ATS Drawings.pdf

PDF 14 MB Posted

Attached to
J059--ATS Testing, Inspection, and Maintenance Federal contract opportunity
Solicitation number
36C25026Q0065
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

These are architectural and engineering drawings for the replacement of automatic transfer switches (ATS) in Building 330 at the Department of Veterans Affairs Medical Center in Dayton, Ohio, located at 4100 West Third Street. The project is fully sprinklered and was issued as final bid documents on June 20, 2014. The drawings include cover sheets, symbols, basement floor plans, fire pump and elevator machine room plans, overall floor plans for basement through ninth floor plus penthouse, elevations, and single-line electrical diagrams for normal operations, emergency operations, and chiller plant systems.

The scope involves removing existing automatic transfer switch mechanisms, controls, and indicator lights while maintaining existing switch tubs for use as splice cabinets, then extending feeders to new sources. A temporary 480V-800A automatic transfer switch and temporary 800A enclosed circuit breaker must be provided to permit splices in existing ATS tubs. The project requires field verification of dimensional information, coordination with existing building systems, and adherence to a detailed sequence of construction that minimizes building electrical system downtime. Testing of ATS units shall occur in groups of no more than four within four days of completion. The drawings specify 16 permanent ATS replacements (ATS-1 through ATS-16) plus specialized equipment including a new fire pump controller with integral ATS, elevator controls, and replacement of various distribution panels and unit substations throughout the facility's electrical distribution system.

View the file

Other files for this federal contract opportunity

Other files attached to J059--ATS Testing, Inspection, and Maintenance, newest first.
File Type Posted
36C25026Q0065 0002.docx DOCX document
36C25026Q0065 0001.docx DOCX document
36C25026Q0065.docx DOCX document
Solicitation Document 36C25026Q0065.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U P

S LO P E S LO P E

S L

O P

E S

L O

P E

R E

-T H

E R

M A

L

IZ

E R

E F

R

IG

C L E A N S T O R A G E

S T

O R

A G

E

B U LK F OOD R E F R I G.

PL

A

TI

N

G

S T OR A G E

C OR R I D O R

M A N U A L

BLG. M A I N T E N .

C A R T W A S H

M E C H A N I C A L E QU I P M E N T

H A C

ST AI R

C OR R .

M A I L R O OM

R E P R O D U C T I O N

P U B LI C A T I ON

SU P V .

C OR R I D O R

C E N T E R

C O M M

D I E T A R Y

F.

S

TF

. T

M. ST F. T.

OF FI C E

OF FI C E

OF FI C E

CH IE F

OF FI C E

A R E A W A Y # 1

T U N N E L

AIR

F R E S H

C OR R .

T.

RE FR IG.

H A C

P R OS T H E C T I C E S

N O U R I S H M E N T

S T OR A G E

C A R T

T R A N S P O R T

C A

R T

S T

O R

A G

E B B - 10 0a

B B -101

B B -1 01k

B B - 10 0c BB -1 b

B B -1 01g

B B - 10 0h

B B -1 00f

BB

-1

B B - 10 0e

B B - 10 0d

C B - 13

B B - 10 8

B B - 10 2 S -2

C B -1 4

B C - 10 9

B C - 10 8

B C -1 08 a

C B - 15

B B -100j

B C - 10 4

BC

-1

B C - 10 2

B B - 10 0o

B B - 10 0n

B B - 10 0 m

B B - 10 0k

B B -100i

B B -100l

C B - 7

B B -1 01a

BB

-1 g

T7 T7

OF FI C E

P U R C H A S I N G

E X A M

P L

A S

T E

R

FI NI S HI N G

P S A S

CH IE F

S T OR A G E

LA

M

IN

GOO D S S T O R .

M A T L. / S OF T

M A C H I N E

R O O M

U P

C G

C G

C G

C G

C G

C G

C G

C G C G

C G

C G C G

SS

C G

C G

C G

C G

C G

C G

C G

C G

C G

C GC G

C G

C G

C G

C G

C G

C G

C G C G

C GC G

C G

C G

C G

C G C G

C G

C G

C G

C G

C G

C G

C G

C G C G

C G

C G

C G C G

C G

U P

C A R T P A R K I N G

R O O M

M A C H I N E

D I S P A T C H A R E A

PR EP .

& T E S T I N G

W A S H

D E C O N T A M I N A T I ON

EQU I P . S T OR .

CH IE F

ASS IS T.

H. A. C

M. LKR . /T .

LO U N G E

F. LK R. /T .

S T A GI N G

S T OR A G E

S T E R I LE -N ON S T E R I LE

H. A. C

F.

L

KR

T.

T.

SI

G

N A

L

S T

O R

A G

E

F. T .

M . T

L O

U N

G E

C A R T W A S H

EQU IP .

M A N U A L

C OR R I D O R

C OR R I D O R

P R O C E S S I N G

E T O

A U T O

S L A B O N G R A D E A B O V E

CL

-3

P OR T I C O F O U N D A T I ON

(U N E X C A V A T E D )

S T OR A G E

E T O T A N K B A - 10 2n

B A - 10 2p

B A -1 02 o

B A -1 02f

B A - 10 2e

B A - 10 0b

B A - 10 0c

B A - 10 0

B D -1 02 a

B A - 10 0a

B D - 10 1b

B D -101

C B -2 3

B D - 10 1a

B A - 10 2

BA-102m

B A -102l

BA

-1 k

B A -102j

BA

-1 h

BD

-1

B D -111

BD

-1

C B - 4

B A - 10 2q

BD

-1

B A - 10 2d

D R E S S I N G B OO T H

SS

SI LV E R

C OL LE C T

B B - 10 7

B B - 10 2

BA

-1 a

B C -1 16B C - 11 3B C -111

B C - 10 7 B C - 11 0 B C - 11 4 B C - 12 2

B C -124jB C -124i

H A C B C -1 24 g

C OR R I D O R

C B -2 4

CH IE F

B A - 10 2a 45

SE CY .

B A - 10 2 45

M. LK R .

B A -102i 72

TR A I N I N G

B A - 10 2g 72

ELEC .

B D - 10 5

LI NE N

B D - 10 6

D R E S S I N G

B O OT H

C OR R .

C B -2 8

M . L

KR

BD

-1

F. LK R.

B D - 11 2 72

T R A S H

B D - 10 7 67

C OR R .

C B -2 7 72

LO U N G E

B D - 10 8 72

W /C

T

BD

-1

C OR R I D O R

C B -2 9

M E C H A N I C A L

E QU I P M E N T

B D - 11 4

ST AI R

S -4

C OR R I D O R

C B -2 6

C B

-2

M E C H A N I C A L

E QU I P M E N T

B D - 10 0

T W O LE V E L

F R E S H A I R

T U N N E L

F R E S H A I R

A R E A W A Y # 4

M A C H I N E

R O O M

B D -1 00 a

B C - 10 6

B C -1 05 b B C -1 05 a

B C - 10 5

B C - 12 4F

B C -101 B C -1 24 d

B C -1 24 a

B C - 12 4c B C -1 24 b

B C - 13 2

B C -1 32 h

BC

-1 a

B C -1 32 b

B C - 13 2c

B C -131 B C - 12 9 B C - 12 8

B C - 13 0

B C - 12 6

B C - 12 5

B C - 12 3c

B C -1 23 d

B C - 12 7

B C -1 23 a B C -1 23 b

B C -121

B C -1 19 119-A

B C - 11 2

B A - 10 5 B A - 10 6

U P

B A - 10 0d

B C - 12 4k

B C -1 24 L

BB -101l

B B -101j

B B -1 01h

BB -101i

B B -101f

B B -1 01e

B B -1 01d

B B -1 01c

B B -1 01b

EXIT

B B - 10 0e

OF FI C E

P U R C H A S I N G

OF FI C E

OF FI C E

B A - 10 4

B A - 10 3

B C -101

T.

B A - 10 2 72

B A - 10 2g

A&MM

OF FI C E

OF FI C E

OF FI C E OF FI C E

OF FI C E

OF FI C EOF FI C E

C H I LLE R

OF FI C E

OF FI C E

OF FI C E TR A I N I N G

OF FI C E

OF FI C E

D R U G V A U L T

OF FI C E

OF FI C E

OF FI C E

OF FI C E

R O O M

C O P Y

OF FI C E

S W I T C H GE A R

LA U N D R Y

OF FI C E

F OLD I N G

OF FI C E

OF FI C E

S P

A C

E O

T H

E R

A I D

OF FI C E

S H O P

OF FI C E

B I OM E D I C A L

OT H E R S P A C E

R O O M

GE N E R A L

S T OR A G E

M E C H A N I C A L

EN G.

R O O M

EN G.

GE N E R A L

S T OR A G E

C OR R I D O R

R O O M

C OR R I D O R ST AI R W A Y

B I OM E D I C A L

S H O P

C LOS E T

R O O MSE W I N G

R O O M

LI NE N DI S TR I B UT I ON

W A S T E

B I O -H A Z A R DC OM M .

E LE C T R I C A L

C LOS E T

H O U S E

M E C H A N I C A L

E QU I P M E N T

M E C H A N I C A L

E QU I P M E N T

C O

R R

ID

O

R C

O R

R

ID

O R

W A Y

PIT

C O F E R E N C E

C O

R R

ID

O

R C

O R

R

ID

O R

C O

R R

ID

O

R

C OR R I D O R

IN P A TI E N T

PHARMACY

IN P A TI E N T

PHARMACY

IN P A TI E N T

PHARMACY

B C - 11 8

B C - 11 8a

RE C E I V I N G

B C - 11 5

B C - 12 3

E LE C T R ON I C S

H A N D L E R S

ST A F F

ST A F F

R O O M

B D - 10 0

B D - 10 0

C H U T E

ST A F F

B U

L K

B C - 12 4E

B C - 12 4

B C - 12 4

OF FI C E

DI ET ET IC S

C LOT H I N G

R O O M

E X A M E X A M

OF FI C E

R E C E P T I ON

A R E A

WA I T I N G

A R E A

R O O M

H A Z A R D

W A S T E

B C - 12 0

B C -1 24 h

C OR R I D O R

M E C H A N I C A L

S C A LE

A R E A

I V P R E P R O OM

C O

R R

ID

O

R

U P

D N

SLOPE 1"

SLOPE 1"

S W I T C H G E A R G E N E R A T O R S E M E R G E N C Y

AREAWAY

C O R R .

C O R R I D O R

E L E C T R I C A L R M

D I S T R I B U T I O N E L E C T R I C A L

T R A N S F O R M E R R M

F I R E A L A R M R M

C O R R .

AREAWAY #8

B B -1 0 5 B B - 10 5 a

C B - 11

B B - 10 4 a

B B -1 0 4 B B - 10 4 b

B B -1 0 3

C B - 9

C B -1 0

C B - 8

U P

C H I L L E R P L A N T

P U M P R O O M T R A N S F O R M E R S

S W I T C H G E A R

L O U N G E

WORKROOM

O F F I C E H . A . C .

