CD ?c�E��LITION PLAN

DEMOLITION NOTES:

1. DISCONNECT EXISTING DEDICATED POWER AT COPIER/PRINTERS, SALVAGE CIRCUITS FOR

RE-USE

2. DISCONNECT (2) QUADPLEX AND (4) DUPLEX POWER OUTLETS ABOVE COUNTER. SALVAGE

CIRCUITS FOR RE-USE

3. DISCONNECT EXISTING DATA AT COPIER/PRINTERS, (2) FAX MACHINES ON COUNTERTOP,

SALVAGE FOR RE-USE.

4. EXISTING LIGHTING TO REMAIN

® ���T�

TRUCTION PLAN

CONSTRUCTION NOTES:

1. PROVIDE POWER AND DAT A AT EACH WORKSTATION AS FOLLOWS:

1.1. SPLIT QUAD OUTLET (1-COMPUTER, 1-CONVENIENCE) SURFACE MOUNTED BELOW DESKTOP

AT EACH WORKSTATION. NO MORE THAN (4) OUTLETS ON COMPUTER POWER CIRCUITS

1.2. PROVIDE (4) NEW 20A 120V 1P CIRCUIT BREAKERS IN EXISTING PANEL

1.3. DISTANCE TO PANEL FROM WORK ROOM 100LF

2. PROVIDE (2) CABLE DAT A DROP AT EACH WORKSTATION, TERMINATE IN RJ45 JACK AT

WORKSTATION, AND (1) NEW PATCH PANEL IN DATA CLOSET. DISTANCE TO DATA PATCH PANEL

AVERAGE 100LF PER CABLE

3. PROVIDE DEDICATED POWER AND CONNECTION TO NEW VAV TERMINAL BOX, PROVIDED BY

MECHANICAL CONTRACTOR. POWER TO BE 20A 277V 1P. DISTANCE TO ELECTRICAL PANEL 100LF

PROJECT IWIAGt:R

DGK

SHEET 1111.E:

DEfilGNER

DGK

DRAIN BY

DGK

STATION PLACE

SAMPLE PROJECT

CONTRACTOR

WORKROOM

NEW

CONTRACTOR

WORKROOM

PRO.ECT NUMBER: 2015SP1 CWR

REVISIONS:

DA 1E CF ISSUE:

DRAVl1NG SCALE:

NTS

APPR0',£1) BY:

DA 1E CF APPROVAL:

SHEET NUMBER

A.1

SHEET 1 OF 1