOND
AT THE ABUTMENT CONTACT.
CONTRACTOR SHALL USE EXTREME CAUTION WHEN WORKING IN THIS AREA TO PREVENT DAMAGE TO THE ABUTMENTS AND ITS FOUNDATIONS. CONTRACTOR SHALL CLEAN EXPOSED CONCRETE FOOTING AND
PROVIDE RESIDUE FREE SURFACE THAT WILL BE IN CONTACT WITH THE GROUT.
PERFORM ALL EXCAVATION WORK IN ACCORDANCE WITH FP-14 SECTION 208 AND 209. INSTALL NON-SHRINK GROUT CONFORMING TO FP-14, 725.13 (b).
PAYMENT FOR THE ABOVE WORK SHALL BE MADE AT THE UNIT PRICE BID FOR ITEM 55240, GROUT, AND SHALL INCLUDE ALL PROVISIONS AS SET FORTH IN THESE DRAWINGS AND IN THE SPECIFICATIONS UNDER ITEM 552, AS WELL AS ALL LABOR, TOOLS, EQUIPMENT, AND MATERIALS NECESSARY TO COMPLETE THE
WORK.
ITEM 602 - 6-INCH PIPE CULVERT, PVC
THIS WORK SHALL CONSIST OF FURNISHING AND INSTALLING RETAINING WALL DRAINAGE OUTLET PIPE TO THE LOCATIONS, LINES, AND ELEVATIONS SHOWN IN THESE DRAWINGS. PIPE SHALL BE SIX (6) INCH
DIAMETER, NONPERFORATED, SMOOTH WALL PVC PIPE CONFORMING TO FP-14, 708.05.
PAYMENT FOR THE ABOVE WORK SHALL BE MADE AT THE UNIT PRICE BID FOR ITEM 60201-0200, 6-INCH PIPE CULVERT, PVC, AND SHALL INCLUDE ALL PROVISIONS AS SET FORTH IN THESE DRAWINGS AND IN SPECIFICATIONS UNDER ITEM 602, AS WELL AS ALL LABOR, TOOLS, EQUIPMENT, AND MATERIALS
NECESSARY TO COMPLETE THE WORK.
ITEM 602 - 18-INCH PIPE CULVERT, HDPE
THIS WORK SHALL CONSISTS OF FURNISHING AND INSTALLING STORM CULVERTS TO THE LOCATIONS, LINES, ELEVATIONS, AND CROSS SECTIONS SHOWN IN THESE DRAWINGS. PIPE SHALL BE 18 INCH DIAMETER, CORRUGATED POLYETHLENE SMOOTH LINE PIPE CONFORMING TO THE MATERIAL REQUIREMENTS OF FP-14,
708.02. PIPE SHALL BE DUAL WALL HDPE WITH SMOOTH INTERIOR AND ANNULAR EXTERIOR CORRUGATIONS.
PIPE SHALL CONFORM TO AASHTO M 294, TYPE S PIPE. BEDDING AND BACKFILLING OF THE TRENCH SHALL
BE AS SHOWN IN THE DRAWINGS.
PAYMENT FOR THE ABOVE WORK SHALL BE MADE AT THE UNIT PRICE BID FOR ITEM 60201-0600, 18-INCH PIPE CULVERT, HDPE, AND SHALL INCLUDE ALL PROVISIONS AS SET FORTH IN THESE DRAWINGS AND IN THE SPECIFICATIONS UNDER ITEM 602, AS WELL AS ALL LABOR, TOOLS, EQUIPMENT, AND MATERIALS NECESSARY TO COMPLETE THE WORK.EXCAVATION, HAULING, BEDDING, BACKFILLING, AND COMPACTION
SHALL BE CONSIDERED INCIDENTAL.
ITEM 617 - REMOVE AND RESET, GUARDRAIL
ALL EXISTING W-BEAM GUARDRAIL, RAIL ELEMENTS, ANCHOR ASSEMBLIES, AND APPURTENANCES SHALL BE CAREFULLY REMOVED FOR STORAGE INCLUDING ALL NUTS, BOLTS, AND OTHER HARDWARE. WHEN RESETTING RAIL, THE HEIGHT OF THE RAIL SHALL BE INSTALLED TO MEET THE REQUIREMENTS INDICATED
IN THESE DRAWINGS.
