Atch 8 Asbestos Report.pdf

PDF 126 KB Posted

Attached to
Install Modular Facility inside Hangar 75 JBSA-Randolph, TX
Solicitation number
FA301621Q0048
Issued by

View the file

Other files

File Type Posted
Atch 3 HGR 75 MOD Spacing.png PNG image
Atch 4 100 Amp Panel.jpg JPG image
SOW Revised 01 March.pdf PDF
Atch 5 Hanger SPACE.png PNG image
Davis Bacon Act WD TX20210011.pdf PDF
Atch 1 H75 Modular Layout.pptx PPTX presentation
Atch 6 Layout.jpg JPG image
Atch 2 Overview HGR 75.png PNG image
Atch 7 Layout.jpg JPG image
RFQ and Pricing FA301621Q0048.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JBSA Asbestos Inventory Print Report

Facility Type:

Facility Site: JBSA Randolph

Aircraft Maintenance

Square Footage: 85477Number of Floors: 1

B75.tifDrawing File Name:

Facility Status: Manned

75.jpgPhoto File Name

Date Constructed: 1931

Facility Number: Facility Name:75 HG MAINT

Facility Owner: 902/CES

Facility Address: 650 NEW Street West Asbestos:

Facility Summary Report:

Major renovation abatement, took place on this facility from 03/30/2011 - 05/30/201

05/17/2013 - Workorder 11279 - Install sound supression material throughout hangar - Since all of the surfaces are constructed of Concrete, there are no concerns for Asbestos Containing Materials. The interior of the hangar and all rooms within have been abated of all Asbestos Containing Materials. This does not include any attic areas that may still contain asbestos pipe insulation, HDUCT Mastic, and beams sprayed with an asbestos texture.

04/25/2011 - Floor Felt Found During Abatement - All floor Felt material is NAD (No Asbestos Detected)

03/31/2011 - Contractor SW Environmental Request sampling of suspect materials for asbestos. Material sampled from HDUCT is NAD (No Asbestos Detected)

11 Jun 10, Work Order L3119 - LSI Transition Project, The following areas contain asbestos containing materials (ACM). 1).

Egress and Egress Office Area -Floor Tiles, 2). Tool Crib Breezeway - Floor Tiles and Mastic. 3). Tool Crib, Floor Tiles and Mastic. 4). Admin Office, Floor Tile and Mastic. 5.) Ceiling above lay in Ceiling tiles - Throughout facility - All Ceiling Joint Compound. 6).Superintendents Office - Mastic under Carpet Tiles. Non Asbestos Materials are Pipe Insulation, HDUCT Mastic, Wall-Sheetrock, Ceiling Tiles, Wall Boards above suspended ceiling, Sheet Rock-Wall - Joint Compound. Wall Plaster, Wall Mastic above suspended ceiling, Ceiling Sheetrock except for the joint compound, and all Window Glazing throughout.

12 May 10, 2GWLAN ProjectArea of penetration is NAD for Asbestos

25 Mar 10, All 12" X 12" floor tile in Egress shop is asbestos containing at 2% Chrysotile

13 Mar 10, K7995, Reseal Roof. All roof areas were NAD for Asbestos Containing Materials.

ViewFacility Comments: