| File | Type | Posted |
|---|---|---|
| Amend 0003.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| Atch(4)_PreBid_Inquiry_Form.xlsx | XLSX spreadsheet | |
| Invitation For Bid_SF1449.pdf | ||
| Atch(3)_1-Day_Official_Entry-Exit_Request.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE REC
| ATTACHMENT J-0200000-16 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-20-B-0054 |
| EXHIBIT A - CLIN 0001 |
| 1 September 2020 through 31 August 2021 |
| Line Item 0001 Recurring Work - Base Period |
| PROVIDE PRICES TO PERFORM SERVICES FOR MCAS IWAKUNI, INCLUDING ATAGO HILLS - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs A001 through A130 |
| Note: The Contractor may be required to submit the breakdown of the ELIN prices during the contract period. If requested, the breakdown shall be submitted at no additional cost to the Government. |
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | ||
| SLIN 000101 | STATION | ||||||
| 1 | Collection and Disposal of waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "S," and Disposal of the waste collected by the Government specified in J-1503030-11 per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 2 | Collection and Disposal of waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "S (Kintai)" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 3 | Collection and Disposal of waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "S (MCCS)" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 4 | Collection and Disposal of waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "S (J)" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 5 | Providing CFE Containers at the locations specified in J-1503030-08 with the Supported Command as "Station" per Spec Items 3.4.2. | 12 | MO | ¥ - | |||
| 6 | Collection and Disposal of waste from the locations specified in J-1503030-08 with the Supported Command as "Station" per Spec Items 3.1, 3.1.2, and 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 7 | Providing CFE Containers at the locations specified in J-1503030-08 with the Supported Command as "Station (MCCS)" per Spec Items 3.4.2. | 12 | MO | ¥ - | |||
| 8 | Collection and Disposal of waste from the locations specified in J-1503030-08 with the Supported Command as "Station (MCCS)" per Spec Items 3.1, 3.1.2, and 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 9 | Collection and Disposal of waste from the locations specified in J-1503030-09 with the Supported Command as "Station" per Spec Items 3.1.2.4 and 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 9 | AA | Collection and Disposal of Ash from Bldgs. #1770 & #2630. | 12 | MO | |||
| 9 | AB | Collection and Disposal of Shisa from Bldgs. #1769 & #2631. | 12 | MO | |||
| 10 | Collection and Disposal of waste from the locations specified in J-1503030-09 with the Supported Command as "Station(MCCS)" per Spec Items 3.1.2.4, 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 11 | Solid Waste Collection and Disposal Services for MCAS Iwakuni Spring and Fall Bazaar Events per Spec Items 3.3 and 3.3.2. | 2 | EA | ¥ - | |||
| 12 | Solid Waste Collection and Disposal Services for MCAS Iwakuni Marine Corps Ball/Navy Ball per Spec Items 3.3 and 3.3.3. | 1 | EA | ¥ - | |||
| 13 | Maintenance of Vehicles and Equipment per Spec Item 3.3. | 12 | MO | ¥ - | |||
| 14 | Replace GFE containers per Spec Item 3.4.1. | 12 | MO | ¥ - | |||
| 15 | Collection and Disposal services for waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "MCCS" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2 for one (1) month from September 01, 2020 until September 30, 2020. | 1 | MO | ¥ - | |||
| 16 | *** Refer to ELIN A020. *** | ||||||
| (Twenty (20) % of the total cost for the work described in ELIN A020 will be allocated to this ELIN.) | 11 | MO | ¥ - |
STATION Subtotal ¥ -
| SLIN 000102 | MCCS | |||
| 20 | Collection and Disposal services for waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "MCCS" Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2 for 11 months from October 01, 2020 until August 31, 2021. | |||
| ** See Note (2) below. | 11 | MO | ||
| Eighty (80) % of the total price will be allocated to this ELIN. | ||||
| (Twenty (20) % will be allocated to ELIN A015.) | ¥ - |
MCCS Subtotal ¥ -
| SLIN 000103 | AMC | |||
| 30 | Collection and Disposal services for waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "AMC" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
AMC Subtotal ¥ -
| SLIN 000104 | THRIFT STORE | |||
| 40 | Collection and Disposal services for waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "TS" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
THRIFT STORE Subtotal ¥ -
| SLIN 000105 | FAMILY HOUSING | |||
| 50 | Collection and Disposal services for waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "FH" per Spec Items 3.1, 3.1.1.2 and 3.2 through 3.2.2. | 12 | MO | ¥ - |
FAMILY HOUSING Subtotal ¥ -
| SLIN 000106 | U.S. NAVY | |||
| 60 | Collection and Disposal of waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "USN" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
| 61 | Providing CFE Containers at the locations specified in J-1503030-08 with the Supported Command as "U.S. Navy" per Spec Items 3.4.2. | 12 | MO | ¥ - |
| 62 | Collection and Disposal of waste from the locations specified in J-1503030-08 with the Supported Command as "U.S. Navy" per Spec Items 3.1, 3.1.2, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
U.S. NAVY Subtotal ¥ -