WHEN RESETTING THE RAIL, THE EXISTING POSTS SHALL BE REMOVED AND LEGALLY DISPOSED OF OFF GOVERNMENT PROPERTY. THE HOLES SHALL BE BACKFILLED PRIOR TO INSTALLING NEW POSTS. INSTALL NEW STEEL POSTS IN ACCORDANCE WITH THESE DRAWINGS AND OTHER APPLICABLE PORTIONS OF THE
PROJECT SPECIFICATIONS.
PAYMENT FOR THE ABOVE WORK SHALL BE MADE AT THE UNIT PRICE BID FOR ITEM 61708-1000, REMOVE AND RESET, GUARDRAIL, AND SHALL INCLUDE ALL PROVISIONS AS SET FORTH IN THESE DRAWINGS AND IN THE SPECIFICATIONS UNDER ITEM 617, AS WELL AS ALL LABOR, TOOLS, EQUIPMENT, AND MATERIALS NECESSARY TO COMPLETE THE WORK. BACKFILLING, DISPOSAL OF EXISTING POSTS, AND INSTALLATION OF
NEW POSTS SHALL BE CONSIDERED INCIDENTAL.
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
H U
N
TI
N G
TO
N
D
IS
TR
IC
T H
U N
TI
N
G
TO
N , W
ES
T
VI
R
G
IN
IA
H U
N
TI
N G
TO
N
D
IS
TR
IC
T
8T
H S
TR
EE
T H
U N
TI
N
G
TO
N , W
V
AN
SI
D
N
IC
H O
LA
S
C O
U N
TY
, W
V / W
EB
ST
ER
C
O U
N
TY
, W V
M O
N O
N G
AH
EL
A N
AT
IO
N
AL
F O
R
ES
T
SE
R
VI
C E
FR
-7
EM
BA
N
KM
EN
T
ST
AB
IL
IZ
AT
IO
N
C
ER
TI
FI
ED
F
IN
AL
D O
C U
M
EN
TS
R
TA
JA
T
D M
U
JA
T
M W
C
SH
EE
T
O
F
G
EN
ER
AL
N O
TE
S
GI003
SITE 1 - ESTIMATE OF QUANTITIES
ITEM NO. DESCRIPTION UNIT QUANTITY
15101 MOBILIZATION LS 1
15201 CONSTRUCTION SURVEY AND STAKING LS 1
15701 SOIL EROSION CONTROL LS 1
15702-6000 SOIL EROSION CONTROL, TEMPORARY STREAM DIVERSION LS 1
20102 CLEARING AND GRUBBING, AS DIRECTED LS 1
20302-2100 REMOVAL OF PIPE CULVERT LF 47
20401 ROADWAY EXCAVATION CY 37
20403 UNCLASSIFIED BORROW, AS DIRECTED CY 169
20420 EMBANKMENT CONSTRUCTION CY 76
25102-0200 PLACED RIPRAP, METHOD A, CLASS 2 TON 12
25102-0300 PLACED RIPRAP, METHOD A, CLASS 3 TON 138
25102-0700 PLACED RIPRAP, METHOD A, CLASS 7 TON 336
26303-0100 CONCRETE LAGGING, 8-INCH THICKNESS, 4-FT SPACING SF 405
26303-0200 CONCRETE LAGGING, 8-INCH THICKNESS, 6-FT SPACING SF 770.5
26304-0100 STEEL H-PILE, HP12X74, IN PLACE LF 1335
26304-0200 STEEL H-PILE, W18X119, IN PLACE LF 884
30105-2000 SUBBASE GRADING B TON 124
30110 AGGREGATE SURFACE COURSE, GRADING F TON 110
55240 GROUT CF 710
55401-2000 REINFORCING STEEL, EPOXY COATED LB 154
60201-0200 6-INCH PIPE CULVERT, PVC LF 20
60201-0600 18-INCH PIPE CULVERT, HDPE LF 60
61708-1000 REMOVE AND RESET, GUARDRAIL LF 195
63501 TEMPORARY TRAFFIC CONTROL LS 1
SITE 2 - ESTIMATE OF QUANTITIES
ITEM NO. DESCRIPTION UNIT QUANTITY
15101 MOBILIZATION LS 1
15201 CONSTRUCTION SURVEY AND STAKING LS 1
15701 SOIL EROSION CONTROL LS 1
