This addendum modifies the specifications and drawings for solicitation number FA520523D0005, a requirements contract for roads, pavements, and miscellaneous civil work at Misawa Air Base in Japan.

The addendum revises the specifications by removing and adding line item numbers for excavation, earthwork, drainage, utility, sidewalk, curb, and pavement removal and construction work. It also modifies the descriptions of several existing line items. The drawings are changed by removing areas delineated in red and clarifying that certain line item numbers apply to work in multi-family housing carport areas from parking lots to housing units, excluding roadways. The contractor must coordinate work in phases to minimize resident impact, with each phase including 16 parking lots. The revised specifications and drawings are attached.

View the file

Other files for this federal contract opportunity

Other files attached to Roads/Pavements & Misc. Civil Work, newest first.
File Type Posted
Atch2 Specifications_.pdf PDF
Atch1 Other Contract Requirements_.pdf PDF
Contract_FA520523D0005.pdf PDF
Atch3 Drawings_.pdf PDF
Atch4 Schedule of Material Submittals_.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 1 to

FA520523R0007

Roads/Pavements & Misc. Civil Work IDIQ Contract, MISAWA AIR BASE, JAPAN

14 Jul 23

Specifications and Drawings are modified to provide the following changes:

A. Specification Section 01 11 00

1. The following items are deleted from the Specifications:

1) Para. 1.1.1.2 SURVEY AND TEST

a) ELIN A004, B004 and C004, Field CBR and Laboratory Tests of Roads, Parking

Lots and Other Surfaces”

2) Para. 1.1.1.4 ASPHALT PAVING WORK

a) ELIN A029, B029 and C029, Base Stabilization for Pavement, Mix 200mm Thick

3) Para. 1.1.1.8 EARTH WORK, SODDING, PLANTING WORK

a) ELIN A048, B048 and C048, Construct Embankment with Excavated Soil

b) ELIN A049, B049 and C049, Construct Embankment with New Soil

4) Para. 1.1.1. 11 REMOVAL AND DISPOSAL WORK

a) ELIN A071, B071 and C071, Removal of Reinforced Concrete by Machine

b) ELIN A072, B072 and C072, Removal of Plain Concrete by Labor

c) ELIN A073, B073 and C073, Removal of Plain Concrete by Machine

d) ELIN A079, B079 and C079, Removal of Existing Tree and Stump, Circumference of tree 31~60cm

e) ELIN A080, B080 and C080, Removal of Existing Tree and Stump, Circumference of tree 61~90cm

5) Para. 1.1.1.12 GENERAL CONSTRUCTION AND OTHER WORK FOR MFH

CARPORT AREA

a) ELIN A094, B094 and C094, Place Concrete (24-8-25)

6) Para. 1.1.1. 13 ASPHALT PAVING WORK FOR MFH CARPOT AREA

a) ELIN A103, B103 and C103, Construct AC Surface by Modified Asphalt (AC No.5)

b) ELIN A107, B107 and C107, AC Wearing Course (Labor)

7) Para. 1.1.1.15 EARTH WORK FOR MFH CARPORT AREA

a) ELIN A116, B116 and C116, Road Excavation

8) Para. 1.1.1. 16 REMOVAL AND DISPOSAL WORK FOR MFH CARPOT AREA

a) ELIN A121, B121 and C121, Saw Cutting of Existing AC Pavement, less than 15cm

b) ELIN A123, B123 and C123, Removal of Plain Concrete by Machine

2. The following items are added in the Specifications:

1) Para. 1.1.1.6 SIDEWALK, CURBS, and GUTTERS WORK

a) ELIN A035, B035 and C035, Place Concrete (24-8-25) for Concrete Sidewalks

b) ELIN A036, B036 and C036, Place Concrete (24-8-25) for Concrete Curbs

c) ELIN A037, B037 and C037, Place Concrete (24-8-25) for Concrete Curbs & Gutters

2) Para. 1.1.1.8 EARTH WORK, SODDING, PLANTING WORK

a) ELIN A048, B048 and C048, Excavation for Underground Utility

b) ELIN A051, B051 and C051, Backfill Excavated Material (For Underground Utility)

