This document package includes construction drawings and specifications for a federal contract opportunity for road paving work at Pinnacles National Park in California. The project involves paving areas at the West Visitor Center, Maintenance and Housing facilities. Work includes removing existing asphalt and aggregate in some areas, excavating subgrade, installing new aggregate base and 3 inches of asphalt pavement. Other tasks encompass adding curb, gutter and concrete channels, and replacing culverts. The contract will be awarded through solicitation number 140P8420R0005 by the National Park Service Pacific West Region. Bids are due by the date specified in the solicitation. The contractor will be required to follow the design plans and technical specifications in the provided drawings when performing the work.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jawbone Parking area:

Excess soil and aggregate stockpile location

Cover Sheet

West Side

#10, PWR Monterey California

Pave Visitor, Housing, & Maintenance AreasQuality Design CerCficaCon

GENERAL NOTES:

1. See Specifications for Scope of Work and all technical specifications.

DRAWING INDEX

Cover Sheet C1 Maintenance & Housing Area Plan C2 Visitor Center Parking and Entrance Station Area Plans C3 Asphalt Details C4 Concrete and Aggregate-Road Details

N

East Entrance StationBear

Gulch

1 PROJECT AREA AERIAL VIEW

SCALE (FT):

2 PARK AND VICINITY MAP

SCALE (MILES):

United States Department of the Interior

National Park Service Pacific West Region

333 Bush St Suite 500 San Francisco, CA 94104

Location within Park

Name of Park

Region County State

Issue Date Issued for Park Review 5/4/20

Recommended: SB 5/4/20 Project Manager

Approved: - - Superintendent

SheetPkg.

No.

Pinnacles NaConal Park

Title of Drawing of 5

Drawing No.

114/168639

West Entrance / Project Area

Visitor Center Parking Area, see Plan 1/C2

Entrance Station Area, see Plan 2/C2

Maintenance & Housing Area, see

Plan 1/C1

Chaparral Parking area:

water source

To Soledad & 101

San Benito Co.

Monterey Co.

San Benito

County

M onterey

County

00 01 02

00 100 200

Storage Yard

Dormitory

Du pl ex

Duplex 2

Maint Bldg

Rad ius

~=30 ’ Radius

~=30’ Ra diu s

Mech

Ra diu s

Maintenance&Housing
AreaPlanC1

Install (N) Curb w/o gutter, per detail 1/C4. Begin at (E) block wall

(E) cross-ditch Install 10’ wide permeable aggregate base. Follow centerline of (E) road to (E) cross ditch, ~145’ from intersection with

(N) Curb. See Specification section 02725.

Terminate (N) curb

(E) Block wall

NPS will remove

(E) rodent barriers before construction

Parking area, remove and reset wheel stops, and install stripes

14’ wide (N) asphalt, follow centerline of

(E) road

Boundary with (E) asphalt of main road

15’ for garage entry 14’ wide (N) asphalt, follow centerline of (E) road

Drainage flow line within concrete channel, maintain 1% min slope

1 MAINTENANCE & HOUSING AREA PLAN

SCALE: 1” = 50’

N

(E) Patio slab

(E) Asphalt parking

C4

(E) Edge boards mark extent of asphalt where present, typical. See detail 2/C3

Clean (E) Trench drain

(E) Asphalt, remains

C4

(E) Sidewalk

Transition from curb w/ gutter, detail 2/C4, to ‘V’ channel, detail 3/C4

C4

5’

(E) Manhole

(E) slab

Clean (E) drop inlet

Clean (E) drop inlet

NOTES:

1. Sawcut all (E) asphalt at interfaces with (N) pavement, see detail 1/C3

C3

Transition from curb w/o gutter, detail 1/C4, to curb w/ gutter, detail 2/C4

Transition from curb w/ gutter, detail 2/C4, to curb w/o gutter, detail 1/C4

Legend Approximate location of Treatment Area A: no excavation of (E) aggregate, place 3” of HACP

Approximate location of Treatment Area B: excavate 3” of (E) aggregate, place 3” of HACP

Approximate location of Treatment Area C: excavate all base aggregate and shape sub grade, place 3” of HACP

Approximate direction of slope for drainage

NOTES: Refer to specifications section 02725 for requirements of each treatment area.

HACP: Hot Asphalt Concrete Pavement Drawing No.

SheetPkg.

No.

Title of DrawingSub Sheet No.Designed:

Tech.

Review:

Date:

Pinnacles Na4onal Park of 5198

114/168639SB

16 Jun 2020

DK

200’

VisitorCenterParkingand
EntranceSta3onAreaPlansC21 VISITOR CENTER PARKING AREA PLAN

SCALE: 1” = 40’

2 ENTRANCE STATION AREA PLAN

SCALE: 1” = 50’

(E) Aggregate sidewalk remains

(E) Edge boards mark extent of asphalt where present, typical, see detail 2/C3

Boundary with (E) asphalt of main road

N

Parking area, remove and reset wheel stops, and install stripes. Match parking stall-striping to (E) paved stalls.

