Att 02_SOW.pdf
PDF 166 KB Posted
- Attached to
- Septic and Vault Pumping, NPS-PORE Federal contract opportunity
- Solicitation number
- 140P8420Q0148
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Att 06_Anticipated Pumping Totals_0001.xlsx | XLSX spreadsheet | |
| Att 01_Quote Sheet_revised_0001.pdf | ||
| Sol_140P8420Q0148_Amd_0001.pdf | ||
| Att 07_SCA Wage Rates.pdf | ||
| Att 04_Map-Septic.pdf | ||
| Sol_140P8420Q0148.pdf | ||
| Att 03_Location and Volume Information.xlsx | XLSX spreadsheet | |
| Att 01_Quote Sheet.pdf | ||
| Att 05_Map-Vault.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ No. 140P8420Q0148 Attachment 02
SCOPE OF WORK
Septic / Vault Pumping Services Point Reyes National Seashore
The Contractor shall furnish the necessary personnel, materials, equipment, and services as necessary to successfully provide septic & vault pumping services to all locations as requested within Point Reyes National Seashore (the Park), West Marin County, California.
A base year purchase order with two (4) option years is contemplated. The Request for Quotation (RFQ) will include:
one base line item for the 2020/2021 service period of October 20, 2020 – October 19, one option item for the 2021/2022 service period of October 20, 2021 – October 19, 2022 one option item for the 2022/2023 service period of October 20, 2022 – October 19, 2023 one option item for the 2023/2024 service period of October 20, 2023 – October 19, 2024 one option item for the 2024/2025 service period of October 20, 2024 – October 19, 2025
Requirement Details: The estimated volume of wastewater to be pumped annually is 120,000 gallons, from multiple sites within the Park. Gallons to be pumped vary, depending on usage and park visitation. Septic tanks and vault toilets are located throughout Point Reyes National Seashore. Septic tanks and vaults range in size from 1,200-gallons to 16,000-gallons. See “Locations and Volume Information” spreadsheet, and the Maps for septic and vault toilet locations (these are separate attachments to the Solicitation). Not all sites shown on the maps will get pumped under this contract. The first pumping is estimated to start on October 20, 2021.
Additional pumping will be performed on call, on an as needed basis throughout the year. The contractor will base their annual pricing on a per trip cost, assuming there will be 78 anticipated number of trips per year.
See attached “Anticipated Annual Pumping Totals by Location” spreadsheet. The spreadsheet shows the locations and number of times the Park anticipates pumping each site. However, the Park may request service under this contract for any location listed in the Park as needed.
Point Reyes National Seashore authorized personnel will call/notify the Contractor of the vaults and or septic tanks to be pumped. This will include the order of priority as well as dates of desired pumping. A minimum response time of 48 hours is required, with 24-hour response required in the event of notification of an emergency situation. Notification of pumping will only be made by Park Utility System Operator (USRO) Nathaniel Radmacher, Water Operator Casey Heninger, Building’s and Utilities Supervisor Greg Crawford, Contracting Officer Alanna Gardner, and Supervisory Contracting Officer Yvonne Morales. Any changes or additions to the park staff authorized to provide the Contractor with this notification shall be communicated to the Contractor and authorized in writing solely by the Contracting Officer.
Park personnel will escort pumping trucks to locations that require access through locked gates.
Park personnel will be available to escort to other locations if requested by the Contractor.
RFQ No. 140P8420Q0148 – Scope of Work Attachment 02
Disposal of wastes by the Contractor will be done according to all County / State regulations at a State / County permitted disposal site. The Contractor is responsible for the arrangement and disposal of all waste. The Contractor will be responsible for complete clean up any leakage or spillage that occurs in relation to pumping operations. Any materials/trash removed during pumping shall be properly bagged and disposed of outside the Park.
Contractor vehicles and all equipment must be free of leaks and in safe operating condition.
Contractor is responsible for the complete cleanup of all vehicle/equipment spills or leaks within Point Reyes National Seashore. Contractor vehicles/equipment must be free of any non-native vegetative material.
Per the California Water Quality Control Board; the Contractor will maintain, throughout the contract period, a Septic Pumping and Disposal Log (as shown on last page of this document).
This form will be mailed, faxed, or emailed after each callout to:
Point Reyes National Seashore 1 Bear Valley Road Point Reyes Station, CA 94956 Attn: Nathaniel Radmacher 415-464-5166 fax Nathaniel_Radmacher@nps.gov
The Contractor will invoice submit their pumping and disposal log (see next page for log form) and draft invoice for Park Utility System Operator review on a monthly basis, prior to submitting their payment request online via the U.S. Department of Treasury’s Invoice Processing Platform (IPP) located at www.ipp.gov.
POINT REYES NATIONAL SEASHORE
SEPTAGE PUMPING AND DISPOSAL LOG
(2020/2021)
DRIVERS DATE SOURCE VOLUME SLUDGE PUMPERS DISPOSAL
INITIAL GAL. % NAME SITE
COMPLETE AND MAIL REPORT AFTER EACH CALLOUT.
Mail Report To:
Point Reyes National Seashore 1 Bear Valley Road Point Reyes Station, CA 94956 Attn: Nathaniel Radmacher Nathaniel_Radmacher@nps.gov 415-464-5166 Fax
File details come from the government source that posted it. Updated .