| SLIN 000107 | DeCA MAIN STORE | |||
| 70 | Collection and Disposal of waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "DeCA MAIN" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
| 71 | Collection and Disposal of waste from the locations specified in J-1503030-09 with the Supported Command as "DeCA" per Spec Items 3.1.2.4 and 3.2 through 3.2.2. | 12 | MO | ¥ - |
DeCA MAIN STORE Subtotal ¥ -
| SLIN 000108 | DeCA CDC AND COLD STORAGE | |||
| 80 | Collection and Disposal of waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "DeCA CDC" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
| 81 | Providing CFE Containers at the locations specified in J-1503030-08 with the Supported Command as "DeCA CDC" per Spec Items 3.4.2. | 12 | MO | ¥ - |
| 82 | Collection and Disposal of waste from the locations specified in J-1503030-08 with the Supported Command as "DeCA CDC" per Spec Items 3.1, 3.1.2, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
| 83 | Collection and Disposal of waste from the locations specified in J-1503030-09 with the Supported Command as "DeCA CDC" per Spec Items 3.1.2.4 and 3.2 through 3.2.2. | 12 | MO | ¥ - |
DeCA CDC AND COLD STORE Subtotal ¥ -
| SLIN 000109 | DoDEA | |||
| 90 | Collection and Disposal services for waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "DoDEA" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
DoDEA Subtotal ¥ -
| SLIN 000110 | AFN | |||
| 100 | Collection and Disposal services for waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "AFN" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
AFN Subtotal ¥ -
| NFBC & 11th DENTAL CLINIC | |||
| SLIN 000111 | NFBC Subtotal | ¥ - | |
| SLIN 000112 | 11th DENTAL CLINIC Subtotal | ¥ - |
110 Collection and Disposal services for waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "NFBC/DENT" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. 12 MO ¥ -
| SLIN 000113 | FRIENDSHIP DAY EVENT (STATION) | |||
| 130 | Waste Management services, including collection and disposal, for wastes generated at the MCAS Iwakuni Friendship Day Event per Spec Item 3.5.1. Detailed requirements are described in J-1503030-15. | 1 | EA | ¥ - |
FRIENDSHIP DAY EVENT (STATION) Subtotal ¥ -
| TOTAL RECURRING WORK PRICE - BASE PERIOD | ¥ - | |
| MO = Month, EA = Each | ||
| Note (1) Price Column - Prices must be expressed in whole YEN amounts. | ||
| Note (2) For ELIN A020, round the unit price to the nearest hundred. |
&"Times New Roman,Regular"&8&KFF0000UNCLASSIFIED/FOR OFFICIAL USE ONLY
SOURCE SELECTION SENSITIVE INFORMATION [WHEN FILLED]
BASE NON-REC
| ATTACHMENT J-0200000-16 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-20-B-0054 |
| EXHIBIT A - CLIN 0002 |
| 1 September 2020 through 31 August 2021 |
| Line Item 0002 Non-Recurring Work - Base Period |
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT -NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 through A748 |
| Part Number (ELIN) | Part Name (Product) (120 Characters) | Price | Unit of Issue | Unit per UOI (Quantity) | OEM Name (Contractor Name) | OEM Number (ELIN) | Description (NTE 120 Characters) | ARO Days | PSC Code | Long Description (NTE 2,048) | Estimated Quantity | Extended Price (Price × Estimated Quantity) | IMAP CAC | ||
| Unit Priced Task (UPT) Work | |||||||||||||||
| A700 | General Waste (GW) | ||||||||||||||
| in 35-55 gallon container | EA | 1 | A700 | General Waste (GW) | |||||||||||
| in 35-55 gallon container | The Contractor shall collect general waste (mixture of combustible and non-combustible) from a container, segregate and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | ||||||||||||
| 1 | GW in GFE tri-wall* | EA | 1 | 1 | GW in GFE tri-wall* | The Contractor shall collect general waste (mixture of combustible and non-combustible) from a GFE tri-wall, segregate and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 2 | GW in CFE 2-ton/4㎥ container | EA | 1 | 2 | GW in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect general waste (mixture of combustible and non-combustible) from the dumpster within five working days after staging the dumpster, segregate and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 3 | GW in CFE 4-ton/8㎥ container | EA | 1 | 3 | GW in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect general waste (mixture of combustible and non-combustible) from the dumpster within five working days after staging the dumpster, segregate and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 4 | Glass waste in 35-55 gallon container | EA | 1 | 4 | Glass waste in 35-55 gallon container | The Contractor shall collect glass waste from a container and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 5 | Glass Waste in GFE tri-wall* | EA | 1 | 5 | Glass Waste in GFE tri-wall* | The Contractor shall collect glass waste from a tri-wall and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 6 | Glass waste in CFE 2-ton/4㎥ container | EA | 1 | 6 | Glass waste in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect glass waste from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 7 | Glass waste in CFE 2-ton/4㎥ container | EA | 1 | 7 | Glass waste in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect glass waste from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 8 | Glass waste in CFE 4-ton/8㎥ container | EA | 1 | 8 | Glass waste in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect glass waste from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 9 | Glass waste