3) Para. 1.1.1.9 SANITARY SEWER, DRAINAGE WORK

a) ELIN A057, B057 and C057, Install 300mm VU Rib Pipe

4) Para. 1.1.1.11 REMOVAL AND DISPOSAL WORK

a) ELIN A072, B072 and C072, Removal of Concrete Pipe

b) ELIN A073, B073 and C073, Removal of Existing Catch Basin

c) ELIN A074, B074 and C074, Removal of Existing Concrete Curbs

d) ELIN A075, B075 and C075, Removal of Existing Concrete Curbs and Gutters

e) ELIN A076, B076 and C076, Removal of Existing Concrete Sidewalks

f) ELIN A077, B077 and C077, Removal of Existing Leveling Concrete

5) Para. 1.1.1.14 SIDEWALK, CURBS, and GUTTERS WORK FOR MFH CARPOT

AREA

a) ELIN A115, B115 and C115, Place Concrete (24-8-25) for Concrete Sidewalks

b) ELIN A116, B116 and C116, Place Concrete (24-8-25) for Concrete Curbs

c) ELIN A117, B117 and C117, Place Concrete (24-8-25) for Concrete Curbs & Gutters

6) Para. 1.1.1.15 EARTH WORK FOR MFH CARPORT AREA

a) ELIN A119, B119 and C119, Excavation for Parking Lot

7) Para. 1.1.1.16 REMOVAL AND DISPOSAL WORK FOR MFH CARPOT AREA

a) ELIN A125, B125 and C125, Removal of Existing Concrete Curbs

b) ELIN A126, B126 and C126, Removal of Existing Concrete Curbs and Gutters

c) ELIN A127, B127 and C127, Removal of Existing Concrete Sidewalks

d) ELIN A128, B128 and C128, Removal of Existing Leveling Concrete

3. The following items are changed:

1) Para. 1.1.1.4 ASPHALT PAVING WORK

a) Leveling AC Pavement (Recycled AC No. 2, Average thickness 40mm)

From:

“ELIN A020, B020 and C020, Leveling AC Pavement (Recycled AC No.1, Average thickness 50mm)

Leveling AC pavement (recycled AC No.1, Average thickness 40mm) shall be per metric ton (MTON.) of AC intermediate course, including but not limited to fine grade preparation, edge preparation & restoration, placement of variable thickness

AC intermediate leveling course, compaction and testing”.

To:

“ELIN A019, B019 and C019, Leveling AC Pavement (Recycled AC No.2, Average thickness 40mm)

Leveling AC pavement (recycled AC No.2, Average thickness 40mm) shall be per metric ton (MTON.) of AC intermediate course, including but not limited to fine grade preparation, edge preparation & restoration, placement of variable thickness

AC intermediate leveling course, compaction and testing. Applies to pavement construction widths of 1.5m or more”.

2) Para. 1.1.1.7 PAVEMENT MARKINGS, TRAFFIC SAFTY WORK

a) Alphanumeric Concrete Curb Making

“ELIN A042, B042 and C042, Alphanumeric Concrete Curb Marking

Alphanumeric concrete curb marking shall be per each (EA.) of location of painted curb background and alphanumeric set of markings, including but not limited to preparatory work, protection until dry/ cured, and clean-up.”

“ELIN A043, B043 and C043, Alphanumeric Concrete Curb Marking Alphanumeric concrete curb marking shall be per each (EA.) of location of painted curb background and alphanumeric set of markings, including but not limited to preparatory work, protection until dry/ cured, and clean-up. Handwriting is acceptable.”

b) Relocate Traffic Sign & Post

“ELIN A044, B044 and C044, Relocate Traffic Sign & Post

Relocate traffic sign & post shall be per each (EA.) of traffic sign w/foundation relocated, complete and ready for use, including but not limited to removal, re-installation and clean-up.”

“ELIN A045, B045 and C045, Relocate Traffic Sign & Post

Relocate traffic sign & post shall be per each (EA.) of traffic sign w/foundation relocated, complete and ready for use, relocation will be within a 5-meter radius of the existing post, including but not limited to removal, re- installation and clean-up.”

