ATCH B-Sample Task Order Drawing-Convert Wkstn to Office.pdf
PDF 200 KB Posted
- Attached to
- Headquarters Electrical Services
- Solicitation number
- 50310222R0007
- Issued by
-
Securities and Exchange Commission
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I I
D -□
CD ��E��LITION PLAN
DEMOLITION NOTES:
1. DISCONNECT EXISTING WORKSTATION POWER WHIP. COIL CIRCUITS ABOVE CEILING FOR REUSE
2. DISCONNECT EXISTING WORKSTATION DAT A CABLING. COIL ABOVE CEILING FOR REUSE
H I j
F'-� OFFICE
0 0 - ® +A- �
I 1,,.-'
""""I I I ,�
I L:=J=
I
OJ
I ---� I -------
II
® 1
® ���T�
TRUCTION PLAN
CONSTRUCTION NOTES:
1. INSTALL QUADPLEX OUTLET IN WALL AS SHOWN (OPPOSITE NEW DOOR SWING)
2. INSTALL DUPLEX OUTLET IN WALL AS SHOWN (DOOR SWING WALL)
3. PROVIDE (2) WIRE DAT A DROP AT DESK LOCATION, AS SHOWN
4. REUSE EXISTING POWER CIRCUITS AND DAT A CABLING FOR NEW OUTLETS
5. FURNISH AND INST ALL (2) NEW LED 2X4 LIGHTING FIXTURES
5. PROVIDE NEW VACANCY SENSOR SWITCH AT DOOR
6.
�II
PROJECT IANAGER
DGK
DESIGNER
DGK
DRAIN BY
DGK
STATION PLACE
SAMPLE PROJECT
NEW OFFICE
NEW
OFFICE
PRO.ECT NUMBER: 2015SP10FC
REVISIONS:
DAlE OF ISSUE:
DRA'MNG SCALE:
NTS
APPRO'IED BY:
DAlE OF APPROVAL;
SHEET NUMBER
A.1
SHEET 1 OF 1
File details come from the government source that posted it. Updated .