in CFE 4-ton/8㎥ container | EA | 1 | 9 | Glass waste in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect glass waste from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 10 | Wood waste in CFE 4-ton/8㎥ container | EA | 1 | 10 | Wood waste in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect wood waste from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 11 | Wood waste in CFE 4-ton/8㎥ container | EA | 1 | 11 | Wood waste in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect wood waste from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 12 | PET Bottles in GFE tri-walls* | EA | 1 | 12 | PET Bottles in GFE tri-walls* | The Contractor shall collect PET bottles from a tri-wall and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 13 | PET Bottles in CFE 2-ton/4㎥ container | EA | 1 | 13 | PET Bottles in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect PET bottles from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 14 | PET Bottles in CFE 2-ton/4㎥ container | EA | 1 | 14 | PET Bottles in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect PET bottles from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 15 | PET bottles in CFE 4-ton/8㎥ container | EA | 1 | 15 | PET bottles in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect PET bottles from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 16 | PET bottles in CFE 4-ton/8㎥ container | EA | 1 | 16 | PET bottles in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect PET bottles from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 17 | Styrofoam in GFE tri-wall* | EA | 1 | 17 | Styrofoam in GFE tri-wall* | The Contractor shall collect Styrofoam from a tri-wall and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 18 | Styrofoam in CFE 2-ton/4㎥ container | EA | 1 | 18 | Styrofoam in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect Styrofoam from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 19 | Styrofoam in CFE 2-ton/4㎥ container | EA | 1 | 19 | Styrofoam in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect Styrofoam from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 20 | Styrofoam in CFE 4-ton/8㎥ container | EA | 1 | 20 | Styrofoam in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect Styrofoam from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 21 | Waste Container | EA | 1 | 21 | Waste Container | The Contractor shall collect a 35-55 gallon waste contianer from the designated location and properly dispose of the collected container to ensure it is properly collected and disposed of. | 50 | ¥ - | |||||||
| 22 | Plastic Waste in CFE 4-ton/8㎥ container | EA | 1 | 22 | Plastic Waste in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect Plastic Waste from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 23 | Plastic Waste in CFE 4-ton/8㎥ container | EA | 1 | 23 | Plastic Waste in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect Plastic Waste from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 24 | Recyclable Cardboard | EA | 1 | 24 | Recyclable Cardboard | The Contractor shall collect up to 20 cardboards from the designated location and deliver them to Recycle Center. | 2 | ¥ - | |||||||
| 25 | Recyclable Cardboard in GFE tri-walls* | EA | 1 | 25 | Recyclable Cardboard in GFE tri-walls* | The Contractor shall collect cardboards in a tri-wall from the designated location and deliver them to Recycle Center. | 2 | ¥ - | |||||||
| 26 | Recyclable Cardboard in CFE 4-ton/8㎥ container | EA | 1 | 26 | Recyclable Cardboard in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect cardboards from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 27 | Recyclable Cardboard in CFE 4-ton/8㎥ container | EA | 1 | 27 | Recyclable Cardboard in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect cardboards from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 28 | Bicycle | EA | 1 | 28 | Bicycle | The Contractor shall collect up to five bicycles from the designated locations and deliver them to Recycle Center. | 2 | ¥ - | |||||||
| 29 | Other Recycle Center Acceptable Recyclable Waste in GFE Tri-wall* | EA | 1 | 29 | Other Recycle Center Acceptable Recyclable Waste in GFE Tri-wall* | The Contractor shall collect recyclable waste from a GFE tri-wall and deliver it to Recycle Center. | 2 | ¥ - | |||||||
| 30 | Mattress Collection and Disposal | EA | 1 | 30 | Mattress Collection and Disposal | The Contractor shall collect up to five mattresses from the designated location and dispose of the waste to ensure refuse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 31 | Mattress Collection and Disposal | EA | 1 | 31 | Mattress Collection and Disposal | The Contractor shall collect 6 to 10 mattresses from the designated location and dispose of the waste to ensure refuse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 32 | Mattress Collection and Disposal | EA | 1 | 32 | Mattress Collection and Disposal | The Contractor shall collect 11 to 15 mattresses from the designated location and dispose of the waste to ensure refuse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 33 | Mattress Collection and Disposal | EA | 1 | 33 | Mattress Collection and Disposal | The Contractor shall collect 16 to 20 mattresses from the designated location and dispose of the waste to ensure refuse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 34 | Mattress Collection and Disposal | EA | 1 | 34 | Mattress Collection and Disposal | The Contractor shall collect 