T O I L E T

B U I LD I N G

F U E L T A N K

W/C

B B -1 0 6

B B - 10 6 k B B - 10 6j

B B -106i

B B - 10 6 c B B - 10 6 h

B B - 10 6 d

B B - 10 6 a B B - 10 6 g

B B -1 06 f

B B - 10 6 L

T - 7T - 7

FE

B B -1 0 6

K I T C H E N

G A T E

FD

A R E A A R E A A R E A

S T O R A G ES T O R A G ES T O R A G E

FDFDFD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FE

FE

29'-9"

16'-5

4100 WEST THIRD STREET

U.S. ROUTE 35

U.S . R

O

UTE 3

SE

R

VIC

E R

D

N HAMPSHIRE

DELAWARE

DELAWARE

N J

E R

S E

Y

CIRCLE

R H

O D

E

IS

L A

N D

A V

E

MISSOURI AVE

M

IN

N E

S O

T A

A V

E

MASSACHUSETTS BLVD.

M A

R Y

L A

N D

A V

E

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER

M

IN

N E

S O

T A

A V

E

TEXAS AVE.

Dayton, Ohio 45428

WISCONSIN

IOWA

CEMETERY

K A

N S

A S

CEMETERY

A V

E

McMAHON

CEMETERY

AVE.

KENTUCKY

C O

L O

R A

D O

A V

E

BROWN

IN

D

IA

N

A A

V E

A

VE

MONUMENT

McMAHON

AVE.

AVE.

IL

L

IN

O I S

A V

E

AVE.

NEW

O H

IO

YORK

KENTUCKY

S O

U T

H

AVE.

P E

N N

S Y

L V

A N

IA

AVE.

A V

E

O H

IO

WEST VIRGINIA

AVE.

A

VE

AVE.

A V E

G E

T T

Y S

B U

R G

A V

E

WEST THIRD ST.

CEMETERY

MICHIGAN AVE

C O

N N

E C

T

IC

U T

A V

E

M A

IN

E

A V

E

DAKOTA AVE.

LAKE

LAKE-

V E

R M

O N

T A

V E

O R

E G

O N

A V

E

E

A

B

C

D

118 400

CITY OF DAYTON

FIRE HOUSE NO. 17

131 26

34139

RETENTION

POND

NEW

M

EXIC

O P

LACE

A V

E

AVE.

A V

E

B R O

W N

AVE.

S E R V I C E

R D

R D

E

I C E

R V

S

MICHIGAN AVE

E

D R

R

C I V

S E

KENTUCKYAVE.

AVE.

WISCONSIN AVE.

TEN

N

ESSEE

P E

N N

S Y

L V

A N

IA

HAWAII

PLACE

Liscum Dr.

Secondary

Supply

AVE.

BUILDING 330

AREA OF WORK

BASEMENT PLAN

AREA OF WORK

BASEMENT PLAN

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

Project No.

Department of Veterans Affairs Medical Center

FULLY SPRINKLERED

FIRM LICENSE No.: 01528

Replace Automatic Transfer Switches B330

04/04/2014

COVER SHEET

330G001

PJMMSG

2013-04012

552-15-205

Dayton, Ohio

Replace Automatic Transfer Switches B330

4100 West Thrid Street Dayton, Ohio 45428

Scale: 1" = 50'-0"

KEY PLAN

Scale: 1" = 400'-0"

CAMPUS PLAN

N N

INDEX OF DRAWINGS

SHEET DESCRIPTION

330G001 COVER SHEET

330E001 SYMBOLS

330EP101 BASEMENT FLOOR - REMOVALS AND NEW WORK

330EP102 FIRE PUMP & ELEVATOR MACHINE ROOMS - REMOVALS AND NEW WORK

330EP103 FLOOR PLANS - OVERALL

330EP104 FLOOR PLANS - OVERALL

330EP105 FLOOR PLANS - OVERALL

330EP106 FLOOR PLANS - OVERALL

330EP201 ELEVATIONS

330E601 SINGLE LINE DIAGRAM - NORMAL

330E602 SINGLE LINE DIAGRAM - EMERGENCY

330E603 SINGLE LINE DIAGRAM - CHILLER PLANT

Revisions Date

FINAL BID DOCUMENTS FOR CONSTRUCTION 06/20/14

EN

M

A

M

V

G

GFP

K

VFD

E N

SWBD

METERING

NOTE: ALL SYMBOLS AND ABBREVIATIONS ARE SUBJECT

TO MODIFICATIONS ON OTHER DRAWINGS.

ALL SYMBOLS OR ABBREVIATIONS MIGHT NOT

NECESSARILY BE USED ON THIS PROJECT.

ABBREVIATIONS

AAP - AREA ALARM PANEL - MEDICAL GAS

CC - ACCESS

ADJ - ADJUSTABLE

AF - ARC FAULT CIRCUIT INTERUPTER

AFCI - ARC FAULT CIRCUIT INTERUPTER

AFF - ABOVE FINISHED FLOOR TO BOTTOM OF ITEM

AFG - ABOVE FINISHED GRADE TO BOTTOM OF ITEM

ALT - ALTERNATE

AP - ACCESS PANEL

APPROX - APPROXIMATE

ARCH - ARCHITECT OR ARCHITECTURAL

ASSY - ASSEMBLY

ATS - AUTOMATIC TRANSFER SWITCH

BLDG - BUILDING

BOE - BOTTOM OF EQUIPMENT

BOT - BOTTOM

BTWN - BETWEEN

CFCI- CONTRACTOR FURNISHED CONTRACTOR INSTALLED

CKT - CIRCUIT

CLG - CEILING

CMU - CONCRETE MASONRY UNIT

CONN - CONNECT OR CONNECTION

CONTR - CONTRACTOR

CORR - CORRIDOR

COR - CONTRACTING OFFICER'S REPRESENTATIVE

CTR - CENTER

D - DEPTH

DET - DETAIL

DIA - DIAMETER

DIM - DIMENSION

DIV - DIVISION

DN - DOWN

DWG - DRAWING

EA - EACH

EC - ELECTRICAL CONTRACTOR (DIVISION 26)

EJ - EXPANSION JOINT

ELEC - ELECTRICAL

ELEV - ELEVATION OR ELEVATOR

EM - EMERGENCY

EQ - EQUAL

EQS - EQUIPMENT SUPPLIER

EQUIP - EQUIPMENT

ETR - EXISTING TO REMAIN

EX - EXISTING

EXP - EXPANSION

EXT - EXTERIOR

FCE - FIRE CONTROL EQUIPMENT

FF - FINISHED FLOOR ELEVATION

FLR - FLOOR

FSC - FIRE SUPPRESSION CONTRACTOR (DIVISION 21)

FT - FEET

FTG - FOOTING

GC - GENERAL CONTRACTOR

GF - GROUND FAULT CIRCUIT INTERRUPTER

GFCI - GROUND FAULT CIRCUIT INTERRUPTER OR GOVERNMENT

FURNISHED CONTRACTOR INSTALLED

GFFT - GROUND FAULT FEED THRU

HC - HVAC CONTRACTOR (DIVISION 23)

HP - HORSE POWER OR HIGH POINT

HVAC - HEATING, VENTILATING, AND AIR CONDITIONING

ID - INSIDE DIAMETER

IN - INCHES

KEC - KITCHEN EQUIPMENT CONTRACTOR

L - LENGTH

LBS - POUNDS

MAP - MASTER ALARM PANEL (MEDICAL GAS)

MAX - MAXIMUM

MEZZ - MEZZANINE

MFR - MANUFACTURER

MH - MANHOLE OR MOUNTING HEIGHT TO CENTER LINE OF ITEM

MIN - MINIMUM OR MINUTE

MISC - MISCELLANEOUS

MTD - MOUNTED

MTG - MOUNTING

NIC - NOT IN CONTRACT

NOM - NOMINAL

NTS - NOT TO SCALE

OD - OUTSIDE DIAMETER

OFCI - OWNER FURNISHED CONTRACTOR INSTALLED

OFOI - OWNER FURNISHED OWNER INSTALLED

PC - PLUMBING CONTRACTOR (DIVISION 22)

PLBG - PLUMBING

RAD - RADIUS

REC - RECESSED

REQD - REQUIRED

RI - ROUGH-IN

S - SURFACE MOUNTED

SC - SECURITY CONTRACTOR

SCH - SCHEDULE

SHT - SHEET

SMS - SECURITY MANAGEMENT SYSTEM

SPEC - SPECIFICATIONS

SQ - SQUARE

SS - STAINLESS STEEL

STD - STANDARD

STRUC - STRUCTURAL OR STRUCTURE

SUC - SITE UTILITY CONTRACTOR

TC - TECHNOLOGY CONTRACTOR

TEMP - TEMPERATURE

TOE - TOP OF EQUIPMENT

TYP - TYPICAL

UNO - UNLESS NOTED OTHERWISE

VFD - VARIABLE FREQUENCY DRIVE

VOL - VOLUME

W/ - WITH

W/0 - WITHOUT

WP - WEATHERPROOF

ZVC - ZONE VALVE CABINET

FIRE ALARM SYMBOLS

E2

B

E2

DETAIL: B = DETAIL DESIGNATION

E2 = SHEET WHERE DETAIL IS LOCATED

SECTION: 1 = SECTION DESIGNATION

E2 = SHEET WHERE DETAIL IS LOCATED

PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN.

DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.

GENERAL FLOOR PLAN NOTES

WIRE & CONDUIT IN WALL OR ABOVE CEILING.

WIRE & CONDUIT IN OR BELOW SLAB OR GRADE.

EACH ARROWHEAD REPRESENTS ONE COMPLETE CIRCUIT; "X" DENOTES PANEL NAME; NUMBER(S) DENOTES

CIRCUIT(S).

CABLE TRAY, 12" x 4" DEEP UNLESS NOTED OTHERWISE.

FIRE ALARM BELL & SIGNAL LIGHT (80" AFF), (# WHEN SHOWN INDICATES CANDELA RATING OF STROBE. WHEN A # IS NOT

SHOWN, THE STROBE SHALL BE RATED 75 CANDELA.

ELECTRICAL SYMBOLS

EXISTING OUTLET OR DEVICE TO REMAIN. MAINTAIN EXISTING CIRCUITING.

DASH SYMBOL INDICATES PARTICULAR OUTLET OR DEVICE TO BE REMOVED AND CIRCUITRY MADE CONTINUOUS

WHERE REQUIRED.

ELECTRICAL CONNECTION.

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R (18" MH UNLESS NOTED OTHERWISE).

20A-125V SINGLE RECEPTACLE, NEMA 5-20R (18" MH UNLESS NOTED OTHERWISE).

SPECIAL PURPOSE RECEPTACLE. REFER TO NOTE ON PLAN.

20A-125V DOUBLE DUPLEX RECEPTACLE. NEMA 5-20R, (18" MH UNLESS NOTED OTHERWISE) TWO GANG ASSEMBLY.

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R WITH BOTTOM OUTLET CONTROLLED BY WALL SWITCH. (18" MH UNLESS

NOTED OTHERWISE).

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R, WITH GROUND FAULT CIRCUIT INTERRUPTER (18" MH UNLESS NOTED

OTHERWISE).

20A-125V WEATHERPROOF DUPLEX RECEPTACLE, NEMA 5-20R (HORIZONTAL 18" MH UNLESS NOTED OTHERWISE) WITH

COVER, VERTICAL MOUNT.

20A-125V WEATHERPROOF DUPLEX RECEPTACLE, NEMA 5-20R WITH GROUND FAULT CIRCUIT INTERRUPTER (18" MH

UNLESS NOTED OTHERWISE), WITH STANDARD COVER, VERTICAL MOUNT.

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R, ON EMERGENCY POWER (18" MH UNLESS NOTED OTHERWISE).

20A-125V POWERLOCK GROUNDING TYPE RECEPTACLE, HOSPITAL USE (66" MH UNLESS NOTED OTHERWISE).