20401 ROADWAY EXCAVATION CY 7
20420 EMBANKMENT CONSTRUCTION CY 43
26303-0200 CONCRETE LAGGING, 8-INCH THICKNESS, 6-FT SPACING SF 851
26304-0100 STEEL H-PILE, HP12X74, IN PLACE LF 461
30105-2000 SUBBASE GRADING B TON 61
30110 AGGREGATE SURFACE COURSE, GRADING F TON 44
60201-0200 6-INCH PIPE CULVERT, PVC LF 12
60703 CLEANING CULVERTS IN PLACE LF 33
63501 TEMPORARY TRAFFIC CONTROL LS 1
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
H U
N
TI
N G
TO
N
D
IS
TR
IC
T H
U N
TI
N
G
TO
N , W
ES
T
VI
R
G
IN
IA
H U
N
TI
N G
TO
N
D
IS
TR
IC
T
8T
H S
TR
EE
T H
U N
TI
N
G
TO
N , W
V
AN
SI
D
N
IC
H O
LA
S
C O
U N
TY
, W
V / W
EB
ST
ER
C
O U
N
TY
, W V
M O
N O
N G
AH
EL
A N
AT
IO
N
AL
F O
R
ES
T
SE
R
VI
C E
FR
-7
EM
BA
N
KM
EN
T
ST
AB
IL
IZ
AT
IO
N
C
ER
TI
FI
ED
F
IN
AL
D O
C U
M
EN
TS
R
TA
JA
T
BR
S
JA
T
M W
C
EN
VI
R
O N
M
EN
TA
L
PR
O
TE
C
TI
O
N M
EA
SU
R
ES
GI004
EPM NO. 1 - FOR AREAS OF DISTURBANCE LESS THAN AN ACRE, THE CONTRACTOR SHALL IMPLEMENT APPLICABLE BEST MANAGEMENT PRACTICES (BMPs) AS APPROVED BY THE GOVERNMENT IN THE EROSION AND SEDIMENT CONTROL PLAN.
EPM NO. 2 - SILT TRAPS, SILT FENCES, AND / OR OTHER FILTERING DEVICES SHALL BE MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION
TO CONTROL SEDIMENT RUNOFF.
EPM NO. 3 - ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED WHERE INDICATED ON THE PLANS AND IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. APPLY TEMPORARY OR PERMANENT SEED, MULCH, EROSION CONTROL FABRIC, OR OTHER CONTROLS AS SOON AS THE WORK IS
COMPLETED, BUT NO LATER THAN 14 DAYS AFTER GRADING WORK IN AREAS IS COMPLETED.
EPM NO. 4 - THE FOLLOWING INSPECTION AND MAINTENANCE PRACTICES SHALL BE USED TO MAINTAIN EROSION AND SEDIMENT CONTROLS AND
STABILIZATION MEASURES:
· ALL CONTROL MEASURES SHALL BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN ONE-HALF INCH OF RAIN PER 24-HOUR PERIOD OR AS REQUIRED BY LOCAL AND STATE REGULATIONS.
· ALL MEASURES SHALL BE MAINTAINED IN GOOD WORKING ORDER: IF REPAIRS OR OTHER MEASURES ARE FOUND TO BE NECESSARY, THEY
SHALL BE INITIATED WITHIN 24 HOURS.
· BUILT-UP SEDIMENT SHALL BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE HEIGHT OF THE FENCE. SEDIMENT SHALL
BE REMOVED FROM SILT TRAPS WHEN IT CONSUMES ONE-THIRD OF THE DESIGN VOLUME.
· SILT FENCES SHALL BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS, ETC. TO SEE IF THE FABRIC IS SECURELY ATTACHED TO THE FENCE
POSTS AND TO DETERMINE IF THE POSTS ARE SECURELY IN THE GROUND.
