ATCH A-Sample Task Order Drawing-Contractor Work Room.pdf
PDF 1 MB Posted
- Attached to
- Headquarters Electrical Services
- Solicitation number
- 50310222R0007
- Issued by
-
Securities and Exchange Commission
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CD ?c�E��LITION PLAN
DEMOLITION NOTES:
1. DISCONNECT EXISTING DEDICATED POWER AT COPIER/PRINTERS, SALVAGE CIRCUITS FOR
RE-USE
2. DISCONNECT (2) QUADPLEX AND (4) DUPLEX POWER OUTLETS ABOVE COUNTER. SALVAGE
CIRCUITS FOR RE-USE
3. DISCONNECT EXISTING DATA AT COPIER/PRINTERS, (2) FAX MACHINES ON COUNTERTOP,
SALVAGE FOR RE-USE.
4. EXISTING LIGHTING TO REMAIN
® ���T�
TRUCTION PLAN
CONSTRUCTION NOTES:
1. PROVIDE POWER AND DAT A AT EACH WORKSTATION AS FOLLOWS:
1.1. SPLIT QUAD OUTLET (1-COMPUTER, 1-CONVENIENCE) SURFACE MOUNTED BELOW DESKTOP
AT EACH WORKSTATION. NO MORE THAN (4) OUTLETS ON COMPUTER POWER CIRCUITS
1.2. PROVIDE (4) NEW 20A 120V 1P CIRCUIT BREAKERS IN EXISTING PANEL
1.3. DISTANCE TO PANEL FROM WORK ROOM 100LF
2. PROVIDE (2) CABLE DAT A DROP AT EACH WORKSTATION, TERMINATE IN RJ45 JACK AT
WORKSTATION, AND (1) NEW PATCH PANEL IN DATA CLOSET. DISTANCE TO DATA PATCH PANEL
AVERAGE 100LF PER CABLE
3. PROVIDE DEDICATED POWER AND CONNECTION TO NEW VAV TERMINAL BOX, PROVIDED BY
MECHANICAL CONTRACTOR. POWER TO BE 20A 277V 1P. DISTANCE TO ELECTRICAL PANEL 100LF
PROJECT IWIAGt:R
DGK
SHEET 1111.E:
DEfilGNER
DGK
DRAIN BY
DGK
STATION PLACE
SAMPLE PROJECT
CONTRACTOR
WORKROOM
NEW
CONTRACTOR
WORKROOM
PRO.ECT NUMBER: 2015SP1 CWR
REVISIONS:
DA 1E CF ISSUE:
DRAVl1NG SCALE:
NTS
APPR0',£1) BY:
DA 1E CF APPROVAL:
SHEET NUMBER
A.1
SHEET 1 OF 1
File details come from the government source that posted it. Updated .