20A-125V DUPLEX PEDESTAL TYPE FLOOR RECEPTACLE, NEMA 5-20R, FLOOR BOX WITH COVERPLATE HOUSING.

PROVIDE CARPET FLANGE WHERE REQUIRED.

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R, FLUSH FLOOR BOX WITH ROUND COVERPLATE. PROVIDE CARPET FLANGE

WHERE REQUIRED.

20-125V DUPLEX RECEPTACLE, NEMA 5-20R, WITH ISOLATED GROUND (18" MH UNLESS NOTED OTHERWISE).

JUNCTION BOX.

CLOCK HANGER OUTLET, SINGLE NEMA 5-15R RECESSED IN COVER PLATE (84" MH UNLESS NOTED OTHERWISE).

SINGLE POLE SWITCH (46" MH UNLESS NOTED OTHERWISE).

TWO POLE WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).

THREE-WAY WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).

FOUR-WAY WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).

SWITCH WITH NEON PILOT LIGHT. ONE-GANG ASSEMBLY (46" MH UNLESS NOTED OTHERWISE).

KEY OPERATED WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).

LIGHTING DIMMER SWITCH (46" MH UNLESS NOTED OTHERWISE) 1000 WATTS UNLESS OTHERWISE INDICATED.

FLUSH FRACTIONAL HORSEPOWER MOTOR STARTER WITH NEON PILOT LIGHT. ONE-GANG ASSEMBLY (46" MH UNLESS

NOTED OTHERWISE).

DISCONNECT SWITCH.

MOTOR STARTER.

COMBINATION MOTOR STARTER AND DISCONNECT SWITCH.

ELECTRIC MOTOR.

ELECTRICAL PANEL OR SWITCHBOARD PER DRAWINGS.

PULL BOX.

LINE VOLTAGE THERMOSTAT.

UNIT HEATER.

FAN COIL.

ELECTRIC BASEBOARD HEATER.

AIR CONDITIONER.

CONDENSING UNIT.

UNIT VENTILATOR.

PHOTOELECTRIC SENSOR.

LIGHTING CONTACTOR.

CEILING MOUNTED OCCUPANCY SENSOR.

CEILING MOUNTED DAYLIGHT SENSOR.

FIRE ALARM SPEAKER & SIGNAL LIGHT (80" AFF), (# WHEN SHOWN INDICATES CANDELA RATING OF STROBE. WHEN A # IS

NOT SHOWN, THE STROBE SHALL BE RATED 75 CANDELA.

FIRE ALARM CHIME & SIGNAL LIGHT (80" AFF), (# WHEN SHOWN INDICATES CANDELA RATING OF STROBE. WHEN A # IS NOT

SHOWN, THE STROBE SHALL BE RATED 75 CANDELA.

FIRE ALARM HORN & SIGNAL LIGHT (80" AFF), (# WHEN SHOWN INDICATES CANDELA RATING OF STROBE. WHEN A # IS NOT

SHOWN, THE STROBE SHALL BE RATED 75 CANDELA.

FIRE ALARM SIGNALING LIGHT (80" AFF), (# WHEN SHOWN INDICATES CANDELA RATING OF STROBE. WHEN A # IS NOT

SHOWN, THE STROBE SHALL BE RATED 75 CANDELA.

FIRE ALARM MANUAL STATION (46" MH UNLESS NOTED OTHERWISE). SUBSCRIPT "K" INDICATES KEY OPERATED.

CEILING MOUNTED SMOKE DETECTOR.

CEILING MOUNTED HEAT DETECTOR.

DUCT MOUNTED SMOKE DETECTOR. SUBSCRIPT "S" INDICATES SUPPLY. SUBSCRIPT "R" INDICATES RETURN.

DUCT MOUNTED HEAT DETECTOR. SUBSCRIPT "S" INDICATES SUPPLY. SUBSCRIPT "R" INDICATES RETURN.

ELECTRIC RELEASE DOOR CLOSER.

ELECTRO-MAGNETIC DOOR HOLDER.

WATER FLOW SWITCH.

VALVE SUPERVISORY SWITCH.

DUCT MOUNTED DETECTOR REMOTE TEST STATION AND ALARM INDICATOR LIGHT. SUBSCRIPT "W" INDICATES WALL

MOUNTED.

SMOKE DAMPER.

FIRE FIGHTER'S TELEPHONE (60" MH UNLESS NOTED OTHERWISE).

PUSHBUTTON (46" MH UNLESS NOTED OTHERWISE) (120 VOLT).

LUMINAIRE SYMBOLS

LIGHTING FIXTURE. CAPITAL LETTER DENOTES FIXTURE TYPE, LOWER CASE LETTER DENOTES SWITCHING

ARRANGEMENT.

LIGHTING FIXTURE ON NIGHT LIGHT OR EMERGENCY CIRCUIT.

EXIT LIGHTING FIXTURE, ARROWS AS INDICATED.

CONDUIT FOR DATA CIRCUITRY.DAT

WIRE & CONDUIT FOR FIRE ALARM CIRCUITRY.FA

WIRE & CONDUIT FOR NURSE CALL CIRCUITRY.NC

EXISTING WIRE & CONDUIT TO REMAIN.E

CONDUIT TO BE REMOVED.

WIRE & CONDUIT FOR NIGHT LIGHT CIRCUITRY.NL

CONDUIT FOR PHONE CIRCUITRY.PHO

WIRE & CONDUIT FOR SECURITY SYSTEM CIRCUITRY.SEC

WIRE RUN IN SURFACE WIREWAY.W

CABLE MANAGEMENT SYSTEM PATHWAY.CM

X - 1,2

WIRE & CONDUIT FOR EMERGENCY CIRCUITRY.EM

WIRE & CONDUIT FOR SOUND SYSTEM CIRCUITRY.S

WIRE & CONDUIT FOR INTERCOM SYSTEM CIRCUITRY.I

WIRE & CONDUIT FOR TELEVISION SYSTEM CIRCUITRY.TV

GF

WP

WP/GF

EM

T

IG

J

P

K

DM

UH

FC

AC

CU

UV

OS

DS

PC

T

F

F

F

F

S F

CEILING MOUNTED FIRE ALARM SPEAKER.

KF

S

H

C

D

FS

V

R W

SD

FT

PRESSURE SWITCH.

ADDRESSABLE MODULE. SUBSCRIPT "I" INDICATES INPUT. SUBSCRIPT "C" INDICATES CONTROL.

POST INDICATOR VALVE.

KNOX BOX.

PS

AM

C/I

PIV

K

A a

FIRE ALARM CONTROL PANEL.

20A-125V DUPLEX RECEPTACLE, NEMA 5-20R (46" MH UNLESS NOTED OTHERWISE).

C

M

LC

P/B

H

S S/R

S/R

INTERCOM SYSTEM DESK MOUNTED MASTER CONTROL STATION. SUBSCRIPT "W" INDICATES WALL MOUNT (46" MH

UNLESS NOTED OTHERWISE).

INTERCOM STAFF STATION (46" MH UNLESS NOTED OTHERWISE).

INTERCOM HORN TYPE SPEAKER (84" MH UNLESS NOTED OTHERWISE).

INTERCOM SPEAKER FLUSH MOUNT IN CEILING.

I

M

H

S

FACP

S HORN TYPE PAGING/INTERCOM SYSTEM SPEAKER (90" MH UNLESS NOTED OTHERWISE). 1-GANG BOX WITH 0.75"

CONDUIT TO ABOVE ACCESSIBLE CEILING.

IC

WALL MOUNTED AUDIO/VIDEO INTERCOM DOOR STATION (46" MH UNLESS NOTED OTHERWISE). 1-GANG BOX WITH 0.75"

CONDUIT TO ABOVE ACCESSIBLE CEILING, INTERCOM AND CABLING.

DM

DOOR POSITION SWITCH WITH WIRING. CONDUIT PATHWAYS FROM DOOR FRAME TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING. PROVIDE ONE CONTACT FOR EACH LEAF IN MULTI-DOOR OPENINGS. REFER TO SECURITY

ROUGH-IN DETAILS.

EL

ELECTRONIC DOOR LOCK AND INSTALLATION BY OTHERS. PROVIDE LOW VOLTAGE WIRING, CONDUIT PATHWAYS FROM DOOR FRAME TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING. REFER TO SECURITY ROUGH-IN DETAILS.

EM

ELECTRONIC MAG LOCK AND INSTALLATION BY OTHERS. PROVIDE LOW VOLTAGE WIRING, CONDUIT PATHWAYS FROM DOOR FRAME TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING. REFER TO SECURITY ROUGH-IN DETAILS.

ES

ELECTRONIC STRIKE AND INSTALLATION BY OTHERS. PROVIDE LOW VOLTAGE WIRING, CONDUIT PATHWAYS FROM DOOR FRAME TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING. REFER TO SECURITY ROUGH-IN DETAILS.

RX

REQUEST TO EXIT SWITCH IN DOOR HARDWARE BY OTHERS. PROVIDE LOW VOLTAGE WIRING, CONDUIT PATHWAYS FROM DOOR FRAME TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING. REFER TO SECURITY ROUGH-IN

DETAILS.

CR

WALL MOUNTED PROXIMITY CARD READER (46" MH UNLESS NOTED OTHERWISE). 1-GANG BOX WITH CONDUIT TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING, CARD READER AND CABLING. REFER TO SECURITY

ROUGH-IN DETAILS.

MD

WALL MOUNTED MOTION DETECTOR (90" MH UNLESS NOTED OTHERWISE). 1-GANG BOX WITH 0.75" CONDUIT TO ABOVE

ACCESSIBLE CEILING, MOTION DETECTOR, WALL MOUNT HARDWARE, AND CABLING.

PP W

WALL MOUNTED PANIC/DURESS BUTTON (46" MH UNLESS NOTED OTHERWISE). 1-GANG BOX WITH 0.75" CONDUIT TO

ABOVE ACCESSIBLE CEILING, BUTTON AND CABLING.

MD

DUCT HEATER.H

DH

H

EB

CEILING MOUNTED MOTION DETECTOR. 1-GANG BOX MOUNTED IN CEILING, DETECTOR AND CABLING.

JB

SECURITY SYSTEM JUNCTION BOX TO BE LOCATED ABOVE ACCESSIBLE CEILING (MIN 6"X6"X4"). ROUTE LOCAL DOOR SECURITY WIRING CONDUITS/RACEWAYS TO JUNCTION BOX. EXTEND 1" CONDUIT WITH DOOR SECURITY WIRING TO LOCAL 2-DOOR CONTROL PANEL/REMOTE DOOR CONTROL PANEL AS INDICATED ON DRAWINGS. REFER TO SECURITY

ROUGH-IN DETAILS.

LOW-VOLTAGE MOMENTARY WALL SWITCH (46" MH UNLESS NOTED OTHERWISE).

L

TECHNOLOGY SYMBOLS

P WALL MOUNTED PHONE OUTLET (46" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT TO ABOVE ACCESSIBLE

CEILING, JACKS, FACEPLATE AND CABLE.

X R

WALL MOUNTED AV OUTLET (84" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT, JACKS, FACEPLATE AND

CABLING. SUBSCRIPT "X" INDICATES ALTERNATE CONFIGURATION.

TECHNOLOGY FLOOR BOX, PROVIDE APPROPRIATE CONNECTOR PLATE AND HINGED COVER. "#" INDICATES OUTLET

TYPE. SUBSCRIPT "X" INDICATES ALTERNATE CONFIGURATION.