· TEMPORARY AND PERMANENT SEEDING AND OTHER STABILIZATION MEASURES SHALL BE INSPECTED FOR BARE SPOTS, WASHOUTS, AND
HEALTHY GROWTH.
· DISTURBED AREAS AND MATERIAL STORAGE AREAS SHALL BE INSPECTED FOR EVIDENCE OF OR POTENTIAL FOR POLLUTANTS ENTERING
STORMWATER SYSTEMS.
· WEEKLY INSPECTION OF EROSION AND SEDIMENT CONTROL FEATURES SHALL BE DOCUMENTED, AND COPIES OF THESE DOCUMENTS SHALL BE PROVIDED TO THE COR WEEKLY. SUBMITTED REPORTS SHALL BECOME PART OF THE PROJECT RECORDS. NOTED DEFICIENCIES SHALL
BE REMEDIED WITHIN 24 HOURS.
EPM NO. 5 - AT ALL TIMES OF THE YEAR, SPECIAL MEASURES SHALL BE TAKEN TO PREVENT CHEMICALS, FUELS, OILS, GREASES, BITUMINOUS MATERIALS, WASTE WASHINGS, HERBICIDES, INSECTICIDES, LIME, WET CONCRETE, SILT OR ORGANIC OR OTHER ENVIRONMENTALLY DESTRUCTIVE
MATERIAL FROM ENTERING ADJACENT STORM SEWERS OR WATERWAYS.
EPM NO. 6 - CONTRACTOR SHALL SUBMIT A SPILL PREVENTION, CONTROL, AND COUNTERMEASURE PLAN FOR APPROVAL, PRIOR TO START OF
WORK.
EPM NO. 7 - WATERS USED TO WASHDOWN EQUIPMENT SHALL BE DISPOSED OF IN A MANNER TO PREVENT THEIR DIRECT ENTRY INTO STORM SEWERS OR ADJACENT WATERWAYS. THE CONTRACTOR SHALL USE APPROPRIATE BMPs AT WASHOUT AREAS.
EPM NO. 8 - NO BURNING IS PERMITTED ON GOVERNMENT PROPERTY.
EPM NO. 9 - DURING CLEARING OPERATIONS, TREES AND DEBRIS SHALL NOT BE ALLOWED TO FALL OUTSIDE THE APPROVED CLEARING LIMITS
WHERE SUCH FALLS WOULD DAMAGE OR INJURE TREES AND SHRUBS WHICH ARE TO REMAIN.
EPM NO. 10 - THIS PROJECT IS LOCATED WITHIN THE KNOWN HABITAT RANGES OF FEDERALLY LISTED BATS. NO TREES SHALL BE REMOVED UNDER THIS PROJECT EXCEPT DURING PERMISSIBLE TIMES OF TREE CLEARING INDICATED IN THE DRAWINGS AND / OR PROJECT SPECIFICATIONS. THIS REQUIREMENT IS NECESSARY TO AVOID AND MINIMIZE IMPACTS TO THESE SPECIES AS REQUIRED BY THE ENDANGERED SPECIES ACT.
* SCHEDULED DATES AND REQUIREMENTS FOR TREE CLEARING SHALL BE COORDINATED WITH THE COR.
EPM NO. 11 - THE CONTRACTOR SHALL REFER TO THE PROJECT SPECIFICATIONS FOR ADDITIONAL ENVIRONMENTAL PROTECTION REQUIREMENTS.
EPM NO. 12 - THE CONTRACTOR SHALL SUBMIT A TEMPORARY STREAM DIVERSION WORK PLAN, TO INCLUDE DEWATERING, DETAILING HOW BARRENSHE RUN FLOWS WILL BE CONTROLLED AND MAINTAINED THROUGHOUT THE ENTIRE DURATION OF REQUIRED INSTREAM CONSTRUCTION WORK. WORK PLAN SHALL BE SUBMITTED TO THE GOVERNMENT THIRTY (30) CALENDAR DAYS PRIOR TO THE START OF CONSTRUCTION. NO WORK SHALL BE PERFORMED IN THE STREAM UNTIL THE TEMPORARY DIVERSION WORK PLAN IS APPROVED.