21 to 50 mattresses from the designated location and dispose of the waste to ensure refuse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 35 | Carpet Collection and Disposal | EA | 1 | 35 | Carpet Collection and Disposal | The Contractor shall collect a carpet or carpets up to 50 kg from the designated location and dispose of the waste to ensure refuse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 36 | Carpet Collection and Disposal | EA | 1 | 36 | Carpet Collection and Disposal | The Contractor shall collect a carpet or carpets up to 100 kg from the designated location and dispose of the waste to ensure refuse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 37 | Tire Collection and Disposal | EA | 1 | 37 | Tire Collection and Disposal | The Contractor shall collect up to four automobile tires from a trash enclosure and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 38 | Bumper Collection and Disposal | EA | 1 | 38 | Bumper Collection and Disposal | The Contractor shall collect a bumper from a trash enclosure and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 39 | Food Waste in CFE 2-ton/4㎥ container | EA | 1 | 39 | Food Waste in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after oder, and collect food waste from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 40 | Food Waste in CFE 4-ton/8㎥ container | EA | 1 | 40 | Food Waste in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect food waste from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 41 | Refrigerator | EA | 1 | 41 | Refrigerator | The Contractor shall collect and dispose of a refrigerator to ensure the watse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 42 | Washer/Dryer | EA | 1 | Washer/Dryer | The Contractor shall collect and dispose of a washer/drier to ensure the watse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | ||||||||
| 43 | Plasterboard in CFE 2-ton/4㎥ container | EA | 1 | 43 | Plasterboard in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect Plasterboard from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 44 | Plasterboard in CFE 4-ton/8㎥ container | EA | 1 | Plasterboard in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect Plasterboard from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | ||||||||
| 45 | Dried Sludge from STP (up to 500kg) | EA | 1 | 45 | Dried Sludge from STP (up to 500kg) | The Contractor shall collect up to 500 kg of dried sludge in plastic bags and dispose of it to ensure refuse is properly collected and disposed of. Refer to Spec Item 4.1 for more information. | 2 | ¥ - | |||||||
| 46 | Dried Sludge from STP (over 500, up to 1,000 kg) | EA | 1 | 46 | Dried Sludge from STP (over 500, up to 1,000 kg) | The Contractor shall collect over 500 and up to 1,000 kg of dried sludge in plastic bags and dispose of it to ensure refuse is properly collected and disposed of. Refer to Spec Item 4.1 for more information. | 2 | ¥ - |
| Unit Priced Labor (UPL) Work |
| Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work. |
Also refer to J-0200000-01, Definitions and Acronyms, for the description of UPL Hour to determine the labor hour unit prices below.
| Labor | |||||||||||
| 47 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO | 47 | Labor Hours | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | |||||||
| Total of A747AA through A747AC | ¥ - | ||||||||||
| 47 | AA | Labor Price -Regular Worker | HR | 1 | 47 | Labor Price -Regular Worker | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | ||||
| Regular workers include, but are not limited to, on-site workers for collection and segregation, drivers, etc. | 1,420 | ¥ - | |||||||||
| 47 | AB | Labor Price -SSHO | HR | 1 | 47 | Labor Price -SSHO | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 500 | ¥ - | ||
| 47 | AC | Labor Price -QM | HR | 1 | 47 | Labor Price -QM | Provide labor to perform all UPL work per the scope and delivery schedule specified in the order. | 500 | ¥ - | ||
| Material | |||||||||||
| 48 | Material Costs- MUST BE NEGOTIATED BY KO | ¥ 1 | EA | 1 | 48 | Materials | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A747. | 31,500,000 | ¥ 31,500,000 | ||
| Fixed Burden Rate (FBR) | % | Fixed Burden Rate (FBR) | The Contractor's FBR is the additional cost (expressed in percent) for ordering, handling, and stockpiling materials, repairs parts, and equipment. The FBR will be added to the direct material and equipment price that is negotiated by KO. |
| For example, if the Contractor's Fixed Burden Rate in this period is 10%, then the total negotiated material and equipment price equals ¥110,000 = ¥100,000 + (¥100,000 x 10%). | - 0 | ||
| TOTAL NON-RECURRING WORK PRICE - BASE PERIOD | ¥ 31,500,000 |
Abbreviations: EA = Each, HR = Hour
* Size of the GFE tri-wall = Approximately 146cm × 102cm × 95cm (length × width × height)
| Special Notes to Offerors: |
| (1) Price Column - Prices must be expressed in whole YEN amounts. Extended Price must equal Price multiplied by Estimated Quantity. |
| (2) For all Non-recurring negotiated task order work, the Contractor shall provide a breakdown of labor hours, material and equipment prices as a part of the price proposal. Overhead and profit is not authorized for subcontracted costs. The price breakdown shall be included in the Non-Recurring Work Proposal. Refer to Spec Item 2.15.2.1 of Annex 2. |
(3) For FedMall orders, the Contractor shall contact the supported command upon completion of work for acceptance and payment.