X

CONDUIT SLEEVE / FIRE RATED SLEEVE ASSEMBLY THRU WALL (1-2" SLEEVE UNLESS NOTED OTHERWISE).

D WALL MOUNTED VOICE/DATA OUTLET (18" MH UNLESS NOTED OTHERWISE). BOX WITH CONDUIT(S) TO ABOVE

CORRIDOR CEILING, JACKS, FACEPLATE AND CABLE. REFER TO FACEPLATE DETAILS.

AP

EXISTING CEILING MOUNTED WIRELESS ACCESS POINT AND OUTLET. REMOVE AP AND CABLING BACK TO EXISTING SIGNALS CLOSET. RE-INSTALL AP AND PROVIDE NEW 1-DATA DROP WITH 20' MANAGED SLACK COIL ABOVE CEILINGTO NEW SIGNALS CLOSET. FINAL LCOATIONS OF APS TO BE DETERMINED AFTER PERFORMANCE OF RF SITE SURVEY.

SC CEILING MOUNTED PAGING/INTERCOM SYSTEM SPEAKER.

4-20A-125V RECEPTACLE, NEMA 5-20R, WITH 4 KEYSTONE OPENINGS FOR DATA CABLING IN A 4" CORE HOLE FIRE RATED POKE THRU. POKE-THRU SHALL BE PROVIDED WITH ONE 0.75" EMT CONDUIT FOR POWER AND ONE 1.5" EMT CONDUIT FOR COMMUNICATIONS. PROVIDE WITH APPROPRIATE SUB-PLATE CONTAINING (4) 20A, 125V RECEPTACLES AND (4) KEYSTONE OPENINGS. COORDINATE TOP COVER WITH ARCH TO MATCH FLOOR FINISH.

PT

A. ALL ELECTRICAL SPLICES FOR WIRE SIZES 6 AWG AND LARGER SHALL BE HYDRAULIC

CRIMP TYPE.

B. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.

C. SITE VISIT(S) SHALL BE AS OUTLINED IN PROJECT SPECIFICATIONS.

D. ANY ASBESTOS WORK PERFORMED AS PART OF THIS PROJECT SHALL BE COMPLETED

PRIOR TO STARTING ANY OTHER PROJECT SITE WORK.

E. THE NOTES AND SYMBOLS SET DOWN ON THESE DRAWINGS ARE FOR THE GUIDANCE OF

ALL TRADES INVOLVED IN THE PROJECT AND MUST BE FOLLOWED TO EXECUTE THE WORK

AS INTENDED.

F. THE CONTRACTORS SHALL REFER TO ALL SPECIFICATION SECTIONS, AND ELECTRICAL

DRAWINGS FOR DETAILS OF BUILDING CONSTRUCTION TO ENSURE SPACE AND

SATISFACTORY ARRANGEMENT FOR THEIR WORK. THE VARIOUS DRAWINGS COMPRISING

THE SET ARE INTERDEPENDENT AND MUST BE USED JOINTLY AT ALL TIMES. EACH

CONTRACTOR SHOULD REFER TO THE GENERAL REQUIREMENTS OF THE CONTRACT.

THESE NOTES AND SYMBOLS SET DOWN ON THE DRAWINGS ARE FOR THE GUIDANCE OF

ALL TRADES INVOLVED IN THE PROJECT AND MUST BE FOLLOWED TO EXECUTE THE WORK

AS INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE COR THRU THE CONTRACTING

OFFICER FOR CLARIFICATION BEFORE PROCEEDING.

G. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE

CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS ON

THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING

PERFORMANCE OF THE WORK. THIS WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO

NORMAL WORKING HOURS. SEE SPECIFICATIONS FOR MORE SPECIFIC DETAILS ON

RESPONSIBILITIES.

H. ALL WORK MUST BE COORDINATED WITH THE COR TO MAINTAIN OPERATION OF THE

EXISTING FACILITY.

I. FIELD VERIFY DIMENSIONAL INFORMATION PRIOR TO ORDERING EQUIPMENT. DO NOT

SCALE DRAWINGS.

J. DIMENSIONS ARE TYPICALLY INDICATED TO THE FINISHED FACE OF WALLS OR

PARTITIONS AND CENTER LINES OF COLUMNS UNLESS OTHERWISE INDICATED.

K. TITLES, CAPTIONS, HEADINGS, ETC. ARE INTENDED FOR GENERAL REFERENCE AND ARE

NOT INTENDED TO LIMIT THE WORK REQUIRED IN ANY WAY.

L. EACH CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF OTHERS. HE

SHALL KEEP HIMSELF INFORMED OF THE PROGRESS AND DETAIL DEVELOPMENT OF THE

WORK OF OTHERS AND SHALL BE RESPONSIBLE FOR COORDINATING AND EXPEDITING HIS

WORK WITH OTHERS SO THAT THE PROGRESS OF THE TOTAL WORK SHALL BE KEPT ON

SCHEDULE.

M. ALL WORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE WITH ALL GOVERNING

CODES AND STANDARDS.

N. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON AVAILABLE DRAWING

INFORMATION AND MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE. THE

CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL

CONDITIONS AFFECTING THE EXECUTION OF THE WORK. ANY DISCREPANCIES BETWEEN

EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS WHICH

MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF

THE CONTRACTING OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH

THE WORK.

O. EACH CONTRACTOR AND/OR TRADE FITTING OR PLACING HIS WORK INTO OR ON THE

WORK OF OTHERS DOES SO WITH THE UNDERSTANDING THAT THE INSTALLATION OF HIS

WORK CONSTITUTES HIS ACCEPTANCE OF THE SUITABILITY OF THE WORK IN PLACE. IF

THE WORK OF OTHERS IS NOT ACCEPTABLE, HE SHALL NOTIFY THE COR AND SUCH WORK

SHALL BE CORRECTED. ANY NEW WORK INSTALLED IN UNSUITABLE EXISTING WORK

SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE INSTALLING THE NEW

WORK. NO CLAIMS FOR ADDITIONAL COMPENSATION FOR CORRECTING WORK INSTALLED

IN UNSUITABLE EXISTING CONDITIONS WILL BE CONSIDERED.

P. ANY STRUCTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION, OR PLUMBING

INFORMATION INDICATED ON THE ARCHITECTURAL DRAWINGS IS FOR REFERENCE

PURPOSES ONLY UNLESS OTHERWISE INDICATED.

Q. ABATEMENT, REMOVAL OR ENCAPSULATION OF EXISTING MATERIALS CONTAINING

ASBESTOS IS NOT INCLUDED IN THE ELECTRICAL CONTRACT. IF REQUIRED, NECESSARY

WORK OF THIS NATURE WILL BE ARRANGED BY THE VAMC TO BE DONE OUTSIDE OF THIS

CONSTRUCTION PROJECT BY A COMPANY REGULARLY ENGAGED IN ASBESTOS

ABATEMENT.

R. IF, IN THE PERFORMANCE OF THE ELECTRICAL WORK, MATERIALS ARE OBSERVED WHICH

ARE SUSPECTED TO CONTAIN ASBESTOS, THE ELECTRICAL CONTRACTOR SHALL

IMMEDIATELY INFORM THE COR. WORK THAT WOULD EXPOSE WORKERS TO THE

INHALATION OF ASBESTOS PARTICLES SHALL BE TERMINATED. WORK MAY BE RESUMED

ONLY AFTER A DETERMINATION HAS BEEN MADE AND UNSAFE MATERIALS HAVE BEEN

REMOVED OR ENCAPSULATED AND THE AREA DECLARED SAFE.

S. PROPER PERSONNEL PROTECTION EQUIPMENT SHALL BE WORN PER OSHA AND VA

REQUIREMENTS WITH VAMC COR AND SAFETY OFFICER.

T. FIRESTOPPING ASSEMBLIES SHALL BE PROVIDED AT PENETRATIONS OF CONDUITS AND

OTHER ELECTRICAL ITEMS THRU FIRE RATED FLOORS, FIRE RATED WALLS AND

PARTITIONS AND FIRE RATED SHAFT WALLS AND PARTITIONS. ALL PENETRATIONS

THROUGH 0-HOUR RATED WALLS SHALL BE CAULKED SMOKE-TIGHT. REFER TO

SPECIFICATION SECTION 07 84 00.

U. REMOVE EXISTING ELECTRICAL SYSTEMS WHICH ARE MADE SUPERFLUOUS WHEN NEW

SYSTEMS ARE INSTALLED INCLUDING ALL ASSOCIATED WIRING AND DEVICES. PROVIDE

BLANK STAINLESS STEEL COVERPLATES PROPERLY SIZED FOR EXISTING BACKBOX AND

WALL OPENING FOR ALL RECESSED WALL MOUNTED DEVICES REMOVED. ALL ABANDON

RACEWAY, CONDUIT AND BOXES SHALL BE REMOVED.

V. REFER TO SPECIFICATION SECTION 01 00 00 GENERAL REQUIREMENTS FOR STATEMENT

OF BID ITEM(S) AND DEDUCTIVE ALTERNATES.

GENERAL NOTES

HD

HANDICAP DOOR OPERATOR MOTOR ASSEMBLY BY OTHERS. 120V POWER CONNECTION AND CONDUIT FROM DOOR FRAME TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING, LOW VOLTAGE WIRING AND INTERFACE WITH SMS

AND DOOR ACTUATOR BUTTONS.

HA

WALL/PEDESTAL MOUNT HANDICAP DOOR ACTUATOR BUTTON, FURNISHED BY OTHERS. BOX AS REQUIRED BY SYSTEM MANUFACTURER WITH INSTALLATION AND CONDUIT TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING. ALL

LOW VOLTAGE WIRING AND INTERFACE WITH SMS AND DOOR MOTOR.

HO

FA

WALL/FLOOR MOUNTED ELECTROMAGNETIC DOOR HOLD OPEN WITH POWER SUPPLY, 120V POWER AND CONNECTION, BOX AS REQUIRED BY MANUFACTURER AND CONDUIT TO COMMON SMS JUNCTION BOX ABOVE ACCESSIBLE CEILING.

LOW VOLTAGE WIRING FROM POWER SUPPLY TO HOLD OPEN AND INTERFACE WITH SMS, SUBSCRIPT "FA" INDICATES DEVICES POWERED FROM FIRE ALARM SYSTEM AND INTERFACE FROM SMS TO FIRE ALARM SYSTEM REQUIRED FOR

DOOR RELEASE.

CC

1 CCTV SYSTEM CEILING MOUNTED CAMERA. REFER TO CAMERA SCHEDULE FOR MOUNTING HEIGHT AND CAMERA

SPECIFICATIONS. SUBSCRIPT "X" INDICATES ENTRY IN CAMERA SCHEDULE.

IM DESK MOUNTED AUDIO/VIDEO INTERCOM MASTER STATION.

PB DESK MOUNTED PUSH BUTTON FOR LOCAL ELECTRONIC DOOR RELEASE.

X

PP DESK MOUNTED PANIC/DURESS BUTTON.

WALL MOUNTED DOORBELL.DB

E/R

D E/R EXISTING DATA DROP TO BE RE-CABLED WITH 2-DATA FROM NEW SIGNALS CLOSET. RE-USE EXISTING BOX AND

CONDUIT, PROVIDE NEW FACEPLATE.

ELECTRICAL SINGLE-LINE LEGEND

TRANSFORMER

VOLTAGE TERMINATION - PRIMARY

SURGE PROTECTIVE DEVICE

AUTOMATIC TRANSFER SWITCH

GENERATOR

EQUIPMENT CONTACTOR

ELECTRIC METER

EQUIPMENT GROUND

GROUND FAULT PROTECTOR

EQUIPMENT MULTIMETER

EQUIPMENT POTENTIAL TRANSFORMER

PANELBOARD BREAKER

CIRCUIT BREAKER - MEDIUM VOLTAGE DRAWOUT

FUSED CUTOUT

FUSED SWITCH - SECONDARY

SINGLE POLE SWITCH

FUSED SWITCH - PRIMARY

UNINTERRUPTIBLE POWER SYSTEM

DELTA SYMBOL

DISCONNECT

EQUIPMENT AMMETER

EQUIPMENT CAPACITOR

EQUIPMENT CURRENT TRANSFORMER

EQUIPMENT LIGHTNING ARRESTOR

TAP SWITCH WITH GROUND POSITION

EQUIPMENT VOLTMETER

EQUIPMENT WYE SIDE OF TRANSFORMER WITH GROUND

KEYED INTERLOCK

MOTOR

MOTOR STARTER

MOTOR STARTER AND DISCONNECT

PANELBOARD - MAIN LUG ONLY

PANELBOARD - DOUBLE SET OF LUGS

PANELBOARD - MAIN BREAKER

DRAWOUT CONNECTION

SHORT CIRCUIT FAULT LOCATION

VARIABLE FREQUENCY DRIVE

VOLTAGE TERMINATION - SECONDARY

AUTOMATIC TRANSFER SWITCH - BYPASS

BUS LINK

BUS DUCT

OR

BUSSING

SWITCHBOARD ENCLOSURE

INTEGRATED EQUIPMENT ENCLOSURE

EXISTING CONDUIT & WIRE TO REMAIN

CONDUIT & WIRE TO BE REMOVED

CONDUIT & WIRE

EQUIPMENT SWITCHBOARD METER

CIRCUIT BREAKER

A. SEQUENCE OF CONSTRUCTION INDICATED BELOW IS ONE POSSIBLE SOLUTION TO

MINIMIZE DOWNTIME OF THE BUILDING ELECTRICAL SYSTEM. CONTRACTOR IS REQUIRED

TO SUBMIT A DETAILED SEQUENCE OF CONSTRUCTION NARRATIVE TO THE

COR/ENGINEER AT THE BEGINNING OF THE PROJECT. DEVIATIONS FROM THE

FOLLOWING PROPOSED SEQUENCE OF CONSTRUCTION WILL BE REVIEWED, BUT WILL

NOT BE GROUNDS FOR ADDITIONAL COST TO THE GOVERNMENT.

B. ALL CUTOVER WORK REQUIRING BUILDING ELECTRICAL SYSTEM OUTAGES AND/OR

EMERGENCY SYSTEM DOWNTIME SHALL BE DONE OUTSIDE OF NORMAL WORKING

HOURS (NIGHTS / WEEKENDS) AND SHALL BE COORDINATED WITH COR WELL IN

ADVANCE. OUTAGES OF ALL TYPES SHALL BE AS MINIMAL AS POSSIBLE. OUTAGES

AFFECTING HVAC SYSTEMS SHALL BE PERFORMED DURING PERIODS OF MILD WEATHER.

C. THE PHASE DESCRIPTIONS INDICATE A GENERAL FLOW OF WORK AND ARE NOT

INTENDED TO CONVEY INSTRUCTIONS FOR EVERY ASPECT OF THE CONSTRUCTION

PROJECT.

D. TEST ATS'S IN GROUPS OF NO MORE THAN FOUR, IN NO LONGER THAN 4 DAYS AFTER

COMPLETION OF WORK.

SEQUENCE OF CONSTRUCTION

PHASING:

1. PREPARE COORDINATION DRAWINGS OF ALL FEEDERS 2" AND LARGER SHOWING

EXISTING FEEDERS IN MAIN ELECTRIC ROOM AND CONGESTED CORRIDOR WHERE

NEW FEEDERS WILL RUN. COORDINATE WITH NEW/EXISTING BUILDING, STRUCTURE,

DUCTWORK, PIPING, ETC.

2. CONTRACTOR SHALL SURVEY EACH ATS INTERIOR AND DECIDE WHERE NEW

CONDUITS WILL ENTER, WHERE SPLICES WILL BE MADE AND BEST METHOD FOR

MINIMIZING DOWNTIME OF OCCUPIED HOSPITAL BUILDING.

3. POUR NEW CONCRETE HOUSEKEEPING PADS AND SET NEW ATS’S. ROUGH IN ALL

CONDUITS THAT DO NOT REQUIRE POWER OUTAGES. SET TEMPORARY ATS AND

ADJUSTABLE TRIP CIRCUIT BREAKER, NORMAL AND EM FEEDERS TO TEMPORARY

SOURCES.

4. FOR ATS’S 1-16 (EXCEPT 6, 7 AND 8): ONE TRANSFER SWITCH AT A TIME (ORDER/DATE

TO BE APPROVED BY COR), ADJUST THE TEMPORARY LONG TIME SETTING TO THE

APPROPRIATE AMPERAGE IT WILL BE PROTECTING (BEFORE ENERGIZING). DE-

ENERGIZE NORMAL/EM FEEDERS TO ATS, DISCONNECT LOAD SIDE FEEDER IN ATS,

SPLICE AND EXTEND LOAD SIDE FEEDER TO TEMPORARY ATS (INSULATED

SPLICE/CABLING OUT THE FRONT OF THE ATS). ENERGIZE TEMPORARY ATS AND

VERIFY LOADS ARE RESTORED ON EACH FLOOR. MAXIMUM DURATION FOR THIS

OUTAGE SHALL BE 45 MINUTES. PROCEED TO REMOVE ATS INTERIOR, SPLICE AND

EXTEND NORMAL/EM FEEDERS AND CONTROL WIRING TO NEW ATS LOCATION AND

MAKE READY FOR FINAL CUTOVER TO PERMANENT ATS. THIS WORK SHALL BE

COMPLETED IN NO LONGER THAN 4 HOURS. DE-ENERGIZE TEMPORARY CIRCUIT

BREAKER SERVING LOAD SIDE FEEDER, INTERCEPT AND MAKE FINAL SPLICE TO

PERMANENT LOAD SIDE FEEDER TO NEW ATS. ENERGIZE NEW ATS AND VERIFY

LOADS ARE RESTORED ON EACH FLOOR. MAXIMUM DURATION FOR THIS OUTAGE

SHALL BE 30 MINUTES.

5. FOR ATS 6: NOTIFY DAYTON FIRE DEPARTMENT (WELL IN ADVANCE) THAT FIRE PUMP

WILL BE OUT OF SERVICE AND PROVIDE STAFF FOR FIRE WATCH DURING

REPLACEMENT WORK. DE-ENERGIZE NORMAL AND EM FIRE PUMP SOURCE,

DISCONNECT ALL PIPING, FEEDERS, CONTROL WIRING, ETC. AND REMOVE FIRE PUMP

CONTROLLER/ATS. INSTALL NEW CONTROLLER/ATS AND PERFORM ALL FUNCTIONAL

TESTING TO ENSURE WORKING PER MANUFACTURER’S PROCEDURES. MAXIMUM

DURATION FOR THIS OUTAGE SHALL BE 6 HOURS.

6. FOR ATS’S 7 AND 8: PROVIDE TEMPORARY WIRING TO SUPPLY THREE CARS TO OTHER

ELEVATOR PANEL (E.G. WHEN REPLACING ATS-7, TEMPORARY THREE CARS FROM

PANEL EL1 FROM EL2 AND VICE VERSA). UTILIZE THE SPARE BREAKERS/FUSIBLE

SWITCHES EXIST IN EACH PANEL TO ACCOMPLISH THIS. COORDINATE THIS WORK

CLOSELY WITH VA ELEVATOR ENGINEER. PROCEED WITH SAME PROCEDURE AS

OTHER ATS FOR REPLACEMENT. ELEVATORS SHALL BE ON TEMPORARY SOURCE FOR

NO LONGER THAN 4 HOURS.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

Project No.

FULLY SPRINKLERED

FIRM LICENSE No.: 01528

Replace Automatic Transfer Switches B330

04/04/2014

SYMBOLS

330E001

PJMMSG

2013-04012

552-15-205

Dayton, Ohio

D 1V,1D

EM

E M

E M

EM

W S

F

330EP2011

330EP201 2

330EP2013

PBATS14

PBATS13

PBATS12

PBATS11

PBATS10

PBATS15

ATS15

PBATS9

EDP1

PBATS3

PBATS4

EMD2 EMD1

EMD4 EMD3

ATS4

ATS3

ATS1

ATS16

PBATS1

PBATS2

PBATS5

PBATS16

ATS9

ATS10

ATS13

ATS12

ATS11 ATS2

ATS5

ATS14

USB

USA

MC2

MCB1

MCB2

CDALSD

0E

P10

0E

P10

330EP101

0E

P10

0E P10

4'-6" MIN.

E P

0 1

(TYP.)

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

Project No.

FULLY SPRINKLERED

FIRM LICENSE No.: 01528

Replace Automatic Transfer Switches B330

04/04/2014

BASEMENT FLOOR - REMOVALS

AND NEW WORK

330EP101

PJMMSG

2013-04012

552-15-205

Dayton, Ohio

N Scale: 3/8" = 1'-0"1

BASEMENT FLOOR - NEW WORK

N.T.S.Scale:2

SITE PHOTOGRAPH

N.T.S.Scale:3

SITE PHOTOGRAPH

N.T.S.Scale:4

SITE PHOTOGRAPH

N.T.S.Scale:5

SITE PHOTOGRAPH

N.T.S.Scale:6

SITE PHOTOGRAPH

PLAN NOTES

1. NEW 4"H. CONCRETE HOUSEKEEPING CURB.

2. REMOVE AUTOMATIC TRANSFER SWITCH MECHANISM, CONTROLS, INDICATOR LIGHTS,

ETC. AND MAINTAIN TUB FOR SPLICE CABINET. LABEL CABINET WITH "ATS-XX SPLICE",

NORMAL AND EMERGENCY SOURCES AND WIRE/GROUND SIZES PAINTED ON COVER.

3. TEMPORARY 480V-800A/4P ATS. REFER TO SINGLELINE DIAGRAM.

4. TEMPORARY 800A ENCLOSED CIRCUIT BREAKER. REFER TO SINGLELINE DIAGRAM.

5. RELOCATE PAGING SPEAKER.

6. PROVIDE UNISTRUT AS REQUIRED TO MOUNT BREAKER.

7. REMOVE ABANDON DRY-TYPE TRANSFORMER.

Revisions Date

FINAL BID DOCUMENTS FOR CONSTRUCTION 06/20/14

N.T.S.Scale:7

SITE PHOTOGRAPH

DN

OPEN TO BELOW

OPEN TO BELOW

T-7T-7

CHILLER PLANT

LOUNGEWORKROOM

OFFICE

H.A.C.

TOILET

W/C

BB-106

FD

FD

FD

FD

FD FE

TOILET

W/C

BB-106

BB-106cBB-106h

BB-106d

BB-106a BB-106g

BB-106f

VV

V V

AM

IAM

IAM

I

HD

ATS-8

ATS-8

ATS-7

ATS-7

EL1

LLP1

EL2

LLP2

9 7

PB

PB

330EP102

E P

PUMP RUN

PUMP REVERSE

POWER FAILURE

FIRE PUMP CONTROLLER

JP

50HP

0E

P

E

P

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

Project No.