ENVIRONMENTAL PROTECTION MEASURES
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
H U
N
TI
N G
TO
N
D
IS
TR
IC
T H
U N
TI
N
G
TO
N , W
ES
T
VI
R
G
IN
IA
H U
N
TI
N G
TO
N
D
IS
TR
IC
T
8T
H S
TR
EE
T H
U N
TI
N
G
TO
N , W
V
AN
SI
D
N
IC
H O
LA
S
C O
U N
TY
, W
V / W
EB
ST
ER
C
O U
N
TY
, W V
M O
N O
N G
AH
EL
A N
AT
IO
N
AL
F O
R
ES
T
SE
R
VI
C E
FR
-7
EM
BA
N
KM
EN
T
ST
AB
IL
IZ
AT
IO
N
C
ER
TI
FI
ED
F
IN
AL
D O
C U
M
EN
TS
R
TA
JA
T
BR
S
JA
T
M W
C G
EN
ER
AL
L
EG
EN
D
GI005
STORM SEWER - EXISTING
STORM SEWER - PROPOSED
DITCH OR SWALE
SURFACE DRAINAGE FLOW
CATCH BASIN OR DROP INLET
STORM MANHOLE
CULVERT END
HEADWALL
DIRECTION OF FLOW
NEW RELIEF WELL
SILT FENCE
CURB
UNIMPROVED ROAD
TRAIL
RAILROAD
US HIGHWAY
STATE HIGHWAY
INTERSTATE HIGHWAY
GUARDRAIL
IN SITU ROCK
EXISTING GROUND
FINISHED GRADE
UNIFORM SLOPE DESIGNATON
STONE SLOPE PROTECTION LIMITS (PLAN)
IRON PIN AND CAP
RAILROAD SPIKE
SPOT ELEVATION LOCATOR
GPS MONUMENT
CONCRETE MONUMENT
CORE DRILL HOLE DRILLED
CONTROL POINT
MONUMENT
CORE DRILL HOLE UNDRILLED
EXISTING RELIEF WELL
CONTRACTOR WORK LIMITS
RIGHT OF WAY
CENTERLINE, BASELINE OR AXIS
CONCRETE
GRAVEL
GROUT
PHANTOM LINE
WOODEN HUB
EDGE OF WATER
SWAMP
CORPORATE BOUNDARY LIMITS
FENCE
TREELINE
BRUSH LINE
TREE / BUSH
TREE WITH BASE
SHEET ON WHICH
SECTION IS SHOWN
POINT OF CURVATURE
POINT OF INTERSECTION
PLATE OR PROPERTY LINE
ON CENTER
OUTSIDE DIAMETER
OUTSIDE FACE
OPENING
OPPOSITE
OUNCE
REINFORCED CONCRETE PIPE
REINFORCING
REQUIRED
ROOF FRAME
RIGHT
SOUTH
SECTION
SQUARE FEET
OC
OD
OF
OPG
OPP
OZ
PC
PI
P
PSI
PSF
QUAN
R
RCP
RD
REINF
REQ'D
RF
RT
S
SECT
SF
L
PROJ
RGC RIGID GALVANIZED CONDUIT
POB POINT OF BEGINNING
POE
POT
OP OVERHEAD POWER
RADIUS
ROAD
SAN
PVC
AMERICAN CONCRETE INSTITUTE
ALTERNATE
ALUMINUM
AMERICAN WATER WORKS ASSOC.