(E) Asphalt parking

N

(2) Bus stalls labeled “LARGE

VEHICLES ONLY”

M ain Road

Park West Entrance Station

At eroded road edge, sawcut 12” width from

(E) asphalt and replace with 24” of Treatment C per specifications section 02725, increasing road width by 12”.

(N) 24” x 80’ CMP culvert under road.

Install with flared end sections at inflow and outflow. Verify utilities and route with COR.

(E) Drainage ditch

(E) Concrete Sidewalk

NOTES:

1. Sawcut all (E) asphalt at interfaces with (N) pavement, see detail 1/C3.

2. Min. slope is 1.5% for new pavement for drainage.

Location of Treatment Area B Per specifications section 02725

Boundary with (E) asphalt of parking area

C3

C3

Legend Approximate location of Treatment Area A: no excavation of (E) aggregate, place 3” of HACP

Approximate location of Treatment Area B: excavate 3” of (E) aggregate, place 3” of HACP

Approximate location of Treatment Area C: excavate all base aggregate and shape sub grade, place 3” of HACP

Approximate direction of slope for drainage

NOTES: Refer to specifications section 02725 for requirements of each treatment area.

HACP: Hot Asphalt Concrete Pavement

LA

RGE

VE

HIC

LE

S

ONLY

LA

RGE

VE

HIC

LE

S

ONLY

Drawing No.

SheetPkg.

No.

Title of DrawingSub Sheet No.Designed:

Tech.

Review:

Date:

Pinnacles Na3onal Park of 5198

114/168639SB

(E) Aggregate base, excavate, shape, and compact to support (N) asphalt

(E) subgrade

Sawcut and remove edge of

(E) asphalt boundary

(N) 3” Asphalt Pavement

(E) 2” Asphalt

6"

(E) Aggregate base, excavate, shape, and compact to support (N) asphalt

(E) Plastic edging, do not disturb

(N) 3” Asphalt Pavement, at same grade as previous aggregate grade

(E) Aggregate wWalkway or natural grade

(N) 3” Asphalt Pavement (E) Ashpalt

Sawcut (E) asphalt boundary30’ transition grade

6” (E) aggregate base, re-graded and compacted

Subgrade Excavate shoulder and place 6” depth of (N) aggregate base(E) subgrade

Sawcut and remove 12” edge of (E) asphalt roadway

Place 3” depth of asphalt for road widening

(E) Roadway

12” 12”

(E) base course

(N) to (E) PAVEMENT INTERFACE

TYPICAL DETAIL

SCALE: 1/2” = 1’-0”

PAVEMENT EDGE

TYPICAL DETAIL

SCALE: 1/2” = 1’-0”

3 ROADWAY TRANSITION PROFILE TYPICAL DETAIL

SCALE: 1/2” = 1’-0”

Asphalt Details

C3

4 ROAD WIDENING DETAIL

SCALE: 1/2” = 1’-0”

2'-6"

Drawing No.

SheetPkg.

No.

Title of DrawingSub Sheet No.Designed:

Tech.

Review:

Date:

Pinnacles Na0onal Park of 5198

114/168639SB

5 1/2"4"

4'-0"

NOTES:

1. Min slope for concrete flow-line is 1%.

2. Asphalt pavement shall be sloped toward the channel with a 1.5% min. slope.

3. Grade and compact the subgrade to achieve slope criteria.

Concrete Channel

3” Asphalt Pavement

6” Aggregate base

Excavated, regraded and compacted subgrade

6”

1-1/2”

6” Aggregate base

2:1 Max slope on backside of curb

Apply and compact 4” permeable aggregate base course

Re-grade and compact (E) access road

2"

NOTES:

1. Min slope for concrete flow-line is 1%.

2. Asphalt pavement shall be sloped toward the channel with a 1.5% min. slope.

3. Shape and compact the aggregate base to achieve slope criteria.

6"

1 1/2"

2”

Concrete Curb with gutter

3” Asphalt Pavement

6” Aggregate base

6”

2:1 Max slope on backside of curb

3 CONCRETE FLOW CHANNEL DETAIL

SCALE: 1/2” = 1’-0”1

CALTRANS TYPE A1

CONCRETE CURB DETAIL

SCALE: 1” = 1’-0”

ConcreteandAggregate-
RoadDetailsC4

12”

R=1/2”

4 WATER TANK ACCESS ROAD TYPICAL DETAIL

SCALE: 1/4” = 1’-0”

CALTRANS TYPE A2 CONCRETE CURB

WITH GUTTER DETAIL

SCALE: 1” = 1’-0”

1'-0"

R=1/2”

R=1”

6”

10'-0" 12”

Drawing No.

SheetPkg.

No.

Title of DrawingSub Sheet No.Designed:

Tech.

Review:

Date:

Pinnacles Na5onal Park of 5198

114/168639SB