FULLY SPRINKLERED

FIRM LICENSE No.: 01528

Replace Automatic Transfer Switches B330

04/04/2014

FIRE PUMP & ELEVATOR

MACHINE ROOMS - REMOVALS

AND NEW WORK

330EP102

PJMMSG

2013-04012

552-15-205

Dayton, Ohio

N Scale: 1/8" = 1'-0"2

ELEVATOR MACHINE ROOM - NEW WORK

PLAN NOTES

1. REMOVE METRON #M400-60-460 C PRIMARY RESISTANCE TYPE FIRE PUMP

CONTROLLER AND INTEGRAL ATS #ZTS10E5.

2. EXISTING FIRE PUMP MOTOR, 50HP, 480V-3PH.

3. EXISTING JOCKEY PUMP MOTOR, 3HP, 480V-3PH.

4. EXISTING JOCKEY PUMP CONTROLLER, ATL START.

5. EXISTING FIRE PUMP RUNNING, PUMP REVERSAL AND POWER FAILURE

FIRE ALARM MONITORING MODULES. RECONNECT TO NEW CONTROLLER.

6. NEW PRIMARY RESISTANCE START FIRE PUMP CONTROLLER WITH

INTEGRAL ATS. REFER TO DIV 21 SPECIFICATIONS. FIELD VERIFY

MEASUREMENTS PRIOR TO ORDERING.

7. RELOCATE METAL SHELVING UNIT TO NEW LOCATION PER COR.

8. RELOCATE FIRE SUPPRESSION PENDANT TYPE SPRINKLER SO NOT

DIRECTLY ABOVE NEW ATS.

9. NEW 4"H. CONCRETE HOUSEKEEPING CURB.

10. REMOVE AUTOMATIC TRANSFER SWITCH MECHANISM, CONTROLS,

INDICATOR LIGHTS, ETC. AND MAINTAIN TUB FOR SPLICE CABINET. LABEL

CABINET WITH "ATS-XX SPLICE", NORMAL AND EMERGENCY SOURCES AND

WIRE/GROUND SIZES PAINTED ON COVER.

N Scale: 1/4" = 1'-0"1

BASEMENT PLAN - NEW WORK

N.T.S.Scale:3

SITE PHOTOGRAPH

N.T.S.Scale:4

SITE PHOTOGRAPH

N.T.S.Scale:5

SITE PHOTOGRAPH

N.T.S.Scale:6

SITE PHOTOGRAPH

29'-9"

16'-5 1_

T-7T-7

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CGCG

CG CG

SS

CG

CG

CG

CG

CG

CG

CG

CG

CG

CGCG

CG

CG

CG

CG

CG

CG

CG

CG

CGCG

CG

CG

CG

CG CG

CG

CG

CG

CG

CG

CG

CG

CG CG

CG

CG

CG CG

CG

SS

SWITCHGEAR GENERATORS

EMERGENCY

AREAWAY

C O

R R

CORRIDOR

E L E

C T

R

IC

A L R

M

D

IS

T R

IB

U

T

IO

N E

L E

C T

R

IC

A L

TRANSFORMER RM

FIRE ALARM RM

C O

R R

AREAWAY #8

CHILLER PLANT

PUMP ROOM TRANSFORMERS

LOUNGEWORKROOM

OFFICE

H.A.C.

TOILET

BUILDING

FUEL TANK

W/C

FE

BB-106

GATE

FD

AREA AREA AREA

STORAGESTORAGESTORAGE

FDFDFD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FE

FE

TOILET

W/C

UP

DN

SLOPE 1"

SLOPE 1"

SLOPE 1"

UP

BB-105 BB-105a

CB-11

B B

-1 a

B B

-1

BB-104b

BB-103

CB-9

C B

-1

C B

-8

BB-106

BB-106k BB-106j

BB-106cBB-106h

BB-106d

BB-106a BB-106g

BB-106f

BB-106L

F

SLOPE SLOPE

S L O

P E

S L O

P E

R E

-T H

E R

M A

L

IZ

E R

E F

R

IG

CLEAN STORAGE

S T

O R

A G

E

BULK FOOD REFRIG.

P L

A T

IN

G

STORAGE

CORRIDOR

MANUAL

BLG. MAINTEN.

CART WASH

MECHANICAL EQUIPMENT

HAC

STAIR

CORR.

MAIL ROOM

REPRODUCTION

PUBLICATION

SUPV.

CORRIDOR

CENTER

COMM

DIETARY

F S

T F

T

M. STF. T.

OFFICE

OFFICE

OFFICE

CHIEF

OFFICE

AREAWAY #1

TUNNEL

AIR

FRESH

CORR.

T.

REFRIG.

HAC

PROSTHECTICES

NOURISHMENT

STORAGE

CART

TRANSPORT

C A

R T

S T O

R A

G E

OFFICE

PURCHASING

EXAM

P L

A S

T E

R

FINISHING

PSAS

CHIEF

STORAGE

L A

M

IN

GOODS STOR.

MATL./SOFT

MACHINE

ROOM

CART PARKING

ROOM

MACHINE

DISPATCH AREA

PREP.

& TESTING

WASH

DECONTAMINATION

EQUIP. STOR.

CHIEF

ASSIST.

H.A.C

M. LKR./T.

LOUNGE

F. LKR./T.

STAGING

STORAGE

STERILE-NONSTERILE

H.A.C

F L

K R

T.

T.

S

IG

N A

L

S T

O R

A G

E

F. T.

M T

L O

U N

G E

CART WASH

EQUIP.

MANUAL

CORRIDOR

CORRIDOR

PROCESSING

ETO

AUTO

SLAB ON GRADE

ABOVE

C L

-3

PORTICO FOUNDATION

(UNEXCAVATED)

STORAGE

ETO TANK

DRESSING BOOTH

SILVER

COLLECT

HAC

CORRIDOR

CHIEF

SECY.

M. LKR. TRAINING ELEC.

LINEN

DRESSING

BOOTH

CORR.

M L

K R

F. LKR.

TRASH

CORR. LOUNGE

W /C

T

CORRIDOR

MECHANICAL

EQUIPMENT

STAIR

CORRIDOR

MECHANICAL

EQUIPMENT

TWO LEVEL

FRESH AIR

TUNNEL

FRESH AIR

AREAWAY #4

MACHINE

ROOM

OFFICE

PURCHASING

OFFICE

OFFICE

T.

A&MM

OFFICE

OFFICE

OFFICE OFFICE

OFFICE

OFFICEOFFICE

CHILLER

OFFICE

OFFICE

OFFICE TRAINING

OFFICE

OFFICE

DRUG VAULT

OFFICE

OFFICE

OFFICE

OFFICE

ROOM

COPY

OFFICE

SWITCH GEAR

LAUNDRY

OFFICE

FOLDING

OFFICE

OFFICE

S P

A C

E O

T H

E R

AID

OFFICE

SHOP

OFFICE

BIOMEDICAL

OTHER SPACE

ROOM

GENERAL

STORAGE

MECHANICAL

ENG.

ROOM

ENG.

GENERAL

STORAGE

CORRIDOR

ROOM

CORRIDOR STAIR WAY

BIOMEDICAL

SHOP

CLOSET

ROOMSEWING

ROOM

LINEN DISTRIBUTION

WASTE

BIO-HAZARDCOMM.

ELECTRICAL

CLOSET

HOUSE

MECHANICAL

EQUIPMENT

MECHANICAL

EQUIPMENT

C O

R R

ID

O

R C

O R

R

ID

O R

WAY

PIT

COFERENCE

C O

R R

ID

O

R C

O R

R

ID

O R

C O

R R

ID

O

R

CORRIDOR

INPATIENT

PHARMACY

INPATIENT

PHARMACY

INPATIENT

PHARMACY

RECEIVING

ELECTRONICS

HANDLERS

STAFF

STAFF

ROOM

CHUTE

STAFF

B U

L K

OFFICE

DIETETICS

CLOTHING

ROOM

EXAM

EXAM

OFFICE

RECEPTION

AREA

WAITING

AREA

ROOM

HAZARD

WASTE

CORRIDOR

MECHANICAL

SCALE

AREA

IV PREP ROOM

C O

R R

ID

O

R

UP

UP

UP

UP

BB-100a

BB-101

BB-101k

BB-100c B B

-1 b

BB-101g

BB-100h

BB-100f

B B

-1

BB-100e

BB-100d

CB-13

BB-108

BB-102

S-2

CB-14

BC-109

BC-108

BC-108a

CB-15

BB-100j

BC-104

B C

-1

BC-102

BB-100o

BB-100n

BB-100m

BB-100k

BB-100i

BB-100l

CB-7

BB-101a

B B

-1 g

T

T

BA-102n

BA-102p

BA-102o

BA-102f

BA-102e

BA-100b

BA-100c

BA-100

BD-102a

BA-100a

BD-101b

BD-101

CB-23

BD-101a

BA-102

BA-102m

BA-102l

B A

-1 k

BA-102j

B A

-1 h B

D -1

BD-111

B D

-1

CB-4

BA-102q

B D

-1

BA-102d

BB-107

BB-102

B A

-1 a

BC-116BC-113BC-111

BC-107 BC-110 BC-114 BC-122

BC-124jBC-124i

BC-124g

CB-24

BA-102a 45

BA-102 45

BA-102i 72 BA-102g 72 BD-105

BD-106

CB-28

B D

-1

2 BD-112 72

BD-107 67

CB-27 72

BD-108 72

B D

-1

CB-29

BD-114

S-4

CB-26

C B

-2

BD-100

BD-100a

BC-106

BC-105b BC-105a

BC-105

BC-124F

BC-101

BC-124d

BC-124a

BC-124c BC-124b

BC-132

BC-132h

B C

-1 a

BC-132b

BC-132c

BC-131 BC-129 BC-128

BC-130

BC-126

BC-125

BC-123c

BC-123d

BC-127

BC-123a BC-123b

BC-121

BC-119

119-A

BC-112

BA-105 BA-106

BA-100d

BC-124k

BC-124L

BB-101l

BB-101j

BB-101h

BB-101i

BB-101f

BB-101e

BB-101d

BB-101c

BB-101b

EXIT

BB-100e

BA-104

BA-103

BC-101

BA-102 72

BA-102g

BC-118

BC-118a

BC-115

BC-123

BD-100

BD-100

BC-124E

BC-124

BC-124

BC-120

BC-124h

T

EWC

1D-145d 1D-145c

VL31-30

VL4-30

VL31-30

VL4-30

VL31-30

VL31-30

VL4-30

VL4-30

NEG

PRESSURE

PROCEDURE

RM. 2

TOILET

NEG

PRESSURE

PROCEDURE

RM. 3

FELLOWS

OFFICE

PROCEDURE

RM. 4

TOILET

PROCEDURE

RM. 5

OFFICE

TOILET/

DRESSING

TOILET

OFFICE

BREAK/CONF.

