CONTRACT BID SCHEDULE

RFQ NO. 140P8422Q00318419Q0022

PROJECT AREA: Channel Islands National Park, Ventura County, CA PROJECT TITLE: Commissioning to Bring On‐Line Solar PV System with Generator Backup on Santa Rosa Island at the Main Ranch – Electrical System Building

NOTICE: Quoters are required to submit, at a minimum, a quotation that conforms to the solicitation documents with pricing for all base line items. Failure to do so may render your quotation unacceptable. On lump‐sum (LS) line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs on a related item.

In case of error in summation, the total of the corrected amounts govern. Round totals and extend prices to whole dollars.

CONTRACT CONTRACT

LINE ITEM LINE ITEM TITLE

NUMBER

(CLIN)

QUANTITY AND

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

BASE LINE ITEMS

1. Mobilization/Demobilization 1 LS @$ =$

2.

Deficiency Correction: Solar Panels

1 LS

3. Deficiency Correction: Inverter Panel #3

1 LS @$ =$

4. Program & Activate Automatic Generator Start Function

1 LS @$ =$

5. Test Batteries & Bring Batteries On-Line

1 LS @$ =$

6. Deactivate DC Feeders from Wind Turbines

1 LS @$ =$

7. Test Generators Under Load Condition

1 LS @$ =$

8. Prepare Maintenance & Service Life Plans

1 LS @$ =$

9. Prepare Training Manual & Provide Training

1 LS @$ =$

10. Prepare Final Commissioning Report

1 LS @$ =$

TOTAL BASE PRICE – (Items 1 to 10) =$____________