Att 06_Anticipated Pumping Totals_0001.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Septic and Vault Pumping, NPS-PORE Federal contract opportunity
Solicitation number
140P8420Q0148
Issued by
Department of the Interior National Park Service Pacific West Region

View the file

Other files for this federal contract opportunity

Other files attached to Septic and Vault Pumping, NPS-PORE, newest first.
File Type Posted
Att 01_Quote Sheet_revised_0001.pdf PDF
Sol_140P8420Q0148_Amd_0001.pdf PDF
Att 07_SCA Wage Rates.pdf PDF
Att 04_Map-Septic.pdf PDF
Sol_140P8420Q0148.pdf PDF
Att 03_Location and Volume Information.xlsx XLSX spreadsheet
Att 01_Quote Sheet.pdf PDF
Att 02_SOW.pdf PDF
Att 05_Map-Vault.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Anticipated Locations & Volume

Location CodeVolume (Gal)Vault ToiletsHow many timesLocation CodeVolume (Gal)Septic TanksHow many timesLocation CodeVolume (Gal)Septic TanksHow many times
PINKVault ToiletsGREENSeptic Tank LocationsGREENSeptic Tank Locations
A1200Lighthouse Parking Lot51Lighthouse Area9Bear Valley Area
B1200Chimney Rock Parking Lot21A3500Lighthouse Flush Toilets19A1500Admin Bldg1
C600Schooner Bay21B1500Lighthouse Apartments19B1500Ranger Bldg1
D1200Estero12Chimney Rock Area9C1500B&U Bldg
E1200Abbotts Lagoon22A1500Chiefs House9D3000Resource / NOAA Quad1
F1200Kehoe22B1000Boathouse29E1500Fire Cache1
G1200McClures23Beaches Area9F1500R&T1
H1200Tomales23A1500South Beach19G1500Red Barn1
I1200Marshall13B2000Drakes Beach (Lift Stn)9H6000Bear Valley VC2
J3600Limantour Group (3 Dbl Vaults)33C1500North Beach29I3000Trailhead2
K600Limantour Single33D1500Res 53619J1500Res 71/ PRNSA1
L1200Coast Camp23E1500NDOC10Olema Valley
M1200Sky Camp24Sac Landing Area10A1500Res 529
N1200Divide Meadow24A1500Sacramento Landing210B1500Res 168
O1200Kule Loklo14B1500Sac Landing / Spenger110C1500Res 157
P1200Five Brooks25Pierce Point Area10D1500Res 519
Q1200Glen Camp25A1500Res 170110E1500Res 5491
R1200Wildcat Camp25B1500Pierce Point10F1500Res 178
S1200Palomarin (Old)56Olema Marsh Area10G1500PRBO
T2000Palomarin (New)56A1500Rohman House / Res 55110H1500PCLC
6B1500Olema Marsh / Res 53010I1500Res 550 (A&B)1
Anticipated sites / loads pumped487Laguna Area10J1500Res 531
7A1500Res 162110K1500Res 201
7B1500Res 169111Mt Vison Area
7C2000Ed Center111A1500Res 1641
7D1500Clem Miller Grease Trap111B1500Res 161
8Limantour Area11C1500Res 535
8A1500Res 165
Estimated Total Gallons to be Pumped8B1500Res 128
60,000est volume from Vaults8C1500Res 160Anticipated sites to be pumped14
60,000est volume from septicsAnticipated sites to be pumped16Area
120,000GallonsArea930000
15000103000
22000111500
48 loads - Vault toilets3600034500Volume
30 Septic tanks44500
78 Total Sites (Est)51500
60
76500
80
25500Volume

Solicitation 140P8420Q0148, Attachment 06 - Septic/Vault Pumping Service, Point Reyes National Seashore - Anticipated Annual Pumping Totals by Location

File details come from the government source that posted it. Updated .