1st REC
| ATTACHMENT J-0200000-16 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-20-B-0054 |
| EXHIBIT B - CLIN 0003 |
| 1 September 2021 through 31 August 2022 |
| Line Item 0003 Recurring Work - 1st Option Period |
| PROVIDE PRICES TO PERFORM SERVICES FOR MCAS IWAKUNI, INCLUDING ATAGO HILLS - RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELINs B001 through B130 |
| Note: The Contractor may be required to submit the breakdown of the ELIN prices during the contract period. If requested, the breakdown shall be submitted at no additional cost to the Government. |
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total | ||
| SLIN 000301 | STATION | ||||||
| 1 | Collection and Disposal of waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "S," and Disposal of the waste collected by the Government specified in J-1503030-11 per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 2 | Collection and Disposal of waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "S (Kintai)" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 3 | Collection and Disposal of waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "S (MCCS)" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 4 | Collection and Disposal of waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "S (J)" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 5 | Providing CFE Containers at the locations specified in J-1503030-08 with the Supported Command as "Station" per Spec Items 3.4.2. | 12 | MO | ¥ - | |||
| 6 | Collection and Disposal of waste from the locations specified in J-1503030-08 with the Supported Command as "Station" per Spec Items 3.1, 3.1.2, and 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 7 | Providing CFE Containers at the locations specified in J-1503030-08 with the Supported Command as "Station (MCCS)" per Spec Items 3.4.2. | 12 | MO | ¥ - | |||
| 8 | Collection and Disposal of waste from the locations specified in J-1503030-08 with the Supported Command as "Station (MCCS)" per Spec Items 3.1, 3.1.2, and 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 9 | Collection and Disposal of waste from the locations specified in J-1503030-09 with the Supported Command as "Station" per Spec Items 3.1.2.4 and 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 9 | AA | Collection and Disposal of Ash from Bldgs. #1770 & #2630. | 12 | MO | |||
| 9 | AB | Collection and Disposal of Shisa from Bldgs. #1769 & #2631. | 12 | MO | |||
| 10 | Collection and Disposal of waste from the locations specified in J-1503030-09 with the Supported Command as "Station(MCCS)" per Spec Items 3.1.2.4, 3.2 through 3.2.2. | 12 | MO | ¥ - | |||
| 11 | Solid Waste Collection and Disposal Services for MCAS Iwakuni Spring and Fall Bazaar Events per Spec Items 3.3 and 3.3.2. | 2 | EA | ¥ - | |||
| 12 | Solid Waste Collection and Disposal Services for MCAS Iwakuni Marine Corps Ball/Navy Ball per Spec Items 3.3 and 3.3.3. | 1 | EA | ¥ - | |||
| 13 | Maintenance of Vehicles and Equipment per Spec Item 3.3. | 12 | MO | ¥ - | |||
| 14 | Replace GFE containers per Spec Item 3.4.1. | 12 | MO | ¥ - | |||
| 15 | *** Refer to ELIN B020. *** | ||||||
| (Twenty (20) % of the total cost for the work described in ELIN B020 will be allocated to this ELIN.) | 12 | MO | ¥ - |
STATION Subtotal ¥ -
| SLIN 000302 | MCCS | |||
| 20 | Collection and Disposal services for waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "MCCS" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | |||
| ** See Note (2) below. | 12 | MO | ||
| Eighty (80) % of the total price will be allocated to this ELIN. | ||||
| (Twenty (20) % will be allocated to ELIN B015.) | ¥ - |
MCCS Subtotal ¥ -
| SLIN 000303 | AMC | |||
| 30 | Collection and Disposal services for waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "AMC" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
AMC Subtotal ¥ -
| SLIN 000304 | THRIFT STORE | |||
| 40 | Collection and Disposal services for waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "TS" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
THRIFT STORE Subtotal ¥ -
| SLIN 000305 | FAMILY HOUSING | |||
| 50 | Collection and Disposal services for waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "FH" per Spec Items 3.1, 3.1.1.2 and 3.2 through 3.2.2. | 12 | MO | ¥ - |
FAMILY HOUSING Subtotal ¥ -
| SLIN 000306 | U.S. NAVY | |||
| 60 | Collection and Disposal of waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "USN" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
| 61 | Providing CFE Containers at the locations specified in J-1503030-08 with the Supported Command as "U.S. Navy" per Spec Items 3.4.2. | 12 | MO | ¥ - |
| 62 | Collection and Disposal of waste from the locations specified in J-1503030-08 with the Supported Command as "U.S. Navy" per Spec Items 3.1, 3.1.2, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
