ATCH04 JB McGuire Bldg. 2783 BathTub and Shower Site Specific.pdf

PDF 235 KB Posted

Attached to
Bathroom renovation
Solicitation number
F41999-24-Q-0017
Issued by

About this file

This site-specific document outlines requirements for renovating bathtubs and showers across 48 rooms in Building 2783 at Joint Base McGuire-Dix-Lakehurst in New Jersey. The renovation work includes installing new custom acrylic shower walls and pans, tub liners, plumbing fixtures, grab bars and accessories. Two rooms will receive ADA-compliant tub and shower upgrades. Contractors must remove existing fixtures as needed, repair walls and subfloors, and ensure new installations meet specified design standards including fixture heights and materials. The related federal contract opportunity is solicitation number F41999-24-Q-0017 issued by the Department of the Air Force Air Education and Training Command to provide all labor, materials and services for the bathroom renovations according to the requirements outlined in the site-specific document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Air Force Lodging Site Specific for Bathtub/Shower Renovation Services

GENERAL WORK TO BE INCLUDED: DATE: 26 September 2023

Base: - JB McGuire, Wrightstown, New Jersey Burlington

Building: - Building #2783, 2 floors, #3 elevators interior entrances

Bathrooms - (48) Rooms with tub/shower to receive (2) ADA room tub/shower (identify room numbers) renovation RMs: 112 and 124

BATHROOM RENOVATION REQUIREMENTS

Existing Conditions:

Existing wall substrate in tub/shower:

Acrylic- All units Existing showerhead height: 7 1/2 inches Existing ceiling substrate in tub/shower:

Sheetrock Existing shower floor substrate: N/A Existing Tub material: Porcelain

Existing Shower Doors: None Existing Wainscot in bathroom area: N/A Existing flooring is:

Tile- Not remove, needs to protect.

NOTE: No new flooring to be installed.

New Conditions:

New Shower/Tub combo:

Install custom white acrylic seamless one-piece wall system to the ceiling.

Savona 6”x6” tile pattern on tub/shower walls Aristocrat white custom acrylic tub liner New chrome drain & overflow cap, valve with trim kit, shower head, tub spout Oxford - single corner shelf with top soap ledge.

Tub/Shower combo receives Arco brushed stainless/chrome curved shower rod.

Contractor shall clean and prepare existing surfaces. Repair wall and sub-floor if required. Contractor shall assess during site visit if existing shower/tub walls, ceiling or tubs need to be removed and disposed or if new can be installed over existing.

New Stand-Alone Shower: ADA Room Install custom white acrylic seamless one-piece wall system to the ceiling.

Savona 6”x6” tile pattern on tub/shower walls White custom acrylic shower pan New chrome drain, valve with trim kit, shower head Oxford - single corner shelf with top soap ledge Stand-alone shower receives brushed stainless/chrome straight rod.

Contractor shall clean and prepare existing surfaces. Repair wall and sub-floor if required. Contractor shall assess during site visit if existing shower/tub walls, ceiling or tubs need to be removed and disposed or if new can be installed over existing.

New Shower head height: 78”

New Fixtures: Moen Chateau Positemp (Chrome)

New ADA grab bar: 24in Knurled grab bar (only required in ADA rooms)

MISC REQUIREMENTS

Bathroom accessories: Remove and reinstall by PM.

Vents: - Are they being replaced? NO just painted.

Light/Heat Bulb: - Remove and reinstall by PM.

Toilets: - Large Renovation with Project Manager: Project Manager shall remove toilets, when necessary.

Bathroom ONLY renovations: Contractor shall remove toilets, when necessary.

Storage: - Provided by the contractor Phasing: - Continues phase release incrementally by floor/room at a time.

Site Visit: - A site visit is required.

Notes: - Any specific circumstances to your project

Scope of Work:

Contractor shall provide all labor, material, tools, disposal, transportation, lodging, etc to renovate bathrooms in accordance with the above listed site conditions.

ADA Tub/Shower Tub/Shower Non ADA Room

Air Force Lodging
Site Specific for Bathtub/Shower Renovation Services
GENERAL WORK TO BE INCLUDED: DATE: 26 September 2023