AT
BENCH MARK
CENTERS
CENTERLINE
CONSTRUCTION JOINT
CLEAR
COLUMN
CONCRETE
CONSTRUCTION
CONTINUOUS
CORROSION RESISTANCE STEEL
CUBIC YARD
DROP INLET
DIAMETER
DIMENSION
DRAWING
ACI
ALT
ALUM
AWWA
BM
C
CJ
COL
CONC
CONST
CONT
CRS
CY
DIP
DI
DIA
DIM
DWG
L
C
CTRS
CL, CLR
CC CENTER TO CENTER
CMP CORRUGATED METAL PIPE
CHANNEL
AVE AVENUE
CR COUNTY ROUTE
ACMP ALUMINIZED CORRUGATED METAL PIPE
POUNDS PER SQUARE INCH
POUNDS PER SQUARE FOOT
QUANTITY
PROJECTION
POINT OF TANGENCY
POINT OF ENDING
POLYVINYL CHLORIDE PIPE
B,BOT BOTTOM
BCCMP BITUMINOUS COATED CORRUGATED
METAL PIPE
SHEET
SIMILAR
SPACES
SQUARE
STATION
STANDARD
STIRRUPS
STEEL
STRAIGHT, STRUCTURAL
SQUARE YARD
SYMMETRICAL
TOP OR TREAD
TOP OF EXCAVATION
TYPICAL
UNLESS NOTED OTHERWISE
VERTICAL
VARIES
VERTICAL CURVE
VERTICAL POINT OF TANGENCY
VERTICAL POINT OF CURVATURE
VERTICAL POINT OF INTERSECTION
SHT
SIM
SPC
SQ
SS
STA
STD
STIR
STL
STR
SY
SYM
T
TOE
TYP
UNO
V, VERT
VAR
VC
VPT
VPC
VPI
STAINLESS STEEL, SIDE SLOPE
UP UNDERGROUND POWER
SD
SR STATE ROUTE
TOP OF SLAB
TOC
TOS
TOP OF CONCRETE, TOP OF CASTING
EAST
EACH
EACH FACE
E
EA
EF
EXPANSION JOINT
ELEVATION
EQUAL
EACH WAY
EXISTING
EXPANSION
FINISHED
FEET, FOOT
GAUGE OR GAGE
GALVANIZED
HORIZONTAL
INSIDE FACE
ISOLATION JOINT
INVERT
IRON PIN
JOINT
POUND
TENSILE DEVELOPMENT LENGTH
LEFT
EJ
EJFS
EL, ELEV
EQ
EW
EX, EXIST
EXP
FIN
FT
GA
GALV
H, HORIZ
HS
IF
IJ
INV
IP
JT
LB
Ld
LT
EXPANSION JOINT FILLER STRIP
LLH LONG LEG HORIZONTAL
HEX HD HEXAGONAL HEAD
GRD GROUND
ELE
EOR
ELECTRICAL
EDGE OF ROAD
HIGH STRENGTH
MAXIMUM
MANHOLE
MINIMUM
MARK
NORTH
NUMBER
MAX
MH
MK
N
MIN
MJ MECHANICAL JOINT
#, NO
PAVED ROAD EDGE
+0
HAZARDOUS MATERIALS
DUCTILE IRON PIPE
SANITARY SEWER
STORM DRAINAGE
WESTW
CWL CONTRACTOR'S WORK LIMITS
SD
SD
CB
D
SF
R/W
HAZ
RR SPIKE
IP
DEMOLITION LINE
PIEZOMETER
SHEET ON WHICH
STANDARD DETAIL IS
SHOWN
CONSTRUCTION EASEMENTC/E
DRAINAGE
MAPPING ABBREVIATIONSROADS AND RAILWAYS
EARTHWORK
SURVEY SYMBOLS
GEOTECHNICAL SYMBOLS
SECTION DESIGNATIONS
GENERAL LEGEND
HORIZONTAL / VERTICAL CONTROL
HORIZONTAL CONTROL
FLOW DIRECTION ARROW
BORROW AREA LIMIT LINE
PROPOSED PIEZOMETER
DEMOLITION REFRENCE NUMBER
CONTRACTOR WORK LIMIT COORDINATE
DBH DIAMETER BREAST HEIGHT
WATERLINEW
COR CONTRACTING OFFICER AND
AUTHORIZED REPRESENTATIVES
(FOREST SERVICE)
SLOPE ARROW
CLEARING LIMITS
X-### X#
X-### X#
N
NORTH ARROW
SYMBOLS
CONTOUR LINE - MAJOR
CONTOUR LINE - MINOR
CULVERT PIPECP
RIP RAP
TOR TOP OF ROCK
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