U.S. NAVY Subtotal ¥ -
| SLIN 000107 | DeCA MAIN STORE | |||
| 70 | Collection and Disposal of waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "DeCA MAIN" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
| 71 | Collection and Disposal of waste from the locations specified in J-1503030-09 with the Supported Command as "DeCA" per Spec Items 3.1.2.4 and 3.2 through 3.2.2. | 12 | MO | ¥ - |
DeCA MAIN STORE Subtotal ¥ -
| SLIN 000308 | DeCA CDC AND COLD STORAGE | |||
| 80 | Collection and Disposal of waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "DeCA CDC" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
| 81 | Providing CFE Containers at the locations specified in J-1503030-08 with the Supported Command as "DeCA CDC" per Spec Items 3.4.2. | 12 | MO | ¥ - |
| 82 | Collection and Disposal of waste from the locations specified in J-1503030-08 with the Supported Command as "DeCA CDC" per Spec Items 3.1, 3.1.2, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
| 83 | Collection and Disposal of waste from the locations specified in J-1503030-09 with the Supported Command as "DeCA CDC" per Spec Items 3.1.2.4 and 3.2 through 3.2.2. | 12 | MO | ¥ - |
DeCA CDC AND COLD STORE Subtotal ¥ -
| SLIN 000309 | DoDEA | |||
| 90 | Collection and Disposal services for waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "DoDEA" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
DoDEA Subtotal ¥ -
| SLIN 000310 | AFN | |||
| 100 | Collection and Disposal services for waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "AFN" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. | 12 | MO | ¥ - |
AFN Subtotal ¥ -
| NFBC & 11th DENTAL CLINIC | |||
| SLIN 000311 | NFBC Subtotal | ¥ - | |
| SLIN 000312 | 11th DENTAL CLINIC Subtotal | ¥ - |
110 Collection and Disposal services for waste from the Waste Deposit Areas listed in J-1503030-05 with the Supported Command as "NFBC/DENT" per Spec Items 3.1, 3.1.2 through 3.1.2.3, and 3.2 through 3.2.2. 12 MO ¥ -
| SLIN 000313 | FRIENDSHIP DAY EVENT (STATION) | |||
| 130 | Waste Management services, including collection and disposal, for wastes generated at the MCAS Iwakuni Friendship Day Event per Spec Item 3.5.1. Detailed requirements are described in J-1503030-15. | 1 | EA | ¥ - |
FRIENDSHIP DAY EVENT (STATION) Subtotal ¥ -
| TOTAL RECURRING WORK PRICE - 1st OPTION PERIOD | ¥ - | |
| MO = Month, EA = Each | ||
| Note (1) Price Column - Prices must be expressed in whole YEN amounts. | ||
| Note (2) For ELIN B020, round the unit price to the nearest hundred. |
1st NON-REC
| ATTACHMENT J-0200000-16 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N40084-20-B-0054 |
| EXHIBIT B - CLIN 0004 |
| 1 September 2021 through 31 August 2022 |
| Line Item 0004 Non-Recurring Work - 1st Option Period |
| PROVIDE PRICES FOR INTEGRATED SOLID WASTE MANAGEMENT -NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs B700 through B748 |
| Part Number (ELIN) | Part Name (Product) (120 Characters) | Price | Unit of Issue | Unit per UOI (Quantity) | OEM Name (Contractor Name) | OEM Number (ELIN) | Description (NTE 120 Characters) | ARO Days | PSC Code | Long Description (NTE 2,048) | Estimated Quantity | Extended Price (Price × Estimated Quantity) | IMAP CAC | ||
| Unit Priced Task (UPT) Work | |||||||||||||||
| B700 | General Waste (GW) | ||||||||||||||
| in 35-55 gallon container | EA | 1 | B700 | General Waste (GW) | |||||||||||
| in 35-55 gallon container | The Contractor shall collect general waste (mixture of combustible and non-combustible) from a container, segregate and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | ||||||||||||
| 1 | GW in GFE tri-wall* | EA | 1 | 1 | GW in GFE tri-wall* | The Contractor shall collect general waste (mixture of combustible and non-combustible) from a GFE tri-wall, segregate and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 2 | GW in CFE 2-ton/4㎥ container | EA | 1 | 2 | GW in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect general waste (mixture of combustible and non-combustible) from the dumpster within five working days after staging the dumpster, segregate and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 3 | GW in CFE 4-ton/8㎥ container | EA | 1 | 3 | GW in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect general waste (mixture of combustible and non-combustible) from the dumpster within five working days after staging the dumpster, segregate and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 4 | Glass waste in 35-55 gallon container | EA | 1 | 4 | Glass waste in 35-55 gallon container | The Contractor shall collect glass waste from a container and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 5 | Glass Waste in GFE tri-wall* | EA | 1 | 5 | Glass Waste in GFE tri-wall* | The Contractor shall collect glass waste from a tri-wall and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 