ROOM

PHYSICIAN

OFFICE

PHYSICIAN

OFFICE

PHYSICIAN

OFFICE

OFFICE

CHAPLAIN'S

OFFICE

CHAPLAIN'S

OFFICE

STORAGE

MEN'S STAFF

TOILET

WOMEN'S

STAFF TOILET

WOMEN'S

LOCKERS

MEN'S

LOCKERS

WAITING

PREP/

RECOVERY

PREP/

RECOVERY

PREP/

RECOVERY

PREP/

RECOVERY

PREP/

RECOVERY TOILET/

DRESSING

PREP/

RECOVERY

PREP/

RECOVERY

PREP/

RECOVERY

PREP/

RECOVERY

PREP/

RECOVERY

TOILET

NURSE

STATION

PROCEDURE

RM. 1

CORRIDOR

RECEPTION

CORRIDOR

CORRIDOR

CLEAN

SUPPLY

CLEAN

SCOPES

SCOPE

PICKUP

STORAGE

COORIDOR

SCHEDULING OFFICE

PREP/

RECOVERY

TOILET

SCALE: 1/8"=1'0"

T

V L

4-

V L

-3

V

L

-3

V L

4-

V L

-3

VL14-42

V L

1-

V L

1-

V L

1-

V L

1-

V L

1-

V L

4-

VL5-36 VL5-36 VL5-36

VL25-36

V L

-4

V L

5-

V L

-4

8 V L

4-

V L

4-

VL25-42

VL5-36

VL4-36

V L

5-

VL29-36

V L

-3

VL4-48VL4-48

G A V

T-37

T -3

T -3

T

-3

T -3

VL31-36 VL25-48 VL25-48

T-7 T-7

VL4-30VL4-30

VL31-30

VL31-30

VL4-30

VL31-30

VL31-30

VL4-30

V L

1-

V L

-4

V L

1-

V

L

1-

V L8

-1

V L4

-3

V L4

-3

VL29-48

V L

1-

VL26-36

VL4-36

V L8

-2

V L4

-3

V L4

-3

V L

-3

V

L

-3

V L

9-

V L

5-

V L

5-

V L

9-

V L

5-

VL45-36

V L

1-

V L

1-

V L

-3

V L

1-

V L

1-

V L

-4

V L

1-

V L

1-

V L

5-

VL45-36VL45-36VL45-36VL45-36 VL45-36 VL45-36 VL45-36 VL45-36

V L

5-

V L

5-

V L

5-

O

VA

O

VA

AVO

A V

O

A V G

V A

O

V A

O

OAV

V A O

OAV

OVA

OAV

VAO

OAV

OAV

OAV

VVAO AO

VAO

VAO

O A

V O

A V

VAO

/2

W A

L L

CALIB.

EQUIP.

WASTE

ACTIVE

STAFF

STERIL.

GLASS

STOR.

PHARM.

REC. STOR.

(RAD. SAFE)

PHYSICIST

STORAGECONFERENCECHIEFFILES

PATIENT

KITCHENETTE/WORK

SUPERVISOR TECHNICIAN PHYSICIANIN-VITRO

LOW LEVEL

OFFICE

H.A.C.

ELEC. LIN. TR.

SIG.

ROOMEXAM INJECTION

CLOS.

STORAGE/PREP.

ISOTOPIC

IN-VITRO

HIGH LEVEL

ROOM

UPTAKE

THYROID

PROCEDURE

SPECIAL

CORRIDOR

STAIR

RECEPT.

WAITING

W/C

W/C T

CORRIDOR

ORGAN SCAN

RECTILINEAR

ROOM

IMAGING

STATIONARY

WAITING

W/C T. W/C T.

CORRIDOR

CORRIDOR

SIGNAL ELEC.

PATIENTTRAININGAPPL.PATIENT

CHIEF

ACTIVE STORAGE

SUBST.

CONTROLLED

SUPVSR.

NURSE

OUTPATIENT

SE-2

SE-1 SE-4

SE-3 P-1 P-2 P-3

P-4P-5P-6

CART LIFT

ELEC.

C L

-1

C L

-2

SIGNAL

CONSULT.

FLAM.

STOR.

AFFAIRS

W/C T

LKR

HAC

CORRIDOR

ELEV. LOBBY

CORRIDOR

C O

R R

STAIR

C O

R R

VEST

LOBBY

ELEV

SERVICE

C O

R R

ID

O

RPASSENGER

C O

R R

ID

O

R

CORRIDOR

CORR

CORR

AREAWAY

STEAM TUNNEL

BELOW

EWC

WAITINGCONFR.OFFICE

TRAINEES OFFICE

OFFICE OFFICE OFFICE

OFFICE

SECY DIRECTOR

SECY

T

CLERK

WAITCOATS

ASST. DIR.

CORRIDOR

STOR

KIT.

CHIEF OF STAFF

T

TOILET

MALE

CONFERENCE

MANAGEMENT

OFFICE

OFFICE

OFFICE

OFFICE

SECY

ELEC.

CORR.

ADMIN

WAITING

TRASH LINEN

CLERKS

LOBBY

LOBBY

CODING UNIT

MED INFO

HEALTH INFO MGT.

OFFICE

RELEASE OF INFO.

WARD ADMIN. SECTION

CORRIDOR

OFFICE OFFICE

LINK

TOILET

H.A.C.

OFFICE.

DINING AREA

DISHWASHING

REFRIG.

FREEZE

H.A.C.

KITCHEN

CORRIDOR

WAITING

DISPATCH OF AMERICA

CCTV.

DISPATCH

BREAK AREA

TOILET

PATIENT

OFFICE

FOOD STORAGE

CORRIDOR

SE-5

RETAIL STORE

CORRIDOR

W WC/T

M WC/T

H.A.C.

C L

-3

STAIR

CORRIDOR

VEST.

VEST.

LOBBY

LOBBY

CL.

VEST.

AREAWAY

AREAWAY

STAIR

C O

R R

ID

O

R

C O

R R

ID

O

R

OFFICE

C O

R R

ID

O

R

CORRIDOR

C O

R R

ID

O

R

POLICE

C O

R R

ID

O

R

DINING AREA

CONDIMENTS

AREA

SERVING

A R

E A

W A

Y

AREAWAY #7

VENDING CHASE

VENDING

SIGNAL

C O

R R

ID

O

R

CORRIDOR

CORRIDOR

ULTRASOUND

CORRIDOR

CONTROL

CONTROL

CONTROL

FLUOROSCOPIC

CORRIDOR

W/C T

W/C T

W/C T

CONTROL

AUTOMATED

ROOM

ULTRASOUND

T. W/C T.

CHEST

D.

D.

D.

RADIOGRAPHIC

GENERAL

PURPOSE

TOMOGRAPHIC

C O

R R

ID

O

R

W/C T

CORRIDOR

CORRIDOR

W/C T

W/C TBELOW

TUNNEL

FRESH AIR

AREAWAY #1

RADIOGRAPHIC/

FLUOROSCOPIC

D.

GENERAL

PURPOSE

D.

FLUOROSCOPIC

D.

RADIOGRAPHIC/

PROCESSING

CLOSET

WAITING

CORRIDORRECEPT. W/C WAITING

CORRIDOR

S

IG

N A

L C

L O

S E

T

DARKRM.

C O

R R

H.A.C.

TECHNICIANW/C WAITING

RESIDENTS

& STUDY

PHYSICIAN

FILM &

CHEMICAL

STORAGE

CORRIDOR

T.

DARKRM.

CORRIDOR

BAR PREP.

ELECTRIC

SCRUB

AREA

CLEAN

LINEN

CORRIDOR

W/C T.

CONTROL

ROOM

PROCEDURE

SPECIAL

CHIEF

TECHNICIAN

RECOVERY

LOCKER BIO MED

AREAWAY #2

TRANSCRIPT.

ADMIN. ASST.PHYSICIANPHYSICIAN

SECY

COMMON

VIEWING

CHIEF

MULTI-VIEW

FILM LIBRARY

C O

R R

ID

O

R

LOCKERS

TOILET

FEMALE

STRETCHER

WAITING

CORRIDOR

CLOSET

EQUIP ROOM

SCAN ROOM

CONTROL ROOM

TLT. RM

HCP

HCP DRESS

READING

ROOM

CHIEF

CANTEEN

OFFICE OFFICE OFFICE

OFFICE

OFFICE

CANTEEN

OFFICE

HR

PET-CT

DISPENSING

C O

N S

U L

T A

T

IO

N

WAITING AREA

A R

E A

A

R E

A

LOCKERS

OFFICE

CONFERENCE

LOUNGE

COFFEE

SHOP

PROCEDURES

SPECIAL

RECORD

X-RAY

LOCKER ROOM

CONFERENCE ROOM

X-RAY ROOM

WAITING

AREA

M R I

PATIO AREA

SMOKING AREA

VFW

VETS.

BLINDED

ROOM

COPY

AMVETS

LEGION

AMERICAN

DAV

VBC

MCL

VETERANS

WOMANS FINANCIAL

SERVICE

OFFICEOFFICE

OFFICEOFFICEOFFICEOFFICE

OFFICE

OFFICE

OFFICE

OFFICE

COPIER

C O

R R

ID

O

R

HEALTH INFO.

DECED.

CHIEFBUSINESSOFFICERCOORD.BUSINESS

PREP 2

PATIENT

PREP 1

PATIENT

ROOM

IMAGING

X-RAY

PET/CT

TOILET

PATIENT

CONTROL

CORRIDOR

CORRIDOR

ROOM

ELEC

PATIO AREA

SMOKING AREA

SMOKING

SHELTER

SECURITY/

IN-PATIENT PHARMACY

WAITING AREA

STOR.

DRK.

PATIO AREA

SMOKING AREA

WELCOME

CENTER

C A

N O

P Y

C

O V

E R

E D

W A

L K

UP

DN.

DN. UP

DN.

UP

DN.