RW
AutoCAD SHX Text T
AutoCAD SHX Text T
OOO
OOO
OOO
OOO
OOO
OOO
OOO
O O O O O O O O O
O O O
EDGE OF
CHANNEL
BEGIN PROJECT
STA. 10+00.00
N: 467583.05 E: 2103650.46
FLOW
FLOW
BARRENSHE RUN
BARRENSHE RUN
BARRENSHETRAIL
CP-1002
FOREST ROAD 76 (FR-76)
23552355
235523552355
PROPOSED EDGE
OF ROAD
EDGE OF
CHANNEL
EXISTING BRIDGE
VEGETATION
LIMITS
CP-1001
START WORK
STA. 10+40.00
RETAINING
WALL A
PROPOSED BOTTOM
OF DITCH
EDGE OF
CHANNEL
EXISTING STORM PIPE
TO BE REMOVED
EXISTING EDGE
OF ROAD
STREAMBANK STONE BUTTRESS
SEE DETAIL K13 ON SHEET CS302
FOR MORE INFORMATION
PROPOSED 18'' HDPE
STORM CULVERT
RIPRAP CULVERT
END TREATMENT,
SEE DETAIL K2 ON
SHEET CS507
EXISTING STORM PIPE
TO BE REMOVED
℄ OF CHANNEL
EXISTING EDGE
OF ROAD
VEGETATION
LIMITS
CP-1003
VEGETATION
LIMITS
END WORK
STA. 15+60.00
CONTRACTOR
WORK LIMITS
RETAINING
WALL B
END PROJECT
STA. 16+15.00
N: 467788.58 E: 2103745.89
RIPRAP CULVERT
END TREATMENT,
SEE DETAIL K2 ON
SHEET CS507
PROPOSED 18'' HDPE
STORM CULVERT
PROPOSED BOTTOM
OF DITCH
PO
B
10+00.00
PO
E
+1
5.
PC10+37.26
PC11+90.95
PC12+75.73
PC 14
+8
7.
PT10+72.56
PT12+11.80
PT 14
+8
0.
26PT 15
+4 4.
PCC
13+59.50
PCC
+9
7.1
10+00
11+00
12+00
13+00
14+00
15+00 16+0016+15
℄ OF CHANNEL
RIPRAP
SEE DETAILS ON SHEET CS302
FOR MORE INFORMATION
EXISTING GUARDRAIL TO
BE REMOVED AND RESET
PROPOSED ℄ OF FR-76
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
JA
T
BR
S
JA
T
M W
C O
VE
R
AL
L
PR
O
JE
C
T
SI
TE
P
LA
N
CS100
SITE 1
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
H U
N
TI
N G
TO
N
D
IS
C
TR
IC
T
H U
N
TI
N G
TO
N
, W
ES
T
VI
R G
IN
IA
H U
N
TI
N G
TO
N
D
IS
TR
IC
T
8T
H S
TR
EE
T H
U N
TI
N
G
TO
N , W
V
N
IC
H O
LA
S
C O
U N
TY
, W
V / W
EB
ST
ER
C
O U
N
TY
W V
M O
N O
N G
AH
EL
A N
AT
IO
N
AL
F O
R
ES
T
SE
R
VI
C E
FR
-7
EM
BA
N
KM
EN
T
ST
AB
IL
IZ
AT
IO
N
C
ER
TI
FI
ED
F
IN
AL
D O
C U
M
EN
TS
R
TA
A1 SCALE: 1" = 20'
OVERALL PROJECT SITE 1 PLAN
20' 40'0
SITE 1 CWL ALIGNMENT COORDINATES
POINT NO. NORTHING EASTING
A-1 467548.84 2103648.67
A-2 467619.63 2103927.79
A-3 467591.26 2103971.40
A-4 467592.53 2104044.10
A-5 467636.10 2104044.10
A-6 467733.24 2104021.01
A-7 467815.14 2103904.04
A-8 467815.44 2103733.51
A-9 467758.73 2103733.51
A-10 467760.00 2103845.30
A-11 467733.06 2103903.89
A-12 467716.26 2103923.25
A-13 467676.13 2103906.40
A-14 467611.41 2103638.17
CONTRACTOR
WORK LIMITS
PROPOSED
SURFACE
AGGREGATE
LEGEND
CONTROL POINT DATA