6 | Glass waste in CFE 2-ton/4㎥ container | EA | 1 | 6 | Glass waste in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect glass waste from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 7 | Glass waste in CFE 2-ton/4㎥ container | EA | 1 | 7 | Glass waste in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect glass waste from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 8 | Glass waste in CFE 4-ton/8㎥ container | EA | 1 | 8 | Glass waste in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect glass waste from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 9 | Glass waste in CFE 4-ton/8㎥ container | EA | 1 | 9 | Glass waste in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect glass waste from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 10 | Wood waste in CFE 4-ton/8㎥ container | EA | 1 | 10 | Wood waste in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect wood waste from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 11 | Wood waste in CFE 4-ton/8㎥ container | EA | 1 | 11 | Wood waste in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect wood waste from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 12 | PET Bottles in GFE tri-walls* | EA | 1 | 12 | PET Bottles in GFE tri-walls* | The Contractor shall collect PET bottles from a tri-wall and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 13 | PET Bottles in CFE 2-ton/4㎥ container | EA | 1 | 13 | PET Bottles in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect PET bottles from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 14 | PET Bottles in CFE 2-ton/4㎥ container | EA | 1 | 14 | PET Bottles in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect PET bottles from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 15 | PET bottles in CFE 4-ton/8㎥ container | EA | 1 | 15 | PET bottles in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect PET bottles from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 16 | PET bottles in CFE 4-ton/8㎥ container | EA | 1 | 16 | PET bottles in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect PET bottles from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 17 | Styrofoam in GFE tri-wall* | EA | 1 | 17 | Styrofoam in GFE tri-wall* | The Contractor shall collect Styrofoam from a tri-wall and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 18 | Styrofoam in CFE 2-ton/4㎥ container | EA | 1 | 18 | Styrofoam in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect Styrofoam from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 19 | Styrofoam in CFE 2-ton/4㎥ container | EA | 1 | 19 | Styrofoam in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect Styrofoam from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 20 | Styrofoam in CFE 4-ton/8㎥ container | EA | 1 | 20 | Styrofoam in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect Styrofoam from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 21 | Waste Container | EA | 1 | 21 | Waste Container | The Contractor shall collect a 35-55 gallon waste contianer from the designated location and properly dispose of the collected container to ensure it is properly collected and disposed of. | 50 | ¥ - | |||||||
| 22 | Plastic Waste in CFE 4-ton/8㎥ container | EA | 1 | 22 | Plastic Waste in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect Plastic Waste from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 23 | Plastic Waste in CFE 4-ton/8㎥ container | EA | 1 | 23 | Plastic Waste in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect Plastic Waste from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 24 | Recyclable Cardboard | EA | 1 | 24 | Recyclable Cardboard | The Contractor shall collect up to 20 cardboards from the designated location and deliver them to Recycle Center. | 2 | ¥ - | |||||||
| 25 | Recyclable Cardboard in GFE tri-walls* | EA | 1 | 25 | Recyclable Cardboard in GFE tri-walls* | The Contractor shall collect cardboards in a tri-wall from the designated location and deliver them to Recycle Center. | 2 | ¥ - | |||||||
| 26 | Recyclable Cardboard in CFE 4-ton/8㎥ container | EA | 1 | 26 | Recyclable Cardboard in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect cardboards from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 27 | Recyclable Cardboard in CFE 4-ton/8㎥ container | EA | 1 | 27 | Recyclable Cardboard in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect cardboards from the dumpster 6 - 10 working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 28 | Bicycle | EA | 1 | 28 | Bicycle | The Contractor shall collect up to five bicycles from the designated locations and deliver them to Recycle Center. | 2 | ¥ - | |||||||
| 29 | Other Recycle Center Acceptable Recyclable Waste in GFE Tri-wall* | EA | 1 | 29 | Other Recycle Center Acceptable Recyclable Waste in GFE Tri-wall* | The Contractor shall collect recyclable waste from a GFE tri-wall and deliver it to Recycle Center. | 2 | ¥ - | |||||||
| 30 | Mattress Collection and Disposal | EA | 1 | 30 | Mattress Collection and Disposal | The Contractor shall collect up to five mattresses from the designated location and dispose of the waste to ensure refuse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 31 | Mattress Collection and Disposal | EA | 1 | 31 | Mattress Collection and Disposal | The Contractor shall collect 6 to 10 mattresses from the designated location and dispose of the waste to ensure refuse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 32 | Mattress Collection and Disposal | EA | 1 | 32 | Mattress Collection and Disposal | The Contractor shall collect 11 to 15 mattresses from the designated location and dispose of the waste to ensure refuse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 33 | Mattress Collection and Disposal | EA | 1 | 33 | Mattress Collection and Disposal | The Contractor shall collect 16 to 20 mattresses from the designated location and dispose of the waste to ensure refuse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 34 | Mattress Collection and Disposal | EA | 1 | 34 | Mattress Collection and Disposal | The Contractor shall collect 21 to 50 mattresses from the designated location and dispose of the waste to ensure refuse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 35 | Carpet Collection and Disposal | EA | 1 | 35 | Carpet Collection and Disposal | The Contractor shall collect a carpet or carpets up to 50 kg from the designated location and dispose of the waste to ensure refuse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 36 | Carpet Collection and Disposal | EA | 1 | 36 | Carpet Collection and Disposal | The Contractor shall collect a carpet or carpets up to 100 kg from the designated location and dispose of the waste to ensure refuse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 37 | Tire Collection and Disposal | EA | 1 | 37 | Tire Collection and Disposal | The Contractor shall collect up to four automobile tires from a trash enclosure and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 38 | Bumper Collection and Disposal | EA | 1 | 38 | Bumper Collection and Disposal | The Contractor shall collect a bumper from a trash enclosure and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 39 | Food Waste in CFE 2-ton/4㎥ container | EA | 1 | 39 | Food Waste in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after oder, and collect food waste from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 40 | Food Waste in CFE 4-ton/8㎥ container | EA | 1 | 40 | Food Waste in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect food waste from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 41 | Refrigerator | EA | 1 | 41 | Refrigerator | The Contractor shall collect and dispose of a refrigerator to ensure the watse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | |||||||
| 42 | Washer/Dryer | EA | 1 | Washer/Dryer | The Contractor shall collect and dispose of a washer/drier to ensure the watse is properly collected and disposed of. The waste will be loaded by the Government. | 2 | ¥ - | ||||||||
| 43 | Plasterboard in CFE 2-ton/4㎥ container | EA | 1 | 43 | Plasterboard in CFE 2-ton/4㎥ container | The Contractor shall stage a 2-ton/4㎥ dumpster at the designated location within five working days after order, and collect Plasterboard from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | |||||||
| 44 | Plasterboard in CFE 4-ton/8㎥ container | EA | 1 | Plasterboard in CFE 4-ton/8㎥ container | The Contractor shall stage a 4-ton/8㎥ dumpster at the designated location within five working days after order, and collect Plasterboard from the dumpster within five working days after staging the dumpster and dispose of the waste to ensure refuse is properly collected and disposed of. | 2 | ¥ - | ||||||||
| 45 | Dried Sludge from STP (up to 500kg) | EA | 1 | 45 | Dried Sludge from STP (up to 500kg) | The Contractor shall collect up to 500 kg of dried sludge in plastic bags and dispose of it to ensure refuse is properly collected and disposed of. Refer to Spec Item 4.1 for more information. | 2 | ¥ - | |||||||
| 46 | Dried Sludge from STP (over 500, up to 1,000 kg) | EA | 1 | 46 | Dried Sludge from STP (over 500, up to 1,000 kg) | The Contractor shall collect over 500 and up to 1,000 kg of dried sludge in plastic bags and dispose of it to ensure refuse is properly collected and disposed of. Refer to Spec Item 4.1 for more information. | 2 | ¥ - |
| Unit Priced Labor (UPL) Work |
| Refer to Spec Item 2.15.2 and its subordinate spec items in Annex 2 for the requirements and descriptions of UPL work. |
Also refer to J-0200000-01, Definitions and Acronyms, for the description of UPL Hour to determine the labor hour unit prices below.