UP

FD

FD

FD

FD

FD

FD

EWC

EWC

FD

EWC

E W

C

ARCHWAY

ARCHWAY

ARCHWAY

L

EA

D

#4

#5

1C-138

S-3

1C-139

1C-142

1C-141

1C-144

1C-133

1C-1361C-1341C-131

1C-147

1C-128 1C-130 1C-1321C-127

1C-145

C1-56

1C-153

1C-151 1C-149

1C-152

C1-57

1C-126 1C-123 1C-124

1C-120

1C-1291C-1251C-1221C-121

C1-51

S-2

C1-47 C1-49

1C-118

C1-45

1C-1191C-117

C1-46

1C-116 1C-115

C1-44

C1-63

1C-168 1C-169

1C-172a1C-1721C-172b1C-1731C-1741C-175

1D-103a

1C-100

1C-100b

1C-100c

1A-111

1A-110

C1-10

1A-109

C1-65

1C-178

1C-117a 1C-146

C1-55

C1-541C-143

C1-15 C1-11

C -5

C

-5

C -1

C

-9

C -1

1D-108e1D-1091D-112

1D-108d

1D-115 1D-116 1D-117

1D-113

1D-120 1D-119

1D-108a

1D-119a

1D-108

1D-108b

1D-108c

1D-121

C1-71

1D-118

C1-72

1D-122

1D-121a

1D-110

1D-104a

1D-105

1D-127

1D-126

1D-125

1D-124

1D-123

1D-136

1D-1371D-1381D-139

1D-134

1D-135

1D-131

1D-132

C1-76

C1-77

C1-74

1D-129 1D-128

1D-140

1D-141

1D-142

1D-143

C1-1

C1-4

C1-2

C1-3

C1-5

C1-6

1D-103

1D-100C 1D-100b

1D-101

1D-102

C1-66

1D-103c 1D-103b

1D-107

1D-107b

1D-106

1D-100a

1D-130

1A-102

1A-102k

1A-102j

1A-102a

1A-102b

1A-102g

1A-102f

1A-102e

1A-102h

1A-102c

A

-1 i

C1-68

1D-133

1D-144 1D-133a

1A-101

1A-101b

1A-101a

1A-102m

1A-102l

1D-133c

1D-133b

1A-102d

C1-64

1A-100

C1-7

1A-108 1A-107

1A-106

S-1 C1-13

1A-100a

C1-69

S-4

C1-75

C -7

C -7

1D-114

C -6

C

-5

C -3

1B-105

C1-17

C1-16

1B-118b

1B-113b

1B-109aC1-26

1B-113a

1B-110a

1B-107

1B-106a

1B-106

1B-100b

1B-108

1B-104

1B-103 1B-102

1B-109

1B-113

1B-111

1B-110

1B-112

1B-119a

C1-28

C1-27

1B-118a

1B-115a

C -2

1B-117

1B-116

1B-115

1B-118

1B-119

1B-131A

1B-101

C1-23

C1-24 C1-18 C1-20

C1-19

1B-128

C1-34

CL-35

C -3

1B-130

C1-21

C1-21a

1B-143

1B-134

1B-131

C1-36

1B-141

1B-140

1B-124

1B-125

1B-126

C1-31

C1-32

C1-33

1B-121

1B-123

1B-122

C1-29

1B-135

1B-132

1B-133

C1-37a

1B-136a

1B-1481B-1461B-144

C1-38

1B-145

1B-147

1B-139

1B-142

1B-138

1B-137

C -3

1D-107a

1B-135A

1D-111

C1-8

1C-140

1B-120a 1B-120

1B-120b

1B-120e

1B-120d

1B-120c

1B-119b

1D-145

1D-145b

1D-145a

1D-145f

1D-145h

1D-145g

1C-100g1C-100f1C-100e

1D-100

1B-136

1B-135B

1C-135 1C-135a

1B-100a

1B-100c

1B-100

1D-104

1D-145e

1D-108d

C -5

1C-137a 1C-137b 1C-137c

1C-137f 1C-137e 1C-137d

C1-51

C1-50

1C-136b

1C-150

1C-100

C1-177

1C-148

1C-148b

1C-150

1C-148a

GI-115

GI-115A

GI-114

GI-113

GI-120

GI-120A

GI-121

GI-122

GI-112

1C-148C

GI-129

GI-130

GI-132

GI-134

GI-135

GI-1361C-171

1C-170

GI-103

GI-104

GI-105

GI-133A

GI-131A

GI-131

GI-133

GI-101

GI-124 GI-125 GI-126 GI-127

GI-128

GI-107GI-108GI-109GI-110GI-111

GI-114A

GI-106

GI-116

C1-61

GI-102

C1-62

C1-60

GI-119GI-118

GI-117

GI-117A

C1-59

GI-123

GI-100

VL29-48

VL26-36

VL4-36EWC

CG

CGCG CG CG

SS

SWITCH GEAR

MECHANICAL

ENG.

ROOM

ENG.

CORRIDOR STAIR WAY

?CORRIDOR

BC-119

119-A

BC-118

BC-118a

330EP103

330EP103

330EP103

330EP103

330EP101

330EP102

330EP103

HEBA

LE1B

150KVA

EMB2 LEBE

5KVA

USA-1

USAUSB

2000 KVA

2000 KVA

US-1P XFMR

US-1X XFMR

US-1B XFMR

US-1A XFMR

US-1P

US-1X

US-1B

US-1A

LCBD HCBD

15KVA

LLB HLB1

15KVA

PARALLELING

SWITCHGEAR

GEN #4

GEN #3

GEN #2

GEN #1

EMB1

HNBD2

30KVA

LNBD2

75KVA

75KVA

HNBD1

HEBD

150KVA

LEBD1

LEBD2

LNBD1

MCC

330EP103

330EP103

330EP103

330EP103

330EP103

LN1B6

LN1B5

LN1B4

LN1B3

LN1A1

LN1A2

LC1ALN1A3

HN1A

HC1A

15 KVA

75 KVA

ELECTRIC

1C-151

HN1B

HC1B

LC1B

LN1B1

LN1B2

30 KVA

15 KVA

ELECTRIC

1D-131

HN1C LN1C

HL1

15 KVA

ELECTRIC

1A-110

HN1D LN1D1 LN1D2

X1D

E1X

HC1D LC1D

75 KVA

30 KVA

ELECTRIC

1B-126 30 KVA

15 KVA

HN1E

HC1E

LN1E1 LN1E2

LC1E

ELECTRIC

1C-169

LCBA

15KVA

HCBA

HNBA30KVALNBA

ELECTRIC

BC-113

HNBB

45KVA

LNC1

LNB1

ELECTRIC

BD-105

HNBC 45KVA LNBC

LNBC1

HLB2

ELECTRIC

BA-104HNBE

30KVA

LNBE

LCBE

30KVA

HCBE

ELECTRIC

BC-131

UNIT SUBSTATION

US1C

UNIT SUBSTATION

US1D

XFMR

US1D

XFMR

US1C

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number

Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

F E

D C

B A

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

ARCHITECT/ENGINEERS:CONSULTANTS:

Office of Construction and Facilities Management

Project No.

FULLY SPRINKLERED

FIRM LICENSE No.: 01528

Replace Automatic Transfer Switches B330

04/04/2014

FLOOR PLANS - OVERALL

330EP103

PJMMSG

2013-04012

552-15-205

Dayton, Ohio

N Scale: 1/32" = 1'-0"1

BASEMENT PLAN - POWER

N Scale: 1/32" = 1'-0"2

FIRST FLOOR PLAN - POWER

Scale: 1/4" = 1'-0"3

PARTIAL FIRST FLOOR PLAN

Scale: 1/4" = 1'-0"4 PARTIAL FIRST FLOOR PLAN Scale: 1/4" = 1'-0"5

PARTIAL FIRST FLOOR PLAN

Scale: 1/4" = 1'-0"6

PARTIAL FIRST FLOOR PLAN

Scale: 1/4" = 1'-0"7

PARTIAL FIRST FLOOR PLAN

N.T.S.Scale:8

PARTIAL BASEMENT PLAN

N.T.S.Scale:9

PARTIAL BASEMENT PLAN

N.T.S.Scale:10

PARTIAL BASEMENT PLAN

N.T.S.Scale:11

PARTIAL BASEMENT PLAN

N.T.S.Scale:12

PARTIAL BASMENT PLAN

Revisions Date

ALL THESE VIEWS ARE SHOWN FOR REFERENCE ONLY

1024 sqft

1670 sqft

179 sqft

192 sqft

124 sqft

203 sqft

192 sqft

230 sqft 161 sqft

407 sqft

111 sqft

74 sqft

1166 sqft

1558 sqft

BLOCK

V

AO

OA

V

O A

V

VAO

O V

OV

A G

O V

A

O

VA

V

OV

OV

O

OV

A

GA

O V

O

V

G

O

V

GA

GA

O

V

GA

OV

GA

VO

VO

GA

V O

O

GA

AG

V

O

V

GA

O

V

V O

G

A

A

A

A G

G

A

GAS

G A

G A

A

A G

V

AO

GA

VO

G A

A

OAV

2C-1162C-113

C2-24 2C-117

2C-115

2C-114

C2-23

2C-1102C-108

2C-107

2C-1122C-1112C-1092C-1052C-103

2C-106

C2-21

2C-102 2C-104

C2-22

2C-118 2C-119

C

-1

C

-1

2C-100b

2C-124a

2C-124d2C-124c

2C-124b 2C-124e

2C-124f

C2-122

2C-123

2C-100

2C-101

2C-100a

2C-100c

C2-25

2C-100d

2C-130 2C-129

2C-126

2C-125

C -2

2C-124

2C-127

C2-27

2C-128

C -2

2C-100e

2C-100f

C -2

2C-100g C2-32

C2-31C2-33

2C-131

C -2

2C-1372C-1382C-139

2C-141

2C-140

C -3

2C-132

2C-133

2C-134

2C-135

2C-143

2C-145 2C-146

C2-35

2C-144

C -3

C2-1

C

-2

2A-1252A-124

2A-100

2A-101

A

-1

2A-105

2A-119

2A-121

2A-122

2A-123

C2-8

S-1

S-3

C2-11

2B-118

2B-115 2B-113

B

-1

C2-13

B

-1

2B-116

C -1

2B-114 2B-111

B

-1

B

-1

B

-1

C2-17

C -1

2B-110

C2-16

2B-133

2B-134

2B-129

B

-1

B

-1

2B-131

2B-109

B

-1 a

B

-1 b

B

-1 c

C -1

2B-135

2B-136

C2-18

2B-138

2B-137

2B-139

C2-19

2B-140

2B-141

S -2 2B-142

2B-108

2B-107

2B-106

2B-105

2B-104

2B-103

2B-102

2B-101

2B-100

2B-100a

C2-9

C2-10

2D-126

2D-127 2D-129

2D-1302D-128 2D-126a

2D-120

2D-119

2D-118

2D-117

2D-116

2D-115

2D-132 2D-134 2D-135 2D-136 2D-139

2D-143

2D-140

2D-131 2D-133 2D-137 2D-138

C2-47

2D-141 2D-142

C2-50

C2-49

S-4

2D-163

2D-162

2D-159

2D-161

C2-44

2D-151

D

-1

D

-1 52D-123

2D-122

2D-107

2D-107k

C2-43

2D-121

2D-111

C2-40

2D-110

2D-109

2D-112

2D-108a

2D-114

2D-113

C2-39

2D-108

2A-103

2D-106

2D-105

2A-102

A

-1 a

A

-1 b

A

-1 c

A

-1 d

2D-107a

2D-107b 2D-103

C2-38

2D-158

2D-157

2D-156

2D-154

2D-152

2D-1552D-1022D-1012D-100

C2-3

C2-4

2A-107

2A-116

A

-1 a

C2-6

2A-115

2A-114

2A-113 2A-108

A

-1 a2A-108a

2A-109

2A-110

A

-1 a

2A-111

2A-112

2A-113b

C -4

2D-1482D-149

2D-1472D-1462D-1452D-144

C2-52

2D-160

C2-53

2D-150

2D-153

2D-120a

C -4

C -5

C -4

C -3

C -4

5C -4

2D-55

C -5

C

-7

2A-117

2A-104

2B-121

2B-132

2B-130

2B-128

2B-122

2B-120

2B-119

2D-126

2D-107c

2D-107d

2D-107e

2D-107f

2D-107j

2D-107i 2D-107h 2D-107g

2D-151a

2D-160a

2D-160b

2A-120

PHYS. READEVOKE P.

STORAGE AREA RECORD

CLOSET

EEGEEG TESTINGEMG

STAFF T.

PHYS.

ASSIST.

PHYS.CHIEF

ASSIST.

CHIEFCONF.

SLEEP

CORRIDOR

SLEEP OBSERVATION

SEC'Y. CLK.

SIGNAL ELEC.

L

IN

T R

. DRESSING

KITCHEN

LIVING RM.BEDROOM

LIVING EVAL.

O.T. DAILY

BATH

SPLINT

CUBICLE

ACOUSTIC

STORAGE

O. T.

ADMIN.

O. T.

P.T. NON-HYDROTHERAPY

THERAPY

PHOTO

P.T. HYDROTHERAPY

W/C T CORRIDOR

P.T. STOR.

C.T. STOR.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .