Att 01_140P8420Q0042_Contract Bid Schedule.pdf

PDF 99 KB Posted

Attached to
ATT Dunes Fencing Phase II, NPS-PORE
Solicitation number
140P8420Q0042
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT NO. 01

RFQ NO. 140P8420Q0042

CONTRACT BID SCHEDULE

RFQ NO. 140P8420Q0042P8419Q0022

PROJECT AREA: Point Reyes National Seashore, Marin County, CA PROJECT TITLE: ATT Dunes Fencing Phase II

NOTICE: Quoters are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items.

Failure to do so may render your quotation unacceptable. On lump‐sum (LS) line items, provide the total price only. For all unit‐price (UP) line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs on a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extend prices to whole dollars.

CONTRACT

LINE ITEM

NUMBER

(CLIN)

CONTRACT LINE ITEM TITLE

QTY

UNIT OF

MEAS.

UNIT

PRICE

TOTAL PRICE

Installation of new barbed and smooth/barbless double-stranded wire fencing with galvanized t-posts and galvanized post H-braces along southern perimeter of dune swale wetland in coastal dunes at AT&T (includes approximately 468 linear feet of brushcutting)

1,749 LF $ $

Repair of former fenceline through removing (and disposing of) any old barbed wire present re-stringing 4 (four) double-stranded barbed and smooth/barbless wire onto existing wooden posts

241 LF $ $

ATTACHMENT NO. 01

RFQ NO. 140P8420Q0042

Installation of two (2) barbed-wire gates along both new fenceline and repaired fenceline areas

1 LS $ $

Installation of one (1) 4-foot tube metal gate in the existing fencing along the northern part of the swale

Mobilization of all equipment and materials pertaining to Items No. 1 and 2

1 LS $ $

Demobilization and close-out measures

TOTAL PRICE FOR BASE LINE ITEMS (CLINS 0001-0006)………..……………………………….…

File details come from the government source that posted it. Updated .