POINT ID NORTHING EASTING ELEVATION STATION OFFSET DESCRIPTION
CP-1001 467580.59 2103689.74 2349.25 10+38.31 8.90' RT. REBAR WITH USACE CAP
CP-1002 467692.07 2103981.00 2346.35 13+47.41 15.76' RT. REBAR WITH USACE CAP
CP-1003 467800.14 2103661.96 2357.48 N/A N/A REBAR WITH USACE CAP
CP-1004 467846.50 2103590.90 2359.66 N/A N/A REBAR WITH USACE CAP
A-1
A-2
A-3
A-5
A-6
A-7 A-8
A-9 A-10
A-11
A-12
A-13
A-14
PROPOSED
RIP RAP
UNCLASSIFIED
BORROW
EXCAVATION
LIMITS
A-4
SITE 1 FR-76 ROAD ALIGNMENT DATA
POINT CURVE TANGENT
POINT TYPE STATION NORTHING EASTING RADIUS (FT) DELTA DISTANCE (FT) BEARING IN BEARING OUT
POB 10+00.00 467583.05 2103650.46 37.26 N80° 28' 41.61"E
PC 10+37.26 467589.21 2103687.20
PI 10+54.93 467592.14 2103704.63 350.00 5° 46' 45" (LT) 17.67 N80° 28' 41.61"E N74° 41' 57.06"E
PT 10+72.56 467596.80 2103721.67 118.39
PC 11+90.95 467628.04 2103835.86
PI 12+01.38 467630.79 2103845.92 350.00 3° 24' 44" (RT) 10.43 N74° 41' 57.06"E N78° 06' 41.23"E
PT 12+11.80 467632.94 2103856.12 63.93
PC 12+75.73 467646.11 2103918.68
PI 13+26.07 467656.48 2103967.94 60.00 79° 59' 28" (LT) 50.34 N78° 06' 41.23"E N1° 52' 47.20"W
PCC 13+59.50 467706.79 2103966.29
PI 13+79.28 467726.57 2103965.64 50.00 43° 10' 49" (LT) 19.79 N1° 52' 47.20"W N45° 03' 36.38"W
PCC 13+97.18 467740.54 2103951.63
PI 14+39.82 467770.66 2103921.45 150.00 31° 44' 08" (LT) 42.64 N45° 03' 36.38"W N76° 47' 44.16"W
PT 14+80.26 467780.40 2103879.94 6.86
PC 14+87.12 467781.97 2103873.26
PI 15+16.06 467788.58 2103845.09 250.00 13° 12' 16" (LT) 28.94 N76° 47' 44.16"W N90° 00' 00.00"W
PT 15+44.74 467788.58 2103816.15 70.26
POE 16+15.00 467788.58 2103763.64
N
10+00 11+00
12+00
OOOOOOOO
OOO
OOO
OOO
OOO
OOOOOO
CURVE DATA
PI STA.= 10+54.93
N:= 467592.1356 E:= 2103704.6275
R= 350.0' D= 016°22'13"
Δ= 5°46'45" T= 35.29' L= 35.30' E= 0.446
CURVE DATA
PI STA.= 12+01.38
N:= 467630.7899 E:= 2103845.9160
R= 350.0' D= 016°22'13"
Δ= 3°24'44" T= 20.84' L= 20.84' E= 0.155
PC
10+37.26
PC11+90.95
PT10+72.56
PT
12+11.80
.4
.3
.2
.2
.1
.1
.0
.9
.8
.7
.6
.4
.3
.2
.0
.9
.7
.6
.4
.3
.2
.1
.0
.9
.2
.2
.1
.1
.0
.0
.9
.8
.7
.6
.5
.4
.3
.2
.0
.9
.8
.7
.6
.4
.4
.3
EXISTING GRADE = -0.61%
L 100.00'
PV
C
S
TA
. 1 0+
EL
. 2
9.
PV
T
ST
A.
1+
EL
. 2
8.
22PVI STA. 11+20 EL. 2348.85
G1 -0.54% G2 -1.27%
K 138
PVI STA. 12+50 EL. 2347.20
G1 -1.27% G2 -0.40%
K 115
PV
C
S
TA
. 1 2+
EL
. 2
7.
L 100.00'
GRADE = -0.54%
GRADE = -1.27%
PV
I S
TA
. 1
0+
.0
EL
. 2
9.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .