This document is a Statement of Objectives (SOO) for an Asbestos and Lead-Based Paint Abatement project at Holloman Air Force Base. The project involves comprehensive removal of asbestos and lead-based paint materials from Building 584, an unoccupied two-story, 210' x 48' barracks. Specific abatement requirements include removing approximately 15,500 SF of ceiling drywall, 10,500 SF of floor tile and mastic under carpet, 1,200 SF of floor tile in kitchen areas, 35,000 SF of textured drywall, 4,100 SF of exterior soffit/ceiling drywall, and small areas of lead-based paint in a bathtub and janitor closet sink.

The project is solicited under Solicitation Number FA480125Q0421 by the 49th Civil Engineering Squadron, Department of the Air Force Air Combat Command. The performance period is 90 days, with standard working hours from 7:00 am to 5:00 pm. The contractor is responsible for providing all materials, labor, and equipment, and must collect and dispose of all demolished materials at a certified landfill or recycling center in compliance with state and federal regulations. Interested vendors must demonstrate technical expertise, certifications, and experience to meet the project's technical requirements.

View the file

Other files

File Type Posted
Atch 4 - FAR and DFARS Provisions and Clauses IBR and Full Text.pdf PDF
Asbestos Combo - SAM.docx DOCX document
Atch 5 - DAFFARS 5352.242-9000.docx DOCX document
Atch. 3 LBP Survey.pdf PDF
Atch. 2 ACM Survey.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HOLLOMAN AIR FORCE BASE

PROJECT

Asbestos Abatement B584

STATEMENT OF OBJECTIVES

15 November 2024

1. PROJECT SPECIFIC INFORMATION:

1.1. Location: B584

1.2. User Contact:

1.3. Design effort: None.

1.4. Performance Period of Design (days): 0

1.5. Performance Period of Construction (days): 90

1.6. Working Hours: Standard (7:00 am to 5:00 pm)

1.7. Restricted area (as defined in HAFB Instruction 31-102): No

2. SCOPE OF WORK:

This project will abate asbestos and lead paint from B584. B584 is an unoccupied 210’ x 48’, 2 story barracks.

Work shall be in accordance with this Statement of Objectives (SOO) and Unified Facilities Criteria (UFC).

2.1. The contractor shall provide all materials, labor and equipment to complete all work described in the SOO. The contractor is responsible for collecting and disposing of all demolished/discarded/unusable materials resulting from this project.

2.2. The contractor shall establish a staging area for all equipment and materials.

2.2.1. The contractor will coordinate with user for an appropriate staging area of materials and equipment.

2.3. All government provided dimensions are approximate. It is the contractor’s responsibility to determine exact dimensions for planning and estimating.

2.4. Contractor shall remove asbestos materials in B584.

2.4.1. Abate all asbestos referenced in attached asbestos survey dated 09 May 2024.

2.4.2. Abate approximately 15500 SF of ceiling drywall materials located throughout building

2.4.3. Abate approximately 10500 SF of floor tile and mastic under carpet located in living and hallway areas

2.4.4. Abate approximately 1200 SF floor tile and mastic located in kitchen areas

2.4.5. Abate approximately 35000 SF textured drywall located throughout building

2.4.6. Abate approximately 4100 SF exterior soffit/ceiling drywall located in exterior soffits/ceilings

2.5. Contractor shall remove Lead Based Paint materials in B584.

2.5.1. Abate all asbestos referenced in attached asbestos survey dated 09 May 2024.

2.5.2. Abate approximately 7.2 SF in bathtub in 4105 restroom

2.5.3. Abate approximately 10.1 SF in 1st floor janitor closet sink

2.6. All disassembled or demolished materials shall be removed from Holloman AFB and disposed of in a certified landfill or recycle center per state and federal laws.

END STATEMENT OF WORK