3) Para. 1.1.1.8 EARTH WORK, SODDING, PLANTING WORK

a) Earthwork (Digging and Grading)

“ELIN A046, B046 and C046, Earthwork (Digging and Grading)

Earthwork (digging and grading) shall be per cubic meter (CM.) of excavated materials for structures, including and not limited to excavation of earth, base course and subbase course material to predetermined elevations, leveling grading and loading.”

“ELIN A047, B047 and C047, Earthwork (Digging and Grading)

Earthwork (digging and grading) shall be per cubic meter (CM.) of excavated materials for structures, including and not limited to excavation of earth, digging for curbs & gutter work, excavation for catch basin and manhole work, base course and subbase course material to predetermined elevations, leveling grading and loading.”

4) Para. 1.1.1.11 REMOVAL AND DISPOSAL WORK

a) Removal of PVC Pipe

“ELIN A081, B081 and C081, Removal of PVC Pipe

Removal of PVC pipe shall be per linear meter (LM.) of pipe, including and not limited to excavation, cutting, cap, plug, removal of water pipe, backfilling and site cleaning.”

“ELIN A084, B084 and C084, Removal of PVC Pipe

Removal of PVC pipe shall be per linear meter (LM.) of pipe, including and not limited to, cutting, cap, plug, and site cleaning.”

5) Para. 1.1.1.12 GENERAL CONSTRUCTION AND OTHER WORK FOR MFH

a) Leveling Basis Crushed Stone

“ELIN A091, B091 and C091, Leveling Basis Crushed Stone (RC-40, Average thickness 30mm)

ELIN A092, B092 and C092, Construct Basis Crushed Stone (RC-40)

Frost inhibition course (RC-40)/leveling basic crushed stone (RC-40)/construct basis crushed stone (RC-40) shall be per cubic meter (CM.) of compacted material in-place and ready for use, including but not limited to preparatory work, spreading and compaction and clean-up.”

“ELIN A094, B094 and C094, Leveling Basis Crushed Stone (RC-40, Average thickness 30mm)

ELIN A095, B095 and C095, Construct Basis Crushed Stone (RC-40)

Leveling basis crushed stone (RC-40, average thickness 30mm)/construct basis crushed stone (RC-40) shall be per cubic meter (CM.) of compacted material in-place and ready for use, including but not limited to preparatory work, spreading and compaction and clean-up.”

6) Para. 1.1.1.15 EARTH WORK FOR MFH CARPORT AREA

a) Title of Para, 1.1.1.15 EARTH WORK, SODDING, PLANTING WORK FOR MFH

1.1.1.15 EARTH WORK, SODDING, PLANTING WORK FOR MFH CARPORT

AREA

1.1.1.15 EARTH WORK FOR MFH CARPORT AREA

b) Earth Work (Digging and Grading)

“ELIN A117, B117 and C117, Earthwork (Digging and Grading)

Earthwork (digging and grading) shall be per cubic meter (CM.) of excavated materials for structures, including and not limited to excavation of earth, base course and subbase course material to predetermined elevations, leveling grading and loading.”

“ELIN A120, B120 and C120, Earthwork (Digging and Grading)

Earthwork (digging and grading) shall be per cubic meter (CM.) of excavated materials for structures, including and not limited to excavation of earth, digging for curbs & gutter work, excavation for catch basin and manhole work, base course and subbase course material to predetermined elevations, leveling grading and loading.”

4. The ELINs are re-numbered per above changes as indicated in the revised Specifications Section

01 11 00.

B. Drawings

1. The drawings are changed as follows:

1) SEQ. NO. 5 and SEQ. NO. 6

a) All red lines are deleted.

b) MFH Carport Aeras are changed:

“MFH Carport Areas include the streets, sidewalks and areas under the carports, as indicated in the red lines (ref. Specifications Section 01 11 00, para. 1.1.1.12 thru

1.1.1.16). For the streets not indicated in the red lines, Specifications Section 01 11

00, para. 1.1.1.1 thru 1.1.1.11 apply.”

“ELINs 094 thru 129 are applicable to MFH Carport Areas from parking lots to housing units, not including roadways, in the MFH areas shown above. The contractor is required to develop phasing work plan thru coordination with the

Government for MFH areas to minimize impact on the residents. Each phase is planned to include 16 parking lots.”